Loading...
Resolution 021-19RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 21-19 Passed , 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE 2019 STREET MAINTENANCE PROGRAM — PHASE I WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of the Dublin Code, for the 2019 Street Maintenance Program — Phase I; and WHEREAS, Council has determined that the bid submitted by Kokosing Construction constitutes the lowest and best bid. NO , THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted by Kokosing Construction in the total amount of $2,689,443.50 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Kokosing Construction for performance and completion of the 2019 Street Maintenance Program — Phase I pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the Project. Section 4. This Resolution shall take effect upon passage in accordance with Sectiop,4.04(a) of the Rev*d Charter. ft Pa se this y of , 2019. ayor -Presiding Officer ATTEST: Clerk of Council Aft UTTIce- of theCifty Manager 5200 Emerald Parkway * Dublin, OH 43017-1090 1TV 10 Phone-, 614.410.4400,e Fax: 614.410.4490 /Cit. o ubli n Tom, Members of Dublin City Council From,v Dana McDaniel, City Manag, Date: April 2, 2019 Initiated By: Paul A. Hammersmith, PE, Director of Engineering/City Enginee Barbara Cox, PE, Engineering Manager John Henderson, PE, Civil Engineer II I Re: Resolution 21-19 — Bid Acceptance for 2019 Street Maintenance Program — Phase I On March 21, 2019, (5) bids were received, publicly opened, and read by Engineering staff for the 201 Street Maintenance Program — Phase I. A copy of the 2019 Street Maintenance Program — Phase I construction drawings has been placed in the Council Planning Room for your reference and review. The Engineer's estimate for this project is $2,900,,000. The budgeted funds for this Street Maintenanct Program — Phase I in the 2019-2023 Capital Improvement Program are $2,900,000 of the $6,000,000 total programmed in account AT191, Annual Street Maintenance Program. Kokosing Construction submitted the lowest and best bid of $2,689,443.50. Staff has reviewed all bids and a summary of the bids received is listed below. Additionally, Houchard Road and Hyland -Croy Road have been chosen for Cold In-place Recycling (CIR). CIR is the processing and treatment of existing asphalt pavements with bituminous and/or chemical additives without heating to produce a restored pavement layer. CIR reuses the existing material which reduces the amount of outside material required to be hauled to, and away from the site, thus making it Bl'od as Read Bl*dder BI'od as Read Over (+) or Under i Corrected BIW n Estimate Kokosing Construction $2,689,443.50 Strawser Paving Company, Inc. T_ $2,766,905.20 -4.6% Decker Construction any $2,873,408.76 -0.9% Columbus Asphalt Paving, Inc. $2f887,387.80 -0.4% $2,888,246.50 Shelly & Sands, Inc. $2,959,310.00 1 +2.0% $2,959,467.17 Additionally, Houchard Road and Hyland -Croy Road have been chosen for Cold In-place Recycling (CIR). CIR is the processing and treatment of existing asphalt pavements with bituminous and/or chemical additives without heating to produce a restored pavement layer. CIR reuses the existing material which reduces the amount of outside material required to be hauled to, and away from the site, thus making it Resolution 21-19 - Bid Acceptance for 2019 Street Maintenance Program — Phase I April 2, 2019 a more environmentally friendly option. The road is topped with a surface course of asphalt in the traditional manner. Streets 'included for the 2019 Street Maintenance Program — Phase I: The 2019 program includes resurfacing on City streets as depicted on the attached City map. The streets to be improved are as follows: Houchard Rd.f Hyland -Croy Rd... Hanna Hills Dr., r, '' .and Rd., and Ashbaugh Rd. All work will be performed while maintaining traffic where possible with efforts being taken to minimize interruptions to motorists, provide access for emergency services, maintain access to 4-riveways and adjacent streets as much as possible, and consistently provide a safe work area for motorists and workers. q 11�'i��Iipii 111� 11111 �II III III Staff has thoroughly reviewed the bid submitted by Kokosing Construction. Previous experience with Kokosing Construction has been favorable, including these projects-, 2004 Street Maintenance Program and 2002 Street Maintenance Program, Staff recommends Council approval of Resolution No. 21-19, accepting as lowest and best the bid of Kokosing Construction in the amount of $2,689,443.50 and authorizing the City Manager to enter into a contract with Kokosing Constructino for this project. 2019 CITY OF DUBLIN STREET TI'xu,w5 � }p @ye.9:19 pp6lA 9vyt p4 CNA'• i 3 e_qq_ yq ""°'� E a ➢� c� w..p m��• Gia 1 �d �1�• f .ww a p a�4 a". 1��� \ Ikk' MAINTENANCE PROGRAM nwMp A %Ywn�n S Aq 'n`aa g rn°'wM*° ag u^w40q Ha Nps rF� ^3§mag A,8 nyaw ww^ A99r w•° o,^„, e�" �� zl� � vrr.rrn�. •wt� � a Phase I V LOCATION MAP NTS PHASE 1 19-001-C I P SHEETINDEX MAP NO. TITLE SHEET e s 2 - 10 GENERAL SUMMARY II - 12 PLAN SHEETS 15-17 3 HANNA HILLS DR. 6 4 MUIRFIELD DR. F � � bbg09 9 —u BRAND RD. 27-28 6 ASHBAUGH RD. 28-31 RD -06 M-S133A MT -97.12 RD -07 AA-S133B MF -99.20 RD -11 M-5134 MT -105.10 RD -13 M-5142 MT -110.10 M-5159 TC -71.10 TC -82.10 nwMp A %Ywn�n S Aq 'n`aa g rn°'wM*° ag u^w40q Ha Nps rF� ^3§mag A,8 nyaw ww^ A99r w•° o,^„, e�" �� zl� � vrr.rrn�. •wt� � a Phase I V LOCATION MAP NTS PHASE 1 19-001-C I P SHEETINDEX MAP NO. TITLE SHEET I GENERAL NOTES 2 - 10 GENERAL SUMMARY II - 12 PLAN SHEETS 15-17 MAPINDEX MAP NO. LOCATION SHEET NO, 1 HOUCHARD RD. 13-14 2 HYLAND-CROY RD. 15-17 3 HANNA HILLS DR. 18-19 4 MUIRFIELD DR. 20-26 5 BRAND RD. 27-28 6 ASHBAUGH RD. 28-31 7ci of Dublin OHIO, USA PROJECT DESCRIPTION PAVEMENT RESURFACING, PAVEMENT RECONSTRUCTION, CURB RECONSTRUCTION, AND SIDEWALK RECONSTRUCTION OF VARIOUS CITY ROADS. .I I �/ BeIOhYW 019 GPD GROUP' CENGINEER�S LAdz z/M/i9 REGI ERED ENGINEER GAH STANDARD CONSTRUCTION DRAWINGS CITY OF DUBLIN CITY OF COLUMBUS MD -05 AA -5120 ODOT ODOT MT -95.30 BP -3.1 SUPPLEMENTAL SPECIFICATIONS RD -01 AA -$121 MT -95.31 ODOT 800 RO-02 M-5123 MT -95.32 RD -03 M-S125A MT -B].10 RD -05 AA -5128 MT -97.11 RD -06 M-S133A MT -97.12 RD -07 AA-S133B MF -99.20 RD -11 M-5134 MT -105.10 RD -13 M-5142 MT -110.10 M-5159 TC -71.10 TC -82.10 .I I �/ BeIOhYW 019 GPD GROUP' CENGINEER�S LAdz z/M/i9 REGI ERED ENGINEER GAH