Loading...
53-99 Ordinance RECORD OF ORDINANCES Dayton Legal Blank Co. Form No. 30043 Ordinance No.-----~-~- Passed------ -------------------------------------------19------- AN ORDINANCE AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH THE DAIMLER GROUP FORA SANITARY SEWER EXTENSION FOR THEIR PROJECT KNOWN AS "THE PRESERVE" LOCATED AT FRANTZ ROAD AND TUTTLE CROSSING BOULEVARD. WHEREAS, an 8-inch sanitary sewer is necessary to serve "The Preserve" which is in the process of being developed by The Daimler Group, Inc., within the City of Dublin; and WHEREAS, an existing sanitary sewer presently terminates at the easterly property line i of the Thomas Elementary School property and will need to be extended to the east property line of the 17.6-acre property to be known as The Preserve, an approximate distance of 614 feet at an approximate cost of $27,400.00; and WHEREAS, the immediate surrounding area has akeady developed with commercial office uses; and WHEREAS, it is the City's desire to assist The Daimler Group, Inc. in order to ensure that they will locate their project within the City of Dublin, by reimbursing The Daimler Group, Inc. for the cost of construction of the aforementioned 8-inch sanitary sewer to serve the subject site; and WHEREAS, The Daimler Group, Inc. intends to develop the 17.6-acre site by constructing three (3) office buildings conducive with the area. Phase I of the project will be the construction of a 65,000 sq. ft. building with an estimated construction cost of 7 million dollars within the City of Dublin. NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, State of Ohio, ~ of the elected members concurring: Section 1. That the City Manager is hereby authorizing to execute The Preserve Sanitary Sewer Agreement with The Daimler Group, Inc. ~ Section 2. That this Ordinance shall take effect and be in force from and after the earliest period allowed by law. assed this ~ ! `7 day of ,,2/1..~-,.t , 1999. I yor -Presiding Officer j I i ttest: i Jerk of Council i 1 ~iereby certify that copies of this Ordnance/Resolution wec City of Dublin in accordance with Sect~on 731.25 of a Posted in the ~ the Ohio Revised Code. . a~l6tin, Ohio s-r THE PRESERVE SANITARY SEWER AGREEMENT WHEREAS, an 8-inch sanitary sewer is necessary to serve The Daimler Group, Inc. project known as The Preserve as The Daimler Group, Inc. is desiring to develop a 17.6-acre site on the southeast corner of Frantz Road and Tuttle Crossing Boulevard within the City of Dublin; and WHEREAS, an existing sanitary sewer presently terminates at the easterly property line of Thomas Elementary School, owned by the Dublin City School System, and the 8-inch sanitary sewer will need to be extended to the east property line of the to be developed parcel, an approximate distance of 614 feet, for an approximate cost of $27,400.00; WHEREAS, the immediately surrounding area has already developed with commercial uses; and WHEREAS, it is City's desire to assist The Daimler Group, Inc. in order to ensure that they will develop their project within the City of Dublin by reimbursing The Daimler Group, Inc. for the cost of construction of the aforementioned 8-inch sanitary sewer to serve the subject site. NOW, THEREFORE, in consideration of the foregoing and the mutual promises contained herein, the parties agree as follows: 1. The Daimler Group, Inc. hereby agrees to arrange, contract for and cause to be done such engineering and construction work as shall be necessary in order to design and construct an 8-inch sanitary sewer extension from the existing terminus of such sanitary sewer at the southeast corner of Frantz Road and Tuttle Crossing Boulevard, a distance of 614 feet to a terminus point located at the east property line of the project. 2. The Daimler Group, Inc. shall obtain all necessary easements for the construction, operation and maintenance of the sanitary sewer extension at its sole cost and expense. 3. The Daimler Group, Inc. shall, obtain cost estimates and take bids for the construction of the sanitary sewer extension which shall be subject to review and approval by the City Engineer. 4. Upon completion and construction of the sanitary sewer extension and acceptance thereof by Dublin, The Daimler Group, Inc. will convey to Dublin title to the sanitary sewer extension and shall grant to Dublin any necessary permanent easements for the repair, maintenance and replacement thereof. 5. Certification by the City Engineer that the sanitary sewer extension has been constructed in accordance with the plans and specifications shall constitute acceptance thereof by Dublin, and upon delivery of the instruments conveying title, the title of the sanitary sewer extension shall be vested in City of Dublin. After acceptance of the sanitary sewer extension by Dublin, The Daimler Group, Inc. shall have no liability or responsibility whatsoever in connection therewith, except that The Daimler Group, Inc. shall cause repairs to be made to the sanitary sewer extension as may be necessitated by defects in the original construction which appear within a period of one (1) year following the date of such acceptance. 6. As consideration for the construction of the sanitary sewer extension, and its related economic development benefits to the City of Dublin, the conveyance to Dublin of title to the sanitary sewer extension and the granting to Dublin of any necessary easements as provided in paragraph 4, Dublin shall reimburse to The Daimler Group, Inc. the full cost of the design and construction of the sanitary sewer extension, as previously agreed by the City Engineer. In no case, shall Dublin's cost exceed the sum of $27,400.00, without the approval of Dublin City Council. 