Loading...
Resolution 069-17RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 69 -17 Resolution No. Passed , 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE HOLDER - WRIGHT PARK DEVELOPMENT PROJECT AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A COrITRACT FOR THE PROJECT. WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter, for the Holder- Wright Park Development project, and WHEREAS, Council has determined that the base bid in the amount of $1,657,000.00 submitted by Thomas & Marker Construction is the lowest and best bid; and WHEREAS, this project was programmed in the 2017 CIP; and WHEREAS, funding will be available in the Capital Improvements Tax Fund. NOW, THE EFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, of the elected members concurring, that: Section 1. The base bid in the amount of $1,657,000.00 submitted by Thomas Marker Construction is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract for said project as specified within the bid proposal and the City's bid documents on file in the Department of Parks &Recreation. Sect. This Re7;'e4(a) on shall take effect and be in force upon passage in accordance with Section of the Revised Charter. P sed this y of � t�►��r�c'�017 i Mayor — Pr sidin�jOffic i t ttet: Clerk of Council &4%frice of the City Manager 5200 Emerald Parkway * Dublin, OH 43017-1090 TV /Cit. o ubli n Phone:, 614.410.4400 614.410.4490 Tom. Members of Dublin City Council eF From: Dana L McDaniel, City Mana Date,* September 21, 2017 EnIftloated By: Matt Earman, Director of Parks & Recreation"" Re: Resolution 69-17 - Holder Wright Park Development -T- ,o t i1#1 t 'L**Mfr�l �, This particular phase of the project will enable the City to open the park to the public with the construction of a parking lot, small pedestrian bridge, restroom facility, specialized form liner concrete work, sidewalks, grading and landscape installation. Attached are maps of the location of the parkland and the site where construction will take place (Exhibits C and D). For your reference, complete construction details are available for review in the Council Planning room. 7 Staff recommends adoption of Resolution 69-17, accepting the complete bid by Thomas & Marker Construction in the amount of $1,657,000.00. References have been verified by CT Consultant and City staff, and have determined to be satisfactory (Exhibit E). CITY OF DUBLIN HOLDER WRIGHT PARK OJ ORIENTATION CENTER TOTOTAL L PR T ENGINEER'S OPINION OF PROBABLE BNBLE CONSTNUCTION COST JUNE 9, 20 17 ITEM DESCRIPTION Site Preparation OTT. UNIT UNIT COST TOTAL COST 261 Clearing and Grubbing 3 ITS $23,66606 262 Curb Removed 445 LF $6,67522 262 Pipe Removed 75 LF $1,52202 262 Pavement Removed 451 Sy $6,]6566 255 Full Depth Pavement Sawing, Emerald Parkway 375 LF $1,56606 469 Sawing and Sealing Asphalt Concrete PavementJoints, Asphalt Path 76 LF $23606 642 Removal of Pavement Marking Emerald ParkwaV 1 ITS $56606 661 Tae Relocation along Emerald Parkway 6 EA $3,22202 Spec Tae Protection Fence 796 LF $4,]4202 Subtotal Pavement $52,960.00 263 Excavation 2,113 Cy $33,63406 263 Embankment 2,]12 Cy $112,43202 264 Subgatle Compaction 4,41] Sy $22,23522 264 POP Polling 3 HOUR $2,46606 361 Asphalt Concrete Base 616 Cy $11],24202 364 Aggregate Base 664 Cy $56,44202 467 Tack Coat 453 GAL $1,33266 443 Asphalt Concrete ,Intermediate Course (Medium Traffic) PG6422 iW Cy $33,42202 443 Asphalt Concrete Surface Course (Medium Traffic) PG6422 126 Cy $2],62202 443 Asphalt Course ,Intermediate COUae(Heavy Traffic) , PG6422 22 Cy $4,34202 443 Asphalt Course Surface Course (IT eavy Traffic) , PG6422 16 Cy $4,16606 452 3" Non Reinforced Concrete Pavement 97 Sy $13,29522 669 Straight 18 Concrete Curb 1,144 LF $23,62202 669 Intregal Curb and Walk 97 LF $5,32202 625 Conduit Sleeve, 2" (for future lighting) 64 LF $1,23606 636 Ground Mounted Support , Square Post and Anchor Train Cap 52 LF $13606 636 Sign, Flat Sheet 36 SF $66606 642 4 Parking Lot Striping White 436 LF $97266 642 Stop Line 12 LF $13606 642 ADA Pavement Marking 2 EA $2,22202 644 Edge Line Yellow 6 MILE $15606 644 Channelhing Line 136 LF $54606 644 LaneAnow 2 EA $46606 659 Seeding and Mulching 5,666 Sy $15,22202 Spec Brick Pavers 127 Sy $31,]5202 Spec Traffic Directional Sign (Stop Sign) 1 EA $26606 Spec Traffic Directional Sign(ADA Sign) 2 EA $46606 Spec Concrete Parking Blocks 34 EA $6,32202 Subtotal Utilities $526,6]6.00 662 Headwall 3 EA $5,25202 663 4 " Card Hit T e F For U ntleNal n Outlet 46 LF $36606 664 Catch Basin 3 EA $6,22202 664 Curb Inlet 3 EA $],32202 664 Outlet Control Structure 1 EA $16,66606 665 4 "Pipe UntleNaln 956 LF $14,34202 361 8 Inch Water Pipe and FlMngs 663 LF $34,42202 362 6 Inch Valve and Appurtenances 2 EA $4,22202 362 8 Inch Valve and Appurtenances 1 EA $2,52202 363 12 Inch x 3 Inch Tapping Sleeve and Valve and Appurtenances 1 EA $12,22202 365 2 Inch Water Service Tap, Complete, AS per Plan 1 EA $2,52202 363 Plug 3 Inch Water Line 1 EA $1,22202 369 Fire H tlant 2 EA $3,66606 961 6 "Sanitary Servlce 471 LF $]2,65202 961 12" Pipe, With Type l Bedding 169 LF $9,26522 961 15 " Pipe ,With race IBeddin 266 LF $13,66606 961 13" Pipe, With Type l Bedding 295 LF $23,22522 915 Sanitary Cleanout 4 EA $2,55202 Spec Water Line Casing Pipe Jack and Bore 146 LF $146,66602 Spec Electric Servlce 1 ITS $45,22202 Subtotal Erosion Control $0]0,100.00 227 Straw Wattle Banter 1,232 LF $12,24202 227 Inlet Protection ] EA $]2202 227 Concrete Washout 1 EA $1,22202 227 Construction Entrance 1 EA $5,22202 227 Rock Channel Pmtection TYbe C 5 Cy $62522 227 Sediment Basin 1 EA $1222202 Subtotal $27,565.00 Page 1 CITY DUBLIN HOLDER WRIGHT PART, VISITOR ORIENTATION CENTER CT PROJECT ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST JUNE 9, 2017 ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL COST Landscaping 881 Basin Plugs 12 FLAT $4,30000 881 Deciduous Trees 52 FA $30,00000 881 Evergreen Trees W FA $27 750 00 881 Shrubs 130 EA $0,75000 881 Perennials 224 EA $443000 Spec Basin seeding 450 SY $2,25000 Spec Landscape Boulders 1 LS $7,50000 Spec No Mow seeding 300 SY $4,00000 Subtotal $99,530.00 Miscellaneous 603 Concrete Walk (BuffWash Finish) 4,532 1 SF 1 $114,55000 603 Concrete Walk (4 00 SF $00000 614 Maintaining Traffic 1 LS $20,00000 623 Construction Layout Staking 1 LS $40,00000 624 Mobilization 3 LS $40,00000 Spec Filter Pave Specialty Paving 276 SF $1242000 Spec Bike Rack 4 EA $4,00000 Spec Trash Receptacle 1 EA $75000 Spec Interpretive Si n (Provided :V Owner Installed :V Contractor 2 EA $3,00000 Spec Restroom Facility Complete, with wing walls and benches 1 LS $45000000 Spec Pedestrian Bridge, Complete, with abutments and columns 1 LS $14300500 Subtotal $713,265.00 TOTAL - OPINION OF PROBABLE CONSTRUCTION COST 1 $1,890,298.00 Sanitary Capacity