A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER
INTO A LETTER OF AGREEMENT WITH OHIO POWER COMPANY
FOR THE DESIGN AND CONSRUCTION OF AN AEP OVERHEAD TO
UNDERGROUND RELOCATION PROJECT, IN CONJUNCTION WITH
THE I- 270/US33 INTERCHANGE UPGRADE PHASE 1 PROJECT.
WHEREAS, the City of Dublin's adopted 2015 -2019 Capital Improvements Progra
includes the I -270 AEP Overhead to Underground Crossing project; and
WHEREAS, the City of Dublin has worked closely with AEP Ohio on design and
construction drawings to bury two overhead power line locations that cross I -270 in
the vicinity of the IGS Energy building and near the southern terminus of Shamrock
Court; and
WHEREAS, Dublin has agreed to reimburse AEP Ohio to bury two overhead power
line locations that cross I -270 in conjunction with the I- 270/US33 Interchange
Upgrade, Phase 1 project; and
NOW. THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
of its elected members concurring, that:
Section 1. The City Manager is hereby authorized to enter into a Letter of
Agreement with AEP Ohio for the reimbursement of the portion of the cost of the
total project to relocate the two overhead power line locations under I -270, which is
located within the City of Dublin, in substantially the same form as attached, with
changes not inconsistent with the Resolution and not substantially adverse to the City
and which shall be approved by the City Manager and Director of Finance.- The
approval of changes thereto by those officials, and their character as not being
substantially adverse to the City, shall be evidenced conclusively by their execution
thereof.
Section 2 . The City Manager, the Clerk of Council, the Director of Law, the
Director of Finance, or other appropriate officers of the City are hereby authorized to
prepare and sign all agreements and instruments and to take any other actions as
may be appropriate to implement this Resolution. The City Manager and the Director
of Finance are also authorized, for and in the name of the City, to execute any
amendments to the Letter of Agreement, which amendments are not inconsistent
with the Resolution and not substantially adverse to this City.
Section 3. This Resolution shall take effect upon adoption in accordance with
Section 4.04(a) of the Revised Charter.
Passed this bud day of c -/ qaV &U ' 2015.
C
ayor - Presiding Officer
ATTEST:
- OZ71L'�� a 0
Clerk of Council
Office of the City Manager
5200 Emerald Parkway- Dublin, OH 43017 -1090
7c 4 ity of Dublin Phone: 614 - 410 -4400 - Fax: 614 - 410 -4490
Memo
To: Members of Dublin City Council
From: Dana L. McDaniel, City Man r
Date: March 19, 2015
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer
Jean -Ellen M. Willis, P.E., Engineering Manager - Transportation
Re: Resolution No. 31 -15 - Authorizing the City Manager to enter into a
Letter of Agreement with Ohio Power Company for the Design and
Construction of an AEP Overhead to Underground Relocation Project, in
conjunction with the I- 270 /US 33 Interchange Upgrade, Phase 1
Project.
Summary
The City of Dublin's adopted 2015 -2019 Capital Improvements Program includes the I -270 AEP
Overhead to Underground Crossing project, which is identified as Project # ET 1525. Staff has
worked closely with Ohio Power Company, an Ohio Corporation ("AEP Ohio'J on design and
construction drawings to bury two overhead electric power line locations that cross I -270 in the
vicinity of the IGS Energy building, located at 6100 Emerald Parkway, and near the southern terminus
of Shamrock Court. These two existing AEP power line locations tie into the AEP substation located in
the southwest corner of the Emerald Parkway and Shier Rings Road intersection. See Figure 1 below
to show location of project.
AEP Su)st-tlon
f
:r N
Figure 1: AEP Overhead to Underground Burial Project Location
Letter of Agreement with Ohio Power Company
March 19, 2015
Page 2 of 2
Dublin has agreed to reimburse AEP Ohio for the portion of the cost of the project that buries the two
overhead power line locations under I -270. While there is additional work that is being performed,
the financial responsibility of the remaining work is of either the Ohio Department of Transportation
(ODOT) or AEP Ohio. We will know actual expenses /costs of the project later this year and will
receive invoices from AEP Ohio once the work is complete. The costs broken out by each agency for
the overall project is included in the Table below.
