Loading...
HomeMy WebLinkAboutResolution 60-14RECORD OF RESOLUTIONS Daylon I. sgal ftna Inc Form No 30045 60 -14 Resolution No. a Passed - 20 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A REIMBURSEMENT AGREEMENT WITH THE CITY OF COLUMBUS FOR THE RESURFACING OF SAWMILL ROAD WITHIN THE CITY OF DUBLIN WHEREAS, the cities of Dublin and Columbus identified the need to repair and resurface Sawmill Road from I -270 south to State Route 161; and WHEREAS, the two outside southbound lanes of this section of Sawmill Road are located in Dublin's jurisdiction and Dublin is responsible for pavement maintenance; and WHEREAS, Dublin has coordinated with Columbus to include pavement maintenance and curb ramps within Dublin's jurisdiction in Columbus' contract; and WHEREAS, the Dublin Community Plan promotes working cooperatively with surrounding jurisdictions to promote regional transportation planning and programming; and WHEREAS, Dublin agrees to reimburse Columbus for the work performed within Dublin's jurisdiction as a part of Columbus' contract. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The City Manager is hereby authorized to enter into a Reimbursement Agreement with the City of Columbus for the resurfacing of Sawmill Road within the City of Dublin, in substantially the same form as attached, with changes not inconsistent with this Resolution and not substantially adverse to this City and which shall be approved by the City Manager and Director of Finance. The approval of changes thereto by those officials, and their character as not being substantially adverse to the City, shall be evidenced conclusively by their execution thereof. Section 2 . The City Manager, the Clerk of Council, the Director of Law, the Director of Finance, or other appropriate officers of the City are hereby authorized to prepare and sign all agreements and instruments and to take any other actions as may be appropriate to implement this Resolution. The City Manager and the Director of Finance are also authorized, for an in the name of the City, to execute any amendments to the Reimbursement Agreement, which amendments are not inconsistent with this Resolution and not substantially adverse to this City. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed thi day of , 2014. yor - Presiding Officer ATTEST: Clerk of Council Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 -1090 City of Dublin Phone: 614 - 410 - 4400 • Fax: 614 - 410 - 4490 To: Members of Dublin City Council From: Marsha I. Grigsby, City Manager Vk4� Date: June 27, 2014 Initiated By: Megan O'Callaghan, P.E., Public Service Director Memo Re: Resolution No. 60 -14 — Authorizing the City Manager to Enter into a Reimbursement Agreement With the City of Columbus for the Resurfacing of Sawmill Road within the City of Dublin Summary The two outside southbound lanes of Sawmill Road from I -270 south to State Route 161 are located in the City of Dublin (Dublin). Therefore, Dublin is responsible for pavement maintenance on that section of Sawmill Road. The remaining lanes in this section are located in the City of Columbus. The entire section of Sawmill Road south of I -270 severely deteriorated over this past winter and the pavement is in need of repair this year. The City of Columbus (Columbus) will be repairing and resurfacing their portion of Sawmill Road in late July. In the interest of cooperation, efficiency, and minimizing traffic impacts, Dublin staff has been coordinating with Columbus staff to include pavement maintenance and curb ramp work needed for Dublin's section in Columbus' contract. Based on the current estimate, Dublin will contribute $152,326.42 to this project to resurface, replace pavement markings, and perform curb ramp repairs within Dublin's jurisdiction. This work is being accomplished as a part of Columbus' Resurfacing 2014 Project 1. Kokosing Construction Company, Inc. is the contractor and plans on performing the work in late July. Dublin's share will be due to Columbus later