Loading...
010-86 Ordinance RECORD OF ORDINANCES 265 National Graphics Corp., COIs., O. ~ Form No. 2806-A Ordinance NO'm_1Q__a~mmnn Passednmn_un_nmnnmmmmn__mnn19nn- -- AN ORDINANCE AMENDING THE ANNUAL APPROPRIATION ORDINANCE FOR FISCAL 1986, AND DECLARING AN EMERGENCY. WHEREAS, the Ohio Revised Code requires, when necessary, that amendments be made to the Annual Appropriations; and WHEREAS, amendments to Ordinance No. 72-8S, the Annual Appropriation Ordinance for Fiscal 1986, are required, NOW, THEREFORE, BE IT ORDAINED by the Council of the Village of Dublin, State of Ohio, 5 of the elected members concurring that Ordinance No. 72-8S be, and it hereby is amended as follows: Section 1. That there be appropriated from the unappropriated balance in the Municipal Building Expansion Fund, the sum of $16,000.00 to account D06-07-7E-2S30 for Construction Costs; and, Section 2. That there be appropriated from the unappropriated balance in the Water Fund the sum of $10,000.00 to account E01-0S-SJ-2300 for Fire Hydrant Maintenance; and, Section 3. That this Ordinance be and ~t hereby is declared to be an emergency measure necessary for the preservation of the public peace, health, and safety, and therefore this Ordinance shall take effect and be in force immediately upon its passage. Passed this 18th day of March , 1986. ,r' ~M.e ,,; / / "/ / //t?' '/ / i' - Mayor - Presiding Officer Attest: /J J~~,1{~'~ Clerk of Counc 1 I hereby certify thtlt copies af this Ordinancc/R:osolution were pc:;t~d ii tI"!e ViE,'~.} of C;t!ill in "cconL;icc with Section 73~p ::1 ti~: Ci;; R]~j~<:d Coj~. ' J~~.'lf~ Clerk of Cour.cil Sponsor: Finance Director j-,'-vllh'( ~ -- CHANGE Distribution 10: ORDER OWNER IX) ARCHITECT ~ AlA DOCUMENT G701 CONTRACTOR IX) FIELD 0 OTHER 0 PROJECT: Dublin Municipal Building CHANGE ORDER NUMBER: 02, Revised (name, address) Remodeling and Expansion 6665 Coffman Road INITIATION DATE: Feb~uary 26, 1986 TO (Contractor): r. 'ld I ARCHITECT'S PROJECT NO: DUB0184 M1d-State BU1 ers, Inc. CONTRACT FOR: Combined General 4714 Manitoba Court Plumbing, HVAC, Fire Columbus, ohio 43229 Protection, Electric ~r. Chris Heasley -1 CONTRACT DATE: November 15, 1984 You are directed to make the following changes in this Contract: Revise the Drawing and Specification Documents, dated July 24, 1984, revised October 2, 1984 and Addendum No. 1, dated October 16, 1984; Addendum No.2, dated October 19, 1984; Addendum No. 3 dated October 24, 1984 and Addendum No.4, dated November 12, 1984 per the information contained herein. Item l. Add masonry wall and hollow metal door and frame to enclose Police Property Room. It em 2. Additional rough framing at entrance and lobby installation per Architect's instruction. \. Item 3. Delete the telephone counter and revise the drywall partitions at Room 109. Item 4. Additional reinforcing and thickened slab at Room 107 to outside Room 104. Also add reinforcing at vehicle shelter column foundations. Item 5. Move the wall at Room 111 file access back 2" from its original position. continued Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including i1ny adjustment in the Contrilct Sum or Contract Time. The original (Contract Sum) -i6tfaraftteec~tu" C83t) was ........................... $ 777,556 . Net change by previously authorized Change Orders .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $ 16,073. The (Contract Sum) (titr.rranteetH9\aximunM:05tt-prior to this Change Order was .......... $ 793,629. The (Contract Sum) ~~ximum-C05~ will be (increased) (ac(:ruJt:d) (uftehans~) by this Change Order ......................................................... $ 13,913. The new (Contract Sum) ((;ua~lCifJKHR..