Table 1: Financial Responsibility by Agency
Agency
Amount
ODOT
1 250,000
City of Dublin
$1
AEP Ohio
$100,000
Total
$2
Recommendation
Staff recommends approval of Resolution No. 31 -15, Authorizing the City Manager to enter into a
Letter of Agreement with Ohio Power Company for the Design and Construction of an AEP Overhead
to Underground Relocation Project, in conjunction with the I- 270 /US 33 Interchange Upgrade, Phase
1 Project.
Letter of Agreement
This Letter of Agreement is entered into as of March __, 2015 (the "Effective Date'),
between Ohio Power Company, an Ohio corporation ('AEP Ohio') and the City of Dublin, Ohio,
a political subdivision of the State of Ohio (the "City').
Background Information
A. The City has worked with AEP Ohio to determine the scope of work and
construction drawings to bury two overhead power line locations over I -270,
one crossing I -270 near the IGS Energy building, and the second crossing I-
270 near the southern terminus of Shamrock Court, approximately 800 -feet
north of the IGS crossing location ('The Project').
B. The City has requested, and AEP Ohio has agreed, to bury these two overhead
power line locations under I -270 (the "Dublin Work') to be consistent with
current City policy to bury all utility lines as becomes practical in the course of
larger construction projects.
C. The I- 270 /US 33 Interchange Improvement Project, Phase 1, FRA -270 -17.28
PID 88310, identified a utility conflict with the interchange design and requires
the power lines to be relocated as a result of the improvement project.
D. AEP Ohio has estimated the cost of the Project to be $2,530,000, of which the
City has agreed to pay $1,170,000 (the "AEP Work Cost').
The City acknowledges that it is responsible for the portion of the Project that
buries the two overhead power line locations under I -270, identified herein as
the Dublin Work. The City is not responsible for any costs associated with
adding additional circuits, burying or relocating the power line beyond the
proposed I -270 crossing location, or relocations or installation of any
infrastructure associated with burying or relocating the power line beyond the
proposed I -270 location.
The parties hereto desire to set forth the terms upon which the City will
reimburse AEP Ohio for the AEP Work Cost.
Statement of Work
The parties hereto acknowledge the accuracy of the above background information and
agree as follows:
1. The Proiect AEP Ohio shall proceed with the Project, including the Dublin Work,
pursuant to the plans and specifications attached hereto as Exhibit A. AEP Ohio shall pay the
Contractors all expenses associated with the Dublin Work and shall present to the City all
invoices and proof of payment of such invoices that are associated with the Dublin Work. The
City shall reimburse AEP Ohio for all payments made by AEP Ohio that are associated with the
Dublin Work within thirty (30) days of receipt of such invoices.
2. Supervision of Contactors AEP Ohio shall supervise the Contractors pursuant to the
Project contracts with such Contractors. AEP Ohio shall regularly inspect the progress of the
Dublin Work and shall immediately notify the City if AEP Ohio determines that the design
specifications for the Dublin Work are not being met.
3. Title to the AEP Work Facilities. Upon completion of the Project and the City's
reimbursement to AEP Ohio for the Dublin Work, AEP Ohio shall remain the owner of the AEP
Work facilities. It will be AEP Ohio's responsibility to ensure that any and all Contractors release
any and all liens associated with the Dublin Work. Once the City has made final payment, the
City will seek a lien waiver from AEP Ohio releasing the City from further financial obligation.
AEP shall issue the lien waiver within thirty (30) days of the City's request for such waiver.
4. Cost Overruns. The City shall not be responsible for any expenses relating to the Dublin
Work that exceeds $1,170,000, unless the City approves such cost increase in writing, executed
by the parties hereto and makes reference to this Letter of Agreement.
5. Jurisdiction. This Letter of Agreement shall be governed by the laws of Ohio. Any
disputes arising herein shall be adjudicated at the Court of Common Pleas of Franklin County,
Ohio.
This Letter of Agreement is accepted by the parties hereto and executed as of the date
set forth above.
OHIO POWER COMPANY
92
CITY OF DUBLIN, OHIO
0
Exhibit A
AEP Overhead to Underground Relocation Project
Shier Rings Rd,
AEP Substation
d rr, - x Approximate location of
o new underground duck
m m bank
W N
Overhead power line
to be buried
Approximate limits of
ODOTs work
S
Approximate fin, its of
AE P's work ,
Approximate limits of - - -
Dublin's work -
Overhead power line
locations to be - - - -. _
buried I
IGS Energy -
6100 Emerald Parkway
Figure 1: Project Location Map
EXHIBIT B
JULY 20/4
0
LOCATION MAP
N.TS
FM TIIi RVKYW K W1TLR
EXPOSE ALL WATER LEES AT ALL CROSSWGS TO VERUY DEPTH i LA.'ATION PROP TO
EXCA'ATKNL
TAE OLSTOER S RESPOV=E FOR LOCATION ALL NSTOEROWED SERVAL LIES. THE
OHIO
CONTRACTOR
SBL FEN VERNY THE RORORATAL i VERTICAL LOCATION OF AW CRY OR
IRRFZ K SHEETS
Urilities
CUSTOIEROWNED
RAW OR SERVICE LAE THAT RAP BE AFFECTED BT THE PROPOSED
L(CATION NAP i NOTE
FHF ET 0
CONSTRUCTION ACIRRES FEN VEMICATAW SAL TAKE PULL PRIOR TO AW ACHIRTY
THAT RAT ZQO V'ZE THE LWESNLT OF THE FAWN i AT A LOCATIOY NEAREST TIE
4MDET
SHE ET A
POWT OF ANY COVLCT.
