Resolution 25-22 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: May 17, 2022 Initiated By: Matthew C. Earman, Acting Deputy City Manager/Chief Operating Officer Paul A. Hammersmith, PE, Director of Engineering/City Engineer Brian D. Gable, PE, Deputy Director of Engineering – Design & Construction Re: Resolutions 25-22 and 26-22 – Accepting the Lowest and Best Bid for the Annual Street Maintenance Program FY2022 – Phase 1 (22-001-CIP) and Phase 2 (22-002-CIP) Summary On April 20, 2022, four (4) bids were received and publicly opened for the Street Maintenance Program FY2022 – Phase 2 (22-002-CIP). Additionally, on May 4, 2022, four (4) bids were received and publicly opened by Engineering staff for the Street Maintenance Program FY2022 – Phase 1 (22-001-CIP). Both projects in this Program consists of replacing deteriorated concrete curb and gutter, street base stabilization, milling of deteriorated pavement surfaces, placement of new asphalt pavement and other associated street maintenance work. This will maintain the average Pavement Condition Index (PCI) of our roadway network at 77 with an overall goal of 75, which is a “good” condition. Please see the included map for the general work locations. For Council’s reference, a copy of the construction drawings for these phases of the Program have been provided electronically or a print version can be provided to Council upon request. The Engineer’s estimates for Phase 1 and Phase 2 of the 2022 Program are $3,445,000 and $3,100,000, respectively, for a total estimated cost of $6,545,000 for both phases. The 2022 budgeted funds in the 2022-2026 Capital Improvements Program (CIP) for the Annual Street Maintenance Program (AT221) are $6,200,000. Strawser Paving Company, Inc. submitted the lowest and best bid of $2,762,277.00 for the Street Maintenance Program – Phase 1, which includes the bid Alternate 1 (Avery Road and Glick Road). Staff has reviewed all bids and a summary of the bids received is listed below (Base bid plus Alternate 1). Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Strawser Paving Company, Inc. $2,762,277.00 -19.82% N/A Decker Construction Company $2,944,652,.64 -14.52% N/A Kokosing Construction Company, Inc. $2,979,523.42 -13.51% N/A Shelly & Sands, Inc. $4,104,821.60 +19.15% N/A Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo Resolutions 25-22 and 26-22 – Accepting the Lowest and Best Bid for the Annual Street Maintenance Program FY2022 – Phase 1 (22-001-CIP) and Phase 2 (22-002-CIP) May 17, 2022 Page 2 of 4 Kokosing Construction Company Inc. submitted the lowest and best bid of $3,436,896.26 for the Street Maintenance Program – Phase 2 which includes bid Alternate 2 (Perimeter Drive). Bid Alternate 1 (Hospital Drive) was not selected as part of the bid and will be included in the 2023 Street Maintenance Program. Staff has reviewed all bids and a summary of the bids received is listed below (Base bid plus Alternate 2). The resulting total cost as bid with selected alternates for both phases of the Program is $6,199,173.26. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Kokosing Construction Company, Inc. $3,436,896.26 +10.87% N/A Strawser Paving Company, Inc. $3,441,464.77 +11.01% N/A Decker Construction Company $3,488,867.27 +12.54% N/A Shelly & Sands, Inc. $4,036,768.85 +30.22% N/A The work for both phases of the Program is expected to commence in June 2022 and the completion date for Phase 1 and Phase 2 is October 15, 2022 and October 1, 2022, respectively. Streets included for the Street Maintenance Program FY2022 – Phase 1 Phase 1 of the 2022 Program includes resurfacing on City streets as depicted on the included Location Map. The streets to be improved are as follows: Glacier Ridge Boulevard, Tartan Ridge Boulevard, Alder Glen Court, Burnett Lane, Tartan Ridge Court, Enfield Trace, Nicholson Way, Enfield Court, Dumfries Court West, Dumfries Court East, Loch More Court West, Cruden Bay Court, Nairn Court, St. Fillans Court West, St. Fillans Court East, Gairloch Court, Loch Maree Court, Kilbirnie Court, Arbory Hill Court, Beeswing Court, Lananrk Court, Hawthornden Court, Gilmerton Court, Glen Tanar Court, Tibbermore Court, Memorial Drive, Fawnbrook Lane, Forest Knoll Drive, Forest Knoll Court, Bristol Parkway, Baythorn Court, Aldridge Place, Tenbury Drive, Worsley Place, Brandonway Court, Reddington Drive, Reddington Court, Brandbury Place, Avery Road and Glick Road. Streets included for the Street Maintenance Program