Ordinance 020-15RECORD OF ORDINANCES
on Legal Blank Inc.
F orth No_ 30043
20 -15
Ordinance No. _ Passed —20.
AN ORDINANCE AUTHORIZING THE APPROPRIATION OF A
0.018 ACRE, MORE OR LESS, TEMPORARY EASEMENT FROM
FOUR FIVES, LLC, FOR THE PROPERTY LOCATED AT 6300
RIVERSIDE DRIVE, FOR THE CONSTRUCTION OF A
ROUNDABOUT AT THE INTERSECTION OF STATE ROUTE 161
AND RIVERSIDE DRIVE AND A SHARED -USE PATH ADJACENT
TO RIVERSIDE DRIVE, AND DECLARING AN EMERGENCY.
WHEREAS, the City of Dublin (the "City') is preparing to construct a roundabout at
the intersection of State Route 161 and Riverside Drive and a shared -use path
adjacent to Riverside Drive (the "Project'; and
WHEREAS, the Project requires that the City obtain a temporary easement from
Four Fives, LLC, as described in the Exhibits labeled "A" and depicted in the Exhibits
labeled "13," all attached hereto, said property interest located in the City of Dublin,
County of Franklin, State of Ohio.
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, State
of Ohio, (,z of the elected members concurring that:
Section 1. Council considers it necessary and declares its authorization to
appropriate for the appraised value of Nine Hundred Eighty Eight dollars ($988.00),
for the public purpose of constructing a roundabout at the intersection of State Route
161 and Riverside Drive and a shared -use path adjacent to Riverside Drive, a
temporary easement as described in the Exhibits labeled "A" and depicted in the
Exhibits labeled "13," all attached hereto.
Section 2. The City Law Director's office is hereby authorized to file a petition for
appropriation in the county Court of Common Pleas should it become necessary.
Section 3. This Ordinance is declared to be an emergency necessary for the
immediate preservation of the public peace, health, safety or welfare, and for the
further reason that obtaining the property interest is necessary for the advancement
of this Project. The Ordinance shall therefore take effect immediately upon passage.
Passed this .—day o 2015.
ayor — Presiding Officer
ATTEST:
Clerk of Council
I cityof Dublin
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017 -1090
Phone: 614 - 410 -4400 • Fax: 614 - 410 -4490
To: Members of Dublin City Council
From: Dana L. McDaniel, City Manage
Date: February 19, 2015 J
Initiated By: Megan O'Callaghan, PE, Public Service Director
Philip K. Hartmann, Assistant Law Director
Memo
Re: Ordinances 16 -15 through 21 -15 — Authorizing Appropriation - State Route 161
and Riverside Drive Intersection Improvement
BACKGROUND
The City of Dublin ( "City ") is preparing to improve the intersection of State Route 161 and
Riverside Drive (the "Project "). The Project provides for the construction of a multi -lane
roundabout with appropriate pedestrian facilities. The southbound bypass lane will be retained and
a shared use path will be incorporated in the underpass area to provide a north /south connection
adjacent to the river. The project also builds a shared use path connection on the east side of
Riverside Drive between the intersection and Martin Road.
The City must obtain property interests from the following property owners in order to construct
this Project:
■ Four Fives, LLC
■ Karen Michelle R. Friedman
■ Patrick W. Hitesman
■ MR/TSARR Owner, LLC
■ Riverpark Group, LLC
■ River's Edge One
The City is hopeful that an amicable resolution may be reached with the property owners;
however, these ordinances permit the City Law Director's Office to begin the eminent domain
process in the event that negotiations are unsuccessful. The City has made, or attempted to make,
contact with each of the property owners in order to resolve these matters prior to court action.
ACQUISITION
The property acquisition consists of the following property interests from each of the above -named
property owners, as depicted in the maps attached hereto:
Memo re. Ord. 16 -15 through 21 -15 - State Route 161 and Riverside Drive Intersection Improvement
February 19, 2015
Page 2of2
Property Owner Property Interests
Four Fives, LLC
Temporary Easement
(0.018 acre f)
Karen Michelle R Friedman
Permanent Easement
(0.100 acre f)
Temporary Easement
(0.096 acre #)
Patrick W. Hitesman
Permanent Easement
(0.109 acre f)
Temporary Easement
0.130 acre f
MR /TSARR Owner, LLC
Temporary Easement
(0.082 acre t)
Riverpark Group, LLC
Permanent Easement
(0.130 acre f)
Temporary Easement
0.036 acre f
River's Edge One
Temporary Easement
(0.0.11 acre f)
Appraised Value
$27,918.00
$31,779.00
$5,688.00
$35,930.00
$506.00
RECOMMENDATION
Staff recommends approval of Ordinance Nos. 16 -15 through 21 -15 as the construction of the
Project is necessary for public welfare and safety, and approval of the Ordinances will keep the
Project moving forward.
