Loading...
Resolution 11-12RECORD OF RESOLUTIONS Inc.. Form No. 30045 Resolution No 11 -12 Passed .20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE DUBLIN ROAD WATER TOWER PROJECT, AND AUTHORIZING THE CITY MANAGER TO ENTER INTO CONTRACTS FOR THE PROJECT. WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of the Dublin Codified Ordinances, for the Dublin Road Water Tower project; and WHEREAS, on January 25, 2012, four (4) bids were received for the Dublin Road Water Tower project; and WHEREAS, Council has determined that the bid submitted by Caldwell Tanks, Inc. constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted by Caldwell Tanks, Inc. in the total amount of $2,184,000.00 is hereby accepted. S ection 2. The City Manager is hereby authorized to enter into contracts with Caldwell Tanks, Inc. for performance and completion of the Dublin Road Water Tower project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this 1 34� day o �6-t� 2012. Mayor - Pr�idinc Officer ATTEST: Clerk of Council Office of the City Manager City of Dublin Pho 614 - 410.4400- Fax: - 4490 43017-1090 To: Members of Dublin City Council From: Marsha I. Grigsby, City Manager Date: February 9, 2012 Initiated By: Paul A. Hammersmith, PE, Director of Engineering /City Engineer Barbara Cox, PE, Engineering Manager — Development Todd Garwick, PE, Civil Engineer Memo Re: Resolution 11 -12 — Bid Acceptance for the Dublin Road Water Tower Summary On January 25, 2012, four bids were received, publicly opened and read for the Dublin Road Water Tower project. The 2012 budgeted capital improvements funds for construction of this project (including both the water line and the tank) are $2,900,000 (EW1201). The Engineer's Estimate for the tank construction portion of the project was $2,300,000. Caldwell Tanks, Inc. (Caldwell) submitted the lowest and best bid of $2,184,000. The bidding documents contained three alternate bids. This allowed staff to evaluate the costs of an alternate coating supplier and paving material for the site driveway. The base bid specifies Tnemec as the supplier for the coating systems and a standard asphalt driveway. The alternates included Sherwin Williams as the coating alternate and porous asphalt as the driveway alternate in the following manner: • Alternate 1: Sherwin Williams as the coating supplier and a standard driveway • Alternate 2: Tnemec as the coating supplier and a porous asphalt driveway • Alternate 3: Sherwin Williams as the coating supplier and a porous asphalt driveway Based on the costs shown in the summary of the base bids (no corrections of the base bids were needed) and alternates below and the fact that Sherwin Williams products are not yet approved by the City of Columbus for use on exteriors of water towers, staff is recommending using the configuration in the base bid. Bid as Bidder Base Bid as Read Over ( +)or Alternate 1 Alternate 2 Alternate 3 Read Under ( -) En .Est. Caldwell Tanks, $2,184,000.00 -5.0% $2,181,900.00 $2,204,575.00 $2,202,475.00 Inc. CB&I Constructors, $2,191,000.00 -4.7% $2,221,600.00 $2,217,355.00 $2,247,955.00 Inc. Maguire Iron, Inc. $2,270,000.00 -1.3% $2,270,000.00 $2,298,470.00 $2,293,470.00 Phoenix Fabricators $2,867,141.00 +24.7% $2,863,058.00 $2,890,631.00 $2,886,548.00 and Erectors Inc. Memo re. Resolution 11 -12 — Dublin Road Water Tank February 9, 2012 Page 2 of 2 Staff has thoroughly reviewed the Caldwell bid. Caldwell has not constructed a water tower for Dublin. Therefore, staff contacted three of their provided references and inquired about Caldwell's performance. We received favorable references from the Macon (GA) Water Authority, City of Verona, MI and City of Republic, MO on projects of similar size and height of the planned water tower. Staff anticipates minimal interruptions of traffic on Dublin Road. There will be deliveries of concrete for the foundation construction this spring and of the steel for the tower in the summer. The driveway construction may require some one -lane closures of Dublin Road. The contract specifies that the work be completed by August 1, 2013. This is approximately two months before the 2013 Presidents Cup event at the Muirfield Village Golf Club. For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. Recommendation Staff recommends approval of Resolution 11 -12, accepting as lowest and best the bid of Caldwell Tanks, Inc. in the amount of $2,184,000 and authorizing the City Manager to enter into a contract with Caldwell Tanks, Inc. for this project.