Resolution 027-20RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Folin No. 30045 27-20 Resolution No. Passed .20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE 2020 STREET MAINTENANCE PROGRAM - PHASE 1 WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of the Dublin Code, for the 2020 Street Maintenance Program - Phase 1; and WHEREAS, Council has determined that the bid submitted by Strawser Paving Company, Inc. constitutes the lowest and best bid. NO , THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted by Strawser Paving Company, Inc. in the total amount of $2,266,142.10 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Strawser Paving Company, Inc. for performance and completion of the 2020 Street Maintenance Program - Phase 1 pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this ,� 4e tin, day of , 2020. c Mayor - Presiding Officer ATTEST: L 7 Clerk of Council 7City of Dublin Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: May 19, 2020 Memo Initiated By: Megan D. O'Callaghan, PE, Deputy City Manager/Chief Operating Officer Paul A. Hammersmith, PE, Director of Engineering/City Engineer Michael S. Sweder, PE, Interim Engineering Manager John Henderson, PE, Civil Engineer II Re: Resolution 27-20 — Bid Acceptance for 2020 Street Maintenance Program - Phase 1 Summary On May 13, 2020, four (4) bids were received, publicly opened, and read by Engineering staff for the 2020 Street Maintenance Program - Phase 1. A copy of the 2020 Street Maintenance Program - Phase 1 construction drawings has been placed in the Council Planning Room for your reference and review. The Engineer's estimate for this project is $2,770,098. The budgeted funds for this Street Maintenance Program - Phase 1 in the 2020-2024 Capital Improvement Program are $2,770,098 of the $6,300,000 programmed in account AT201, Annual Street Maintenance Program. Strawser Paving Company, Inc. submitted the lowest and best bid of $2,266,142.10. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Over (+) or Under (-) Engineer's Estimate Corrected Bid Strawser Paving Company, Inc. $2,266,142.10 -18.2% Kokosing Construction $2,345,382.89 -15.3% Decker Construction Company $2,419,353.30 -12.7% Shelly & Sands, Inc. $2,680,696.40 -3.2% Work included in the 2020 Street Maintenance Program - Phase 1 consists of roadway resurfacing and reconstruction, base stabilization, spot repair and other associated work. All work is planned to be complete by November 6, 2020. Phase 2 of this maintenance program, which generally consists of streets with curb and gutter, will be advertised for bids this month (May) with a bid opening date in early June. City Council consideration of the bid acceptance for Phase 2 is anticipated at the June 22, 2020 Council meeting. Resolution 27-20 — Bid Acceptance for 2020 Street Maintenance Program - Phase 1 May 19, 2020 Page 2 of 2 Streets included for the 2020 Street Maintenance Program - Phase 1: Phase 1 of the 2020 program includes resurfacing on City streets as depicted on the attached City map. The streets to be improved are as follows: Irelan Place, Avery Road, Dan -Sherri Avenue, Corley Drive, Kendall Ridge Boulevard, Meaghan Drive, Anna Loop, Tuswell Drive, Varwyne Drive, Wilcox Road, Heatherbluff Drive, Clover Lane, Frantz Road, Cramer Creek Court, Commerce Parkway, Indian Run Drive, Wing Hill Lane, South High Street, Pinney Hill Lane, and South Blacksmith Lane. All work will be performed while maintaining traffic where possible with efforts being taken to minimize interruptions to motorists, provide access for emergency services, maintain access to driveways and adjacent streets as much as possible, and consistently provide a safe work area for motorists and workers. Communications with Residents and Motorists The following communication methods will be used to communicate construction information with the residents and motorists throughout the duration of this project. • Fliers are placed on mailboxes at each residence on affected streets. These are distributed by Dublin staff. • Residents whose driveways will be closed during construction will be given written notice at their front door at least 24 hours in advance of the closure. These notices are distributed by the contractor. • Temporary notification signs are placed along streets at least 24 hours in advance of upcoming construction work and anticipated construction dates. • When appropriate, portable message board signs are used for construction notification on arterial and collector streets. • The City of Dublin road improvement updates page provides current construction schedule information. This webpage is listed on the signs posted in advance of construction activities and in the flier placed on mailboxes. See: www.dublinohiousa.aov/construction. • Due to the short notification time period for driveway closures, Dublin Engineering staff makes adjustments to the construction schedule to accommodate resident needs on a case-by-case basis. • The City of Dublin social media channels are used to communicate timely construction updates. Recommendation Staff has thoroughly reviewed the bid submitted by Strawser Paving Company, Inc. Previous experience with Strawser Paving Company, Inc. has been favorable, including these projects: 2019 Pavement Repair Program, 2018 Street Maintenance Program, 2017 Street Maintenance Program, and 2017 Parking Lot and Shared -Use Maintenance Program. Staff recommends Council approval of Resolution No. 27-20 accepting as lowest and best the bid of Strawser Paving Company, Inc. in the amount of $2,266,142.10 and authorizing the City Manager to enter into a contract with Strawser Paving Company, Inc. for this project. Ah ]= no FAI OIa