HomeMy WebLinkAboutResolution 92-14RECORD OF RESOLUTIONS
Dayton Legal Blank, Inc- Form No 30045
92 -14
I I Resolution No. _
Passed 20.
A RESOLUTION CONSENTING TO THE CITY OF DUBLIN
WORKING COOPERATIVELY WITH THE DIRECTOR OF
THE OHIO DEPARTMENT OF TRANSPORTATION FOR THE
UPGRADE AND MAINTENANCE OF TRAFFIC SIGNALS.
WHEREAS, the Ohio Department of Transportation ("ODOT'l and the City of Dublin (the
"City's have identified the need to upgrade signals at the following locations: (1) Bridge Street
at Corbins Mill Drive and Shawan Falls Drive; and (2) Frantz Road at Paul G. Blazer Memorial
Parkway and Longbranch Drive, identified by ODOT as D06 Regional Signals project, PID 98818
(the "Project'j; and
WHEREAS, the Project will upgrade signals by adding non- refiectorized backplates and
upgrading the LED signal displays at those locations; and
WHEREAS, being in the public interest, the City gives consent to the Director of Transportation
of the State of Ohio (the "Director's to complete the Project; and
WHEREAS, the City hereby agrees to cooperate with the Director in the planning, design, and
construction of the Project and grants consent to ODOT for its development and construction of
the Project in accordance with plans, specifications, and estimates as approved by the Director;
and
WHEREAS, ODOT agrees to assume and bear one hundred percent (100 %) of the total costs
of preliminary engineering, right -of -way, and construction; and
WHEREAS, right -of -way costs include eligible utility costs; and
WHEREAS, ODOT agrees to be responsible for all utility accommodation, relocation, and
reimbursement and agrees that all such accommodations, relocations, and reimbursements shall
comply with the current provisions of 23 CFR 645 and the ODOT Utilities Manual; and
WHEREAS, the City agrees to assume and bear one hundred percent (100 %) of the total costs
of those features requested by the City (currently, none are identified), which are not necessary
for the improvement as determined by the State and Federal Highway Administration; and
WHEREAS, the City agrees that all existing City right -of -way required for the Project will be
made available to the Project, and should the Project require additional right -of -way, the City
will work to facilitate ODOT's acquisition of the additional right -of -way in accordance with
current State and Federal regulations; and
WHEREAS, upon completion of the Project, unless otherwise agreed, the City shall: (1) provide
adequate maintenance for the Project in accordance with all applicable State and Federal laws,
including, but not limited to, Title 23, U.S.C., Section 116; (2) provide ample financial resources,
as necessary, for the maintenance of the Project; (3) maintain the right -of -way, keeping it free
from obstructions; and (4) hold said right -of -way inviolate for public highway purposes.
N", THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio,
. /— of the elected members concurring that:
Section 1. The City Manager is hereby empowered on behalf of the City of Dublin to enter
into contracts with the Director of ODOT necessary to complete the Project pursuant to the
terms above.
Section 2. This Resolution shall take effect upon passage in accordance with Section 4.04(a)
of the Revised Charter.
Passed this _ day of PC' t l2� !o if112 014.
I
Mayor – Presiding Officer
ATTEST:
Clerk of Council
Office of the City Manager
5200 Emerald City of Dublin Phone: 614-410-4400 y Fax:b614 -0410- -4490 43017-1090
Memo
To: Members of Dublin City Council
From: Marsha I. Grigsby, City Manager
Date: December 4, 2014
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer
Jean -Ellen M. Willis, P.E., Engineering Manager — Transportation
Eagan L. Foster, P.E., PTOE, Civil Engineer
Re: Resolution No. 92 -14 — Consenting to the City of Dublin Working Cooperatively
with the Director of the Ohio Department of Transportation for the Upgrade
and Maintenance of Traffic Signals
Summary
The Ohio Department of Transportation (ODOT) and the Mid -Ohio Regional Planning Commission
(MORPC) have been working with local communities throughout the region to identify low -cost
safety improvement opportunities. Based on their analysis
of crash data in the City of Dublin, they proposed to
upgrade the traffic signal displays with new LEDs in order
to add backplates around the signal heads. (See Figure 1
at (ght.)
Engineering staff was asked to evaluate a list of potential
intersections as provided by MORK and ODOT for
inclusion in the project. The list identified thirty -three (33)
signalized intersections within Dublin, based on recent
crash data.
As most of the potential intersections already have
backplates installed, these were eliminated from further consideration. As a result, Engineering
staff identified five (5) intersections to evaluate whether the mast arms could support the
additional weight and wind loads of the signal heads with backplates.
The analysis completed by a consultant hired by ODOT determined whether the existing mast
arms could support the enhanced traffic signals, and provided an estimate of the construction cost
to upgrade the intersection. Three (3) of the five (5) intersections submitted for analysis were
removed from further consideration because the upgrade required the replacement of one or more
mast arms. Engineering requested the project proceed for the remaining two (2) intersections.
Resolution No. 92 -14 — ODOT Upgrade and Maintenance of Traffic Signals
December 4, 2014
Page 2of2
! 7
Metro Place M.
—WI ER Place S,
Paul G. Blazer
Memorial Parkway
i
/Shawan
/ Falls Drive
S ., W. Bridge Stree
Longbranch
Drive
Figure 2: Map of Upgraded Intersections
These intersections, shown above in Figure 2, are
• Bridge Street (US 33/SR161) at Corbins Mill Drive / Shawan Falls Drive; and
• Frantz Road at Paul G. Blazer Memorial Parkway/ Longbranch Drive.
ODOT is currently working to design and complete the installation in the second quarter of 2015.
There are no anticipated direct costs to Dublin for this project, as it is entirely funded through
ODOT safety funds.
The estimated installation cost for this safety upgrade is $12,900.
Recommendation
Staff recommends Council adopt Resolution 92 -14 at the December 8 Council meeting.