Loading...
31-10 ResolutionRECORD OF RESOLUTIONS Blank, Int., Fon No. 30045 Resolution No. 31 -10 Passed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE DUBLIN COMMUNITY RECREATION CENTER FAMILY CHANGING ROOMS/MAIN RESTROOMS RENOVATION AND LOCKER REPLACEMENT PROJECT, AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT FOR SAID SERVICES. WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Dublin Charter; and WHEREAS, Council has determined that the bid submitted by Elford, Inc. in the amount of $241,458 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, -1/— of the elected members concurring that: Section 1 . The bid submitted by Elford, Inc. of $241,458 is hereby accepted. Section 2 . The City Manager is hereby authorized to enter into a contract with Elford, Inc. for said project as specified within the bid proposal and the City's bid documents. Section 3 . This Resolution shall take effect and be in force upon on the earliest date permitted by law. Passed this 1 ,5�E day of ' 2010 Mayor – Pre§idr ig Officer Attest: Clerk of Council I hereby certify that copies of this Ordinance/ Resolution were posted in the City of Dublin in accordance with Section 4.12(a) of the Revised Charter of the City of Dublin. puty Clerk of Council, Dublin, Ohio CrrY OF DUBLIN- Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 -1090 Phone: 614 - 410 -4400 • Fax: 614 - 410 -4490 Memo To: Members of Dublin City Counci From: Terry Foegler, City Manager Date: June 25, 2010 Initiated By: Michelle L. Crandall, Director of Administrative Services Brian K. Ashford, Facilities Manager Re: Resolution 31 -10 —Accepting the Lowest and Best Bid for Dublin Community Recreation Center Family Changing Rooms/Main Restrooms Renovation and Locker Replacement Project Summary On June 8, 2010 bids were opened for the next phase of renovations to update the Dublin Community Recreation Center. The full scope of the project is as follows: 1) Identical floor tile to the main locker rooms (renovated last year) and new wall tile will be installed in the four family changing rooms. New sink counters, plumbing fixtures, ceiling tile and fresh paint will provided for the family changing rooms. 2) New lockers will be installed in the men's and women's locker rooms. The lockers will be ADA- compliant and feature an improved locking mechanism, which will be easier to operate and maintain. 3) The white floor tile in the walkway between the men's and women's locker rooms will be replaced with an anti - microbial carpet designed for use in wet areas. This carpet will improve safety, reduce noise and remove more dirt from shoes and strollers prior to entering the pool decks. The doors leading to both pools will also be replaced. 4) Larger, more decorative ceramic tile will be installed in the main restrooms across from the Tallas. The colors will complement the floor tile in the main hallway. New counters, hand -free faucets and soap dispensers, new mirrors and fresh paint will also be provided for the main restrooms. This project will be initiated in mid- August. During the renovations, at least two of the family changing rooms will be open to the public. The locker replacement and most, if not all of the main restroom renovations will occur during shutdown. The goal will be to minimize disruptions to Recreation Center programming and inconvenience to patrons. Off -hours work will be encouraged as much as practicable. Memo re. Res. 3 1 -10 — DCRC Renovations June 25, 20 10 Page 2 of 2 The total amount budgeted for this project is $250,000. Three bids were received, however the low bidder was deemed to be non - responsive due to failure to follow bid requirements regarding the performance bond and locker replacement specifications. Thus, the lowest and best bid for the base bid and four alternates is determined to be Elford, Inc. with a total bid of $241,458. An analysis of their bid and references indicates that the company possesses the skill and experience to successfully perform the work required for the project. The total cost of the project, including architectural and engineering fees is $259,000. Recommendation Staff recommends adoption of Resolution 31 -10 accepting Elford Inc.'s total bid of $241,458. City of Dublin Bid Tabulation for DCRC Men's and Women's Locker Room Renovation Bid Opening June 8, 2010 Base Bid Alternate Alternate Alternate Alternate Total Bid 1 2 3 4 Elford, Inc. $129,458 $99,100 $4,140 $4,600 $4,160 $241,458. Armcorp $143,300 $93,500 $11,300 $12,200 $4,700 $265,000. Construction, Inc. Concept $115,088 $75,816 $6,980 $10,866 $4,585 $213,335. Buildings