this summer after the work is completed. Recommendation Staff recommends approval of Resolution 60 -14, authorizing the City Manager to enter into a reimbursement agreement with the City of Columbus for pavement resurfacing of Sawmill Road and to perform curb ramp repairs within the City of Dublin. CAPITAL IMPROVEMENTS PROJECT REIMBURSEMENT AGREEMENT BETWEEN CITY OF COLUMBUS, OHIO AND CITY OF DUBLIN, OHIO FOR RESURFACING - RESURFACING 2014 PROJECT 1 CAPITAL IMPROVEMENT PROJECT 530282 - 912014 This Reimbursement Agreement the "Agreement"), pursuant to Ordinance No. , passed the day of , 2014, is made and entered into this day of , 2014, by and between the City of Columbus, State of Ohio, hereinafter designated COLUMBUS, acting by and through its Director of the Department of Public Service, hereinafter designated the DIRECTOR, and the City of Dublin, State of Ohio, hereinafter designated DUBLIN, collectively "Parties "; and WHEREAS, COLUMBUS proposes to construct or to cause to be constructed the Public Infrastructure Improvements as defined in Exhibit A attached hereto and incorporated herein and further known as the "Improvements "; and WHEREAS, COLUMBUS recognizes the benefit that the Improvements will have on its citizens and that it is in its best interests of COLUMBUS to enter into a Reimbursement Agreement with DUBLIN to construct such Improvements within the Dublin corporation limits; and WHEREAS, upon completion of the Improvements, DUBLIN shall make payment to COLUMBUS for said Improvements within the Dublin corporation limits. NOW THEREFORE, for and in consideration of the mutual covenants herein contained, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto do hereby covenant and agree, as follows: 1. DEFINITIONS: A. " Contract Documents shall mean collectively: a) this Agreement, including attachments /exhibits; and b) the approved plans and specifications for the Improvements. B. " Cost of Work is defined as the total cost of the project for the construction and inspection of the Improvements pursuant to Section 3 herein. C. " Estimated Cost means $152,326.42 for the Improvements within the Dublin corporation limits and specifically identified within Exhibit B, with the total not to exceed said amount, unless and until additional amounts are appropriated by DUBLIN, and an appropriate modification of this agreement is entered into by the parties. D. " Improvements " means those construction improvements described in the Contract Documents, and specifically identified within Exhibit A and within the Dublin corporation limits. E. " Work " means the construction of the Improvements. 2. CONTRACT TERM This contract shall commence on the date of execution and shall terminate after the project has been closed out. 3. GENERAL CONSIDERATIONS: In consideration of the promises of DUBLIN set forth herein, COLUMBUS agrees to construct, or cause to be constructed, the capital improvements identified in Exhibit A. In making the improvements, DUBLIN shall fully cooperate with COLUMBUS and shall follow and comply with all reasonable requests and instructions of COLUMBUS. The CITY or its contractor(s) shall be responsible for complying with all other Federal State and Local laws. In communications with each other, the Parties shall respond in a timely manner. 4. PROJECT GUARANTY: COLUMBUS shall require its Contractor(s) to warrant that the Work shall be free from defects in materials and workmanship (without regard to the standard of care exercised in its performance) for a period of one (1) year after final written acceptance of the Work. COLUMBUS' contractor(s) shall at its own expense: A. Correct or re- execute any of the Work that fails to conform to the requirements of the Contract Documents and appears during the prosecution of the Work. B. Correct any defects in materials and workmanship of the Work (without regard to the standard of care exercised in its performance) which appear within a period of one (1) year after final written acceptance of the Work or within such longer period of time as may be set forth in the Contract Documents, and C. Replace, repair, or restore any parts of the Work or any of the fixtures, equipment, or other items placed therein that are injured or damaged as a consequence of any such failure or defect, or as a consequence of corrective action taken pursuant hereto. 