23-10 ResolutionRECORD OF RESOLUTIONS Form No X045 23 -10 Resolution No. Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE BELVEDERE PARK DEVELOPMENT PROJECT, AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT FOR SAID SERVICES WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Dublin Charter for the Belvedere Park Development Project; and WHEREAS, Council has determined that the base bid submitted by Builderscape, Inc. in the amount of $126,314.00 constitutes the lowest and best bid; and WHEREAS, this is an approved 2010 Capital Improvements Project. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, 4-1— of the elected members concurring, that: 20 Section 1 . The base bid submitted by Builderscape, Inc. in the amount of $126,314.00 is hereby accepted. Section 2 . The City Manager is hereby authorized to enter into a contract with Builderscape, Inc. for said project as specified within the bid proposal and the City's bid documents on file in the Division of Parks & Open Space. Section 3 . This Resolution shall take effect upon adoption in accordance with Section 4.04(a) of the Revised Charter. Passed this 2 day of ,zt4.4W&1, 2010 Mayor – Pre§ing Officer Attest: � / 6V[� Clerk of Council CITY OF DUBLIN- Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 -1090 Phone: 614- 410 -4400• Fax: 614-410-4490 To: Members of Dublin City Council From: Terry Foegler, City Manager I� Date: March 18, 2010 Initiated By: Fred Hahn, Director of Parks & Open Space Re: Resolution 23 -10, Belvedere Park Development Project Memo Background On Friday, March 5, 2010 bids were opened for the Belvedere Park Development Project. The funds for this project are included in the CIP budget in the amount of $150,000. The base bid estimate for this project was $167,308. Seven (7) bids were received. The City provided the shade structure and playground equipment at the cost of $43,142.00. This amount is in addition to the bid portion of this project. This project consists of all materials and labor necessary for the construction of a playground, bike path, seating, shade structure and associated landscaping. Complete construction details are available for review in the Council Planning room. A public input forum was held on December 3, 2009 in which the park design was reviewed and changes made and endorsed by the local residents. In addition, the park design was posted on the City's website for additional comments and suggestions. This project was reviewed and approved by the Dublin Planning & Zoning Commission on January 21, 2010. Recommendation Staff recommends adoption of Resolution 23 -10 accepting the Builderscape Inc. base bid of $126,314.00. Builderscape has completed previous work for the City, and staff has found its work to be most satisfactory. Staff is not recommending Bid Alternate #1 (deduct for park benches in lieu of seating wall) or Bid Alternate 92 (deduct for playground mulch surface in lieu of poured in place playground surfacing). Staff is confident that the approximate $20,000 budget overage will be made up on other park development projects this year. Base Bid Alternate #1 Alternate 92 Mid -West Landscape Inc. $156,010.00 ($8,800.00) ($59,000.00) Central Ohio Building $163,900.00 ($9,100.00) ($66,100.00) Columbus Asphalt Paving $174,900.00 ($10,000.00) ($60,000.00) Builderscape Inc. $126,314.00 ($4,900.00) ($53,500.00) Brookside Construction $181,400.00 ($7,000.00) ($60,000.00) Stone Creek Landscape Co. $146,368.00 ($13,440.00) ($75,250.00) Janco