7. The Daimler Group, Inc. shall cause its agents, contractors and subcontractors engaged in the construction of the sanitary sewer extension to comply with Workers' Compensation Law of the State of Ohio and shall indemnify and hold Dublin harmless from any and all claims, demands, actions or liabilities arising out of personal injury, death or property damage resulting from the construction work performed or caused to be performed by The Daimler Group, Inc. pursuant to this Agreement. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized officials or agents this day of , 1999. CITY OF DUBLIN By: Timothy C. Hansley, City Manager THE DAIMLER GROUP, INC. By: Its: ~ APR 16 '99 04~22PM THE DAIMLER GROUP P.2/4 THE DAIMLER GROUP, INC. 1553 LAKE SHORE ORIVE COLUMBUS, OHIO a3204-4801 ola/a88-ad2a FAX 61d/a99.0603 April 16, 1999 TELECOPY bELIVERY Mr. Richard B. Helwig Assistant City Manager and Development Director City of Dublin 5800 Shier-Rings Road Dublin, Ohio 43016 Subject: Sanitary Sewer Extension-The Preserve @ Frantz and Tuttle Dear Rick: As you know, The Daimler Group is in contract to purchase an approximately 17.6-acre site at the southeast corner of Frantz and Tuttle Roads. Our desire is to develop the site as a corporate office campus to be known as The Preserve. As part of this development, sanitary and storm sewer will need to be extended to this site because the City does not presently service this site. Our preliminary cost estimates to provide sewer service to this site are as follows: ~ A drainage ditch will need to be constructed adjacent to and east of the Thomas Elementary School property and will span the entire length of the "farm" property {which is owned by Pauline Wuertz but is in contract to be sold to MI Homes) and will discharge into an existing drainage ditch at Dublin Road. Approximate cost to do this will be 521,700. • The required sanitary sewer extension is based upon the design of the existing sewer that currently serves the Thomas Elementary School. The capacity and depth of the existing sewer were designed in a manner to serve our 17.6-acre site which was included in the tributary area for the existing sewer, Approximate cost to extend the sanitary sewer is 527,400. R E A L E S T A T E O E v E l O V M E N T - C O N S T R V C T I O N M A N A G E M E N T ~ APR 16 '99 04~ZiPM THE DAIMLER CROUP P.4/4 Mr. Helwig April 16, 1999 Page 2 ~ As for storm water flow, Ohio law requires that property owners 'down-grade" make provisions for "up-grade" property owners because of the natural tributary concept of water flow. This must be accomplished by either a new storm sewer, drainage swales or the continuance of sheet drainage. In the case of crossing the Thomas Elementary School property, a storm sewer is the only acceptable means of accomplishing this goat. Creating a drainage swale would be unsuitable for the existing baseball and soccer fields. Also routing the drainage across the farm property via a drainage swale would be the best solution so that future development in the area (expected to be single-family residences? would have future options as to how and where to route the off-site storm drainage by means of a new storm sewer. Approximate cost to construct this storm sewer extension would be S 27, 515. We are requesting that the City partner with us for approximately one-third of the costs for the City to service this site with sewer. We are therefore requesting the City portion to be the costs relating to construction of the new sanitary sewer extension, not to exceed S27,400. The following is our proposal on design costs and estimated construction costs for the sanitary sewer extension to service The Preserve. DESIGN The scope of work includes design services for the preparation of detailed drawings and technical specifications, proposed exhibits and descriptions of permanent and temporary easements, field construction layout of proposed improvement, and construction engineering services as needed. We will obtain approval from the City engineer prior to the bidding process. APR 16 '99 04~21PM THE DAIMLER GROUP P.3i4 Mr. Helwig April 16, 1999 Page 3 Our fees to complete this scope of work are as follows: 1. Engineering/Design Phase S3,500 2. Construction Layout 1,200 Total 54,700 CONSTRUCTION The preliminary construction cost estimate for the sanitary sewer is S22,700. We will solicit bids from three contractors and award the contract to the low bidder. We will be responsible for the contracts and project management. We will obtain all necessary easements and have already started discussions with the Dublin City Schools and Mrs. Wuertz and MI Homes to that end. We truly appreciate and enjoy our past and continuing partnership with the City of Dublin, and look forward to this project being equally as rewarding. Best regards, Paul G. Ghidotti General Counsel & Development Director PGG/smd mMleatHrsMMUttle/hsMrip ON 899 cc: Mary L. Bearden (by telecopy) Division of Economic Development 5800 Shier-Rings Road • Dublin, Ohio 43016-1236 CITY OF DUBLIN Phone: 614-761-6550 • Fax: 614-761-6506 ~ /~~~0 To: Dublin City Council From: Timothy C. Hansley, City Manager Date: May 13, 1999 Re: Location Map for Daimler Project Ordinance #53-99 Initiated By: Rick Helwig, Assistant City Manager/Development Director '~3 ~ Mary L. Bearden, Economic Development Director Enclosed as requested is a drawing showing the location of the proposed sanitary sewer for the Daimler Group's project known as "The Preserve" located at Frantz Road and Tuttle Crossing Boulevard. \W IMBUS\VOL I \PER\KG396\OFFICE\WP\99CORRES\CCDAIM LER.DOC O ST . EL M A IDE ~ B ~ r w~„« T R~ A 8" s itary sewer 12 waterline ~TTLE g~ T ~ i ~ Thomas Elementary School ~ ~ ~ ~i , ~ ~ i~ i ~ ~ i ~ 1 ~ ~ . i ~ ~ ~ ~ I ~ I I~ ? ~ ~ . ~ , wxu+.-r ~'7 ~Y a ~ ~~a eo~ d ® 1~ ~ C~~ 1~ 1 1 lO ~ ~ u~n 1 `1 1 ~ - Z~ 1 1 ~ ® D UuJ G N C ~ ~d 0 9 ~