5. ACCEPTANCE OF THE WORK: Acceptance of the Improvements by DUBLIN shall not relieve COLUMBUS of its responsibility for defects in material or workmanship as set forth in Section 4. 6. RECORD PLAN DRAWINGS: If requested by DUBLIN for work done in their jurisdiction, COLUMBUS shall be responsible for requiring and compensating the design engineer for the preparation of record plan drawings for the subject project in accordance with the guidelines established by DUBLIN. The cost for preparation of record plan drawing preparation shall be reimbursed to COLUMBUS by DUBLIN. DUBLIN shall reimburse COLUMBUS within 30 calendar days of receipt of invoice. PERFORMANCE AND PAYMENT BOND: COLUMBUS agrees to require the subcontractor who performs the improvements to execute a contract performance and payment bond for 100% of the Work. 8. PUBLIC USE: DUBLIN and COLUMBUS agree that all improvements under this contract shall be dedicated for public use. Upon expiration of the one (1) year guarantee period as set forth in Section 5 herein, DUBLIN shall accept all maintenance responsibility for the improvements constructed under this agreement. 9. ESTIMATED COST AND FINAL ACCOUNTING: The estimated cost is $152,326.42. A. Exclusive Right — Dublin agrees that the Estimated Cost for the Improvements will be limited to those items specifically delineated within Exhibit `B ". The CITY, through the DIRECTOR, reserves the exclusive right to consider authorizing reasonable increases and /or decreases in said items, or approving new items that are deemed reasonable to the successful completion of the project, so long as the cost therein does not exceed the Estimated Cost. B. Construction Inspection Approval — When COLUMBUS's contractor(s) completes all of the Improvements set forth within Exhibit A, DUBLIN may request a final inspection. If items remain which must be completed or remedied by COLUMBUS's contractor(s) as determined by DUBLIN, COLUMBUS shall cause the work to be performed immediately upon being notified. All work must pass final inspection by COLUMBUS, and include a final accounting of the construction items utilized. C. Final Accounting — For purposes of determining the final construction cost of the project, COLUMBUS shall be required to keep complete and accurate books of account showing the Cost of Work and shall provide documentation of project related expenditures. When COLUMBUS has made final inspection and has deemed the Improvement to have been constructed in accordance with the contract documents, COLUMBUS shall proceed with a final accounting to arrive at the Cost of Work. COLUMBUS shall invoice DUBLIN and DUBLIN shall make payment to COLUMBUS within 30 days of receipt of invoice. If the final cost is greater than the Estimated Cost and additional funding is required, COLUMBUS and DUBLIN shall promptly modify this agreement, and DUBLIN shall make payment to COLUMBUS within 30 days of receipt of invoice and copy of executed agreement modification. D. Invoices — COLUMBUS shall provide DUBLIN with one (1) invoice for the Cost of Work, including City of Columbus inspection costs, that are applicable to the construction of the project, as defined in Section 1 hereof. The invoice is required to be itemized so as to provide a clear definition of the work. 10. LEGAL JURISDICTION: All claims, counterclaims, disputes and other matters in question between DUBLIN, its agents and employees, and COLUMBUS, its contractors, subcontractors and agents arising out of or relating to this agreement or its breach will be decided in a court of competent jurisdiction within the County of Franklin, State of Ohio. 11. ENTIRE