HomeMy WebLinkAboutResolution 77-14RECORD OF RESOLUTIONS
O+YW leQW �. W. Fw W. 300
Resolution No. _ _ Passed
A RESOLUTION GRANTING CONSENT AND COOPERATION WITH THE
OHIO DEPARTMENT OF TRANSPORTATION (ODOT) FOR THE
CONSTRUCTION OF THE I- 270 /US 33 INTERCHANGE UPGRADE,
PHASE 1
WHEREAS, the City of Dublin desires to improve traffic safety, operations,
and efficiencies of I -270 and US 33 and the interchange where these two
facilities meet; and
WHEREAS, the City and ODOT have identified the need to update the I-
270/US 33 Interchange so that the capacity of the interchange keeps pace
with the demands generated by economic development efforts in Dublin; and
WHEREAS, the Dublin Community Plan promotes working cooperatively with
surrounding jurisdictions to promote regional transportation planning and
programming; and
WHEREAS, the City of Dublin and ODOT have agreed to cooperatively
construct the identified transportation improvement project; and
WHEREAS, this project will complete the reconstruction of the FRA -270 at US
33 /SR 161 interchange to include widening US 33 to four lanes in each
direction between Avery- Muirfield Road and I -270 to remove the eastbound
US33 to northbound I -270 loop ramp and the westbound US 33 to
southbound I -270 loop ramp, to construct a new eastbound US 33 to
northbound I -270 ramp and a new westbound US 33 to southbound I -270
ramp, which includes six new bridges; and
WHEREAS, the City of Dublin hereby agrees to cooperate with the Director of
ODOT in the design and construction of the identified highway improvement
project and grants consent to ODOT for its development of the project in
accordance with plans, specifications, and estimates as approved by the
Director.
N W, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
of its elected members concurring, that:
Section 1. The City hereby gives consent to the Director of ODOT to
complete the above - described project.
Section 2 . The City hereby agrees to cooperate with the Director of ODOT
in the above - described project as follows:
1. To finance the portion of the preliminary engineering environmental
phase of the US33 /IR270 interchange up to a maximum of $3,175,890.
2. To finance the portion of the preliminary engineering detailed design
phase of the US33 /IR270 interchange up to a maximum of $2,044,008.
3. To finance the portion of the right of way phase or the US33 /IR270
interchange up to a maximum of $3,500,000.
4. To finance the portion of the reconstruction of the base US33/ IR270
interchange up to a maximum of $33,000,000.
RECORD OF RESOLUTIONS
pa ylon � frank, 4q.. fpm N o. X11645
- � 77 -14 - - - -_ - Page 2
i Resodrtion No. Passed `- _
a. $25,000,000 of this $33,000,000 will be funded by the Mid -Ohio
C� Regional Planning Commission (MORPC), pursuant to Resolution
T- 18 -13, with funding available after SFY 2017.
b. $8,000,000 of this $33,000,000 will be funded by Dublin.
5. To contribute 100% of the total costs of the features, which are not
necessary for the interchange to function for its intended use, including
landscaping (e.g. perennials, trees, irrigation system, brick masonry,
concrete walk, etc.), aesthetic improvements (e.g. guardrail painting,
etc.), and construction inspection costs on these items.
Section 3 . The City agrees to acquire and /or make available to ODOT, in
accordance with current State and Federal regulations, all necessary right -of-
way required for the described Project. The City also understands that right -
of -way costs include eligible utility costs.
Sect ion 4. The City hereby agrees that upon completion of the described
Project, and unless otherwise agreed, the City shall: (1) provide adequate
maintenance for the described Project in accordance with all applicable state
and federal law, including, but not limited to, 23 USC 116; (2) provide ample
financial provisions, as necessary, for the maintenance of the described
Project; (3) maintain the right -of -way, keeping it free of obstructions; and (4)
hold said right -of -way inviolate for public highway purposes.
Section S. This Resolution shall take effect upon passage in accordance
with Section 4.04(a) of the Revised Charter.
Passed this A W day of ✓ 2014.
J
yor - Presiding 6fficer
ATTEST:
061'- CP C?
