Resolution 38-21    To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: June 22, 2021 Initiated By: Paul A. Hammersmith, PE, Director of Engineering/City Engineer Brian D. Gable, PE, Deputy Director of Engineering John Henderson, PE, Civil Engineer II Re: Resolution 38-21 – Accepting the Lowest and Best Bid for the Shannon Glen Pedestrian Bridge Replacement Project (20-016-CIP) Summary On June 10, 2021, three (3) bids were received, publicly opened and read by Engineering staff for the Shannon Glen Pedestrian Bridge Project (20-016-CIP). This Project will replace the existing single span bridge structure with a new box culvert structure that includes head walls, wing walls, a manufactured stone veneer, and a decorative railing. For Council’s reference, a copy of the construction drawings for this Project has been provided for review in the BoardPaq packet for the June 28, 2021 meeting, or a hard copy is available for review upon request. The Engineer’s estimate for this project is $115,000.00. The budgeted funds in the 2021-2025 Capital Improvements Program (CIP) for the replacement of the Shannon Glen Pedestrian Bridge in 2021 are $75,000.00 in account AT20H – Annual Pedestrian Bridge Maintenance. Double Z Construction submitted the lowest and best bid of $146,644.11. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected BidOver (+) or Under (-) Engineer’s Estimate Double Z Construction $146,644.11 27.5% The Righter Company, Inc. $169,470.00 47.4% Decker Construction Company $213,169.00 85.4% The lowest bid received is greater than the Engineer’s estimate and likely reflects the result of recent cost increases in material and labor. The additional funding necessary to complete this project is available from unencumbered funds for related programs within the CIP. The work for this project is expected to commence in July/August 2021 and the completion date is November 1, 2021. A pedestrian detour is planned during the project utilizing the shared-use path along the Shannon Glen Neighborhood, Brand Road and Lombard Way. The typical and customary communication methods will be utilized to convey construction information with the residents and pedestrians throughout the duration of this Project. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo Resolution 38-21 – Accepting the Lowest and Best Bid for the Shannon Glen Pedestrian Bridge Replacement Project (20-016-CIP) June 22, 2021 Page 2 of 2 Recommendation Staff has thoroughly reviewed the bid submitted by Double Z Construction. Previous experience with Double Z Construction has been favorable, including these recent projects: Dublin Methodist Hospital Ingress Lane, Perimeter Drive & Commerce Parkway Roundabout, Dublin Road & Glick Road Intersection Improvements, and S.R. 161/Eiterman Road Roundabout. Staff recommends Council approval of Resolution 38-21 accepting as lowest and best, the bid of Double Z Construction in the amount of $146,644.11 and authorizing the City Manager to enter into a contract with Double Z Construction for this Project. Location Map Shannon Glen Pedestrian Bridge Replacement SHANNON GLEN PEDESTRIAN BRIDGE REPLACEMENT      TYPICAL SECTIONSSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENTLEGEND: TYPICAL 1 TYPICAL 3 TYPICAL 2 GENERAL NOTESSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENTEXISTING UTILITY SYMBOLS PROPOSED LAYOUT EXISTING SURVEY SYMBOLS LEGEND EXISTING CONDITIONS PROPOSED UTILITY SYMBOLS CROSS SECTIONS EXISTING ABBREVIATIONS PROPOSED ABBREVIATIONS GENERAL NOTESSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT GENERAL SUMMARYSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENTITEM NO.ESTIMATED QUANTITY UNIT DESCRIPTION SEE SHEET ROADWAY 201 1 L. SUM CLEARING