FY20222 – Phase 2 Phase 2 of the 2022 Program includes resurfacing on City streets as depicted on the included Location Map. The streets to be improved are as follows: Caplestone Lane, Brigids Close Drive, Curragh Court, Avery-Muirfield Drive, Post Road, Blazer Parkway, Olde Dublin Woods Drive, Red Oak Lane, Betonywood Place, North Riverview Street, Dublin Park Drive, Ligget Road, Perimeter Loop Road, Wilcox Road and Perimeter Drive. Maintenance of Traffic All work will be performed while maintaining traffic, where possible, with efforts being taken to minimize interruptions to motorists, provide access for emergency services, and maintain access to driveways and adjacent streets as much as possible, while consistently providing a safe work area for both motorists and workers. Resolutions 25-22 and 26-22 – Accepting the Lowest and Best Bid for the Annual Street Maintenance Program FY2022 – Phase 1 (22-001-CIP) and Phase 2 (22-002-CIP) May 17, 2022 Page 3 of 4 Communications with Residents and Motorists The following communication methods will be used to communicate construction information with the residents and motorists throughout the duration of this project.  Fliers are placed on mailboxes at each residence on affected streets. These are distributed by Dublin staff.  Residents whose driveways will be closed during construction will be given written notice at their front door at least 24 hours in advance of the closure. These notices are distributed by the contractor.  Temporary notification signs are placed along streets at least 24 hours in advance of upcoming construction work and anticipated construction dates.  When appropriate, portable message board signs are used for construction notification on arterial and collector streets.  The City of Dublin road improvement updates page provides current construction schedule information. This webpage is listed on the signs posted in advance of construction activities and in the flier placed on mailboxes. See: www.dublinohiousa.gov/construction.  Due to the short notification time period for driveway closures, Dublin Engineering staff makes adjustments to the construction schedule to accommodate resident needs on a case-by-case basis.  The City of Dublin social media channels are used to communicate timely construction updates. Recommendation Street Maintenance Program FY2022 – Phase 1 Staff has thoroughly reviewed the bid submitted by Strawser Paving Company, Inc. Previous experience with Strawser Paving Company, Inc. has been favorable, including these recent projects: 2021 Street Maintenance Program – Phases 1 and 2; 2020 Street Maintenance Program – Phase 1. Staff is confident Strawser Paving Company, Inc. will perform well on this Program. Staff recommends Council approval of Resolution 25-22 accepting as lowest and best the bid of Strawser Paving Company, Inc. in the amount of $2,762,277.00 and authorizing the City Manager to enter into a contract with Strawser Paving Company, Inc. for Phase 1 of the 2022 Program. Street Maintenance Program FY2022 – Phase 2 Staff has thoroughly reviewed the bid submitted by Kokosing Construction Company, Inc. Previous experience with Kokosing Construction Company, Inc. has been favorable, including these recent projects: 2020 Street Maintenance Program – Phase 2; 2019 Street Maintenance Program – Phase 1. Staff is confident Kokosing Construction Company, Inc. will perform well on this Program. Staff recommends Council approval of Resolution 26-22 accepting as lowest and best the bid of Kokosing Construction Company, Inc. in the amount of $3,436,896.26 and authorizing the City Manager to enter into a contract with Kokosing Construction Company, Inc. for Phase 2 of the 2022 Program. Resolutions 25-22 and 26-22 – Accepting the Lowest and Best Bid for the Annual Street Maintenance Program FY2022 – Phase 1 (22-001-CIP) and Phase 2 (22-002-CIP) May 17, 2022 Page 4 of 4 Location Map LOCATION MAP22-001-CIPSHEET INDEXTITLE SHEET1GENERAL NOTES2 - 9GENERAL SUMMARY 12 - 14PLAN SHEETS15 - 46CURB RAMP IMPROVEMENTS 47 - 51ENGINEERS SEAL:STANDARD CONSTRUCTION DRAWINGSMAP INDEXMAP NO. LOCATIONSHEET NO.2AVERY RD. - GLICK RD.3DUMFRIES CT. WEST - DUMFRIES CT. EASTST. FILLANS CT. WEST - ST. FILLANS CT. EAST - GAIRLOCH CT.6ARBORY HILL CT.7MEMORIAL DR.8FAWNBROOK LN. - FOREST KNOLL DR. - FOREST KNOLL CT.910111213144 LOCH MORE CT. WESTCITY OF DUBLIN CITY OF COLUMBUS ODOTSUPPLEMENTALSPECIFICATIONS®515 - 1920 - 2122 - 2324CRUDEN BAY CT.NAIRN CT.LOCH MAREE