(;Q5t) including this Change Order will be . .. $ 807,542. The Contract Time will be (1nc~ EElea:easee) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is January 6, 1986. Authorized: HORNE. KING, RAUH, INC. MID-STATE BUILDERS, INC. VTT.I.AGF. OF nIJRI.TN ARCHITECT CONTRACTOR ~rr~RCoffman Road 7219 Sawmill Rd.. Suite 106 4714 M~n;tnh~ f:nllrt Address Address Address Du mbus DU~~ BY I. ~//~ ViI age Manager 6 DA TE ~ I.. I AlA DOCUMENT G701 . CHANGE ORDER . APRil 1978 EDITION . AlAe . @ 1978 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 2()()()(, G701 - 1978 f Change Order No. : 02 Project No. : DUB0184 January 10, 1986 Page 2 Item 6. Relocate HVAC air intakes on roof to new locations. Item 7. Install additional rough framing at the Information Counter and ceiling at Door 110A. Item 8. Add steel lintels at door openings 101, 104, 106, 107, 110, 001, 3' exhaust fan at room 105 and also add lintels over (8) windows on north side of building. Item 9. Dig telephone line under courtyard and up into new building. Item 10. Add new closet with shelving at room 119. Item 11. Install extra framing work at diffusers in rooms 103 and 110, a total of (6) diffusers. Item 12. Install additional redwood trim at entrance on west side of building. Item 13. Install redwood bracing at all exterior louvers. Item 14. Install concrete topping at rooms 130, 131 and 132. Item IS. Install stone returns at jambs of doors l28b and 129. Item 16. Add extra eyelets at flagpole for additional flag. Item 17. Construct a new 6' long rolling cart. Item 18. Revise Police Exit on east side of building into a closet. Item 19. Install a new mailbox and shelf at room 111 per architects sketch. Item 20. Install a new oak trim piece at the overhead door in room 110. Item 21. Paint the (2) outside doors and frames at courtyard to match the siding. Item 22. Cut a slat in the countertop at room 119 for printer relocation. Item 23. Repair wall leakage at basement wall ours ide rooms 006, 007 and 008. Item 24. Install new drywall partition at corridor 002 and relocate existing door and frame. Item 25. Install new drywall partition across room 005 and rework light switch. Item 26. Delete demolition of walls at room 005. Item 27. Replace (2) hinges at doors 103A with spring loaded hinges. .I Change Order No. : 02 Project No. : DUB0184 January 10, 1986 Page 3. Item 28. Revisions to hardware schedule: a. Add pulls at sliding doors 113 b. Add lockset, hinges, surface bolt at new dutch door to room 137 c. Add catch rollers at Council Room Closet doors d. Add dummy trim at door 102F e. Add lockset and cover plates at door 136 f. Add locksets to basement Mechanical Room doors Item 29. Add dedicated circuit to east wall at room.119. Item 30. Add (2) double duplex outlets at new Police Closet. Item 31. Delete (3) windows to Courtyard walls. '. . : . TO: Councilmembers FROM: Bruce H. Warner, Village Engineer RE: Change Order No. 2., Municipal Bldg. Expansion DATE: March 12, 1986 The following information is dealing with change order no. 2., and the related cost per item. Some items we obtained specific quotes and other items are by time and material. The items with firm quotes is as listed below: Item No: 8,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29, 30, & 31. The following items done by time and material with the breakdown as follows: ITEM NO: 2. Material $ 68.00 Labor 6 hrs., @ $31.00 == $ 186.00 Total == $ 254.00 ITEM NO: 4. Material $ 140.00 Labor 5 hrs., @ $31.00 == $ 155.00 Total == $ 295.00 ITEM NO. 5. Material $ 20.00 Labor 12 hrs., @ $31.00 == $ 372.00 Total == $ 392.00 ITEM NO. 6. Material $ 76.00 Labor 4 hrs., @ $31.00 == $ 124.00 Sub contractors cost == $1,100.00 Total == $1,300.00 ITEM NO. 7. Material == $ 27.00 Labor 3 hrs., @ $31.00 == $ 93.00 Total == $ 120.00 ITEM NO. 9. Labor 4 hrs., @ $ 31. 