AND GRUBBING 202 1 EACH BOLLARD REMOVED 203 30 CU YD EXCAVATION 3 203 50 CU YD EMBANKMENT 3 204 50 SQ YD SUBGRADE COMPACTION 204 5 CU YD EXCAVATION OF SUBGRADE 3 204 5 CU YD GRANULAR EMBANKMENT, NO. 2 STONE 3 SPECIAL 1 EACH REMOVABLE BOLLARD (COC STD DWG 2310) DRAINAGE *611 50 FT 8" CONDUIT, TYPE E FOR DRAINAGE CONNECTION 3 *611 50 FT 12" CONDUIT, TYPE E FOR DRAINAGE CONNECTION 3 PAVEMENT 252 20 FT FULL DEPTH PAVEMENT SAWING 301 4 CU YD ASPHALT CONCRETE BASE, PG64-22 (T=3") 304 8 CU YD AGGREGATE BASE (T=6") 423 10 POUND CRACK SEALING, TYPE 1 441 2 CU YD VARIABLE DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG64-22 (T=1.5" TO 3") 441 2 CU YD ASPHALT CONCRETE, SURFACE COURSE, TYPE 1, (448), PG64-22 (T=1.5") SEDIMENT & EROSION CONTROL CMSC 207 130 FT SINGLE COMPOST FILTER SOCK (12" DIAMETER)6 CMSC 207 2 EACH AGGREGATE CHECK DAM 6 CMSC 207 70 SQ YD CONSTRUCTION SEEDING AND MULCHING CMSC 207 1 EACH CONCRETE WASHOUT AREA 6 659 20 CU YD TOPSOIL FURNISHED AND PLACED (T=4") 659 0.02 TON COMMERCIAL FERTILIZER 659 110 SQ YD SEEDING AND MULCHING, CLASS 1 659 0.6 M GAL WATER STRUCTURES 202 1 L. SUM STRUCTURE REMOVED 9 503 1 L. SUM UNCLASSIFIED EXCAVATION 509 2725 POUND EPOXY COATED REINFORCING STEEL 511 8 CU YD CLASS COC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDING FOOTING, AS PER PLAN9 511 26 CU YD CLASS COC1 CONCRETE WITH QC/QA, FOOTING 511 171 SQ FT CONCRETE MISC.: CONCRETE VENEER 9 512 23 SQ YD SEALING OF CONCRETE SURFACES (NON-EPOXY) 512 20 SQ YD TYPE 2 WATERPROOFING 512 29 SQ YD TYPE 3 WATERPROOFING 516 28 SQ FT 1" PREFORMED EXPANSION JOINT FILLER 518 5 CU YD POROUS BACKFILL WITH GEOTEXTILE FABRIC 601 32 CU YD ROCK CHANNEL PROTECTION, TYPE A WITH FILTER 603 13 FT CONDUIT, MISC: 16' X 4', TYPE A, 706.05 9 607 56 FT FENCE, MISC.: DECORATIVE FENCE 9 MISCELLANEOUS 619 1 L.SUM MAINTENANCE OF TRAFFIC, AS PER PLAN 4 623 1 L.SUM CONSTRUCTION LAYOUT STAKES 624 1 L.SUM MOBILIZATION * CONTINGENCY QUANTITYCMSC - THE CITY OF COLUMBUS CONSTRUCTION AND MATERIALS SPECIFICATIONS SEDIMENTATION & EROSION CONTROL NOTESSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENTCMSC ITEM 207 - DESIGNATED CONCRETE WASHOUT AREA CMSC TIEM 207 - SINGLE COMPOST FILTER SOCK (12" DIAMETER) STREAM CULVERT SEDIMENT CONTROL DEWATERING FILTER BAG – – CONSTRUCTION ACCESS N PLAN AND PROFILESHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT0HORIZ1 inch =VERT1 inch =05 Feet5 Feet2.55102.5510Points Northing (Ground)Easting (Ground)Elevation Description 201 777680.1697 1783214.7631 914.961 MAGNETIC NAIL SET 202 777702.4762 17833.13.6220 915.758 203*777787.2978 1783444.9448 920.342 *= NOT SHOWN ON SHEET BENCH MARK ELEVATION DESCRIPTION BM#1*919.903 CHISELED "X" ON EAST BOLT FH, WEST WISE OF LOMBARD WAY, 1ST FH NORTH OF INTERSECTION WITH GREENSWAY LOOP. *= NOT SHOWN ON PLAN BM#2*921.393 CHISELED "X" ON EAST BOLT FH @ NORTHWEST CORNER OF INTERSECTION OF MACKEN CT. & SHANNON GLEN BLVD. MAGNETIC NAIL SET MAGNETIC NAIL SET CULVERT SITE PLANCITY OF DUBLINPEDESTRIAN PATH OVER NORTH FORK INDIAN RUNFranklin CountySta. 1+00.15Sta. 1+18.15SHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT CULVERT GENERAL NOTESCITY OF DUBLINPEDESTRIAN PATH OVER NORTH FORK INDIAN RUNSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT ESTIMATED QUANTITIESCITY OF DUBLINPEDESTRIAN PATH OVER NORTH FORK INDIAN RUNSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT GENERAL PLANCITY OF DUBLINPEDESTRIAN PATH OVER NORTH FORK INDIAN RUNSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT CULVERT ELEVATIONCITY OF DUBLINPEDESTRIAN PATH OVER NORTH FORK INDIAN RUNSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT CULVERT DETAILSCITY OF DUBLINPEDESTRIAN PATH OVER NORTH FORK INDIAN RUNSHANNON GLEN PEDESTRIANBRIDGE REPLACEMENT