Loading...
Resolution 56-23RECORD OF RESOLUTIONS GOVERNMENT FORMS & SUPPLIES 844-224-3338 FORM NO 30045 56-23 Resolution No. Passed 20: ACCEPTING THE LOWEST AND BEST BID FOR THE HYLAND-CROY ROAD IMPROVEMENTS PROJECT (22-029-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Hyland-Croy Road Improvements, 22-029-CIP; and WHEREAS, Council has determined that the bid submitted by Complete General Construction Company on July 12, 2023 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, Delaware, Franklin and Union Counties, State of Ohio, ]__ of the elected members concurring, that: Section 1. The bid submitted by Complete General Construction Company in the total amount of $3,511,541.25 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Complete General Construction Company for the performance and completion of the Hyland-Croy Road Improvements Project, 22-029-CIP pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this 31% day of July, 2023. Pn RL Mayor - Pyegiding Officer To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: July 25, 2023 Initiated By: Robert E. Ranc, Jr., Deputy City Manager Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Deputy Director of Engineering – Design & Construction Chris Huber, P.E., Civil Engineer II Re: Resolution 56-23 - Accepting the Lowest and Best Bid for Hyland-Croy Road Improvements Project, 22-029-CIP Summary On July 12, 2023, two (2) bids were received and publicly opened for the Hyland-Croy Road Improvements Project (Project). The Project includes widening Hyland-Croy Road to a three lane roadway, installing turn lanes where Hyland-Croy Road intersects Springview Lane, Moorland Drive, Holbein Drive and Park Mill Drive and installing a new traffic signal at Moorland Drive. Other improvements included in the Project include timber guardrail, stormwater drainage improvements, lighting at intersections and a shared-use path along the east side of Hyland-Croy Road between Post Road and Park Mill Drive. These improvements to Hyland-Croy Road were identified in the Hyland Glen Subdivision Traffic Impact Study (TIS). Please see the attached Location Map for the general work locations. The intersection improvements, as depicted on the Location Map, include: • Northbound right turn lane at the restricted right-in/right-out at the Springview Lane intersection. • Traffic signal and turn lanes at the Moorland Drive main entrance. • Turn lanes at the Holbein Drive intersection. • Addition of turn lanes at Park Mill Drive. For Council’s reference, a copy of the construction documents for this Project have been provided electronically or a print version can be provided to Council upon request. The City of Dublin (City) entered a Cooperative Construction Agreement (Agreement) with Union County to perform the Project. Under the Agreement, the City agreed to a fixed contribution in the amount of $1,000,100 toward the roadway construction and Union County is responsible for any construction costs in excess of this amount (currently estimated at $2,394,649.25). Union County’s final contribution will be based on actual costs determined at the end of construction. In addition, the City agreed to fund the construction of the shared-use path and the upgrade cost for timber steel- backed guardrail, resulting in a cumulative $116,792 in additional construction costs to the City. The City will manage all project costs, provide inspection during construction and process monthly pay requests. Additionally, Union County must approve of the recommended lowest and best bid per the agreement. The 2023-2027 Capital Improvements Program (CIP) included $1,530,000.00 for the Hyland-Croy Road Corridor Improvements – Post Road to Park Mill Drive (ST23C06), with the remainder of the construction funds provided by Union County as described above. The engineer’s estimate for the Project is $3,250,000.00. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614-410-4400 • Fax: 614-410-4490 Memo Resolution 56-23– Accepting the Lowest and Best Bid for the Hyland-Croy Road Improvements Project, 22-029-CIP July 25, 2023 Page 2 of 2 Complete General Construction Company submitted the lowest and best bid of $3,511,541.25. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid %Over (+) or Under (-) Engineer’s Estimate Complete General Construction Company $3,511,541.25 +8.05 % N/A Double Z Construction Company $3,654,267.67 +12.44 % N/A The two bids received are higher than the engineer’s estimate in accordance with percentages shown above. Upon analysis of the bids, staff believes the engineer’s estimate did not accurately reflect the true cost to perform some items, in particular the excavation (trucking) and drainage items. However, the vast majority of bid items were relatively close to the engineer’s estimate. Union County has reviewed and approved acceptance of the lowest and best bid. The Project is expected to commence in August 2023 and the projected completion date is October 2024. There is multi-phase maintenance of traffic (MOT) planned for this Project. One phase of the MOT will include a closure of southbound traffic on Hyland-Croy Road for an anticipated 70-day period. All other MOT phases will have traffic maintained in both directions. With the exception of the closure, all traffic lanes are planned to be fully open from 7AM to 9 AM and 4PM to 6PM Monday through Friday and when the contractor is not actively working on site. The typical and customary communication methods will be used to convey construction information to the Dublin City Schools, the Ohio Department of Transportation (ODOT), adjacent developments and impacted property owners throughout the duration of the Project. The City will have a designated engineering project inspector assigned to the Project who will provide coordination, be available to answer any questions and manage access needs at adjacent residences throughout the performance of the work. The Project is anticipated to be substantially complete prior to any residents occupying homes within the Hyland Glen Subdivision based on recent discussions with the developer. Recommendation Staff has thoroughly reviewed the bid submitted by Complete General Construction Company. Previous experience with Complete General Construction Company has been favorable including their work on the Muirfield Drive at Brand Road Bridge Replacement Project (20-011-CIP), 2020 Pedestrian Tunnel Maintenance Project (20-005-CIP), and Franklin Street Extension Project (21-012-CIP). Additionally, Complete General Construction Company is performing the construction of the new US- 33/Post Road Interchange near the Project. Staff expects that having a single contractor working on both projects will contribute positively to communication and coordination in the area. Staff recommends Council approve Resolution 56-23 accepting as lowest and best the bid of Complete General Construction Company in the amount of $3,511,541.25 and authorizing the City Manager to enter into a contract with Complete General Construction Company for this Project. }}}}}}}}}HORIZONTALSCALE IN FEETCALCULATEDCHECKEDQ:\Transportation\Projects\Local\City of Dublin\Design\Roadway\Basemaps\CR002_BP001_exhibit.dgn Design 7/17/2023 1:33:58 PM ekisiel0 00XXX XXX N HYLAND-CROY RD. IMPROVEMENTS 75150300