AKlWL
BORE DET
FNE ET B
AW REPAR TO CRY OR CUSTOEROOED WATER LAES O THE /ESPOASIBY/IY O< TIE
PLAN i PACFOE
F"L ETS /TAN/ 6
CONTRACTORTNE CONTRACTOR SKML CONTACT THE CRY OF ML46 MOAT O' WATER
W
AT 0060"M PROP TO AW REPARS ON XVIN ED WATER FACR/!ES REFAM TO
RDS.AOTES i PLANS
W ETS 7 THM 13
COY WATER L ES AW BE RACE ONLY d ACRY OF COLUMBUS LICENSED WATER CONTRACTOR
ff K -2 ENT EAR 6 S0
TIE COYIRACTOP SMALL RAWTAW SMLIIOWZONUL i FMOVERTICAL CLEARANCE FROM
TIE O/TSOIE OAYETER OF ALL WATER LAVES i CLRROEANMOE FROV RR TEECOMNECTIOR
BENDS i EMN OF TIE WATER LAWS AS IEA9AE0 FROM TIE ONTSOE &MIFTER OF THE
WATER LAE TO THE NEAREST EDGE OF TIE FAClRT BERG FLACEO
/ffm A1.1L Nat
La /AM /111ea Ila/
P.
IIfLM LaA/
LIO M4K f��! ipflLl
111[/ �'w ®f?FIMY6
as .Milli l YwLAIY/p
/!4
IOLNCQ/ wClli
I AI N14rC
mE.B1e n EnEL rK>m urs v aN r 1r<AM1®AL
nm AaaL true MW w/ / ci l
��w�er ® maNa
gyros Awa a®r s Lawn
IwIIIO.MINW .Oaw! wI LII.IQ 8 ala! N
aasvastao wwtr wN 1 r AIro� /NI w
� mseuw w� ° wr w.s�Lw v
- ... ./e AmLwarawemw rNro aw/.
Aau mnv s K+av mrn
armors roam/ rAe Kaml w/as
aroma ar /.v1 AaF a1D mrrn v
IIIL��f MM�Kf �K 111 D
wNO / q1Y � eM LK.IF/Ir nC IeyYIFI1d r
r/ a>,rK twro rr raAV! Agra L awo /ra
r K+wr ao w rw tiw / sarA /n+N.N
saawesrF Nrr rmr/ wa L ro K+wr
Arw / N rr .eNNOw r Ii .awNl ro aar N
rL ,e/Na! 1A11s
aNO<sN fat L No ro ru K alsAO AaK
L aua: Not ar lams sN ra aeaws /Awe
wnA a/sae K aNwo sow.
•'B AWL L Awae/ aal8 rrr!/ [aA
N arnssro vawLawaNl morn
Acros n L rawc wwr - - --- - ! sw
T 1'
T
er aAv
i
q1 n 9Lr!
