56-93 Ordinance t . RECORD OF ORDINANCES Dayton Legal Blank Co. Form No. 30043 \ I I Ordinance No... .n..56-~93. Passed.u.__..unununu.--nn. ___19u _ . I AN ORDINANCE ACCEPTING A BID FOR COFFMAN ROAD, PHASE 1A r BRIDGE REPLACEMENT AND DECLARING AN EMERGENCY \... WHEREAS, bids have been received for Coffman Road, Phase 1 A Bridge Replacement; and WHEREAS, the lowest/best bid is from Fort Defiance Construction & SUDDlv. Inc. in the amount of $ 1.483.898.00 ; WHEREAS, the Ohio Public Works Commission requires that this contract be awarded no later than July 1, 1993 in order for the City to obtain funds from the State Issue II Fund; and WHEREAS, the City Engineer has determined that the Coffman Road Bridge over the south Fork of Indian Run is in need of replacement; and WHEREAS, the funding for the project is comprised of $1,135,853 in Issue II money, $250,000 from Franklin County and $250,000 from local income tax revenues allocated for capital improvements; ""'" NOW, THEREFORi, BE IT ORDAINED by the Council of the City of Dublin, I State of Ohio, of the elected members concurring: ~ ....... Section 1, That the bid from Fort Defiance Construction & SUDDlv. Inc. in the amount of $ 1.483.898.00 be, and hereby is, accepted. Section 2, That the City Manager is hereby authorized and directed to execute a contract with Fort Defiance Construction & SUDDlv. Inc. for completion of said project pursuant to the bid specifications and documents on file in the office of the City Engineer, Section 3. That this Ordinance be, and the same hereby is. declared to be an emergency measure for the preservation of the public peace. health or welfare of the residents of this City, and therefore this Ordinance shall take effect and be in force immediately upon its passage. I Passed this A / ,rt day of r ,1993. "... I her!,,~', .grf:fv that copies of this Ord<nance/Rtseltltion were posted in the t I ;' (jty of Dublin in accordance with Section 731.25 of the OfIio Revised Code. -- I ATTEST: ~ C!.- ~ O~- (lJ~ ~ r'M'. ..~ r....f".;!. D',blin. Ohio Clerk of Council Sponsor: City Engineer T:\PER C302\DOCS\PROJECT\COFFMNIA.ORD ~.~ , '".Y _ ~L ' J ..., , . ,."L..,,,. , . . . COFFMAN ROAD, PHASE 1A BID TABULA TION BID OPENING: June 21, 1993 FORT DEFINANCE CONSTRUCTION & SUPPLY, INC. ENGINEER'S ESTIMATE: $1,579,000 ITEM DESCRIPTION OTY. UNIT LABOR MATERIAL TOTAL TOTAL PRICE ROADWAY 201 Trees or Stumps Removed Over 24" 9 EACH $400.00 $0.00 $400.00 $3,600.00 202 Pavement Removed 1,163 S.Y. $0.50 $0.00 $0.50 $581.50 202 Guardrail Removed 321 LF. $1,00 $0.00 $1.00 $321.00 202 Pipe Removed, Under 24" 216 LF. $6.00 $0.00 $6,00 $1,296,00 203 Excavation nol Including Embankment 3,386 C,Y, $10,00 $0.00 $10.00 $33,860,00 203 Embankment 3,437 C.Y. $8.00 $0.00 $6.00 $27,496.00 r" Ililubgrade Compaclion 4,752 S,Y. $2,00 $0.00 $2.00 $9,504,00 3uardrail Tvoe 5 262.50 LF. $6.00 $5.00 $11.00 $2,887.50 \nchor Assembly, Type A 1 EACH $175.00 $450.00 $625,00 $625.00 "ldridge Terminal Assembly, Type 1 1 EACH $300.00 $850.00 $1,150,00 $1,150,00 607 Fence Type CLT, As Per Plan 616 L.F. $5.75 $4.00 $9.75 $6,006.00 616 Waler 50 M GAL. $4.75 $0.25 $5,00 $250,00 616 Calcium Chloride 1 TON $50.00 $200,00 $250,00 $250,00 EROSION CONTROL 207 Straw or Hay Bales 50 EACH $0.25 $1.75 $2,00 $100.00 207 Filter Fabric Fence 200 L.F. $1.00 $2.00 $3.00 $600,00 207 Temporary Ditch Protection 67 S.Y. $1.85 $0.25 $2,10 $140,70 601 Rock Channel Protection Type C w/Filter 85 C.Y. $6,50 $18.50 $25.00 $2,125.00 623 Seedina & Mulchina 3.338 S.Y. $0.85 $0.15 $1,00 $3,338,00 SPEC Bentonite Treatment 0.80 ACRES $11.000.00 $9,000.00 $20,000.00 $16,000,00 DRAINAGE 602 Concrete Masonry 0.49 C.Y. $750.00 $250,00 $1,000,00 $490.00 604 Manhole, Tvpe A 2 EACH $650,00 $600,00 $1,250,00 $2,500.00 604 Catch Basin, Tvpe 3 3 EACH $750.00 $500.00 $1,250.00 $3,750.00 605 4" Shallow Pioe Underdrain 490 LF, $2.65 $1.85 $4.50 $2,205,00 901 12" Storm Sewer Pipe Type 1 Bed. 351 LF. $25.00 $15,00 $40,00 $14,040.00 901 15" Storm Sewer Pipe Type 1 Bed. 52 L.F. $35.00 $23.00 $58.00 $3,016,00 901 27" Storm Sewer Pipe Type 1 Bed. 254 L.F. $40.00 $28.00 $68.00 $17,272.00 PAVEMENT 301 Bituminous Aaareaale Base AC-20 962 C,Y, $28.00 $25.00 $53.00 $50,986,00 304 Aaareaate Base 822 C.Y. $12.00 $16,00 $28,00 $23,016.00 402 Asphalt Concrete 117 C.Y, $29,00 $25.00 $54.00 $6,318.00 404 Asphalt Concrete 263 C.Y. $31.00 $25,00 $56.00 $14,728.00 407 Tack Coat 299 GAL. $1.75 $0.25 $2.00 $598,00 452 6" Plain Concrete Pavemenl 190 S.Y. $18.40 $13.50 $31,90 $6,061.00 609 Curb, Type 6 220 L.F. $10,75 $0,50 $11,25 $2,475.00 609 Combination Curb & Gutter Type 2 506 $6.65 $5.90 $12.55 $6,350.30 r Reinlorced Concrete Approach Slab 15' 393 S.Y. $60.00 $60.00 $120.00 $47,160,00 , STRUCTURE OVER 20' SPAN j' 1 L.S. $50,000.00 $0.00 $50,000.00 $50,000.00 ~StruclUre Removed 5J.> Cofferdams, Cribs & Sheetina 1 L.S. $21.500,00 $3,500.00 $25,000.00 $25,000,00 503 Unclassified Excavation 1258 C.Y. $19.00 $6.00 $25.00 $31,450.00 509 Epoxy Coated Reinforced Steel, Grade 60 81,780 LBS. $0.30 $0.30 $0,60 $49,068,00 511 Class S Concrete, Superstructure As Per Plan 259 C.Y. $240.00 $200.00 $440.00 $113,960.00 511 Class C Concrete Abutmenls Above Footinas 356 C.Y. $250.00 $135.00 $385.00 $137,060.00 511 Class C Concrete Footinas 300 C.Y. $130.00 $95,00 $225.00 $67,500,00 512 Sealina of Concrete Surtaces (Epoxy) 84 S.Y, $6.00 $4.00 $10.00 $640.00 512 Sealing 01 Concrete Surtaces (Non. Epoxy) 303 S,y, $6.00 $4,00 $10.00 $3,030.00 513 Struclural Steel AISC Cat 1 A572-50 . 