Loading...
HomeMy WebLinkAboutResolution 044-15RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 44 -15 Passed 20 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A LETTER OF AGREEMENT WITH TIME WARNER CABLE TO BURY EXISTING OVERHEAD FACILITIES FOR THE I- 270 /US 33 INTERCHANGE UPGRADE, PHASE 1 PROJECT. WHEREAS, the City of Dublin's adopted 2015 -2019 Capital Improvements Program includes the I- 270 /US 33 Interchange Upgrade, Phase 1 project; and WHEREAS, the City of Dublin has worked closely with Time Warner Cable and Dublink to develop design and construction drawings to bury existing overhead facilities along the south side of Post Road, between OCLC and Emerald Parkway; and WHEREAS, Dublin has agreed to reimburse Time Warner Cable for the cost of the initial lease term to occupy existing Dublink conduit to bury Time Warner Cable overhead facilities that cross I -270 in conjunction with the I- 270/US33 Interchange Upgrade, Phase 1 project. N01A THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, _I of its elected members concurring, that: Section 1. The City Manager is hereby authorized to enter into a Letter of Agreement with Time Warner Cable to reimburse Time Warner Cable one hundred percent (100 %) of the cost to occupy existing Dublink conduit to bury existing Time Warner Cable overhead facilities along the south side of Post Road, between OCLC and Emerald Parkway, which is located within the City of Dublin, in substantially the same form as attached, with changes not inconsistent with the Resolution and not substantially adverse to the City and which shall be approved by the City Manager and Director of Finance. The approval of changes thereto by those officials, and their character as not being substantially adverse to the City, shall be evidenced conclusively by their execution thereof. Section 2 . The City Manager, the Clerk of Council, the Director of Law, the Director of Finance, or other appropriate officers of the City are hereby authorized to prepare and sign all agreements and instruments and to take any other actions as may be appropriate to implement this Resolution. The City Manager and the Director of Finance are also authorized, for and in the name of the City, to execute any amendments to the Letter of Agreement, which amendments are not inconsistent with the Resolution and not substantially adverse to this City. Section 3. This Resolution shall take effect upon adoption in accordance with Section 4.04(a) of the Revised Charter. Passed this day of 2015. Mayor - Presiding Officer ATTEST: Clerk of Council Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 -1090 City of Dublin Phone: 614 - 410 -4400 • Fax: 614 - 410 -4490 To: Members of Dublin City Council From: Dana L. McDaniel, City Man Date: April 30, 2015 Initiated By: Megan O'Callaghan, PE, Director of Public Works Paul A. Hammersmith, P.E., Director of Engineering /City Engineer Jean -Ellen M. Willis, P.E., Engineering Manager - Transportation Memo Re: Resolution No. 44 -15 - Authorizing the City Manager to enter into a Letter of Agreement with Time Warner Cable to Bury Existing Overhead Facilities for the I- 270 /US 33 Interchange Upgrade, Phase 1 Project. Summary The City of Dublin's adopted 2015 -2019 Capital Improvements Program includes I- 270 /US 33 Interchange, Phase 1 project (ET# 1401). Staff has worked closely with Time Warner Cable, an Ohio Corporation ("TWC') and Dublink on design and construction drawings to relocate existing TWC overhead facilities into Dublink conduit along the south side of Post Road. See Figure 1 below to show location of project. TWC overhead utility Existing Dublink Conduit Existing utility poles to be removed Figure 1: Time Warner Cable Project Location Res. 44 -15 - Time Warner Cable burial for the I- 270 /US 33 Interchange Upgrade, Phase 1 Project April 30, 2015 Page 2 of 2 Dublin has already entered into a Letter of Agreement with TWC to reimburse them $110,000 for the cost of pulling and splicing fiber optic cable for the project. We will know actual expenses /costs of the project later this year, and will receive invoices from TWC once the work is complete. In addition to the fiber optic cable costs, the work includes occupying approximately 1,814 feet of Dublink conduit. By using the Dublink conduit, the disruption to the right -of -way during