Loading...
Resolution 29-12RECORD OF RESOLUTIONS Dayton Legal Blank, Ino. Form No, 30005 Resolution No 29 -12 Passed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE COSGRAY ROAD /SHIER -RINGS ROAD ROUNDABOUT PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of the Dublin Code, for the Cosgray Road /Shier -Rings Road Roundabout; and WHEREAS, Council has determined that the bid submitted by Trucco Construction Company, Inc. constitutes the lowest and best bid; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above - referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities. NOW THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted by Trucco Construction Company, Inc. in the total amount of $1,061,374.87 is hereby accepted. Section 2 . That the City Manager is hereby authorized to enter into contracts with Trucco Construction Company, Inc. for performance and completion of the Cosgray Road /Shier -Rings Road Roundabout project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. That this Resolution shall take effect and be in force on the earliest date permitted by law. Passed this t i - til day of 2012. Mayor - P iding Officer ATTEST: Clerk of Council Office of the City Manager City of Dublin Pho n ne: 614 - -4400- Fax:b614 --410 -4490 1090 To: Members of Dublin City Council From: Marsha I. Grigsby, City Manager Date: May 31, 2012 Memo Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer Kenneth B. Richardson, P.E., P.S. Engineering Manager — Design Re: Resolution No. 29 -12 - Cosgray Road /Shier -Rings Road Roundabout Bid Acceptance Background On May 24, 2012 five (5) bids were received, publicly opened and read for the Cosgray Road /Shier -Rings Road Roundabout project, which involves the construction of a modern roundabout consisting of asphalt pavement, truck apron with brick pavers, sidewalk, asphalt shared -use path, storm sewers, street lights and dry-laid stone wall. The Engineer's estimate was $1,250,000.00. The 2012 budgeted funds for construction of this project are $1,600,000. Trucco Construction Company, Inc. submitted the lowest and best bid of $1,061,374.87. Staff has reviewed all bids and a summary of the bids is listed below. Bidder Bid as Read Bid as Read Over ( +) or Under ( -) Engineer's Estimate Corrected Bid Trucco Construction Company Inc. 1 061 374.87 - 15.1% McDaniel's Construction Corporation, Inc. -11.0% $1 ____ $1 , 112 , 191.90 Complete General Construction Company, Inc. $1,124,231.22 -10.1% Geor e J. I el & Company Inc. $1,192,831.50 -4.6% Columbus Asphalt Paving Inc. $1,339,691.90 +7.2% For Council reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. Staff anticipates the construction to commence in late June. All four legs of the current Cosgray Road /Shier -Rings Road intersection will be closed during the construction. The scheduled completion date for the project is September 28, 2012. Access to Darree Fields via S.R. 161 /Post Road to Cosgray Road shall be maintained at all times from a temporary access drive to be constructed with this project. The location of this access drive is opposite Dublin Park Drive (which provides access to the Par 3 golf course of Sports Ohio). Resolution 29 -12 - Cosgray Road /Shier -Rings Road Roundabout Bid Acceptance May 31, 2012 Page 2 of 2 Recommendation Staff has thoroughly reviewed the Trucco Construction Company, Inc. bid. Previous experience with Trucco Construction Company, Inc. has been favorable, including these recent projects: UNI- 161 -12.98 Industrial Parkway project; Emerald Parkway — Phase SA (Hard Road to Sawmill Road (2004); and Glick Road /Muirfield Drive Intersection Improvements (2002). Staff therefore recommends approval of Resol the bid of Trucco Construction Company, Inc. the City Manager to enter into a contract with project. ution No. 29 -12 accepting as lowest and best in the amount of $1,061,374.87 and authorizing Trucco Construction Company, Inc. for this