LLC $160,000.00 ($3,200.00) $59,000.00 The City provided the shade structure and playground equipment at the cost of $43,142.00. This amount is in addition to the bid portion of this project. This project consists of all materials and labor necessary for the construction of a playground, bike path, seating, shade structure and associated landscaping. Complete construction details are available for review in the Council Planning room. A public input forum was held on December 3, 2009 in which the park design was reviewed and changes made and endorsed by the local residents. In addition, the park design was posted on the City's website for additional comments and suggestions. This project was reviewed and approved by the Dublin Planning & Zoning Commission on January 21, 2010. Recommendation Staff recommends adoption of Resolution 23 -10 accepting the Builderscape Inc. base bid of $126,314.00. Builderscape has completed previous work for the City, and staff has found its work to be most satisfactory. Staff is not recommending Bid Alternate #1 (deduct for park benches in lieu of seating wall) or Bid Alternate 92 (deduct for playground mulch surface in lieu of poured in place playground surfacing). Staff is confident that the approximate $20,000 budget overage will be made up on other park development projects this year. I "..... 3 ° v Gee '" ' Feet o c �� , Rosser OG�O m �v �� E G 1 [1 CITY OF DUBLIN 0 500 1,000 a 6 ELVEDER D c w C r 5 O z CNP p cc Z 3 .�Il� lllll?11 -c.I1 ll I=ul "i o�� � Gi 1 v ` Lu m . HANOVER Lu t7 = ciR 7 MA GKEN I OF O cc JACOBSEN C LOMBARD Z GT Proposed Development W o ST m a a 9� O F Leh'edere a La - x � N G GREENSWAY � OO M - 0 W oft lop LOOP ti' �Z CT .- ` -eRA/V a DRURYRD Z 03 p ORl� k `� a M CASTLEFORBES F t OF w Z CT 0 RK BLVD __ _, _ _ - - = - -1 CO U G A�WA YAV I Q C7 CAMDE RO► yRD RA N 1 Ii6 L - CT t 4 srE � \R� oSE n ,I - 114Li 1 L l =; i°l c� �� o� y gEARCLOVER r 6� G i CT O DR O O — m 4 = Z MYRTLES TONE -;, i m ST r 10 ��'� NIRE O� �A easy { G s Lu v 3 MONPGHPQ l =� 1 -i. T AVOC G v � < <YMORe 1 D Z c RiUQL I 0 ? V:gs UGG'I 7. 04 AC ANA DR WIL=il Pail" n 2 u Z Qr gURNSIDE LN ����i SOR�R � P� i GCIR � C CT QO N0 JEROME I� TWP - Q z w w (D w w 0 0 < 4 JACOBSEN ST LLJ LLJ 0 m It 9. I I I Z W N W N L.1. C� N W N L.1. O C O G J Q DRURY ROAD W W LJ ' W VJ O N 2 N Of C W C L G VJ STORM WATER POLLUTION PREVENTION NOTES 7. THE CONTRACTOR SHALL CONFORM TO ALL CITY OF DUBLI STANDARDS FOR EROSION CONTROL PRACTICES. S. ALL CLEANING AND GRADING OPERATIONS SHALL BE CONFINED TO THE LIMITS SHOWN ON THE PLAN. 9. SEDIMENTATION BASINS AND ALL PERIMETER SILT FENCING (SF) SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF GRADING OPERATIONS AND SHALL REMAIN IN PLACE UNTIL CONSTRUCTION ACTIVITIES ARE COMPLETE AND UPSTREAM AREAS HAVE BEEN STABILIZED. 10. INTERIOR SILT FENCING AND DANDY BAG INLET FILTERS SHALL BE INSTALLED WITHIN 7 DAYS AFTER FINISHED GRADE IS REACHED AND SHALL REMAIN IN PLACE UNTIL CONSTRUCTION ACTIVITIES ARE COMPLETED AND UPSTREAM AREAS HAVE BEEN STABILIZED. 11. TEMPORARY SEEDING SHALL BE PROVIDED FOR ALL EXPOSED SURFACES AND SOIL STOCKPILES WHERE PERMANENT SEEDING ORADDITIONAL WORK IS NOT SCHEDULED FOR A PERIOD OF FORTY -FIVE (45) DAYS. SEEDING SHALL BE PROVIDED WITHIN SEVEN (7) DAYS AFTER CONSTRUCTION OPERATIONS CEASE. 12. PERMANENT SEEDING SHALL BE PROVIDED FOR ALL EXPOSED SOIL SURFACES WITHIN SEVEN (7) DAYS AFTER THE FINISH GRADE IS REACHED. 13. AREAS WHERE TEMPORARY OR PERMANENT SEEDING HAS FAILED TO GERMINATE SHALL BE RESEEDED AND MULCHED AS NECESSARY TO ACHIEVE STABILIZATION. 