construction activities is minimized. The cost of occupying the Dublink conduit is part of the overall utility burial project costs, and as such, it is Dublin's responsibility to fund the initial lease term on behalf of TWC. This is because Dublin has asked TWC to bury their facilities along this stretch of Post Road. The Dublink lease cost for twenty -five (25) years is $87,616.20. When the twenty -five (25) year term expires, TWC will be responsible for negotiating and renewing the lease. Recommendation Staff recommends approval of Resolution No. 44 -15, Authorizing the City Manager to enter into a Letter of Agreement with Time Warner Cable to Bury Existing Overhead Facilities for the I- 270 /US 33 Interchange Upgrade, Phase 1 Project. Letter of Agreement This Letter of Agreement is entered into as of May __, 2015 (the "Effective Date'), between Time Warner Cable, an Ohio corporation ("TWC') and the City of Dublin, Ohio, a political subdivision of the State of Ohio (the "City'). Background Information A. The City has worked with TWC to determine the scope of work and construction drawings to relocate their existing overhead facilities along the south side of Post Road, between OCLC and Emerald Parkway, into existing Dublink conduit ('The Project'). See attached Exhibit A for Project location map. B. The City has requested, and TWC has agreed, to bury their facilities along the south side of Post Road into the existing Dublink conduit (the "Dublin Work') to be consistent with current City policy to bury all utility lines as becomes practical in the course of larger construction projects. C. The I- 270 /US 33 Interchange Improvement Project, Phase 1, FRA -270 -17.28 PID 88310, identified a utility conflict with the interchange design and requires the overhead utility poles to be relocated as a result of the improvement project. D. The City has requested that TWC relocate their facilities into existing Dublink conduit and has agreed to reimburse TWC $87,616.20, which is the cost of occupying the Dublink conduit (the "TWC Work Cost'). E. The City acknowledges that it is responsible for the Project to relocate the overhead facilities to existing Dublink conduit, identified herein as the Dublin Work. The City is not responsible for any costs associated with adding additional capacity, burying or relocating any other facilities than those required to remove the existing utility poles along the south side of Post Road, as identified in Exhibits A and B. F. The parties hereto desire to set forth the terms upon which the City will reimburse TWC for the TWC Work Cost. Statement of Work The parties hereto acknowledge the accuracy of the above background information and agree as follows: 1. The Proiect TWC shall proceed with the Project, including the Dublin Work, pursuant to the plans and specifications attached hereto as Exhibit B. TWC shall pay the Contractors all expenses associated with the Dublin Work and shall present to the City all invoices and proof of payment of such invoices that are associated with the Dublin Work. The City shall reimburse TWC for all payments made by TWC that are associated with the Dublin Work within thirty (30) days of receipt of such invoices. 2. Supervision of Contactors TWC shall supervise the Contractors pursuant to the Project contracts with such Contractors. TWC shall regularly inspect the progress of the Dublin Work and shall immediately notify the City if TWC determines that the design specifications for the Dublin Work are not being met. 3. Title to the TWC Work Facilities. Upon completion of the Project and the City's reimbursement to TWC for the Dublin Work, TWC shall remain the owner of the TWC Work facilities only. Dublink will retain ownership of all TWC occupied conduit associated with this project. It will be TWC's responsibility to ensure that any and all Contractors release any and all liens associated with the Dublin Work. Once the City has made final payment, the City will seek a lien waiver from TWC releasing the City from further financial obligation. TWC shall issue the lien waiver within thirty (30) days of the City's request for such waiver. 4. Cost Overruns. The City shall not be responsible for any expenses relating to the Dublin Work that exceeds $87,616.20, unless the City approves such cost increase in writing, executed by the parties hereto and makes reference to this Letter of Agreement. 