Resolution 36-12RECORD OF RESOLUTIONS Dayton Legal Blank. lnc_ Form No 30045 Resolution No Parsed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE FISHEL DRIVE WATER MAIN EXTENSION PROJECT AND AUTHORIZING THE CITY MANAGER TO ENTER INTO CONTRACTS FOR SAID PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Fishel Drive Water Main Extension project; and WHEREAS, the 2007 Community Plan states an objective to provide consistency between the water and sewer system service areas; and WHEREAS, on June 12, 2012, six (6) bids were received for the Fishel Drive Water Main Extension project; and WHEREAS, Council has determined that the bid submitted by Conie Construction Company constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted for Alternate #1 by Conie Construction Company in the total amount of $293,179.50 is accepted. — Section 2. The City Manager is hereby authorized to enter into contracts with Conie Construction Company for performance and completion of the Fishel Drive Water Main Extension project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this day of 2012. Mayor - PrI sidi g Officer ATTEST: Clerk of Council 36 -12 11 Office of the City Manager Emerald Parkway * City of Dublin Pho 614-410-4400 • Fax:b614 -0410 -4490 1090 Memo To: Members of Dublin City Council From: Marsha I. Grigsby, City Manager Date: June 28, 2012 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer C. Aaron Stanford, P.E., Civil Engineer Re: Resolution No. 36 -12 - Fishel Drive Water Main Extension Bid Acceptance Summary On June 12, 2012, six (6) bids were received, opened, and publicly read by Engineering staff for the Fishel Drive Water Main Extension project. This project will install approximately 2,800 feet of new 8 -inch ductile iron water line, including fire hydrants and other associated appurtenances along Fishel Drive. Extending public water service will enable the City of Dublin to fulfill its commitment to provide water service to the TALG property, as negotiated during the purchase of the sanitary sewer easement for the COIC Sanitary Sewer Extension Phase 2 project and approved with Ordinance 16 -11. The water main is scheduled to be completed by October 26, 2012. The City will have a designated Engineering Project Inspector assigned to this project who will be available to respond to questions and manage access needs. Cosgray Road will not be closed for the duration of the work scheduled with this project. For Council's reference, a reduced set of project construction drawings has been placed in the Council Planning Room. The Engineer's estimate for this project was $524,000 for the base bid (open -cut installation) and $525,500 for Alternate #1 (directionally drilled installation). Funding of $265,000 for project EW1202, was budgeted in the Water Fund this year, as documented in the 2012 -2016 Capital Improvements Program. Since this project was programmed, the scope of the project expanded to include installation of the waterline around the entire Fishel Drive loop, as opposed to just half the loop. This will prevent the City from having to invest in expensive water quality monitoring equipment, which would have been required by the City of Columbus had we just done half of the loop. Total expenditures for the water projects will be reviewed before the end of the year and additional funding will be requested if necessary. Conie Construction Company submitted the lowest and best bid for both the base bid, $289,997.00 and for Alternate #1, $293,179.50. With the price being nearly equal for both methods of installation, Alternate #1 has been selected as the method of installation and bids were evaluated accordingly. Performing the project using the horizontal drilling method will greatly reduce the impact to the existing property owner's business operations and will reduce the amount of restoration work to be completed. The summaries of the bids received are provided on the following page. Memo re. Res. 36 -12 - Fishel Drive Water Main Extension Bid Acceptance June 28, 2012 Page 2 of 2 BASE BID RESULTS Bidder Bid as Read Bid as Read Over ( +) or Under ( -) Engineers Estimate Corrected Bid Conie Construction Company $289,997.00 -44.7% N/A Darby Creek Excavating $291,123.35 -44.4% N/A Vititoe Construction $315,415.75 -39.8% N/A Danbert Construction $348,020.50 -33.6% N/A Columbus Asphalt Paving $357,335.75 -31.8% N/A Trucco Construction $387,395.20 -26.1% N/A ALTERNATE #1 BID RESULTS Bidder Bid as Read Bid as Read Over ( +) or Under ( -) Engineers Estimate Corrected Bid Conie Construction Company $293,179.50 -44.2% N/A Darby Creek Excavating $325,359.86 -38.1% N/A Vititoe Construction $330,813.70 -37.0% N/A Trucco Construction $431,365.20 -17.9% N/A Columbus Asphalt Paving $449,738.25 -14.4% N/A Danbert Construction $496,160.50 -5.6% N/A -hZ*'T;]�L 1 Fi . Staff has thoroughly reviewed the Conie Construction Company bid. This contractor worked for the City of Dublin successfully on the three water line projects installed in 2011 (the Ballantrae connection, the Dublin Road extension to the Dublin Road water tower, and the Emerald Parkway connection into the Woods of Indian Run). Staff recommends Council approval of Resolution 36 -12 accepting Conie Construction Company's bid as the lowest and best bid in the amount of $293,179.50, and authorizing the City Manager to enter into a contract with Conie Construction Company for this project.