14. THE CONTRACTOR SHALL INSPECT EROSION AND SEDIMENT CONTROL INSTALLATIONS EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENTS EXCEEDING 0.5 INCHES OF RAINFALL PER 24 -HOUR PERIOD. CONTRACTOR SHALL MAKE NECESSARY REPAIRS IMMEDIATELY AND CLEAN TRAPPED SEDIMENT AND DEBRIS. 15. ALL TEMPORARY EROSION AND SEDIMENT CONTROL INSTALLATIONS SHALL BE REMOVED WITHIN 30 DAYS AFTER SITE STABILIZATION IS ACHIEVED. 16. ANY TRAPPED SEDIMENT OR DEBRIS REMOVAL OF INSTALLATIONS SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION. CODED NOTES O NEW PAVEMENT TO MEET FLUSH AND ITS EDGES TO ALIGN WITH THE EXISTING GENERAL NOTES DIVISION OF 1. QUANTITIES SHOWN ARE INTENDED TO ASSIST CONTRACTORS IN EVALUATING THEIR OWN TAKEOFFS AND ARE NOT GUARANTEED AS ACCURATE PARKS AND OPEN SPACE REPRESENTATIONS OF REQUIRED MATERIALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IS BID QUANTITIES AS REQUIRED BY THE PLAN AND 6555 SHIER -RINGS ROAD SPECIFICATIONS. CITA of DL 1111) DUBLIN, OHIO 43016 2. ALL DIMENSIONS USING CURBS, BUILDING WALLS OR PAVEMENT AS A REFERENCE ARE FROM FACE OF CURB, FINISHED FACE OF BUILDING, FINISHED FACE OF PH (614 410 -4700 - 4700 WALL, OR EDGE OF PAVEMENT, WHEN NO CURBING EXISTS, UNLESS OTHERWISE NOTED. FAX (61�) 761 -6512 3. ALL LAYOUT TO BE BY A REGISTERED SURVEYOR OR ENGINEER. THE DIRECTOR OF GROUNDS AND FACILITIES WILL REVIEW THE LAYOUT FOR GENERAL ® TRASH RECEPTACLE PROVIDED BY THE CITY OF DUBLIN. INSTALLED PER CONFORMANCE PRIOR TO CONSTRUCTION. ® BIKE RACK PROVIDED BY THE CITY OF DUBLIN. INSTALLED PER MANUFACTURER'S INSTRUCTIONS. 4. EACH CONTRACTOR SHALL NOTIFY THE PARKS AND OPEN SPACE DIRECTOR IF A DISCREPANCY IS FOUND BETWEEN THE DIMENSION GIVEN AND ACTUAL "" 2 WORKING DAY , °� BEFORE YOU DIG DIMENSIONS IN THE FIELD. CALL TOLL FREE 800362 -2764 OHIO UTILITIES PROTECTION SERVICE 5. EACH CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING ALL EXISTING UTILITIES. B. CONTRACTOR SHALL PROVIDE TEMPORARY BARRIERS AT LIMITS OF CONSTRUCTION TO ASSURE PUBLIC SAFETY DURING CONSTRUCTION. 7. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING DANDY BAG INLET PROTECTION FOR ALL DRAIN INLETS WITHIN THE LIMITS OF CONSTRUCTION. 8. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE ACROSS ALL FINISH GRADED SURFACES. 9. ALL AREAS DISTRIBUTED BY CONSTRUCTION ARE TO BE RESTORED, FINE GRADED AND SEEDED. SEE SPECIFICATIONS. 10. ALL EXISTING PLANT MATERIAL SHOWN ON THIS PLAN IS TO BE PRESERVED UNLESS SPECIFICALLY NOTED OTHERWISE. 11. THE CONTRACTOR SHALL NOT REMOVE ANY TREES ABOVE 6' IN CALIPER NOT DESIGNATED ON PLANS AS BEING REMOVED. PRIOR TO THE REMOVAL OF ANY TREES OVER SIX (6) INCHES IN CALIPER, A TREE REMOVAL PERMIT MUST BE ISSUED BY THE CITY OF DUBLIN. 12. FINE GRADE LAWN AREAS TO PROVIDE A SMOOTH AND CONTINUAL GRADE, FREE OF IRREGULARITIES OR DEPRESSIONS. GRADING NOTES 1. SITE INFORMATION IS BASED 2007 CITY OF DUBLIN AERIAL PHOTOGRAPHY. 2. COMPACT ALL SUBGRADE AS REQREQUIRED TO PROVIDE FULL STRENGTH BEARING WITHOUT SETTLEMENT FORALL FEATURES INTENDED AND DESIGNED. ALL COMPACTION SHALL CONFORM TO O.D.O.T.'S ITEM 203. 3. TREES DESIGNATED TO REMAIN MUST NOT HAVE ANY DISTURBANCE WITHIN THEIR DRIPLINES. MATERIALS AND EQUIPMENT WILL NOT BE PLACEDISTORED NEAR EXISTING TREES. ANY TREES DESIGNATED TO REMAIN THAT ARE DISTURBED OR DESTROYED SHALL BE REPLACED WITH NEW TREES EQUAL IN SUM TO TOTAL TRUNK CALIPER. JACOBSEN STREET 4. FINE GRADE SEEDED AREAS AND REMOVE STONES OVER 1 "AND ALL RIDGES, DEPRESSIONS, AND UNEVEN AREAS. SEED BETWEEN AUGUST 15 AND OCTOBER 15 OR FROM APRIL 1 TO JUNE 1. 5. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL UNDERGROUND UTILITIES. CALL OHIO UTILITIES PROTECTION SERVICE AT 1 -800- 362 -2764 PRIOR TO ANY WORK. B. EROSION PROTECTION WILL BE REQUIRED BY CONTRACTOR. FOLLOW ALL APPLICABLE REQUIREMENTS TO ENSURE CONTROL OF EROSION DURING GRADING -� OPERATIONS. Z W N W N L.1. C� N W N L.1. O C O G J Q DRURY ROAD W W LJ ' W VJ O N 2 N Of C W C L G VJ STORM WATER POLLUTION PREVENTION NOTES 7. THE CONTRACTOR SHALL CONFORM TO ALL CITY OF DUBLI STANDARDS FOR EROSION CONTROL PRACTICES. S. ALL CLEANING AND GRADING OPERATIONS SHALL BE CONFINED TO THE LIMITS SHOWN ON THE PLAN. 9. SEDIMENTATION BASINS AND ALL PERIMETER SILT FENCING (SF) SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF GRADING OPERATIONS AND SHALL REMAIN IN PLACE UNTIL CONSTRUCTION ACTIVITIES ARE COMPLETE AND UPSTREAM AREAS HAVE BEEN STABILIZED. 10. INTERIOR SILT FENCING AND DANDY BAG INLET FILTERS SHALL BE INSTALLED WITHIN 7 DAYS AFTER FINISHED GRADE IS REACHED AND SHALL REMAIN IN PLACE UNTIL CONSTRUCTION ACTIVITIES ARE COMPLETED AND UPSTREAM AREAS HAVE BEEN STABILIZED. 11. TEMPORARY SEEDING SHALL BE PROVIDED FOR ALL EXPOSED SURFACES AND SOIL STOCKPILES WHERE PERMANENT SEEDING ORADDITIONAL WORK IS NOT SCHEDULED FOR A PERIOD OF FORTY -FIVE (45) DAYS. SEEDING SHALL BE PROVIDED WITHIN SEVEN (7) DAYS AFTER CONSTRUCTION OPERATIONS CEASE. 12. PERMANENT SEEDING SHALL BE PROVIDED FOR ALL EXPOSED SOIL SURFACES WITHIN SEVEN (7) DAYS AFTER THE FINISH GRADE IS REACHED. 13. AREAS WHERE TEMPORARY OR PERMANENT SEEDING HAS FAILED TO GERMINATE SHALL BE RESEEDED AND MULCHED AS NECESSARY TO ACHIEVE STABILIZATION. 14. THE CONTRACTOR SHALL INSPECT EROSION AND SEDIMENT CONTROL INSTALLATIONS EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENTS EXCEEDING 0.5 INCHES OF RAINFALL PER 24 -HOUR PERIOD. CONTRACTOR SHALL MAKE NECESSARY REPAIRS IMMEDIATELY AND CLEAN TRAPPED SEDIMENT AND DEBRIS. 15. ALL TEMPORARY EROSION AND SEDIMENT CONTROL INSTALLATIONS SHALL BE REMOVED WITHIN 30 DAYS AFTER SITE STABILIZATION IS ACHIEVED. 16. ANY TRAPPED SEDIMENT OR DEBRIS REMOVAL OF INSTALLATIONS SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION. CODED NOTES O NEW PAVEMENT TO MEET FLUSH AND ITS EDGES TO ALIGN WITH THE EXISTING PAVEMENT. O BIKE PATH. SEE DETAIL 1. © CONCRETE PAVEMENT. SEE DETAIL 2. CONCRETE CURB. SEE DETAIL 3. 50 BASE BID: SEATING WALL. TOTAL OF 3, 12' EACH. SEE DETAIL 4. ALT. #1: IN LIEU OF SEATING WALL, POUR THREE (3) 4%14'X6" CONCRETE PADS, SEE DETAIL 2, AND MOUNT TWO (2) OWNER PROVIDED BENCHES PER PAD. t PLAYGROUND EQUIPMENT PROVIDED BY THE CITY OF DUBLIN. INSTALLED PER MANUFACTURER'S INSTRUCTIONS. SEE DETAIL 5. EXISTING STRUCTURE TO REMAIN. TIMBERS AND MULCH TO BE REMOVED AND DISPOSED OF LEGALLY. T UNDER DRAIN. DAYLIGHT ON SLOPE. SEE DETAIL B. ® SHADE STRUCTURE AND PICNIC TABLE PROVIDED BY THE CITY OF DUBLIN. INSTALLED PER MANUFACTURER'S INSTRUCTIONS. ® TRASH RECEPTACLE PROVIDED BY THE CITY OF DUBLIN. INSTALLED PER MANUFACTURER'S INSTRUCTIONS. ® BIKE RACK PROVIDED BY THE CITY OF DUBLIN. INSTALLED PER MANUFACTURER'S INSTRUCTIONS. © PLAYGROUND SAFETY SURFACE. SEE DETAIL 7. "" 2 WORKING DAY , °� BEFORE YOU DIG CALL TOLL FREE 800362 -2764 OHIO UTILITIES PROTECTION SERVICE BELVEDERE Park Development Project Scale' 7 IN 40' NORTH 7% aL 1 8 - DRAWN BY- I DATE- Laura Perrin Karagory, ASLA I Ohio RLA- #1046 February 2010 SITE PLAN L -2 P.WgaiRPobl&IreNe La n1.N,y - &9qm