5. Jurisdiction. This Letter of Agreement shall be governed by the laws of Ohio. Any disputes arising herein shall be adjudicated at the Court of Common Pleas of Franklin County, Ohio. This Letter of Agreement is accepted by the parties hereto and executed as of the date set forth above. TIME WARNER CABLE 0 CITY OF DUBLIN, OHIO Exhibit A TWC Existing Overhead Facility Burial Project Figure 1: Project Location Map EXHIBIT B LOCATION MAP S/ q / W Y sIDEwALK iELE — o p j 13' GRASS/DIRT SIDEWALK 1 \ I I I I I I I I I I I I I I I I I I I LI �11±r Ex. POL (TAR BY OTHERS) PROP. HANDHOLE 5255 S WILLOW GROVE PL /W _R/W_ _ — s w L EXISTING U SHALL A SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL VERILY THE LOCATOR OF ALL PUBLIC A D rR� /W __ -- �_ PRIVATE UTILITIES PRIOR TO BEGINNING ANY EXCAVATION, _______ 1 // II ______ �_1fi W- _�____�____�_ / ____ —��— _ _— _— �F— ____— ., CONTRACTOR SHALL REPUTE ALL OR SIDEWALK OR .� - - - -� O THER DISTURBED SURFACES TO A CONDITION DITION EQUAL TO DR O �/ 7---- TELE - - - � / II I E- BETTER 1HAN THE PRIOR EXISTING CONDITIONA. I AIDEWALK 3. EXISTING TIME WARNER FACILITIES ARE SHOWN PER RECORDS - - -- REP---------- •[------ - - - - -- ---- - -_ --- ARE ONLY CONTRACTOR SHALL -ATP -- - - -_ —_ ------- ----- -��� IES LOCATED TO DETERMINE ENACT HAVE TIME WARNER FATIUTIES LOCATED HAVE TIM WA I / — __ —_ -- � — SI EWgLK LOCATIONS. / ---- ___ - -- ADJACENT aaaaE CONS / IP $TM 5. cTA SHALL BE RESPONSIBLE FOR A POST RD I II Q N LOCATING ING ALL LL WATER, SEWER, GAS, CABLE N AND ANO ELECTRIC LL F SERVICES PRIOR TO BEGINNING ANY E %CAVATION. Z L 6. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 3' HORIZ. AND - —ii C/L - _ice - s J = 1 VERT. CLEARANCE FROM ALL WATER AND SEWER LINES. II - (D) _� U 7. CONTACT DOWN INSPECTOR ON 571 -B45B 0 HOURS / II PROPOSED TIME WARNER VAULTS PROPOSED TIME WARNER 1 -4" TRENCH, 24' jj� GUY Q w BEFORE DIGGING. II PROFILE 'B' SEE II PROPOSED /TIME WARNER VAULTS II II II OHIO UTILITIES PROTECTION SERVICE II I 1 -600- 362 -2764 EX. DUBLINK MANHOLE II CALL 48 HOURS BEFORE YOU DIG PULLOFF SIDEWALK -- — ------------------ - - - - -- DUBLINK— r . — OHE. —._. — . — . —. —._. —._. —. —01 ROPOSED TIME WARNER RED PROPOSED TIME WARNER 1 -4" TRENCH, 2' 5579 PO OF RD SEE PROFILE 'A' — PROPOSED TIME WARNER 1 -4" TRENCH, 13' EX. POLE (TBR BY OTHERS) / SEE PROFILE 'A' PROPOSED TIME WARNER 1 -4" TRENCH, PROP. HANDHOLE SEE PROFILE 'B' 2' GRASS/DIRT E /P PROP. HANDHOLE � r PROP. HANDHOLE 5' GRASS/DIRT 24' GRASS/DIRT KO 4 9 COMMUNICATION LINE y4 2 CONSTRUCTION CO. LLC. d u 950 FREEWAY DR. N. 2 ti COW MBUS, OHIO 432 � �o� PHONE: 514- 43t -sz sz %ft-IA6 FAX: 614- 431 -9595 OHIO Utilities Protection 600 - SERVICE 362 -2764 Call Before You Dig & TIME WARNER CABLE MIDWEST, LLC 3760 Interchange Rd. Columbus, OH 43204 SCALE: HORIZONTAL 1" =40' VERTICAL: 1 " =10' JOB INFORMATION: TITLE: POST RD PERMIT DESCRIPTION: TIME WARNER TO PLACE 60' OF BURIED CABLE /CONDUIT COUNTY: FRANKLIN TIME WARNER ENGINEER: RAY MAURER DATE: 01 -27 -15 ECO NO.: DRAWING NO.: 1 OF 4 INFORMATIONAL PRINT ONLY 5255 S WILLOW GROVE PL /KI SIDEWALK ZZ� U N � — POST RD SIDEWALK EX1 ING U NOTES. 1. EXISTING L II SHOWN ARE A THE / SIDEWALK CONT SHALL RACTOR SHALL VERITY THE LOCATION OF ALL PHONIC AND I P/C— PRIVATE UTILTIES PRIOR TO BEGINNING ANY EXCAVATION. I / / (OVERPASS)/ % I 2. CONTRACTOR SHALL REPLACE ALL DRIVEWAYS, SIDEWALKS, OR OTHER DISTURBED SURFACES TO A CONDITION EQUAL TO OR BETTER THAN THE PRIOR EXISTING CONDITIONS. m M 3, E %ICING TIME WARNER FACILITIES ARE SHOWN PER RECORDS AVAILABLE AND ARE ONLY APPROXIMATE. CONTRACTOR SHALL W F HAVE TIME WARNER FACILITIES LOCATED TO DETERMINE EXACT Z W LOCATIONS. J BE 4. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT U (D) PROPERTIES DURING CONSTRUCTION OPERATIONS. W Q W 5. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFUNC AND < (n LOCATING ALL WATER, SEWER, GAS, CABLE TV AND ELECTRIC SERVICES PRIOR TO BEGINNING ANY EXCAVATOR. 6. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 3 HORIA AND 1' VERT. CLEARANCE FROM ALL WATER AND SEWER LINES. POLE (TBR BY OTHERS) - OFF —.— _. PDLE (TER BY DITHERS) CC 7. COI DUBLIN INSPECIOR ON 571 -808 4B HOURS BEFORE DOGINO. OHIO UTILITIES PROTECTION SERVICE 1 -600- 362 -2764 CALL 48 HOURS BEFORE YOU DIG 0 COMMUNICATION LINE CONSTRUCTION CO. LLC. 