HomeMy WebLinkAboutResolution 034-15RECORD OF RESOLUTIONS
Dayton Legal Blank, Inc., Form No. 30045
Resolution No.
34 -15
20
A RESOLUTION ACCEPTING THE LOWEST AND BEST BID
FOR THE SR 161 /RIVERSIDE DRIVE ROUNDABOUT
(PART 1), RIVERSIDE DRIVE REALIGNMENT (PART 2),
AND OTHER PUBLIC IMPROVEMENTS PROJECT
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the
Dublin Code, for the SR 161 /Riverside Drive Roundabout (Part 1), Riverside Drive
Realignment (Part 2) and Other Public Improvements project; and
WHEREAS, Council has determined that the bid submitted by Complete General
Construction Company constitutes the lowest and best bid; and
WHEREAS, Council has determined that there may be a legitimate need to
declare the relocation of the utilities in connection with the above - referenced
project as a " "single source" procurement, for reason that the company owning
the utilities in question has the exclusive rights to relocate such utilities.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
_ of its elected members concurring, that:
Section 1. The bid submitted by Complete General Construction Company in
the total amount of $22,533,750.28 is hereby accepted.
Section 2 . The City Manager is hereby authorized to enter into contracts with
NI Complete General Construction Company for performance and completion of the
SR 161 /Riverside Drive Roundabout (Part 1), Riverside Drive Realignment (Part 2)
and Other Public Improvements project pursuant to the Advertisement, Proposal
and Contract Documents for said project on file in the office of the City Engineer.
Section 3. This Resolution shall take effect upon passage in accordance with
Section 4.04(a) of the Revised Charter.
Passed this /2 day of 2015.
J
Mayor - Presiding Officer
ATTEST:
Clerk of Council
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017 -1090
City of Dublin Phone: 614- 410 -4400 • Fax: 614 - 410 -4490
To: Members of Dublin City Council
From: Dana L. McDaniel, City Mana ?KhKI
Date: April 9, 2015
Initiated By: Megan D. O'Callaghan P.E., Director of Public Service
Paul A. Hammersmith, P.E., Director of Engineering /City Engineer
Mandy K. Bishop, P.E., S.I., Program Management Consultant
Memo
Re: Resolution No. 34 -1S - SR 161 /Riverside Drive Roundabout (Parti),
Riverside Drive Realignment (Part 2) and Other Public Improvements
Project - Bid Acceptance
Summary
On March 26, 2015, three (3) bids were received, publicly opened and read for the SR 161 /Riverside
Drive (Part 1), Riverside Drive Realignment (Part 2) and Other Public Improvements project.
The City consolidated several improvements into one strategically planned and coordinated bid, which
will advance multiple projects in an efficient and cost effective manner. This bid strategy will minimize
construction conflicts by having all the work performed under one contract and contractor. Further, by
incorporating utility construction into this bid package, we have reduced the chances of outside
companies coming in to install utilities during or after the completion of these improvements. The City
will be reimbursed for the actual utility construction costs that are incurred on behalf of the utility
companies.
The improvements included in this bid package include:
• SR 161/ Riverside Drive intersection improvement — roundabout;
• realignment of Riverside Drive;
• sanitary sewer installation;
• park grading;
• extension of John Shields Parkway from Riverside Drive to Mooney Street; and
• utility installation and burial construction of duct bank for both AEP and Dublink.
The SR 161 /Riverside Drive intersection is the fourth highest in traffic volume and third highest crash
location in the City. Safety concerns arose in 1993 and operational restrictions have been in place since
that time. An intersection improvement study was performed in the 2005 -2007 timeframe that analyzed
several intersection improvement alternatives. The roundabout solution was identified as the preferred
alternative for several reasons, including: allows left -turn movements from SR 161 to both northbound
and southbound Riverside Drive; does not require replacement of the bridge over the Scioto River;
accommodates the peak hour volume well into the future; central island provides for aesthetically
appealing landscaping opportunities; pedestrians cross one direction, or fewer lanes, of travel at a time;
and has the lowest construction cost of the studied intersection improvement alternatives, based on
peak hour solutions.
Garnering greenspace along the Scioto River has been a long -time goal of the City. In furtherance of this
goal, property along Riverside Drive was acquired in late 2012. Riverside Drive will be realigned
approximately 250 feet to the east between the SR 161 /Riverside Drive intersection and just north of
Tuller Road. This realignment will provide for the future development of a 16 -acre riverside park.
Riverside Drive will become a four- lane divided roadway similar to Emerald Parkway. The land between
the river and Riverside Drive will be graded as a part of these improvements.
SR 161 / Riverside Drive Roundabout, Riverside Drive Realignment and Other Public Improvements Bid Acceptance
April 9, 2015
Page 2 of 2
The Engineer's estimate for the project was $25,070,000. A summary of the bids is listed below.
Bidder
Bid as Read
Bid as Read
Over ( +) or Under ( -)
Engineer's Estimate
Corrected Bid
Complete General Construction
$22,454,639.38
-10.4%
$22,533,750.28
George J. Igel
$24,849,210.50
-1.3%
$24,919,310.50
Shelly and Sands
$26,963,621.46
+7.6%
-
Staff has thoroughly reviewed the SR 161 /Riverside Drive Roundabout (Parts), Riverside Drive
Realignment (Part 2) and Other Public Improvements project bids. Complete General Construction
submitted the lowest and best bid of $22,533,750.28. Previous experience with Complete General
Construction Company has been favorable. Complete General Construction will also be building the I-
270/US 33 interchange and staff believes having the same contractor on both of these projects will
assist with maintenance of traffic coordination.
The budgeted funds for these improvements are from the 2015 Capital Improvements Program (CIP) for
the SR 161 /Riverside Drive intersection improvement, Riverside Drive Realignment, and Emerald
Parkway, Phase 8 projects and total approximately $18,640,000. The estimates for the CIP were
developed in May 2014. Since that time, the detailed design of these improvements was completed,
construction schedules were developed and coordinated, and the Streetscape Character Design
Guidelines were developed. These guidelines established the use of high quality, authentic, durable, and
aesthetically pleasing materials such as granite and brick pavers. While these materials have higher
upfront construction costs, they also have more cost effective life cycles. Costs associated with
maintaining traffic on Riverside Drive and SR 161 throughout the duration of construction, proactive
construction of utility infrastructure, and the grading of future parkland are also accounted for in the
bids. Funding for these projects will come from income tax revenues dedicated to the Capital
Improvement Tax Fund along with revenue generated within our Tax Increment Financing (TIF)
districts.
Staff anticipates construction to commence in late April /early May 2015. Traffic will be maintained on
Riverside Drive and SR 161 throughout the duration of construction. No full closure of the bridge or
intersection is expected with the exception of short-term intermittent closures. The City has
developed a communication strategy that will provide advance information regarding traffic impacts and
alternate routes. The anticipated completion of these improvements is October 2016.
A reduced set of construction drawings has been placed in the Council Planning Room for Council's
reference and review.
Recommendation
Staff recommends Council approval of Resolution 34 -15, accepting as lowest and best the bid of
Complete General Construction in the amount of $22,533,750.28 and authorizing the City Manager to
enter into a contract with Complete General Construction for this project.
_A
EXHIBIT
State Route 161 /Riverside Drive Roundabout (Part 1)
Riverside Drive Realignment (Part 2)
and Other Public Improvements