Resolution 032-20RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 32-20 Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE 2020 STREET MAINTENANCE PROGRAM - PHASE 2 ,20 WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the 2020 Street Maintenance Program - Phase 2; and WHEREAS, Council has determined that the bid submitted by Kokosing Construction constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, '7 of its elected members concurring, that: Section 1. The bid submitted by Kokosing Construction in the total amount of $2,474,446.40 is hereby accepted. Section 2. That the City Manager is hereby authorized to enter into contracts with Kokosing Construction for performance and completion of the 2020 Street Maintenance Program - Phase 2 pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this L day of , 2020. Mayor - Presiding Officer ATTEST: Cie Iof Co&fncil Office of the City Manager 5555 Perimeter Drive * C4ity of Dublin Phone: 614.410..4400 . Da : 6144..4 0.44901090 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: June 16, 2020 Memo Initiated By: Megan D. O'Callaghan, PE, Deputy City Manager/Chief Operating Officer Paul A. Hammersmith, PE, Director of Engineering/City Engineer Michael S. Sweder, PE, Interim Engineering Manager John Henderson, PE, Civil Engineer II Re: Resolution 32-20 — Bid Acceptance for 2020 Street Maintenance Program - Phase 2 Summary On June 10, 2020, five (5) bids were received, publicly opened, and read by Engineering staff for the 2020 Street Maintenance Program - Phase 2. A copy of the 2020 Street Maintenance Program - Phase 2 construction drawings has been placed in the Council Planning Room for your reference and review. The Engineer's estimate for this project is $2,900,000.00. The budgeted funds for this Street Maintenance Program - Phase 2 in the 2020-2024 Capital Improvement Program (CIP) are $2,755,858.00 of the $6,300,000 programmed in account AT201, Annual Street Maintenance Program. Kokosing Construction submitted the lowest and best bid of $2,474,446.40. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Over (+) or Under (-) Engineer's Estimate Corrected Bid Kokosing Construction $2,474,446.40 -14.7% Columbus Asphalt Paving, Inc. $2,643,540.37 -8.8% Decker Construction Company $2,679,850.03 -7.6% Strawser Paving Company, Inc. $2,774,303.65 -4.3% Shelly & Sands, Inc. $3,026,986.50 4.2% Work included in the 2020 Street Maintenance Program - Phase 2 consists of roadway resurfacing and reconstruction generally on streets with curb and gutter, base stabilization, spot repair, curb and gutter replacement, installation of ADA (American with Disabilities Act) compliant curb ramps and other associated work. All work is planned to be complete by November 6, 2020. Resolution 32-20 — Bid Acceptance for 2020 Street Maintenance Program - Phase 2 June 16, 2020 Page 2 of 2 Streets included for the 2020 Street Maintenance Program - Phase 2: Phase 2 of the 2020 program includes resurfacing on City streets as depicted on the attached City map. The streets to be improved are as follows: Hyland Drive, Holywell Drive, Abbey Marie Court, St. Mel Circle, Christie Chapel Road, Terre Prince Court, Bardston Court, Bardston Drive, Tarton Drive, Tarton Circle, Balloch Court, Banavie Court, Glenfinnan Court, Locherbie Court, Braids Court, Traceyton Drive, Loch Broom Circle, Cape Wrath Drive, Culross Court, Avemore Court, Liberton Court, Zetland Court, Inistork Drive, Dunkerrin Court, Inisheer Court, Carrigan Ridge Drive, Carrigan Ridge Court, Macallan Court, Liester Road, Galway Drive, and Brand Road. All work will be performed while maintaining traffic where possible with efforts being taken to minimize interruptions to motorists, provide access for emergency services, maintain access to driveways and adjacent streets as much as possible, and consistently provide a safe work area for motorists and workers. Communications with Residents and Motoristss The following communication methods will be used to communicate construction information with the residents and motorists throughout the duration of this project. • Fliers are placed on mailboxes at each residence on affected streets. These are distributed by Dublin staff. • Residents whose driveways will be closed during construction will be given written notice at their front door at least 24 hours in advance of the closure. These notices are distributed by the contractor. • Temporary notification signs are placed along streets at least 24 hours in advance of upcoming construction work and anticipated construction dates. • When appropriate, portable message board signs are used for construction notification on arterial and collector streets. • The City of Dublin road improvement updates page provides current construction schedule information. This webpage is listed on the signs posted in advance of construction activities and in the flier placed on mailboxes. See: www.dublinohiousa.aov/construction. • Due to the short notification time period for driveway closures, Dublin Engineering staff makes adjustments to the construction schedule to accommodate resident needs on a case-by-case basis. • The City of Dublin social media channels are used to communicate timely construction updates. Recommendation Staff has thoroughly reviewed the bid submitted by Kokosing Construction. Previous experience with Kokosing Construction has been favorable, including these projects: 2019 Street Maintenance Program — Phase 1 (19-001-CIP) and The Dublin Link pedestrian bridge (16-015-CIP). Staff recommends Council approval of Resolution No. 32-20 accepting as lowest and best the bid of Kokosing Construction in the amount of $2,474,446.40 and authorizing the City Manager to enter into a contract with Kokosing Construction for this project. :.I:.IC 1 rallnnC1aoral n[a=Ll;drioIa 4 FAI