Loading...
Resolution 89-23RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 Resolution No.89-23 Passed. " ACCEPTING THE LOWEST AND BEST BID FOR THE BRANDONWAY DRIVE BRIDGE REPLACEMENT PROJECT (22-033-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Brandonway Drive Bridge Replacement Project, 22- 033-CIP; and WHEREAS, Council has determined that the bid submitted by George J. Igel & Co., Inc. on November 16, 2023 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, Delaware, Franklin and Union Counties, State of Ohio, (, _ of the elected members concurring, that: Section 1. The bid submitted by George J. Igel & Co., Inc. in the total amount of $1,608,376.74 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with George J. Igel & Co., Inc. for the performance and completion of the Brandonway Drive Bridge Replacement Project, 22-033-CIP pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 11‘ day of December, 2023. Hace cd Mayor - Presi ing Offi cet / Af Up.s God of Cou nc ATTEST: To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: December 5, 2023 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Deputy Director of Engineering – Design & Construction Kenneth B. Richardson, P.E., P.S., Senior Civil Engineer Re: Resolution 89-23 – Accepting the Lowest and Best Bid for the Brandonway Drive Bridge Replacement Project (22-033-CIP) Summary On November 16, 2023, six (6) bids were received and publicly opened for the Brandonway Drive Bridge Replacement Project (Project). The scope of work for this Project was developed as part of the Annual Vehicular Bridge maintenance within the 2023-2027 Capital Improvements Program (CIP) with design in 2022, construction funded in 2023, and construction occurring in 2024 and provided for the replacement of the entire existing bridge with a new bridge and substructure. The new bridge will be similar in appearance and size to the existing bridge, while slightly wider to allow pedestrian facilities on both sides of Brandonway Drive connecting with existing pedestrian extensions adjacent to the structure. Please see the Location Map included for the general work location. For Council’s reference, a copy of the construction drawings for this Project have been provided electronically or a print version can be provided to Council upon request. The 2023-2027 CIP included $1,025,000 for the Annual Vehicular Bridge Maintenance (BC23M04). Ordinance 36-23 (adopted by City Council on September 25, 2023) provided $600,000 in additional funds for the construction of the Brandonway Drive Bridge Replacement. The engineer’s estimate for the Project is $1,800,000. George J. Igel & Co., Inc. submitted the lowest and best bid of $1,608,376.74. Staff has reviewed the bid and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate George J. Igel & Co., Inc. $1,608,376.74 -10.7% N/A Shelly & Sands, Inc. $1,835,651.69 +2.0% N/A Miller Bros. Const., Inc. $1,849,487.90 +2.8% N/A Complete General Construction $1,912,006.71 +6.2% N/A Double Z Construction Company $1,943,419.24 +8.0% N/A Sunesis Construction Co $1,990,001.45 +10.6% N/A Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo Resolution 89-23 – Accepting the Lowest and Best Bid for the Brandonway Drive Bridge Replacement Project (22-033-CIP) December 5, 2023 Page 2 of 3 The project is expected to commence in July 2024 and the completion date is October 31, 2024. Brandonway Drive will be closed to traffic between Brand Road and Wellston Court/Aldridge Place for four months beginning July 1, 2024. Detours will be posted as described in the plans. The typical and customary communication methods will be used to convey construction information to residents and motorists throughout the duration of the work for this Project. Recommendation Staff has thoroughly reviewed the bid submitted by George J. Igel & Co., Inc. Previous experience with George J. Igel & Co., Inc. has been favorable, including these recent projects: Sanitary Sewer Extension Area 1C (2021); SR 161 / Cosgray Road Roundabout Project (2021). Staff recommends Council approve Resolution 89-23 accepting as lowest and best the bid of George J. Igel & Co., Inc. in the amount of $1,608,376.74 and authorizing the City Manager to enter into a contract with George J. Igel & Co., Inc. for this Project. Resolution 89-23 – Accepting the Lowest and Best Bid for the Brandonway Drive Bridge Replacement Project (22-033-CIP) December 5, 2023 Page 3 of 3 Project Location Map Brandonway Drive Bridge