'e . N. ti COLUMBUS, OHIO 43229 P � ef�ynr „, � VAULT FAX 6114- 433 OHIO Utilities Protection 600 - SERVICE 362 -2764 Call &fore You Dig /f& TIME WARNER CABLE MIDWEST, LLC 3760 Interchange Rd. Columbus, CH 43204 SCALE: HORIZONTAL 1” =40' VERTICAL: 1 " =10' JOB INFORMATION: TITLE: POST RD PERMIT DESCRIPTION: TIME WARNER TO PLACE 600' OF BURIED CABLE /CONDUIT COUNTY: FRANKLIN TIME WARNER ENGINEER: PAY MAURER DATE: 01 -27 -15 ECO NO.: DRAWING NO.: 2 OF 4 INFORMATIONAL PRINT ONLY 5200 POST RD N m W Z W BE (7) BE W C) W Q S8 COMMUNICATION LINE CONSTRUCTION CO. LLC. O '� = FREEWAY N. 950 EWAY DR. F , ti COLUM RE OHIO N. OR C O' PHONE: 614 - 431 -9292 2'RUCT16 FAX 614- 431 -9595 OHIO Utilities Protection 600 - SERVICE 362 -2764 Call &fore You Dig & TIME WARNER CABLE MIDWEST, LLC 3760 Interchange Rd. Columbus, CH 43204 SCALE: HORIZONTAL 1" =40' VERTICAL: 1 " =10' JOB INFORMATION: TITLE: POST RD PERMIT DESCRIPTION: TIME WARNER TO PLACE 600' OF BURIED CABLE /CONDUIT COUNTY: FRANKLIN TIME WARNER ENGINEER: PAY MAURER DATE: 01 -27 -15 ECO NO.: DRAWING NO.: 3 OF 4 CONSTRUCTION NOTES' 1. EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL PUBUC AND c) PRIVATE UTILITIES PRIOR TO BEGINNING ANY EXCAVATION. W F Z W 2. CONTRACTOR SHALL REPLACE ALL DRIVEWAYS, SIDEWALKS, OR W OTHER DISTURBED SURFACES TO A CONDBION EQUAL TO OR J BE BETTER THAN RTE PRIOR EXISTING CONDITIONS. _ (B) C) 3. EXISTING TIME WARNER FACILITIES ARE SHOWN PER RECORDS W AVAILABLE AND ARE ONLY APPROXIMATE CONTRACTOR SHALL Q . W (B) HAVE TIME WARNER FACILITIES LOCATED TO DETERMINE EXACT < LOCATIONS. 4. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTIES DURING CONSTRUCTION OPERATIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND LOCATING ALL WATER, SEWER, GAS, CABLE N AND ELECTRIC SERNSCES PRIOR TO BEGINNING ANY EXCAVATION. 6 CONTRACTOR SHALL MAINTAIN A MINIMUM OF 3' FORD. AND 1 VERT. CLEARANCE FROM ALL WATER AND SEWER LINES. 7. DINIACT DUBLIN INBPECI'OR ON 5]1-84]8 48 HOURS BEFORE DOW. OHIO UTILITIES PROTECTION SPACE 1 -600- 362 -2764 CALL 48 HOURS BEFORE YOU DIG S8 COMMUNICATION LINE CONSTRUCTION CO. LLC. O '� = FREEWAY N. 950 EWAY DR. F , ti COLUM RE OHIO N. OR C O' PHONE: 614 - 431 -9292 2'RUCT16 FAX 614- 431 -9595 OHIO Utilities Protection 600 - SERVICE 362 -2764 Call &fore You Dig & TIME WARNER CABLE MIDWEST, LLC 3760 Interchange Rd. Columbus, CH 43204 SCALE: HORIZONTAL 1" =40' VERTICAL: 1 " =10' JOB INFORMATION: TITLE: POST RD PERMIT DESCRIPTION: TIME WARNER TO PLACE 600' OF BURIED CABLE /CONDUIT COUNTY: FRANKLIN TIME WARNER ENGINEER: PAY MAURER DATE: 01 -27 -15 ECO NO.: DRAWING NO.: 3 OF 4 5200 Post RD solo KILGOUR PL 1 CONSTRUCTION NOTES —B/C 1. EXISTING UTILITIES SHOWN ME APPROXIM • • VERIFY LOCATION O I PRIVATE UTILITIES PRIO T ,' CPA It I • • • 1 • CONDITION • • OR PO e , P.,' (S) Z: —C L— 3. EXISTING TIME WARNER FACILITIES ARE SHOWN PER REC BE C) -C/L — - — - — - AVAILABLE AND ARE ONLY APPROXIMATE. CONTRACTOR SHALL O DETERMINE E XACT CONTRACT SHALL MAINTAIN ACCESS TO ALL A PO LE (FOR BY OTHERS) P DURING CONSTRUCTION OP CONTRACT SHALL BE RESPONSIBLE FOR VERIFYING AND 0' LOCATING ALL " ELECTRIC PROP WATER, HIT � 0 SERVICES EXC • .a.. - - , DRIVEWAY QDEW . CONTRACTOR SHALL MA A M O H OP E. , EOHE F D MI O ,. , ; CLEAR -, , SERVER LINES. ., Ow ;' 0 It no POST RD E3 OHIO UTILITIES PRO TECTION 5175 POST RD � :•. • BEF CALL 48 HOURS YOU D IG PROPOSED TIME WARNER 2-4" TRENCH, 33 PROPO RED TIME WARNER , PREPAR . : : I : • PO I PROPOSED • • CONSTRUCTION CO. � ,. N. C OLUMBUS , FREEW • 01 o4�r PHONE 614-431-9292 UC116 FAX 614-431-9595 PROP PROP ol HAN HOLE HAN DHOLE 11 GRASS/ Call Bdom You Dig ................................................................................................................................. ................................................................................................................................. II....................................................................................................................... II....................................................................................................................... ............................... ............................... ....................................................... ............................... ............................... i ................................................................................................................................. ................................................................................................................................. ................................................................................................................................. I.......................................................................... I II....................................................................................................................... I I.............................. .............................................................................................................. ................................................................................................................................. ................................................................................................................................. II.............................' I......................................................................................... ............................... ............................... _ .............................................................................................. ..............................I ................................................................................................................................. n000000000000000000000000000000000000000000000000000000revmerr00000ul. II...................... 000000000..: R................................................................................................. 0000000000an. eanaa000000000000000000000000000000000000000000000 ............................... uuuu.. uuuu • . • 1' uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuueoe. n0000000000000000000000000000000000000000000000000000000000o.. 9lem. 00000al. 000ul. 000000000un00000000u. 000000000nn0000000. e. o9Q.. 00000000000000000000000000000000000000000000000000000000 JP1u. 0000000000000000000000000000000000000000000000 uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu ....uu.ouu...l I.00....000....nnoo....00.r u0000u0000u0000000000000000000000000000000000000000000000 I I a • '� u00000000000000000000000000000000000000000000000000000000000.. n0000000000000000000000000000000000000000000000000000000000o....... 000ul. ull. 000000000nn00000... 000000000nn00000.. 00000000000000000000000000000000000000000000000000000 0000000000000000000000000000000000000000000000000000000000. ° iiiviiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii000000000000000 00000000000000...............nun... uuuu.. .......... n00000000000000000000000000000..... n000000000000000000000000000000000000000000000000000000000000000ul. uuu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu 00000000000000000000000000 uuuuuuuuuuuuuuuuuuuuuuuuuuuuu .......oee. �!___eo.eee..eeeeou 1. 0000000. uuuuuuu.rauuuuu nnn... noor000.. ii. 0000000000000000000000000000000000000000000000000000o 000000000.. oo00000000000000000000000000000000000000000000000000000 000000000.. 000000000 ..000000000 ..00000000......000000. ........uuuuu •: INFOR n000000000000000000000000000000000000000000000000000000000000000ul n0000000000000000000000000000000000000000000000000000000000uuuuuul .0000000.uun .uuuuuuuunnuuo 000000uuuuuuuuuuuuuuuuuuuuuuuuuuuu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu1. n000000000000000000000000000000000000000000000000000000000000000ul. .. ............................................................................................................................. uL........... uuuuuuu. uuuu.o uuaa .....................................................................................................................0000000. ........ aCUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUU 1................................................................................................... UUUUUUUUUUUUUUUUUUUUUUUUUUUUUUu ............................... POST •1 ................................................................................................................................................ ........................................................................................................................................... ��������������� 11.......................................................... uu.................................................................................................... ................... ..........................fLN ..........................1.... ............................... PERMIT . a ............................................................................................................................................ ........................................................................................................................................... I.......... I1............................................................................................................. u........ u........ u.. u........ u......................................................................................... ...................................................... ............................... TIME WARNER TO PLACE ...........................................................................................................................................' uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu.. n00000000000000000000000000000000000000000000000000000000000000000000n000. I........\.................................................................................................... 000ae. ae00000000000000000000000000000000......................................................0000000. c0000000000000000000000 ........................uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu ............................... 60 OF BURIED ••: 111 .............................................................................................. n0000000000000000000000000000000000000000000000l cone :niul ..ee..ar.e..n.ee.eeo....n.IN.ne aln. \aunlr.I - :..49lC. 011! - folre: - IVU.. - .................. C...' J .............. S ............................................................................................................................... 0..................................................................................... ............................... uuuu... a TY: FRANKLIN iiii n0000000000000000000000000000000000000000000000000000000000000000000................... iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii ............. .....1..................iiiii.. e..onaa :n�a :rr..anm.nn.. . iii...... nrr�o. n.. nu. iiiii............................ orr��n. nn u. ........................................... ..................0000000000000000..... ..........0000000000000000ua ............o.... ..uuuu....... ... TIM E u.............................................................................................................................................. uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu ..........ouuu.n.eu........ ......0000000000000oo.. ........ .0 NI'uu..11......il...l...i. ....u..................uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu n,.unu.nuuuuuuu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu .• 1 u ....................................................................................................................................................................................................................................................... ......................................................................................................................................................................................................................................................... u ....................................................................................................................................................................................................................................................... ............................... ............................... ............................... . . .. . ........................................................................................................................................................................................................................................................ ...................................................................................................................................................................................................................................................... . ............................... ............................... ... . O