� l.O�� I ro �.Y[ • yy,,
asw! 9! nn LIK aoF. O � Ip Y'$
� rrml �ac¢ a�ae wr � f � �'
Kean ns vnslrwcAO/r�/1[x lL m[ [p'IfF w•w• rLr
alerlr rowLS!/wnAA al araa AVSl am r�
esa rage rRLVLrA AWa ruomro rx a.v arw
Nevrw1as �rEn L� , �:
i
r oa�iAr/r was
seat nalR LiKF WI w �a y ��ies�
Ll!/aA P/raN• 111[ .:. b
E�
LrK
YAWaE MWR WrAK LJ
U.1 A
EEV. er
h r
rm"°
u[Aa�r
I
a®a
RF SaLAlIF
�
ItLaLF
� l.O�� I ro �.Y[ • yy,,
asw! 9! nn LIK aoF. O � Ip Y'$
� rrml �ac¢ a�ae wr � f � �'
Kean ns vnslrwcAO/r�/1[x lL m[ [p'IfF w•w• rLr
alerlr rowLS!/wnAA al araa AVSl am r�
esa rage rRLVLrA AWa ruomro rx a.v arw
Nevrw1as �rEn L� , �:
i
r oa�iAr/r was
seat nalR LiKF WI w �a y ��ies�
Ll!/aA P/raN• 111[ .:. b
E�
LrK
YAWaE MWR WrAK LJ
U.1 A
EEV. er
awo irL /au L LnmLa � 3 LILT ro/ s aalaL
• IK.IMaIN NAIM 1®IN KYV L IK I4R
aG ®KL mi 9NLL L /u+aLw�a3 ro nePs
mmt PmKLE[ EIL/6LIL fMLL L I AmLpE
/N AB//M mL
31K m®16tlD L a®M a /KL /Id IYR
�4T w LLw MI iL wEIFER wx Iw /tl
P IIL aLL6 L IIL tlC 91Q16
a,tl m m e�tlr m ePw oa m etl.
aia ror aot mLL c woe wu c/tl
aoe /aou m L arwm wwsmw ro IK
m n W rsao m,c/eQ aasu/s
ne[L ro raf c/tl
stle a,tlw m L w3 r we KI/1! ro m
®I.L IIL iW 6 /tlRO IN fl.Q.iIL mP/PPaS
LOY[0 L1!!I IK !IP/Q Y! LmlAILa LaIM.O
• I[aOIYIIIKL KIO LGOI ®t P.OA
I.MLR ®l/91QR.QmM6 L[I N/LO IIO
�tlrs ew m ctlaeL � n aww m mmr
n rte ososwr m m .wmae c,s/ra
ra rxo .n moot m wo.
ammsr waLKmo�IS/oxm
tl� m aWNOrIWdII66 m.®YL I®L
YlYm' opal mIL Elav(O di m awtl owtl
an1Wa IOIOI IOII Inl1! ro r® tlIML P
m mOPS Y[ mNOWCfl®/C P m aW.
o am mtlnPeoL ,w3anetltl rem
Km1@6
BORE SECTION
N.T.S.
O)[a a fir P
s e� tlKa 1Kr aom / atl
GORE PLAN
N.T.S.
505
900
des Protection
SERVICE
r se
M
D grr «.. .mo w.aros w
IEV. W DATE DATE DESCRIRI(MI
th
R/W
m i
tn
�'———
Q
�
- - - --
--`----------.
- - -� -- --
- - -
SHAV
SHAM K C7
/ r
�e
.. R/W
•,•
�i
�
•� 1
i
PLAN
6
SCALE: ! • 20'
rn r
SCAL P • 20'
ILII p
.
.
... ...
... ...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
9N7
OHIO V
' '
..
.;................
.............
::..
......,..-
:.!................-
............................
U Uhtie s Protection
............................................
.............
........-
....:.:..
.. .............
.........
.........
SEPVICE
..
°YwOg
LIP[p:I
y
_,
_
.
... ........
.........
.
.........
....:.:.
.:......
.......
9N
.:. .:..
.:.:.:.
9�
�I
..
.....
.:.S
...
.:. .:....
:....:.
.:..
.:.....:..
..
;..::
DUBLIN, HI
995
..;
;.
695
....:.......:..............
.
...... ........
.....:.......:...........
.........
210 RELOCATIO
690
.
69
695
.;
Iim
695
Inetelkuan
............
.........
..................
..................
JULY 2014
855
....:......
.:......
.........:......
..........:......
.:..:.:.
.:..:.:..:.:..:.
.:..:.:.
.:..:.:..:.
655
895
M5
P&P
DANB
•.W
bao
7-M
&W
9w
9
SH CALE:F 0S P
SHAMROCK PROFILE
er vann.
SCALE:! • 20 H L
SCALE:! • 20'
! - 5'VERF.VERT.
! - 5'VERr. ERT.
6EV.
br
onre
acre
oe9cavriax
:
x
o
t ------------ -°-- --- 1-- -- ---- -- -- -- -- = ---
PLAN
SCALE: F • 20'
SHAMROCK PROFILE
SCALE: F ' 2 0' IOR /Z.
P • s•VERr.