Clerk of Council
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017 -1090
City of Dublin Phone: 614 - 410 -4400 • Fax: 614 - 410 -4490
Memo
To: Members of Dublin City Council
From: Marsha I. Grigsby, City Manager
Date: August 21, 2014
Initiated By: Angel Mumma, Director of Finance
Megan O'Callaghan, Director of Public Service
Re: Resolution 77 -14 - Granting Consent and Cooperation with the Ohio Department
of Transportation for the Construction of the I- 270 /US 33 Interchange Upgrade,
Phase 1
Background
The Ohio Department of Transportation (ODOT) is leading the design and construction of the I-
270/U.S. 33 Interchange project. CH2M Hill is the design consultant for the project. The
transportation improvements will be constructed in two phases.
Phase 1:
The first construction phase is shown on the following page in Figure 1 and includes the following
improvements:
• The loop ramps in the northwest and southeast quadrants will be eliminated. The new
ramps replacing these movements will pass over I -270 south of US 33, and pass under US
33 east of I -270. New bridges will be installed at these locations.
• The southbound I -270 to westbound US 33 movement will be split into two ramps,
one for drivers exiting onto Avery- Muirfield Drive and one for drivers continuing west on US
33 beyond Avery- Muirfield Drive.
• US 33 will be widened to four lanes in each direction between Avery- Muirfield Drive and I-
270.
• A traffic signal will be introduced for northbound I -270 to eastbound US 33. The signal will
assign right -of -way between this movement and the eastbound US 33 through movement.
Dublin staff has been working closely with ODOT to finalize the construction plans in preparation
for the bidding of this project. ODOT distributed the final draft of the construction plans for review
and comment on June 4, 2014 with comments due on July 8. Dublin staff performed a
comprehensive review of the draft plans and provided extensive comments to the ODOT on July 8.
ODOT is in the process of addressing the comments. ODOT plans on bidding a tree removal
contract on October 30, 2014 with activities expected to begin in December of 2014. The scope of
this tree removal contract is to clear 3" diameter and above trees and other necessary clearing and
grubbing of trees, shrubs, and brush within the project limits prior to the start of Phase 1 of the
interchange improvements.
Interchange Project Update
August 21, 2014
Page 2 of 3
Phase 1 of the interchange improvements is scheduled to bid on January 22, 2015 with
construction activities expected to begin toward the end of February/beginning of March of 2015.
Phase 1 will significantly improve the safety and operations of the interchange, removing the
critical weave areas.
W =
Figure 1. I -270 & US 33 Interchange Improvements - Phase I
Phase 2.
The second phase of construction will include the following improvement:
• The loop ramp in the northeast quadrant will be eliminated. The new ramp replacing this
movement will pass over US 33 and I -270. This will be a significant new bridge.
The construction of phase two is expected to occur in 10 to 15 years.
Summary
Base Construction Funding.
The cost of construction of Phase I is estimated to be $73 million with $25 million funded by
MORPC, $8 million by the City of Dublin, and $40 million from ODOT. The City will be responsible
for initially funding the $25 million MORK portion as well as the $8 million City portion in late
2014 /early 2015. The $25 million will be secured by the City through a State Infrastructure Bank
(SIB) loan with repayment of the loan coming from MORPC. Staff is evaluating options for
securing the $8 million City portion, considering both SIB program as well as the traditional bond
market to determine which is more cost effective.
The City will utilize TIF revenues to repay the $8 million debt issued for the construction.
Landscaping and Enhancements Funding.
Dublin is responsible for the costs of the project features the ODOT determines to be above and
beyond that which is necessary for the construction of the interchange transportation
Interchange Project Update
August 21, 2014
Page 3of3
infrastructure. In case at hand, such features include the landscaping and other aesthetic items
such as guardrail painting. Staff has been negotiating the specific items of work associated with
these aesthetic features with the ODOT. It is anticipated that the additional aesthetic costs that
the City will be responsible for will total approximately $1.9 million. We do not expect any
additional cost for the artwork component.
Recommendation
ODOT requires local public agencies to provide what it refers to as "Preliminary Legislation"
indicating in general terms the governing body agrees to participate in the project prior to bidding
a project. Staff has been working with ODOT to draft a resolution to memorialize the funding
scenario and commitments of Dublin and ODOT as it relates to the interchange improvements.
Staff recommends approval of Resolution 77 -14 Granting Consent and Cooperation with the Ohio
Department of Transportation for the Construction of the I- 270 /US 33 Interchange Upgrade, Phase
1 at the August 25, 2014 Council meeting.
ODOT will also require what it refers to as "Final Legislation" and construction funding in late
December or early January prior to the Phase 1 bid opening.