CITY OF DUBLIN, OHIO
DESCRIPTION OF A 0.018 ACRE TEMPORARY EASEMENT
ACQUIRED FROM FOUR FIVES, LLC
Situated in the State of Ohio, County of Franklin, City of Dublin, being located in Quarter Township 3,
Township 2, Range 19, United States Military Lands, and being a part of that original 8.230 acre parcel
described in a deed to Four Fives, LLC, of record in Instrument Number 200610060200990, all records
referenced herein are on file at the Office of the Recorder for Franklin County, Ohio, and being further
bounded and described as follows:
Commencing for reference at a point on the north line of said original 8.230 acre parcel, being on the
south line of a 0.967 acre parcel described in a deed to Karen Michelle R. Friedman, of record in
Instrument Number 201202230024880, being on the existing east right -of -way line for Riverside Drive
(U.S. 33), being the northeast corner of a 0.492 acre parcel described in a deed to City of Dublin, of
record in Instrument Number 200707030116047, and being the northwest corner of an existing bike
path easement described in a deed to City of Dublin, of record in Instrument Number
200707030116052;
Thence South 89 degrees 07 minutes 14 seconds East, along the north line of said original 8.230 acre
parcel, along the south line of said 0.967 acre parcel and along the north line of said existing bike path
easement, a distance of 15.70 feet to the northeast corner of said existing bike path easement, said
point being the TRUE POINT OF BEGINNING for this description;
Thence South 89 degrees 07 minutes 14 seconds East, continuing along the north line of said original
8.230 acre parcel and the south line of said 0.967 acre parcel, a distance of 28.64 feet to a point;
Thence South 17 degrees 06 minutes 19 seconds West, across said original 8.230 acre parcel, a distance
of 56.99 feet to a point on the east line of said existing bike path easement;
Thence North 12 degrees 12 minutes 31 seconds West, continuing across said original 8.230 acre parcel,
along the east line of said existing bike path easement, a distance of 56.18 feet to the TRUE POINT OF
BEGINNING for this description.
The above description contains a total area of 0.018 acres (including 0.000 acres within the present road
occupied) within Franklin County Auditor's parcel number 273 - 008325.
The bearings herein are based on the Ohio State Plane Coordinate System (South Zone) as per NAD 83
(1986 adjustment). Control for bearings was from coordinates of monuments FRANK 73 and FRANK 74,
having a bearing of South 73° 57' 18" East, established by the Franklin County Engineering Department,
using Global Positioning System procedures and equipment.
This description was prepared by Brian P. Bingham, Registered Professional Surveyor No. 8438 on
November 12, 2014 based on an actual survey performed in the field by American Structurepoint, Inc.
and is true and correct to the best of my knowledge.
American Structurepoint, Inc. e ��tE ' 0F , �������
•
i
BRIAN P.
81NGHAM
Brian P. Bingham ��,. 9 8496 O : ' O` Date
Registered Professional Surveyor No. 8438 '� ' FG/8TS J��`
X00, / ' 'ONAI S
"hnsru%Ns
ERN, No: Z007,00n5
■ o
EXHIBIT 19'
0.018 ACRES
MUNV BY: BPB
E3
AMERICAN 26611 CORPORATE EXCHANIX 0R. M 3W
Meus, ff a
u PAX6,4 o W"2 rcs 266 ,
TEMPORARY EASEMENT
ACQUIRED FROM
ACQUIRED
Ia.
C
00 STRUCTUREPOINT TE�e + +.9o,2C
FOUR FIVES, LLC
Io
INC. v .sbuellrep ami
Q ECKEV er r MTL
®
DUBLIN, OHIO
PAGE / OF i
SITUATED IN THE STATE OF OHIO, COUNTY OF FRANKLIN, CITY OF DUBLIN, LOCATED
IN QUARTER TOWNSHIP 3. TOWNSHIP 2, RANGE 19, UNITED STATES MILITARY LANDS.
