HomeMy WebLinkAboutResolution 59-14RECORD OF RESOLUTIONS Dayton Legal Blank, Inc _ Form No. 30045 59 -14 Resolution No. Passed . 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE 2014 SIDEWALK MAINTENANCE PROGRAM WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the 2014 Sidewalk Maintenance Program; and WHEREAS, Council has determined that the bid submitted by B &C Blacktop Sealing, Inc. constitutes the lowest and best bid; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above - referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted by B &C Blacktop Sealing, Inc. in the total amount of $266,440.00 is hereby accepted. Section 2 . The City Manager is hereby authorized to enter into contracts with B &C Blacktop Sealing, Inc. for performance and completion of the 2014 Sidewalk Maintenance Program pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this day of 2014. Mayor - Presiding Officer ATTEST: Clerk of Council Office of the City Manager 5200 Emerald Parkway • Dublin, 01-143017-1090 City of Dublin Phone: 614 - 410 -4400 • Fax: 614 - 410 -4490 To: Members of Dublin City Council From: Marsha I. Grigsby, City Manager Date: June 27, 2014 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer Memo Re: Resolution No. 59 -14 - 2014 Sidewalk Maintenance Program — Bid Acceptance Summary On June 19, 2014, (5) bids were received, publicly opened and read for the 2014 Sidewalk Maintenance Program, which involves the removal and replacement of deficient sidewalk sections. The 2014 Program will include work on existing sidewalks in the following subdivisions: Indian Run Meadows, Dublinshire, Earlington Village (Sections 2, 3 and 4), Hemingway Village, Shannon Park, Ballantrae (Sections 2 -5 and 1 -1), Waterford Village (Section7) and Brighton Park. The 2014 work was originally intended to be performed by Adleta, Inc. (based in Cincinnati, Ohio) as a second phase of the 2013 Sidewalk Maintenance Program by means of an addendum to the 2013 Program. However, as a result of actual costs exceeding their bid prices, Adleta, Inc. declined the requested addendum for the 2014 Program. This resulted in the 2014 Sidewalk Maintenance Program being advertised for bid as a separate project. The Engineer's estimate is $250,000.00. The budgeted amount in the 2014 Capital Improvement Program (AT1406) for the 2014 Sidewalk Maintenance Program is $250,000.00. B &C Blacktop Sealing, Inc. submitted the lowest and best bid of $266,440.00. Staff has reviewed all bids and a summary of the bids is listed below. Bidder Bid as Read Bid as Read Over ( +) or Under ( -) Engineer's Estimate Corrected Bid B &C Blacktop Sealing, Inc. $266,440.00 +6.5% Shelly & Sands, Inc. $314,952.00 +25.9% Ohio Paving & Construction $348,798.40 +39.5% Columbus Asphalt Paving, Inc. $396,437.00 +58.5% Adleta Construction $528,312.00 +111% For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. The bids received were higher than anticipated for the removal and replacement of the concrete sidewalk areas. The Sidewalk Maintenance Program is not a project where a contractor can expect high productivity, and this is reflected in the increased costs for the replacement of the concrete sidewalks. Memo re. Res. 59 -14 - 2014 Sidewalk Maintenance Program — Bid Acceptance June 27, 2014 Page 2 of 2 As in the past, the majority of the sidewalk repair locations are caused by roots from mature trees heaving the sidewalks. As part of the repair process, these roots will be pruned and removed. A few trees that have larger roots removed in the sidewalk repair process will also have their canopies thinned and trimmed by forestry staff from the Parks Division. Engineering works closely with the forestry staff on the sidewalk repair process to ensure impact to trees will be minimized where feasible. Staff anticipates initial construction activities to begin on August 4, 2014 (after the Irish Festival) with a completion date of October 24, 2014. An Engineering Project Inspector will closely monitor this work, including the coordination with adjacent residents. Staff has thoroughly reviewed the B &C Blacktop Sealing, Inc. bid. While this contractor has not previously worked for the City of Dublin, they did provide references for projects they have recently constructed within central Ohio. Staff has contacted representatives of these projects and received acceptable feedback on the work performed by B &C Blacktop Sealing, Inc. and their performance capabilities. Recommendation Staff recommends Council approval of Resolution 59 -14, accepting as lowest and best the bid of B &C Blacktop Sealing, Inc. in the amount of $266,440.00 and authorizing the City Manager to enter into a contract with B &C Blacktop Sealing, Inc. for this project. 7 city of Dublin Sidewalk Program City of Dublin Division of Engineering