Loading...
71-03 OrdinanceRECORD OF ORDINANCES Dayton Legal Blank, Inc. Form No. 30043 Ordinance No. 71-03 Passed - , 20 AN ORDINANCE TO ACCEPT THE LOWEST/BEST BID FOR THE ARYSHIRE DRIVE CULVERT REPLACEMENT AND DECLARING AN EMERGENCY WHEREAS, after advertising, receiving and opening bids on April 1, 2003 eight (8) bids were received for the Aryshire Drive Culvert Replacement project; and WHEREAS, Council has determined that the lowest and best bid for said project is from Trucco Construction Company in the amount of $445,575.54; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above-referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities; and WHEREAS, it is in the best interest of the City to execute this contract as soon as possible so that construction can commence immediately, NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, Ohio, 5 of the elected members concurring: Section 1. That the bid from Trucco Construction Company in the amount of $445,575.54 be, and hereby is, accepted. Section 2. That the City Manager is hereby authorized and directed to execute a contract with Trucco Construction Company for completion of said project pursuant to the bid specifications and documents on file in the office of the City Engineer. Section 3. That this Ordinance be, and the same hereby is, declared to be an emergency measure for the preservation of the public peace, health or welfare of the residents of this City, and, therefore, this Ordinance shall take effect and be in force immediately upon its passage. Passed this ~,~,? r~ day of , 2003. Mayor -Presiding Officer ATTEST: ~t~1.4_ Clerk of Council I hereby certify that copies of this Ordinance/Resolution were posted in the City of Dublin in accordance with Section 731.25 of the Ohio Revised Code. ~U D uty Clerk of Council, Dublin, Ohio Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 c« of nueL~N Phone: 614-410-4400 • Fax: 614-410-4490 Memo To: Members of Dublin City Council From: Jane S. Brautigam, City Manager Date: June 19, 2003 Initiated By: Paul A. Hammersmith, P.E., Director ofEngineering/City Engineer ~ Jay M. Herskowitz, P.E., Assistant Director of Engineering -Utilities ~ J~ Re: Aryshire Drive Culvert Replacement Bid Acceptance Ordinance Ordinance No. 71-03 Summary: On April 1, 2003 eight (8) bids were received and publicly opened and read for the Aryshire Drive Culvert Replacement project. A summary of the bids is shown on the attached bid tabulation. All bids have been reviewed by Division of Engineering staff. The engineer's estimate for this project was $505,000. In the 1999 Stormwater Master Plan, the Aryshire Drive culvert replacement project was prioritized and initially scheduled for budget year 2006. Evidence of structural deterioration, along with the need to provide 100-year flood protection, has made this project a priority. The project was initially included in the 2001 Stormwater Improvements project, but was removed due to budget constraints. This project, as depicted on the attached exhibit, will consist primarily of replacing an existing 12' diameter circular culvert with a 20' by 10' precast reinforced concrete arch section culvert. The low bid of $445,575.54 was submitted by Trucco Construction Company. Trucco Construction Company has successfully completed several projects administered by the Engineering Division, most recently the Glick/Muirfield intersection improvements. They have demonstrated their ability to effectively manage projects and complete them in a timely manner. As reported to Council in February of this year, the Ohio Public Works Commission (OPWC) recommended that Dublin be awarded a total of $606,131 in combined grant and loan money to fund this project. OPWC requirements stipulate that field construction begin after July 1, 2003. RECOMMENDATION: Staff recommends this ordinance accepting the bid of Trucco Construction Company be adopted by Council, and that a construction contract with Trucco Construction Company be entered into effective July 2, 2003. Emergency action upon adoption is requested to allow the work to commence immediately and be mostly performed during the favorable summer weather, and thus be substantially completed by the final completion date of November 12, 2003. a 0 b a~ ~. T~T~ V1 O A ~MM h~M W ~5 F~ W Q W W Q z ~ H [WLI a o z ~ a w as `', q w~ H ~ v v~ ~w Q G O P U O ~ M O ~ ~ ~ ~ ~ O~0 0~O l~ V M O ~ C/~ Q' ~ '~ ^ ~ ^ ~ 0~0 ~' ~ ~ ~ 6~~4 6~~9 ~ b 4 ~ b~~4 ~ ~ i/~ Q 0 U ~ o a o ~ ~ ~ V v~ O ~ O ° c W ~ U v ~ o ~ A v o Q p~ `~ ~' +3 ° ~ o s , 0 ~ y o ~ v, ~ V ti °~ ~ ~ U ~- ~ ,~ ca a o v ~, o c~ o A ~ C7 U ~ H E~ C~ ~ v~ Z m 'D W O O O N Z o _ O ~ ( U W J ~_ ~ W w ~ z ~ ~ ~ o ~, Q ~--- m ~ ~ o ~ W J ~ m ,~ C~ ~ ~ O O W ~ ~ z a ~, ~ w . c~ ~ ~ O = U ~ ~' ~ Q_ Q U ~D 4- N C7 Z F- N X W c Q 0 v Q N O ~ X U ~ O ~-+ k C = v O E c~ ¢~ 4! u '~ N h U/ K s ~` o~ o° o. ~~ x .p `® _, a ~ p 4 0 ~ y b~~Y Vf K ~ s ~ ~ ~ h~ 3 ~ o H O O 1 ~ H a i '~ ~s s~