Loading...
28-03 Ordinance RECORD OF ORDINANCES Dayton Legal Blank, Inc. Form No. 30043 Ordinance No. 28-03 Passed . 20 AN ORDINANCE TO ACCEPT 'THE LOWEST/BEST BID FOR THE RENOVATION OF THE CITY OF DUBLIN DEVELOPMENT DEPARTMENT BUILDING AT 5800 SHIER RINGS ROAD, APPROPRIATING FUNDS THEREFOR, AND DECLARING AN EMERGENCY. WHEREAS, after advertising, receiving and opening bids for the renovation of the Development Department Building, 5800 Shier Rings Road, on February 20, 2003, Council has determined that the bid submitted by Inca Enterprises in the amount of $227,600 is the lowest and best bid for the project; and WHEREAS, this project is an approved 2003 Capital Improvement project; and WHEREAS, it is necessary to amend the annual appropriations ordinance to provide funding authorization for the project. NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, State of Ohio, elected members concurring: Section 1. That the bid from Inca Enterprises in the amount of $227,600 for the renovation of the Development Department be, and hereby is, accepted. Section 2. That the City Manager and the Director of Finance are hereby authorized to enter into a contract with Inca Enterprises for the project as listed above, and as specified within the bid proposal and the City's bid documents on file in the Department of Development. Section 3. That there be appropriated from the unappropriated balance in the Capital Improvements Tax Fund the amount of $250,000 to account 401-0314-780- 2572 for the purpose of completing renovations to the 5800 Building. Section 4. That this Ordinance is declared to be an emergency measure necessary for the immediate preservation of the public peace, health, safety or welfare, and therefore shall be effective upon passage. Passed this ~ 7~~ day of , 2003. ayor -Presiding Officer ATTEST: - Clerk of Council I hereby certify that copies of this Ordinance/Resolution were posted in the City of Dublin in accordance with Section 731.25 of the Ohio Revised Code. e ~ of Council, Dublin, Ohio rta ~b-~~u.s 11 ~ V,I~ L1 1 Y UI' UUaL 11V bl4 (bl b~bb I'". 1~1G/!'1G Nome S King Architects, Inc_ February Z0, 20Qii Bid Talaulaticn: City of Dublin Development pepartrtlent Renev~tlons CONTRACTOR a o BASE BIO UNR PRICES 0 o Mrs a~vsER# Q c N U a A U R A s R T ~ S E 2 s ES77MATE: $361 000 $FrWDIFFUSER 1 z 3 J ZP . Q 4 5 6 s 9 ,a 1z ,4 ~ _ a~c~.. ,6 17 ]8 19 2D 21 19 21 22 23 2d TOTAL P.02 Office of the City Manager 5200 Emerald Parkway Dublin, Ohio 4301.7-1006 Phone: 614-410-4400 Fax: 614-410-4490 M e m o C[TY OF DUBLIN TO: Members of the Dublin City Council FROM: Jane S. Brautigam, City Managel~~,5. ~7k V - cwv~J DATE: March 3, 2003 INITIATED BY: Bob Price, CBO/Director of Building Standards RE: Development Department Renovations SUMMARY: On Thursday, February 20th' the City opened bids for renovation of the 5800 building. The renovation will remodel and move Building Standards into space previously occupied by Grounds and Facilities. Planning will expand into the space currently occupied by Building Standards. The former Grounds and Facilities lunchroom (upstairs) will be converted to a large conference room, and the front lobby will be updated. The designer's estimate for the project was $361,000. Due to the favorable bidding climate, eleven bids were received in a range of $227,600 to $312,500. Inca Enterprises submitted the low bid. The project budget is $500,000 in total. In addition to the actual building renovation, it will also be necessary to move the phone system for the building and install additional computer cabling. These items were not part of the bid package. Due to the significant savings, some items will be considered that were originally removed from the project to assure the project would be under the budget amount. If there is a decision to proceed, these items will be returned to Council for funding authorization. RECOMMENDATION: The staff is recommending adoption of Ordinance 28-03 to accept the bid of Inca Enterprises for $227,600. The architect has had favorable past experience with this firm. The references show a history of doing many public projects of less than $500,000. N:\LA\ORDINANC\2003 Ord\28-03 Ord - 5800 Building Bid Award.doc Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 Phone: 614-410-4400 • Fax: 614-410-4490 CITY OF Di1BLIN Memo To: Members of the Dublin City Council From: Jane S. Brautigam, City Manager~'~w S. ~ ,/orw./ Date: March 17, 2003 Re: Council Chambers Remodel Summary: At the March 3, 2003 City Council meeting, staff presented several options for the remodeling of the City Council Chambers. After discussion by Council, staff' agreed to provide additional information concerning funding options to maximize the positive changes to the space. Discussion: As Council will recall, the bids to remodel the 5800 Building were quite favorable. The project had been budgeted for $500,000 and the low bid for the project was $227,600. With phone and cable hookups ($30,000 estimate); reimbursement of architectural fees ($55,000) and a contingency ($50,000), the total cost to construct the remodel, as currently bid, would be $362,600. One of the needed improvements that was cut from the remodel due to budgetary concerns was a large conference room. This feature is one which the Department has desperately needed for a long time and it should be added back into the project. The estimated cost for this addition is $50,000 (based on $30.00 per square foot), placing the total for the 5800 Building at $412,600, with a total savings of $87,400. The Council Chambers remodel project as discussed at last week's meeting would total $120,250 after deleting the glass backdrop. With the savings from the 5800 building ($87,400) and the $50,000 budgeted for the project, the funds available total $137,400, more than enough to complete the project. Staff would like to hold any amounts remaining from these two projects (approximately $17,000, plus any unused contingency) for the possible relocation of the city manager's office to the first floor of City Hall. More information will be forthcoming in future weeks. Recommendation: That Council authorize staff to add the large conference room to the 5800 building remodel and to proceed with remodel plans for the Council Chambers.