00 == $ 124.00 ITEM NO. 10. Material == $ 317.00 Labor 14 hrs., @ $31.00 == $ 434.00 Sub contractors cost =: $ 719.00 Total =: $1,470.00 ITEM NO. ll. Material =: $ 20.00 Labor 13 hrs., @ $31.00 =: $ 403.00 Total =: $ 423.00 Page 2. ITEM NO. 12. Material = $ 90.00 Labor 5 hrs., @ $ 31. 00 = $ 155.00 Total = $ 245.00 ITEM NO. 13. Material = $ 167.00 Labor 17 hrs., @ $31.00 = $ 527.00 Total = $ 694.00 ITEM NO. 14. Material = $ 212.00 Labor 18 hrs., @ $31.00 = $ 558.00 Total = $ 770.00 The following is a detailed cost breakdown on the changes per hour for the carpenter used on all the items as the labor from Mid-State Builders, Inc. Wage (Basic Hourly Rate) $ 15.50 Fringe Benefits $ 3.19 Employer Social Security $ 1. 11 Employer State Unemployment $ 1.08 Workers Compensation $ .77 Employer Federal Unemployment $ .13 Subtotal $ 21. 68 Payroll Expenses $ .33 Office Supervision $ 3.84 Misc. Tools $ .66 Subtotal $ 26.42 Profit $ 3.97 Subtotal $ 30.39 i Bond and Insurance $ .61 Total Hourly Rate $ 31.00 Respectfully submitted, ~~ aJ~ Bruce H. Warner Village Engineer BHW:njz . TO: Councilmembers FKOM: Bruce H. Warner, Village Engineer RE: Change Order No. 2., Municipal Bldg. Expansion DATE: March 12, 1986 The following information is dealing with change order no. 2., and the related cost per item. Some items we obtained specific quotes and other items are by time and material. The items with firm quotes is as listed below: Item No: 8,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29, 30, & 31. The following items done by time and material with the breakdown as follows: ITEM NO: 2. Material $ 68.00 Labor 6 hrs., @ $ 31. 00 = $ 186.00 Total = $ 254.00 .. ITEM NO: 4. Material $ 140.00 Labor 5 hrs., @ $31.00 = $ 155.00 Total = $ 295.00 ITEM NO. 5. Material $ 20.00 Labor 12 hrs., @ $31.00 = $ 372.00 Total = $ 392.00 ITEM NO. 6. Material $ 76.00 Labor 4 hrs., @ $31.00 = $ 124.00 Sub contractors cost = $1,100.00 Total = $1,300.00 ITEM NO. 7. Material = $ 27.00 Labor 3 hrs., @ $ 31. 00 = $ 93.00 Total = $ 120.00 ITEM NO. 9. Labor 4 hrs., @ $ 31. 00 = $ 124.00 ITEM NO. 10. Naterial = $ 317.00 Labor 14 hrs., @ $31.00 = $ 434.00 Sub contractors cost = $ 719.00 Total = $1,470.00 ITEM NO. 11. ~"laterial = $ 20.00 Labor 13 hrs., @ $31.00 '" $ 403.00 Total $ 423.00 I';!ge L. ITEM NO. 12. Material ~ $ 90.00 Labor 5 hrs., @ $ 31. 00 = $ 155.00 Total = $ 245.00 ITEM NO. 13. Material = $ 167.00 Labor 17 hrs., @ $31.00 = $ 527.00 Total = $ 694.00 ITEM NO. 14. Material = $ 212.00 Labor 18 hrs., @ $31.00 = $ 558.00 Total = $ 770.00 The following is a detailed cost breakdown on the changes per hour for the carpenter used on all the items as the labor from Mid-State Builders, Inc. Wage (Basic Hourly Rate) $ 15.50 Fringe Benefits $ 3.19 Employer Social Security $ 1. 11 Employer State Unemployment $ 1. 08 Workers Compensation $ .77 Employer Federal Unemployment $ .13 Subtotal $ L 1. 68 Payroll Expenses $ .33 Office Supervision $ 3.84 Misc. Tools $ .66 Subtotal $ 26.42 Profit $ 3.97 Subtotal $ 30.39 Bond and Insurance $ .61 Total Hourly Rate $ 31.00 Kespectfully submitted, ~~ tJ~ Bruce H. Warner Village Engineer BHW:njz