267,076 LBS. $0.40 $0.85 $1.25 $333,845,00 513 Welded Stud Shear Connector 2,739 EACH $3,75 $1.25 $5,00 $13,695,00 516 Struc, Exp. Joinls Incl. Elastomeric Strip Seal 217 L.F. $55.00 $145.00 $200.00 $43,400.00 516 1/Z' PEJF 4 S.F, $2.00 $2.00 $4,00 $16,00 516 PVC Waterstop, As Per Plan 30 L.F. $10.00 $15.00 $25.00 $750.00 516 1/8" Prelormed Bearing Pad 10 S,F. $0.50 $2.50 $3.00 $30,00 516 Elastomeric Bearina w/lntrnl. lam. & Load Plate 22 EACH $50.00 $200.00 $250.00 $5,500,00 517 Railing (Concrete Parapel W. 2 Pipe) 178 L.F. $50.00 $60.00 $110.00 $19,580.00 518 Porous Backlill As Per Plan 122 C,Y. $27,00 $38,00 $65.00 $7,930.00 LIGHTING 625 Light Pole, Design ATB 35 7 EACH $250.00 $850.00 $1,100,00 $7,700.00 625 Transformer Base, Type AT.A 7 EACH $100.00 $300.00 $400,00 $2,800.00 625 Conduit, 3", 713.04 368 LF, $5^50 $4.50 $10.00 $3,680,00 625 Luminaire, SlYle C,Type III, 400 Watts HPS, 713.11.208 Volt 7 EACH $115.00 $525.00 $640.00 $4,480.00 625 Trench 24" Deep 1141 L.F. $3.25 $0,00 $3.25 $3,708.25 625 1.1/Z' Duct Cable w/2 No.4 AWG 600 Volt Cable 1117 L.F. $1.45 $1.65 $3,10 $3,462.70 615 No.4 AWG 600 Volt Distribution Cable 280 L.F, $0.50 $0.70 $1,20 $336.00 625 Connector Kit, Type II 7 Each $30.00 $30,00 $60.00 $420.00 625 Connector Kit, Tvpe III 7 EACH $30.00 $30.00 $60,00 $420.00 ~ Pull Box, 713.09, 24" 3 EACH $170.00 $215,00 $385,00 $1,155,00 r Ground Rod 7 EACH $115.00 $35,00 $150.00 $1,050.00 ~.. Conduit, 713,07, 2" 130 L.F. $3.00 $1.50 $4.50 $585.00 Cable Splicing Kil 8 EACH $30.00 $25.00 $55.00 $440.00 625 L1aht Pole Foundation 7 EACH $500.00 $150.00 $650,00 $4,550.00 625 Power Service 1 EACH $1,000.00 $2,000.00 $3,000.00 $3,000,00 625 Conduit, 713.07 4" Concrete Encased 45 L.F. $15.00 $15.00 $30.00 $1,350.00 625 1-1/2" Duct Cable, w 2 No.2 AWG 5000 Volt Cables 65 L.F. $2.00 $2,00 $4,00 $260.00 Note: Only one bid received Page 1 _ U__"""._.,^~'_._ .-...._... ~ . , . COFFMAN ROAD, PHASE fA BID TABULA TION BID OPENING: June 21, 1993 FORT DEFINANCE CONSTRUCTION & SUPPLY,INC. ENGINEER'S ESTIMATE: $1,579,000 ITEM DESCRIPTION QTY. UNIT LABOR MATERIAL TOTAL TOTAL PRICE TRAFFIC CONTROL 630 Ground Mounted SuPpOrts, #3 Posls 65 LF. $3.00 $3.00 $6.00 $390,00 630 Signs, Flal Sheet, Type G 36 S.F. $7.50 $8.50 $16.00 $576,00 621 Edae Lines 0.269 MILE $1,850.00 $250.00 $2,100.00 $564.90 621 Lane Lines 0,073 MILE $1.650.00 $250,00 $1,900,00 $138.70 621 Cenler Lines 0,198 MILE $2,700,00 $500,00 $3,200,00 $633.60 621. Stop Lines 65 L.F. $2.65 $0.35 $3.00 $195.00 ~r ;rosswalk Lines 276 LF, $1,05 $0.35 $1.40 $386,40 , I Lane Arrows 4 EACH $70,00 $10,00 $80,00 $320,00 f-' ( :;hannelizina Lines 510 L.F, $0,15 $0,35 $0,50 $255.00 6~ Word on Pavement 7'Z' 4 EACH $90.00 $20.00 $110.00 $440.00 WATER WORKS 801 16" Ductile Iron Water Pipe, Class 54 568 LF. $35.00 $75,00 $110,00 $62,480.00 801 Concrete Blocking Class C 4,1 C,Y. $35.00 $90.00 $125.00 $512,50 801 Fittings, Increase or Decrease 500 LBS, $0.15 $1.10 $1.25 $625.00 809 Fire Hydrant 1 EACH $750.00 $1,650.00 $2,400,00 $2,400.00 MISCELLANEOUS 617 Mobilization 1 LS, $35,000,00 $5,000.00 $40,000,00 $40,000.00 627 Construction Staking 1 LS. $17,000,00 $1,000,00 $18,000.00 $18,000,00 614 Mainlenance of Traffic, One Lane Closure on a Two Lane Hiahwav 2 EACH $1,150.00 $350,00 $1,500,00 $3,000.00 603 4" Conduit, TVDe E 120 LF. $3.00 $0.50 $3,50 $420.00 625 Ground Rod 6 EACH $135.00 $40.00 $175.00 $1,050,00 625 Pull Box, 18" 713.08 (Concrete) 4 EACH $275.00 $200.00 $475.00 $1,900,00 625 Pull Box 24" 713,08 (Concrele) 2 EACH $240.00 $300,00 $540.00 $1,080.00 625 Trench 24" DeeD 375 LF, $3.40 $0.00 $3.40 $1,275,00 625 Conduit, 713.04, 'Z' 195 LF, $5.00 $2.15 $7,15 $1,394,25 625 Conduit, 713.04, 3" 42 LF. $6.75 $3.75 $10.50 $441.00 625 Conduit, 713.04, 4" 20 LF, $10.50 $6.50 $17,00 $340,00 625 Conduit, 713.04, 5" 136 L.F, $10,00 $10.00 $20.00 $2,720,00 625 Conduit, 713.04, 6" 7 LF. $18,00 $18,00 $36.00 $252.00 625 Conduit, Jacked Or Drilled Under Pavement 4" 166 L.F. $19^00 $6.00 $25.00 $4,150,00 630 Ground Mounled Supports No.3 Post 65 LF. $3.00 $3.00 $6.00 $390.00 630 Sign Hanger Assembly Mast Arm 1 EACH $70.00 $30,00 $100,00 $100,00 630 Sian SUDPort Assembly Pole Mounted 1 EACH $50.00 $30,00 $80.00 $80.00 630 Signs, Flat Sheet, Type G 39.5 EACH $9.00 $7,00 $16.00 $632,00 631 Internally Illuminated Street Name Signs Double Faced, As per Plan 3 EACH $1,000.00 $750.00 $1,750.00 $5.250.00 632 Vehicular Signal Head, 3-Seclion l'Z' Lens, One-Way 8 EACH $260.00 $250.00 $510.00 $4,080.00 ~ Vehicular Signal Head 5-Section l'Z' Lens, One-Way 5 EACH $450.00 $350,00 $800.00 $4,000,00 Coverina.Vehicular Signal Head 13 EACH $3.00 $1,00 $4.00 $52.00 '-... 'Loop Detector Pavement Cutting 169 L.F. $5.00 $2.50 $7.50 $1,267.50 loop Detector Unil Delay and Extension TVDe, As Per Plan 1 EACH $150.00 $650.00 $800.00 $800,00 632 Sianal Cable, 2 Conductor, No. 14 AWG 1,799 L.F, $0.80 $0.45 $1.25 $2,248.75 632 Signal Cable, 5 Conductor, No, 14 AWG 2,570 L.F. $1,00 $0,50 $1,50 $3,855.00 632 Signal Cable, 7 Conductor, No, 14 AWG 1,519 L.F. $1.10 $0,55 $1,65 $2,506,35 632 Pedeslrian Signal Head, Type 02 6 EACH $200.00 $250.00 $450.00 $2,700.00 632 Pedestrian Pushbutton 6 EACH $50,00 $50,00 $100.00 $600.00 632 Pedestal, 12" Aluminum, Transformer Base, As Per Plan 3 EACH $100,00 $375,00 $475.00 $1,425,00 632 Conduit Riser, 2" Diameter 1 EACH $200.00 $100.00 $300.00 $300,00 632 Signal SUDPort, TVDe TC-12,30 Desian 6 As Per Plan 1 EACH $1,500.00 . $5,000.00 $6,500.00 $6,500,00 632 Signal Support, Type TC 81,20 Design II As Per Plan 1 EACH $1,000,00 $3,500.00 $4,500.00 $4,500,00 632 Concrete For Anchor Base Foundations 6,24 C.Y, $550,00 $200.00 $750.00 $4,680,00 632 Power Service 1 EACH $350.00 $275.00 $625.00 $625,00 632 Maanetometer Sensor Probe, As Per Plan 6 Each $100,00 $240.00 $340,00 $2,040.00 632 Loop Detector Wire, Type E 612 L.F. $0.40 $0.15 $0.55 $336.60 632 Loop Detector Lead-In Cable 1,240 LF. $0.60 $0.40 $1.00 $1,240.00 632 Power Cable, 3 Conduclor, No.6 AWG 82 LF, $1,75 $1.50 $3.25 $266,50 633 Concrete Cabinet Foundations, As Per Plan 1.85 C.Y. $625.00 $225.00 $850.00 $1,572,50 633 Controller Work Pad 10.5 S,F. $9.00 $6.00 $15.00 $157,50 633 Controller, Actualed, 8-Phase, Solid Slate Diaital Microprocessor, As Per Plan 1 EACH $1,500.00 $7,000,00 $8,500.00 $8,500,00 614 Temporary Center Line, Class II 0,05 MILE $900.00 $100.00 $1,000.00 $50.00 614 Temporary Edge Line, Class I 0.11 MILE $2,000.00 $4,500,00 $6,500.00 $715.00 614 Temporary Stop Line. Class I 36 L.F, $2,00 $5,00 $7,00 $252.00 614 Work Zone Marking Signs 6 EACH $13.00 $2.00 $15.00 $90.00 614 Maintainina Traffic L.S, L.S. $11,500.00 $2,500.00 $14,000,00 $14,000,00 622 Portable Concrete Barrier (ODOT CMS) 500 L.F. $8.00 $0.00 $8,00 $4,000.00 SPEC Law Enforcement Officer 100 HOUR $22.50 $0.00 $22.50 $2,250,00 SPEC Law Enforcement Officer with Patrol Car 100 HOUR $27.50 $0.00 $27.50 $2,750,00 ~. TOTAL $1,483,898,00 Page 2 ,.,._.,~...c_,",,_=,,"' ~'" rnt!" ,--: ,,'tii!'$l <'"""",,r'1!J , ..".~~._--_..,~ ~ . . . MEMORANDUM TO: Terry Foegler, Director of Development FROM: Randall J. Bowman, Acting City Engineer fiI!li'"':"~ SUBJECT: Coffman Road, Phase 1 A, Bridge Replacement i , DATE: June 21, 1993 Today. June 21, 1993. bids were received and publicly opened and read for the Coffman Road, Phase 1 A, Bridge Replacement project. Bids were received as shown on the attached bid form. Also attached is a copy of the bid tabulation for your information. All bids submitted have been reviewed and it is recommended that we award this contract to the lowest bidder, Fort Definance Construction & Supply, Inc. In order to receive State Issue II funds from the Ohio Public Works Commission. this contract must be awarded no later than July 1, 1993. Therefore, attached is an emergency Ordinance for approval of City Council prior to awarding this contract to Fort Defiance Construction & Supply, Inc. Also, Franklin County would like this project to begin as soon as possible, Ii"""'" RJB:jc ""","'ffl;<-,,-,