III I 1
■ ■ ■ ■ ■
•� 1
BASIS OF BEARING
I
II
I
y <
O`
0
n
v
osy
I o
0
I �
I
0
I-
.S
g
a POINT OF
BEGINNING
s.
z
Q �
rn O
N �0
W
W y
�Do
x
Ob
n
oT
o
o
v �^
o
y
3p
\ N
x
W
I
PID: 273-008336
KAREN MICHELLE R. FRIEDMAN
0.967 ACRES
INST. NO. 201202230024880
64'
89° 07' 14' E
PID: 273- 008325
FOUR FIVES, LLC
INST. NO. 200610060200990
ORIG. 8.230 AC.
LEGEND
OLP.F. IRON PIN FOUND
Qo P.F. IRON PIPE FOUND
�I.P.6. 518' IRON PIN SET W/
STRUCTUREPOINT -PS 6438' CAP
THE BEARINGS HEREIN ARE BASED ON THE OHIO STATE PLANE COORDINATE SYSTEM SOUTH ZONE AS PER
NAD 83 (1986 ADJUSTMENT). CONTROL FOR BEARINGS WAS FROM COORDINATES OF MONUMENTS FRANK 73
AND FRANK 74, HAVING A BEARING OF SOUTH 73° 57' 18' EAST, ESTABLISHED BY THE FRANKLIN COUNTY
ENGINEERING DEPARTMENT, USING GLOBAL POSITIONING SYSTEM PROCEDURES AND EQUIPMENT.
, ,NsIeuplo 'o
I HEREBY CERTIFY THA T: ��� '(E O F �
THIS DRAWING REPRESENTS THE RESULTS OF AN ACTUAL FIELD SURVEY OF THE �.``g'�p: • �;S' /��•
PREMISES PERFORMED BY AMERICAN STRUCTUREPOINT, INC. IN MARCH APRIL OF : !�
2013. THIS DRAWING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIFF.2 BRIAN P. : L
BINGHAM
O : 8438 '
O�
•
BR AN P. 8INGf4M, r. S. 0. 8438 DAB z 1Opq ;SJ,,,��.
AMERICAN STRUCTURE INC.
II
Ia.
�
Im
— -� -- -mj
Io
�p
I
,owl
o� W m
15.70'
= fr7
S 89° 07' 14' E
3 fC
\
I
x I
( x
W
W
I w
OF
I EFERENC
I OINT
5/8' IRON PN
Ki E INGERS & ASSO
- - - - -- i 4 �
.CAP
I
I
I
I
I
� 1
x
W
I
I
I
- I
I
III I 1
■ ■ ■ ■ ■
•� 1
BASIS OF BEARING
I
II
I
y <
O`
0
n
v
osy
I o
0
I �
I
0
I-
.S
g
a POINT OF
BEGINNING
s.
z
Q �
rn O
N �0
W
W y
�Do
x
Ob
n
oT
o
o
v �^
o
y
3p
\ N
x
W
I
PID: 273-008336
KAREN MICHELLE R. FRIEDMAN
0.967 ACRES
INST. NO. 201202230024880
64'
89° 07' 14' E
PID: 273- 008325
FOUR FIVES, LLC
INST. NO. 200610060200990
ORIG. 8.230 AC.
LEGEND
OLP.F. IRON PIN FOUND
Qo P.F. IRON PIPE FOUND
�I.P.6. 518' IRON PIN SET W/
STRUCTUREPOINT -PS 6438' CAP
THE BEARINGS HEREIN ARE BASED ON THE OHIO STATE PLANE COORDINATE SYSTEM SOUTH ZONE AS PER
NAD 83 (1986 ADJUSTMENT). CONTROL FOR BEARINGS WAS FROM COORDINATES OF MONUMENTS FRANK 73
AND FRANK 74, HAVING A BEARING OF SOUTH 73° 57' 18' EAST, ESTABLISHED BY THE FRANKLIN COUNTY
ENGINEERING DEPARTMENT, USING GLOBAL POSITIONING SYSTEM PROCEDURES AND EQUIPMENT.
, ,NsIeuplo 'o
I HEREBY CERTIFY THA T: ��� '(E O F �
THIS DRAWING REPRESENTS THE RESULTS OF AN ACTUAL FIELD SURVEY OF THE �.``g'�p: • �;S' /��•
PREMISES PERFORMED BY AMERICAN STRUCTUREPOINT, INC. IN MARCH APRIL OF : !�
2013. THIS DRAWING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIFF.2 BRIAN P. : L
BINGHAM
O : 8438 '
O�
•
BR AN P. 8INGf4M, r. S. 0. 8438 DAB z 1Opq ;SJ,,,��.
AMERICAN STRUCTURE INC.