47-07 ResolutionRECORD OF RESOLUTIONS Dayton Legal Blank, Inc Form No 30045 Resolution No. 1 ~~ ~J 47-07 Passed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE AVERY ROAD/ TUSWELL DRIVE ROUNDABOUT PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of the Dublin Code for the Avery Road/Tuswell Drive Roundabout Project; and WHEREAS, Council has determined that the bid submitted by Performance Site Management constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, ~ of the elected members concurring, that: Section 1. The bid submitted by Performance Site Management in the total amount of $1,555,168.85 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Performance Site Management for performance and completion of the Avery Road/ Tuswell Drive Roundabout Project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall be effective upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this day of , 2007 Mayor -Presiding Officer Attest: Clerk of Council 1 Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 Phone: 614-410-4400 • Fax: 614-410-4490 CITY OF llUBLIN To: Members of Dublin City Council From: Jane S. Brautigam, City Manager Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Memo Date: June 27, 2007 Re: Resolution 47-07 -Avery Road /Tuswell Drive Roundabout Bid Acceptance Summary On June 27, 2007 eight (8) bids were received, publicly opened and read for the Avery Road/ Tuswell Drive roundabout project. Staff has reviewed all bids. The Engineer's estimate was $1,700,000.00. Funds budgeted in 2007 for transportation-related capital improvements are sufficient for this project. Performance Site Management submitted the lowest and best bid of $1,555,168.85. A summary of the bids is listed below. Bidder Bid as Read Performance Site Management McDaniels Construction Corp, Inc Trucco Construction Company Strawser Paving George J. Igel & Company Complete General Construction Shelly & Sands, Inc. R. B. Jergens $1,555,168.85 $1,566,803.17 $1,610,547.18 $1,642,549.10 $1,643,969.75 $1,747,402.22 $1,750,031.06 $1,817,313.57 Bicl as Read Over (+) or Under (-) Engineer's Estimate -8.5% -7.8% -5.3% -3.4% -3.3% +2.8% +2.9% +6.9% Corrected Bid $1,610,647.28 The existing two-lane Avery Road between Kendall Ridge Boulevard and Irelan Place will be widened to a four-lane boulevard. The Kendall Ridge Boulevard intersection with Avery Road is currently a full access intersection. This project will change the intersection from full access to right-in, right-out. The intersection of Avery Road and Tuswell Drive will be a two-lane roundabout. The project also includes storm sewer, bikepath, sidewalk and street lighting. Bikepath will be constructed between Kendall Ridge Boulevard and Shier Rings Road. The Avery Road/Tuswell Drive intersection is scheduled to be closed to traffic from August 15, 2007 until October 31, 2007. Traffic will be detoured to Emerald Parkway. Landscaping will be done under a separate City contract to be bid at a later time for installation this fall and next spring. For Council reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. June 27, 2447 Res. 47-47 -Avery Road/Tuswell Drive Roundabout Page 2 Staff has thoroughly reviewed the Performance Site Management bid. Previous experience with Performance Site Management has been favorable, including these recent projects: Glacier Ridge Roundabout in 2446 and the Rings Road CIP project from I-274 to Frantz Road six years ago. Recommendation Staff recommends approval of Resolution 47-47 authorizing the City Manager to enter into a contract with Performance Site Management for this project.