Charges 1 LS $33,00000 water Capacity Cbarges 1 LS $24,00000 TOTAL - OPINION OF PROBABLE PROJECT COST $1,907,298.00 The Opinion of Probable Costs are based on available Information and CT's besTudgment based on experience with the construction of sim nor projects CT Consultants has no control over the cost of labor , materials, count, ent or services furnished by others or over competitive bidding or market conditions and therefore, does not guarantee that this project cost estimate will approximate the actual project cost Page 2 BIDS AS READ Project Name: Holder- Wright Park Development Engineers Estimate : $1,947,298.00 Bid Opening Date and Time: September 7 2017 @ 10:00am Bidder Addendum #1 Received (if applicable) Contract A Bid as Read Contract B Bid as Read Contract C Bid as Read Contract A & B Bid as Read Contract A & C Bid as Read Contract B & C Bid as Read Entire Package Combined (A, B & C) Bid as Read Thomas & Marker Construction Yes $1,039,000.00 $190,000.00 $493,000.00 No Bid No Bid No Bid $1,657,000.00 Elford Inc. Yes No Bid No Bid No Bid No Bid No Bid No Bid $1,739,000.00 GLR, Inc. Yes No Bid No Bid No Bid No Bid No Bid No Bid $1,680,133.35 Setterlin Building Company Yes No Bid $305,000.00 $679,000.00 No Bid No Bid $965,000.00 $1,835,000.00 Trucco Construction Yes $1,198,000.00 No Bid No Bid No Bid No Bid No Bid No Bid Double Z Construction Yes No Bid $194,000.00 No Bid No Bid No Bid No Bid No Bid Strawser Paving Company Yes $1,047,463.00 No Bid No Bid $1,233,157.00 No Bid No Bid No Bid Bid Opened by: Shawn Krawetzki Recorded by: Maria Keplar Comments: Project will be awarded at the September 25, 2017 Dublin City Council Meeting lKsma x by +r its' R 1 r Of I � • ill r 1" a 1 r tcyonsuitants trusted advisor 'engineers architects planners September 10, 2017 Shawn Krawetzki, PLA, ASLA, CPSI Landscape Architect City of Dublin, Parks and Recreation 6555 Shier Rings Road Dublin, Ohio 43016 Re: Holder Wright Park - Bid Results Dear Mr. Krawetzski: Bids were received for the above referenced project on September 7, 2017, and attached you will find a copy of the Bid Summary outlining each bid for your review. The apparent lowest and most responsive bid was received from the combination of Contracts A, B, & C bid together as a single bid. No other combination of bids resulted in a lower total bid. The bids for the combination of Contracts A, B, & C bid together as a single bid ranged from a low bid of $1,657,000.00 to a high bid of $1,835,000.00, as compared to the Opinion of Probable Construction Cost of $1,947,298.00. The apparent lowest and most responsive bidder for the combination of Contracts A, B, & C bid together as a single bid is the Thomas and Marker Construction Co. of Columbus, Ohio, whose bid has been reviewed and found to be in conformance with all contract requirements. We contacted their references and reviewed the information contained in their bid. It is our opinion that they are experienced and qualified to perform the work within the three contracts. Should you have any questions or require additional information, please feel free to contact our office. Respectfully, CT Consultants, Inc. David R. Parkinson, P.E. Senior Project Manager Enclosures H: \2014 \14626 \PHASE \8 Bidding Assistance \Bids From Rebid 9.7.17 \Bid Rec Letter 1.Docx 7965 N. High SC Ste. 340 1 Columbus I OH 1 43235 1 614.885.1700 1 www.ctconsultants.com