HomeMy WebLinkAboutResolution 58-14RECORD OF RESOLUTIONS
Dayton Legal Blank, Inc Form No 3DO45
Resolution No.
58 -14
Passed
20
A RESOLUTION ACCEPTING
THE LOWEST AND BEST BID FOR THE
MUIRFIELD DRIVE /NORTH FORK INDIAN RUN
PEDESTRIAN BRIDGES PROJECT
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of
the Dublin Code, for the Muirfield Drive /North Fork Indian Run Pedestrian
Bridges project; and
WHEREAS, Council has determined that the bid submitted by Complete
General Construction Company constitutes the lowest and best bid; and
WHEREAS, Council has determined that there may be a legitimate need to
declare the relocation of the utilities in connection with the above - referenced
project as a "'single source" procurement, for reason that the company owning
the utilities in question has the exclusive rights to relocate such utilities.
N0 HEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
of its elected members concurring, that:
Section 1. The bid submitted by Complete General Construction Company in
the total amount of $629,727.10 is hereby accepted.
Section 2 . The City Manager is hereby authorized to enter into contracts
with Complete General Construction Company for performance and completion
of the Muirfield Drive /North Fork Indian Run Pedestrian Bridges project
pursuant to the Advertisement, Proposal and Contract Documents for said
project on file in the office of the City Engineer.
Section 3. This Resolution shall take effect upon passage in accordance
with Section 4.04(a) of the Revised Charter.
Passed this day of 2014.
J
140 1 or - Presiding Officer
ATTEST:
Clerk of Council
I cityof Dublin
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017 -1090
Phone: 614 - 410 -4400 • Fax: 614 - 410 -4490
To: Members of Dublin City Council
From: Marsha Grigsby, City Manager \ t J
Date: June 27, 2014
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer
Memo
Re: Resolution No. 58 -14
Muirfield Drive /North Fork Indian Run Pedestrian Bridges - Bid
Acceptance
Resolution No. 61 -14
Muirfield Drive Bike Lanes - Bid Acceptance
Background
In August 2011, the construction of bike lanes along Muirfield Drive from Moors Place to Glick Road was
included in the 2012 -2016 Capital Improvements Program (CIP) to be constructed in 2013 at an
estimated cost of $1,460,000, which did not include any design costs. Additionally, the project also
included shared -use paths, with pre- fabricated pedestrian bridges over the North Fork Indian Run, being
constructed both west and east of Muirfield Drive to connect the bike lanes to the existing shared -use
paths located at the Muirfield Drive /Brand Road roundabout.
It was always anticipated the construction of this project would commence after the annual Memorial
Tournament. In the 2012 update of the CIP, construction was moved to 2014 to avoid construction
during The Presidents Cup Tournament which occurred in October of 2013. Presently, the 2014 -2018
CIP includes $1,210,000 for construction of this project, which is the original construction estimate from
2011 -- less $250,000 for design fees encumbered in 2013.
The detailed design effort to develop the construction plans revealed that the original construction cost
estimate from 2011 did not accurately reflect the cost to construct the pre- fabricated structures over the
North Fork Indian Run. Additionally, the 2011 estimate provided for relocating the existing streets lights
maintained by American Electric Power (AEP) rather than providing an entirely new system of LED
streets lights to be owned and maintained by Dublin.
As a result, the Engineer's estimate for construction that was developed, based on final plans for this
work is $2,800,000. This represents $600,000 for the installation of two 67 -foot long pre- fabricated
pedestrian bridges and the eight -foot wide asphalt path that will connect the existing path located at the
Muirfield Drive /Brand Road roundabout to the bike lanes. The bike lanes represent $2,200,000 for the
addition of full -depth asphalt pavement to the outside of both the northbound and southbound lanes of
Muirfield Drive to create a five -foot wide bike lane. The total project length is approximately 9,200 feet,
beginning just north of the North Fork Indian Run and ending just south of Glick Road. Existing storm
sewers will be modified as necessary along with the installation of some new storm sewers. To allow for
the pavement widening, the existing AEP -owned street lights will be removed and replaced with City of
Dublin -owned LED street lights 25 feet in height. The project was packaged and bid as two separate
projects due to the differing types of work.