AGREEMENT This agreement shall constitute the entire agreement between the parties and shall supersede all prior agreements, proposals, representations, negotiations and letters of intent, whether written or oral, pertaining to the Work. IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their duly authorized officers on the dates appearing below. CITY OF COLUMBUS Da Tracie Davies, Director Department of Public Service APPROVED AS TO FORM AND CORRECTNESS: Richard C. Pfeiffer, Jr., City Attorney CITY OF DUBLIN By: Marsha I. Grigsby City Manager Da EXHIBIT " A " The scope of work for the Improvements within Dublin's corporation limits includes resurfacing of Sawmill Road between SR 161 and I -270 and replacing and / or installing ADA ramps at Sawmill Road and SR 161. EXHIBIT B: CITY OF DUBLIN'S ESTIMATE REF. NO. ITEM NO. DESCRIPTION UNITS SECTIO _(A_ SECTION (B) RESURFACING TOTAL Total 16 254 PLANIN AS CONCRE (1" TO 3 "), AS PER PLAN SQ YD 698.00 11,060.00 11,758.00 $1.10 $12,933.80 21 407 COVER AGGREGATE TON 1.86 29.49 31.00 $7.00 $217.00 22 407 TACK COAT GALLON 69.80 1,106.00 1,176.00 $2.00 $2,352.00 202 ADA WALK REMOVED ASPHALT CONCRETE, SURFACE COURSE, (HEAVY TRAFFIC), PG70- 312.00 150.00 420.00 376.00 1,258.00 *NEW 31 448 22M t1.5" 1 CU YD 29.08 460.83 490.00 $171.00 $83,790.00 RESURFACING TOT $99,292.80 .90 44 608 ADA CURB RAMPS ADA CURB RAMP 1.00 1.00 1.00 1.00 4.00 $130.00 $520.00 45 608 ADA DETECTA WARNINGS, TYPE E _ RAMP #1 RAMP #2 RAMP #7 RAMP #8 $170.00 3 202 ADA CURB AND GUTTER REMOVED LIN FT 21.00 20.00 38.00 32.00 111.00 5 202 ADA WALK REMOVED SQ FT 312.00 150.00 420.00 376.00 1,258.00 *NEW 202 ADA CONCRETE M REMOVED SQ YD 60.00 2.50 250 2.50 2.50 10.00 60.00 12 203 ADA EXCAVATION CU YD 150 150 1.50 1.50 6.00 43 608 ADA CONCRETE WALK, 8" SQ FT 335.00 171.00 432.00 436.00 1,374.00 .90 44 608 ADA CURB RAMPS EACH 1.00 1.00 1.00 1.00 4.00 $130.00 $520.00 45 608 ADA DETECTA WARNINGS, TYPE E _ EACH 1.00 1.00 1.00 1.00 4.00 $170.00 $680.00 48 609 ADA COMBINATION CURB AND GUTTER, TYPE STANDARD LIN FT 21.00 20.00 38.00 32.00 111.00 $18.05 $2,003.55 *NEW* 609 ADA CONCRETE MEDIAN SQ YD 13.80 13.80 $79.60 $1,098.48 57 614 ADA LAW ENFORCEMENT OFFICER WITHOUT PATROL CAR HOUR 2.50 250 2.50 2.50 10.00 $53.00 $530.00 58 614 ADA MAINTAINING TRAFFIC, AS PER PLAN EACH 1.00 1.00 1.00 1.00 4.00 $30.00 $120.00 65 625 ADA PULLBOX, 11" x 18 x 18" D EACH 1.00 1.00 $880.00 $880.00 66 625 CONDUIT, 1 ", 713.04 * *CONTINGEN ** LIN FT 100.00 100.00 $12.00 $1,200.00 6 625 CONDUIT, 2 ", 713.04 * *CONTINGENCY ** LIN FT 100.00 100.00 $16.00 $1,600.00 68 625 GROUND ROD * *CONTINGENCY ** EACH 2.00 2.00 $25700 $514.00 70 625 T * *CONTINGENCY ** LI N FT 200.00 200.00 $17.50 $3,500.00 ADA REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, RE- 71 630 EACH 1.00 1.00 $300.00 $300.00 ERECTION 76 632 DETECTOR LOOP, AS PER PLAN EACH 2.00 2.00 $990.00 $1,980.00 77 632 LOOP DETECTOR LEAD -IN CABLE * *CONTINGENCY *" LIN FT 200.00 200.00 $4.00 $800.00 82 644 CROSSWALK LINE, 10" LIN FT 230.00 230.00 $3.00 $690.00 *NEW* 644 REMOVAL OF PAVEMENT MARKING LIN FT 525.00 525.00 $6.00 53.150.00 93 644 105 653 107 65 114 SPECIAL 116 SPECIAL STOP LINE, 20" LIN FT 60.00 ADA TOPSOI FURNISHED AND PLACED _ CU YD 1.00 ADA SEEDING AND M ULCHI N G SQ YD 2.00 ADA CONCR CUR 12" BEHIND WALK LIN FT 23.20 ADA PEDESTRIAN REMOTE PUSHBUTTON PEDESTAL, AS PER EACH PLAN 60.00 1.00 1.00 1.00 4.00 2.00 2.00 2.00 8.00 $1.0 $8.00 23.20 20.00 15.40 81.80 $15.10 $1,235.18 1.00 1.00 2.00 $2,350.00 $4,700.00 ADA CURB RAMP TOTAL: $40,45 EXHIBIT B: CITY OF DUBLIN'S ESTIMATE REF. NO. ITEM NO. DESCRIPTION UNITS SECTION (A ) S ECTION (B) TOT Total SUMMARY RESURFACING TOTAL: $99,292.80 ADA CURB RAMP TOTAL: $40,456.21 CITY OF COLUMBUS' INSPECTION SERVICES ( @9 %): $12,577.41 CITY OF DUBLIN'S TOTAL: $152,326.42 8 2014 STREET MAINTENANCE PROGRAM SAWMILL ROAD EXHIBIT 7V. .... ..... .... Ic grip 6 SAWMILL ROAD RESURFACING - CITY OF DUBLIN PORTION CORPLIMIT 6/25/2014 CM OF DUBLIN PROJECT NO. 14-001-CIP Ci ty of Dublin