Loading...
Resolution 68-21 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: November 9, 2021 Initiated By: Robert E. Ranc, Jr., Deputy City Manager/Chief Operating Officer Paul A. Hammersmith, PE, Director of Engineering/City Engineer Brian D. Gable, PE, Deputy Director of Engineering Michael S. Sweder, PE, Civil Engineer II Re: Resolution 68-21 – Accepting the Lowest and Best Bid for the Annual Retaining Wall and Decorative Wall Maintenance Program (21-022-CIP) Summary On October 26, 2021, two (2) bids were received and publicly opened through Bid Express by Division of Engineering staff for the Annual Retaining Wall and Decorative Wall Maintenance Program (21-022- CIP). The Annual Retaining Wall and Decorative Maintenance Program (Program) provides funding for maintenance of the City’s retaining and decorative walls. The Program is part of the City’s overall asset management efforts, and as such the Division of Asset Management and Support Services creates the annual Program work plan. The focus of the Program is to address and prioritize structural problems while also focusing on the aesthetics of the wall. The 2021 Program involves replacement of the deteriorated and delaminated stone veneer on the Oak Meadow Drive structure over the North Fork of Indian Run within the Oak Park subdivision. For reference, please find a location map for this Program provided below. The Engineer’s estimate for this Program is $140,000. The budgeted funds for the Annual Retaining Wall and Decorative Wall Maintenance Program in the 2021-2025 Capital Improvements Program (CIP) are $125,000 from account AT21E. 2K General Company, Inc. submitted the lowest and best bid of $148,000. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate 2K General Company, Inc. $148,000 5.7% Quality Masonry Company, Inc. $151,100 7.9% All bids received were higher than the Engineer’s estimate. Staff has determined this is likely the result of the unknown amount of effort involved to remove the existing stone veneer, as well as the necessity of working over the active waterway. The additional funds necessary for this work are available from unencumbered funds from other 2021 projects and programs within the CIP. Due to lowering temperatures and the lead time in obtaining synthetic stone, the work for this Program is expected to commence in the Spring 2022 and will be complete by May 20, 2022. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo Resolution 68-21 – Accepting the Lowest and Best Bid for the Annual Retaining Wall and Decorative Wall Maintenance Program (21-022-CIP) November 9, 2021 Page 2 of 3 The typical and customary communication methods will be used to convey construction information with the residents throughout the duration of this work. The City will have a designated Engineering Project Inspector assigned to the work for this Program who will provide coordination and be available to answer any questions throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by 2K General Company, Inc. Previous experience with 2K General Company, Inc. has been favorable, including the recent completion of the World War II Memorial for the Grounds of Remembrance at Veterans Park. Staff is confident 2K General Company, Inc. will perform well on this project. Staff recommends Council approval of Resolution 68-21 accepting as lowest and best the bid of 2K General Company, Inc. in the amount of $148,000 and authorizing the City Manager to enter into a contract with 2K General Company, Inc. for this Program. Resolution 68-21 – Accepting the Lowest and Best Bid for the Annual Retaining Wall and Decorative Wall Maintenance Program (21-022-CIP) November 9, 2021 Page 3 of 3