Summary
Resolution 58 -14
On June 20, 2014, three (3) bids were received, publicly opened and read for the Muirfield Drive /North
Fork Indian Run Pedestrian Bridges project. The Engineer's estimate is $600,000.00. Complete General
Memo re. Res. 58 -14 and 61 -14 ( Muirfield Drive /North Fork Indian Run Pedestrian Bridges and Muirfield Drive Bike
Lanes — Bid Acceptance)
June 27, 2014
Page 2 of 2
Construction Company submitted the lowest and best bid of $629,727.10. Staff has reviewed all bids
and a summary of the bids is listed below.
Resolution 61 -14
On June 20, 2014, four (4) bids were received, publicly opened and read for the Muirfield Drive Bike
Lanes project. The Engineer's estimate is $2,200,000.00. Complete General Construction Company
submitted the lowest and best bid of $1,733,497.04. Staff has reviewed all bids and a summary of the
bids is listed below.
Bid as Read
Bidder
Bid as Read
Over ( +) or Under ( -)
Corrected Bid
Engineer's Estimate
Complete General Construction
$629,727.10
o
+5.0 /o
Company
George J. Igel & Company, Inc.
$634,284.50
+5.7%
Double Z Construction
$913,225.00
+52.2%
Resolution 61 -14
On June 20, 2014, four (4) bids were received, publicly opened and read for the Muirfield Drive Bike
Lanes project. The Engineer's estimate is $2,200,000.00. Complete General Construction Company
submitted the lowest and best bid of $1,733,497.04. Staff has reviewed all bids and a summary of the
bids is listed below.
For Council's reference and review, a reduced set of project construction drawings for both projects has
been placed in the Council Planning Room.
Staff anticipates the construction to commence in July of 2014. Muirfield Drive will remain open to
traffic for the duration of the construction. The scheduled completion date for the project is November
7, 2014.
Staff has thoroughly reviewed the bids from Complete General Construction Company. Previous
experience with Complete General Construction Company has been favorable, including these recent
projects: Emerald Parkway Improvements (Tuttle Crossing Boulevard to Rings Road); Avery- Muirfield
Drive / Post Road Roundabout; and Historic District Pedestrian Improvements.
Recommendation
Staff recommends Council approval of Resolutions 58 -14 and 61 -14, accepting as lowest and best the
bid of Complete General Construction Company in the amount of $629,727.10 for the Muirfield
Drive /North Fork Indian Run Pedestrian Bridges Project and $1,733,497.04 for the Muirfield Drive Bike
Lanes Project, and authorizing the City Manager to enter into a contracts with Complete General
Construction Company for these projects.
Bid as Read
Bidder
Bid as Read
Over ( +) or Under ( -)
Corrected Bid
Engineer's Estimate
Complete General Construction
$1,733,497.04
-21.2%
Compan
Shelly & Sands, Inc.
$1,800,620.20
-18.2%
Strawser Paving Company, Inc.
$1,880,253.27
-14.5%
Columbus Asphalt Paving, Inc.
$1,926,531.81
-12.4%
For Council's reference and review, a reduced set of project construction drawings for both projects has
been placed in the Council Planning Room.
Staff anticipates the construction to commence in July of 2014. Muirfield Drive will remain open to
traffic for the duration of the construction. The scheduled completion date for the project is November
7, 2014.
Staff has thoroughly reviewed the bids from Complete General Construction Company. Previous
experience with Complete General Construction Company has been favorable, including these recent
projects: Emerald Parkway Improvements (Tuttle Crossing Boulevard to Rings Road); Avery- Muirfield
Drive / Post Road Roundabout; and Historic District Pedestrian Improvements.
Recommendation
Staff recommends Council approval of Resolutions 58 -14 and 61 -14, accepting as lowest and best the
bid of Complete General Construction Company in the amount of $629,727.10 for the Muirfield
Drive /North Fork Indian Run Pedestrian Bridges Project and $1,733,497.04 for the Muirfield Drive Bike
Lanes Project, and authorizing the City Manager to enter into a contracts with Complete General
Construction Company for these projects.