Resolution 09-21 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: March 2, 2021 Initiated By: Paul A. Hammersmith, PE, Director of Engineering/City Engineer Michael S. Sweder, PE, Interim Deputy Director of Engineering John Henderson, PE, Civil Engineer II Re: Resolution 09-21 – Bid Acceptance for the Avery Road Sidewalk Connections & Wilcox Road Shared-Use Path Project Summary On February 18, 2021, five (5) bids were received, publicly opened and read by Engineering staff for the Avery Road Sidewalk Connections & Wilcox Road Shared-Use Path projects (the “Project”). This Project will construct 331 feet of sidewalk along the east side of Avery Road from Hyland Drive to Tara Hill Drive. Additionally, 1,928 feet of shared-use path is to be constructed along the east side of Wilcox Road from Heather Glen Boulevard to Lothian Street and along the west side of Wilcox Road from Lothian Street to Northcliff Boulevard. A copy of the Avery Road Sidewalk Connections & Wilcox Road Shared-Use Path construction drawings has been provided for review in the BoardPaq packet for the March 8, 2021 meeting, or a hard copy is available for review upon request. The Engineer’s estimate for this project is $197,000. The budgeted funds in the 2021-2025 CIP for the Avery Road Sidewalk Connections project are $75,000 in account ET176 and for the Wilcox Road Shared-Use Path project are $160,000 in account ET178. The total budgeted funds for these projects are $235,000. Strawser Paving Co., Inc. submitted the lowest and best bid of $177,725.80. Staff has reviewed all bids and a summary of the bids is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Strawser Paving Co., Inc. $177,725.80 -9.8% n/a Park Enterprise Construction Co., Inc. $181,640.77 -7.8% n/a Columbus Asphalt Paving, Inc. $188,689.10 -4.2% n/a Decker Construction Company $188,889.78 -4.1% n/a Newcomer Concrete Services, Inc. $197,787.12 +0.4% $196,882.12 Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614-410-4400 • Fax: 614-410-4490 Memo Resolution 09-21 – Bid Acceptance for Avery Road Sidewalk Connections & Wilcox Road Shared-Use Path Project March 2, 2021 Page 2 of 2 Both the sidewalk and shared-use path will be located within existing rights-of-way. Avery Road will remain open to traffic for the duration of the construction. During portions of the construction along Wilcox Road, one-lane, two-way traffic will be maintained using flaggers. The completion date for this Project is May 28, 2021. Recommendation Staff has thoroughly reviewed the bid submitted by Strawser Paving Co., Inc. Previous experience with Strawser Paving Co., Inc. has been favorable, including these recent projects: 2020 Street Maintenance Program – Phase 1, Concord Road Shared-Use Path (constructed cooperatively with Concord Township in 2019) and the Hyland-Croy Road/Riviera connector (the extension of Cacchio Lane) project in 2018. Staff is confident Strawser Paving Co., Inc. will perform well on this project. Staff recommends Council approval of Resolution 09-21 accepting as lowest and best the bid of Strawser Paving Co., Inc. in the amount of $177,725.80 and authorizing the City Manager to enter into a contract with Strawser Paving Co., Inc. for the Project.