-r
o dr .w .mo w.sms w
IEV. W DATE DATE DEBCPoRIpI
OHIO
Utilities
--------- - - -- ; ---- - - - -�- -- - --
PUW
SCALE: F • 2O'
----------- - - - - -- --
:sbo sac voo
SHAMROCK PMLE
SCALE: �: 7 IZ
W
M
s+s
a•s wr
90
♦A
,
y�
Qi Qi�
I I� I I tg e a PIZUlT,4WaLLC
' I b Ig 1 Wj S 273-0/0449
S 8/' 44' /5' E
- - -- --- -- Jr -r �- -- -- -- --1- - -- - - - --
• / j j � j ause
_ - - - - - -- - - - -
T n i n
LE
ASHLAND OIL. /NC.
r, i 1 • I I ; I 273.002454
li wl II j 1
'1 i s ', i rmQas.d
� 1' I • � I a�wrrar a•ea emrsmaavr arm. ��
1 � li I II � � am rm �.. a. v ee ar cnle ronc F O h0S PLOtECt10Tl
` nrw
���w�N�t
elan• �����������������������������
l�t
l�t
l�t
�t
l �t
l�t
l�tl�tl
..r�����-
�
�.
® �tl�tl�tl�tl�tl�tl�t1��
1
mm
=MEE
273 -0r p'LLC
ms
mo
M5
em
873
S BI' 44' l5' E 33654'
- - -- -- -----------------
IW
®rt I W
ASH LAND - OW45�94/NC. C x
W nm
I�
S r 43'32' i
Sc - 2V
RD.
SCALE F .
r.
4
ro
•
I
a - - - - --
SWR A GS RA
• � jsgpm ON , vm tivr *Tr
s
jj STEEL PLATE QE
SWER % MTEFkC7iaV
�
i I
1
• •
,d . .
• •• xm ON , a•a w.va� n rrc
STEEL PLATE QET�AK
I
•I
i
ICI
SF� RA RA - - -
i
i
n Oiw g
.
•
•
SIrR lift/NTERSELTA7A
1 I
I
i
,
i
,
i I
i
,
a I i
I
a
,
i
u �
------------- �--- - - - - -� - - -�
_ s
T FX
STEEL PLATE QETA¢
SITR M�ERSEaM
• • w w A • • • SI R Rms RQ —
•
�/ �.._.._.._.._..
..... ................
,
I W I r • a Ps-
FDU
i I
1 i
i
,
i
,
i I
i
,
i I
a I i
a
,
i
u �
------------- �--- - - - - -� - - -�
_ s
js
. , ll� 'S M AlIL II/! T FK
• • SLE•
s STEEL PLATE QETAK
�
r - - - - --
SI R RAW RA • • • •
•
•
•
•
i
i
i
;,4
�•�• 6( !v 1 m m m
ro 4 L Z SI R RMW R0.
• • • • • r — • y- • • • • • •
- - -- - - - -� ------- �- - - - - -- -- - - - - -- -------- - - - - -- - -- -- -- - - - - -- -- ------ - - - 7; 7
EMMjp MWD
7
it t I g 7! far
ie
SiRfR RqY 0 R-* it yes
• • • STEEL PLATE DETAN.
• -- - - - T - -�_-
• • I
•• 1 F>gl�'JF
. _ A ..�, • I �..�
■ ! .�• , RIB DUBLIN, OHIO
■� ^ ��{ •, I F I -M RELOCATION
a 9 pay
1 1 JULYM14
M.O.T.
• u M , ' DA_NBERT
0 0 ON EAS X X CLOSED °"' _ vanme
F ipIMY9' FE/Z D LII m� .�O 110I.WLISW .�
PE�AN� MEK pEV. BY ppTE MME pEEg "Jo 11 X 0
1 8 �
I i
• ♦ ' I i
.i
I ;
SRER R*W RLL I '�.._.._.._.
1
--------- - - - - -- -- - ------- - - - - -- -- - - - - --
ft
I
� Yy
! i F4F[.f�l�Flk
m
Y
•a�w4rF DUBLIN, OHIO
Iaw
STEEL PLATE XTAK I -M RELOCATION
Y Md & WnMle
1m lleum
JULYM14
M.O.T.
ewrra a4•, R �Y�1� �MOI<tK WL DANB
u
ON
• ' • rs er vanm.
F ipadM FE/F D LII .�O 110I.WLISW ,r
PE�AR41Y MEK M. BY MM pEEgryp110X 13 X 0
9
K
0
PL4 MLA iq/fF,C
STEEL PLATE DET
, M FAO C T.
•
•
$WR�A�K�i�- HNNKxX CT �
E A KgRK i
.._ _ ...RYWI
1
i
I -+. ,- 1,
......................... Rqµ.....................................
I -M RELOCATION
Md & WnMle
Im Ilaum
JULYM14
M.O.T.
w
• iar. t rr 0��00