CT.KILBIRNIE CT.16181517BEESWING CT. - LANARK CT.HAWTHORNDEN CT. - GILMERTON CT.GLEN TANAR CT.TIBBERMORE CT.BRISTOL PKWY.BAYTHORN CT.19ALDRIDGE PL. - TENBURY DR. - WORSLEY PL. - WORSLEY CT. -BRANDONWAY CT. - REDDINGTON DR. - REDDINGTON CT. - BRANDBURY PL.42 - 46252627 - 282930313233343536 - 3738 - 394041INTERSECTION DETAILS52 - 53112456319181617157891011121314MD - 05PD - 02PD - 03PD - 04PD - 06PD - 08PD - 11RD - 01RD - 02RD - 03RD - 05RD - 07RD - 10RD - 11RD - 13AA-S124BP - 3.1MT-95.30MT-95.31MT-95.60MT-97.10MT-97.11MT-99.20MT-105.10TC-41.30TC-41.40TC-42.20TC-41.20DETOUR PLANS10 - 11AA-S125AMT-110.10AA-S119AA-S128AA-S149AA-S150AA-S151ENGINNNEERSEERS EEEREEEEREEEERSERSEAL04/13/2204/13/2 GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) GENERAL NOTES22-001-CIP (PHASE 1) 22-001-CIP (PHASE 1)TRUCK DETOUR PLAN 22-001-CIP (PHASE 1)TRUCK DETOUR PLAN GENERAL SUMMARY22-001-CIP (PHASE 1) GENERAL SUMMARY22-001-CIP (PHASE 1) GENERAL SUMMARY22-001-CIP (PHASE 1) 7148 E22-001-CIP (PHASE 1)ROADWAY IMPROVEMENTSGolden Rose WYGlacier Ridge BlvdTartan Ridge Blvd Glacier Ridge Blvd 22-001-CIP (PHASE 1)TARTAN RIDGE BLVD. - TARTAN RIDGE CT. - BURNETT LN.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)BURNETT LN. - ENFIELD TRCE. - NICHOLSON WAYROADWAY IMPROVEMENTSEnfield Trce Burnett LnBurnett Ln Nicholson Way 22-001-CIP (PHASE 1)ENFIELD TRCE. - ENFIELD CT. - NICHOLSON WAY.ROADWAY IMPROVEMENTSEnfield CtNicholson Way Endfield TrEnfield Ct 22-001-CIP (PHASE 1)ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)AVERY RD.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)AVERY RD. - GLICK RD.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)DUMFRIES CT. WESTROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)DUMFRIES CT. EASTROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)LOCH MORE CT. WESTROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)CRUDEN BAY CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)NAIRN CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)ST. FILLANS CT. WEST - ST. FILLANS CT. EAST -GAIRLOCK CT. ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)ST. FILLANS CT. WEST - ST. FILLANS CT. EAST -GAIRLOCK CT. ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)LOCH MAREE CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)KILBIRNIE CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)ARBORY HILL CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)BEESWING CT. - LANARK CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)HAWTHORNDEN CT. - GILMERTON CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)GLEN TANAR CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)TIBBERMORE CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)MEMORIAL DR.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)MEMORIAL DR.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)FAWNBROOK LN. - FOREST KNOLL DR. - FOREST KNOLL CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)FAWNBROOK LN. - FOREST KNOLL DR. - FOREST KNOLL CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)BRISTOL PKWY.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)BAYTHORN CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)ALDRIDGE PL. - TENBURY DR. - WORSLEY PL. - WORSLEY CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)BRANDONWAY CT. - TENBURY DR. - WORSLEY PL. -REDDINGTONDRREDDINGTON CT TENBURYDRWORSLEY PL REDDINGTON DR 22-001-CIP (PHASE 1)REDDINGTON CT.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)BRANDBURY PL.ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)ALDRIDGE PL. - TENBURY DR. - WORSLEY PL. - WORSLEY CT.REDDINGTON DR. ROADWAY IMPROVEMENTS 22-001-CIP (PHASE 1)CURB RAMP IMPROVEMENTSGLACIER RIDGE BLVD.GOLDEN ROSE WAYGLACIER RIDGE BLVD.TARTAN RIDGE BLVD.TARTAN RIDGE BLVD.ALDER GLEN CT.TARTAN RIDGE BLVD.TARTAN RIDGE CT. 22-001-CIP (PHASE 1)CURB RAMP IMPROVEMENTSEMMET ROW LN.BURNETT LN.TARTAN RIDGE BLVD.BURNETT LN.BURNETT LN.ENFIELD TRCE.REDDINGTON DR.REDDINGTON CT. 22-001-CIP (PHASE 1)CURB RAMP IMPROVEMENTSENFIELD TR.BURNETT LN.NICHOLSON WAYENFIELD CT.NICHOLSON WAYENFIELD CT. 22-001-CIP (PHASE 1)CURB RAMP IMPROVEMENTSFOREST KNOLL DR.FOREST KNOLL CT.LOCHMORE CT. WESTCARNOUSTIE DR.FOREST KNOLL DR.FAWNBROOK LN. 22-001-CIP (PHASE 1)CURB RAMP IMPROVEMENTSWELLSTON CT.WORSLEY PL.TENBURY DR.BAYTHORN CT.ALDRIDGE PL.TENBURY DR.WORSLEY PL.WORSLEY CT.REDDINGTON DR. 22-001-CIP (PHASE 1)INTERSECTION DETAILMEMORIAL DR.KILBIRNIE CT.∆∆ 22-001-CIP (PHASE 1)INTERSECTION DETAILMEMORIAL DR.VISTA RIDGE DR.∆