Loading...
69-93 Ordinance ,..,'-~,,~,..__..---~,=-~~~,-,."'-,_.. ---~'~,.~-----------,-- RECORD OF ORDINANCES Dayton Legal Blank Co. Form No. 30043 69-93 Ordinance No. ___________nm Passed noon _00.___00_____________________19.. AN ORDINANCE TO ACCEPT A QUOTE FOR THE LIGGETT ROAD BRIDGE REPLACEMENT WITHOUT FORMAL ADVERTISING AND COMPETITIVE BIDDING AND DECLARING AN EMERGENCY ,.- WHEREAS, the City Engineer has determined that the Liggett Road Bridge is in need of replacement; and ~ WHEREAS, the City has further determined that the Liggett Road Bridge is in such poor repair and condition that it presently presents a threat to the safety and welfare of Dublin residents; and WHEREAS, the City Engineer has further determined that any delay in repairing and/or replacing said bridge will cause a further and more imminent danger to the safety and welfare of Dublin residents; and WHEREAS, Northwest Conduit Corporation has recognized almost exclusive benefit to them of this project and has agreed to donate labor for this project up to $7,000.00; and WHEREAS, the estimated cost of the bridge replacement is $42, 019 and Northwest Conduit's estimate, not including donated labor, is $31,645; and WHEREAS, the normal bidding process could cause the City to spend an additional $5,000 to $10,000 for preparing additional engineering contract documents. WHEREAS, it is in the best interest of the City to accept Northwest Conduit's quote as soon as possible so that construction can take place nthis year; and WHEREAS, Section 8.02 of Dublin's Charter and Section 735.051 of the Ohio Revised Code enables the legislative authority of a City to authorize, by two-thirds vote of its members elected thereto, the City Manager, or other authorized contracting authority, to enter into a purchasing contract .,-- without formal bidding and advertising, when a real and present emergency arises in connection with the operation of any department, division, commission, bureau, or board of the municipality. """- NOW THEREFO~E BE IT ORDAINED by the Council of the City of Dublin, State of Ohio of the elected members concurring: I Section 1. That pursuant to Section 735.051 of the Ohio Revised Code, the quote from Northwest Conduit Corporation for the Liggett Road Bridge Replacement, in the amount of $31,645 be, and hereby is accepted. Section 2. That there be appropriated from the unappropriated balance in the Capital Improvement Tax Fund the sum of $35,000 to account 40-03-14-2550 for the Liggett Road Bridge Replacement. Section 3. That the City Manager is hereby authorized and directed to execute a contract with Northwest Conduit Corporation for completion of said project pursuant to the bid specifications and documents on file in the office of the City Engineer. Section 4. That this Ordinance be, and the same hereby is, declared to be an emergency measure for the preservation of the public peace, health or welfare of the residents of this City, and therefore this Ordinance shall take effect and be in force immediately upon its passage. r ~ ..,"' I. Passed this day of ~ , 1993 ... ~~<}.'i!~' r..~~~' ~ ~~~ A ,.\'\~:~~).~\ ,:.~" I':~. .r" 1".,\ ..' ,'" .1 . ^ \. " ,'\)\' (\. (..?,(." ~,.:."-~ .'$.~' ATTEST: , ~. ~ ,'<, '.~ . Y' 1..."" I ''C'';'''' .... ..:...~:~~:~' ~ C!- ~\':,,~~~~W"\;-;.,' ~ '\)~~\\~,~\\\~ Clerk of Council ~~\~ ~~~, !J. to ().f(,~ \) I _' M _~~'."_~~""''''.'-.," "'~", , """...,-.t--':",...~.-,,,,,,,,,,,,,,,;;;_'_,,,,',','n"' L!,!J r r f"", .. . MEMORANDUM TO: Terry Foegler, Director of Development FROM: Balbir S. Kindra, City Engineer SUBJECT: Liggett Road Bridge Replacement ~,~ DATE: July 23, 1993 Recently, plans were completed by civil Engineering Associates for the Liggett Road Bridge replacement. Even though the bridge only serves two properties, the bridge is in dire need of replacement. Currently, steel plates have been placed on tope of the deck to provide access to Northwest Conduit Corporation. Northwest Conduit has recognized almost exclusive benefit to them of this project and has offered to donate labor costs up to $7,000. The project was designed in a manner to take benefit of this offer. Contract plans and documents for additional engineering work for up to $5,000 - $10,000 and, additional time of up to three (3) months would be needed, should we go through the normal bidding process. It is my recommendation that we accept Northwest Conduit's proposal and waive-off the bidding requirement so that the work could be completed this season. Attached, please find a copy of a proposed draft ordinance for approval by City council, the quote from Northwest Conduit and the Engineer's cost estimate. Sincerely, .iP ~~ Stl~~~ Balbir S. Kindra, P.E. City Engineer BSK: jc Attachment ~....,.