Loading...
Resolution 044-18RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 44-18 Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE 2018 BRIDGE MAINTENANCE — ASHBAUGH ROAD PROJECT ,20 WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the 2018 Bridge Maintenance — Ashbaugh Road Project; and WHEREAS, Council has determined that the bid submitted by The Righter Co., Inc. constitutes the lowest and best bid. NOTHEREFORE, BE IT RESOLVED by the Council of the City of Dublin, ry of its elected members concurring, that: Section 1. The bid submitted by The Righter Co., Inc. in the total amount of $423,982.92 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with The Righter Co., Inc. for performance and completion of the 2018 Bridge Maintenance — Ashbaugh Road Project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the Project. ATTEST: Clerk of Council on passage in accordance with 2018. 10 of Dublin Office of the City Manager 5200 Emerald Parkway ► Dublin, OH 43017-1090 Phone: 614-410-4400 » Fax: 614410.4490 To: Members of Dublin City Council From: Dana L McDaniel, City Marra Date: August 9, 2010 Initiated By: Paul A. Hammersmith, P.F., Director of Engineering/City Engineer Kenneth B, Richardson, P.E., P.S., Senior Civil Engineer Summary Re. Resolution No. 44.18 — Bid Acceptance for 2018 Bridge Maintenance — Ashbaugh Road Project On July 31, 2018, four (4) bids were received, publicly opened and read by Engineering staff for the 2018 Bridge Maintenance — Ashbaugh Road project, The project is on Ashbaugh Road, just north of Brand Road and involves the removal of the existing bridge and installation of a new three -sided arch culvert (bridge) with stone veneer. The existing Ashbaugh Road bridge is one lane in width and the new bridge will also be one lane. For Council's reference and review, a reduced copy of the project construction drawings has been placed in the Council Planning Room, The Engineer's estimate is $435,000. The budgeted funds for the 2018 Bridge Maintenance project in the 2018 Capital Improvement Program are $305,000 from account AT18C, Annual Bridge Maintenance, The additional funds needed for this project will be from available funds in the 2018 Shared Use Path Maintenance account (AT183, $175,000 available) and the 2018 Parking Lot Maintenance account (AT187, $15,000 available), The Righter Co., Inc. submitted the lowest and best bid of $423,982,92, Staff has reviewed all bids and a summary of the bids is listed below. i Bidder Bid as Read did as Read Over O or under t) '� Corrected Bid I Engineer's Estimate The Righter Inc. $� 423,980,00 -2.5% $423982.92 � „Co,,. R & I Construction, Inc, .� $436,999160 ��. +0,5% Eagle Bridge Co. $437,548,50 +0.6% Complete General Construction Co, ! p $459,123 40mT„m +5,5% Staff anticipates the construction to commence in September 2018. Ashbaugh Road will be closed to pedestrian and vehicle traffic at the project site for the duration of the construction period. The completion date for the project is May 31 2019. Recommendation Staff has reviewed the bid submitted by The Righter Co., Inc, Previous experience with The Righter Co,, Inc. has been very favorable, including the 2017 Pedestrian Tunnel Improvements and the Avery- Muirheld Drive over U.S, 33 Barrier Improvements (2009), Res, 44-18 - 2018 Bridge Maintenance - Bid Acceptance August 9, 2018 Page 2 of 2 Staff recommends Council approval of Resolution No, 49.18, accepting as lowest and best the bid of The Righter Co,, Inc, in the amount of $4230982.92 and authorizing the Gly Manager to enter into a contract with The Righter Co., Inc, for this project, Location Map