RECORD OF ORDINANCES
Dayton Legal Blank Co. Form No. 30043
Ordinance No.__~95----------- P assed- u__ __________ ____ ________ ______ ----- ___19 - ---'-
AN ORDINANCE AUTHORIZING THE CITY MANAGER TO
ENTER INTO AN AGREEMENT WITH THE CITY OF COLUMBUS
",.... FOR THE CONSTRUCTION AND MAINTENANCE
OF THE UPPER SCIOTO WEST BRANCH INTERCEPTOR,
AND DECLARING AN EMERGENCY
.....
WHEREAS, the City of Dublin entered into a Sewer Service Agreement with the City
of Columbus on Apri113, 1993 whereby Columbus agreed to receive, transport and treat
sanitary waste water discharged by Dublin into the sewer system of Columbus; and
WHEREAS, the Sewer Service Agreement contemplates a separate agreement for the
construction and maintenance of an extension to the Upper Scioto West Branch
Interceptor, part of which is to be located in the City of Dublin (the "Dublin Segment");
and
WHEREAS, it is necessary for the City of Dublin to execute an agreement with the City
of Columbus for the construction and maintenance of the Upper Scioto West Branch
Interceptor so that the project may commence; and
WHEREAS, the Ohio Environmental Protection Agency has outstanding Orders and
Findings for the City of Dublin requiring the expeditious implementation of the Upper
Scioto West Branch Interceptor.
",...... NOW. ~RE. BE IT ORDAINED. by the Council of the City of Dublin, State
of Ohio, elected members concurring:
-
Section 1. That the City Manager is hereby authorized to execute the agreement with
the City of Columbus for the Construction and Maintenance of the Upper Scioto West
Branch Interceptor in substantially the form attached hereto as Exhibit "A".
Section 2. That this ordinance be, and the same hereby is, declared to be an emergency
measure for the preservation of public peace, health or welfare of the residents of this
City, and for the further reason that the project must be initiated immediately to ensure
adequate sewer capacity and to comply with the Orders and Findings of the Ohio
Environmental protection Agency.
Passed this ~ day of ~' 1995.
Mayor - /!1YJt{!
,....
~~(I~~
.. Clerk of Council
......
d' the
f ~ere {loste \11 '
, his ord'nnnte~~C\\l II} . R ised Code.
titv ,ha\ to\l'.es of t . 73' 2.5 of the 0'1\0 ev
,~y ter . , d vM~ Sed10n .
GIy of oub\in in QttOr Qnte
l-
. \) brn Ohio
\<. t (O\ll1tl\ Ij I .
e\er 0 .
" ...<......,~.~-..-..,...".._''''.",.'''._,~...;'''' , '%:.~....~$I""',.,.-~~,.'"'.'"'''''..-''~-''!'>.''''....~._.''''''"'''
_ ~~___"'_~~~~~h~ ~~~"_ ~ ,...,_~_~._,~.~"=,,,<"
DRAFT
UPPER SCIOTO WEST SANITARY INTERCEPTOR
SEWER CONSTRUCTION AND MAINTENANCE AGREEMENT
This Agreement is entered into by and between the City of
Dublin, Ohio ("Dublin") and t11e City of Columbus, Ohio
("Columbus") .
Recitals
-- I. On April 13, 1993, the parties executed the Sewer
Service Agreement whereby Columbus agreed to receive, transport,
and treat sanitary waste water discharged by Dublin into the sewer
-
system of Columbus.
II. The Sewer Service Agreement contemplates the
construction of an extension to the Upper Scioto West Interceptor
Sewer part of which is to be located in the City of Dublin (the
"Dublin Segment").
III. The Dublin Segment will commence at Drop Shaft
No. 11 approximately 1100 feet south of Tuttle Road, adjacent to
the Hayden Meadows Pump Station and will proceed north
approximately 6800 feet.
IV. The Dublin Segment will include Drop Shaft No. 12
at the Cramer Ditch Pump Station; Drop Shaft No. 13 at Marilea
Drive; and Drop Shaft No. 14 (Exit Portal) at the Dublin Pump
Station.
V. The parties desire that Columbus enter into a
contract with a qualified contractor to construct the Dublin
Segment, and the parties desire that Columbus manage the Project.
VI. Dublin desires to have Columbus provide the
""" engineering services in connection with the construction of the
Dublin Segment and Columbus desires to provide the same.
_M VII. DUblin will pay for the engineering services and
Dublin and Columbus will share the costs of construction for the
Dublin Segment as set forth in this Agreement.
VIII. Dublin intends to apply to the Water Pollution
Loan Fund administered by the Ohio Environmental Protection Agency
for assistance in funding this project.
IX. The parties desire to delineate their
responsibilities with respect to the construction and maintenance
of the Dublin Segment.
-
" .. ~"~~~'.'m~'.....~~.....",-",~
'-'~'''~'''--'~"''''''''''''''_._'''-.'~='"'~''=~-'~"--~-=~' .~ ~--""""""'_..,-,., "..~"=~~~
Therefore, the parties agree as follows:
Section 1. Definitions.
1.1. "Contractor" means the individual, firm,
partnership, or corporation which enters into a contract with
Columbus for the construction of the Dublin Segment.
1.2. "Contract Documents" means the agreement between
-- Columbus and the Contractor, the general and supplemental
condi tions, the drawings, specifications, plans, and any
~ amendments, addenda or supplements thereto.
1.3. "Project" means the construction of the Dublin
Segment.
1.4. "Construction Cost" means the total cost of the
labor, materials and equipment contracted for by the Contractor for
construction of the Dublin Segment. "Construction Cost" shall not
include compensation for engineering services to be performed by
Columbus.
1.5. "proj ect Cost" means the total cost of the
Project including the Construction Cost; the cost of engineering,
construction management and quality control services; and the cost
of acquisition of all real and personal property necessary for the
Project.
Section 2. Engineering Services. Columbus shall provide
design engineering, bidding assistance, construction management,
construction surveying, staking, layout and quality control
management as those services are set forth in this Agreement and as
more fully set forth in the engineering agreement attached hereto
-~ and incorporated herein as Exhibit 2.1.
"..'~
Section 3. Preconstruction.
3.1. Duties of Columbus.
3.1.1. Columbus shall prepare the detailed
plans, drawings, specifications, all other Contract Documents,
and other essential information and documentation.
3.1.2. Columbus shall submit the plans,
drawings, specifications, and all other Contract Documents to
Dublin for its review.
JWS/VLY/153890
035505.188
Revised June 27, 1995 2
-
- .'-..,.....
-~ ~"".'-'--_."~
3.1.3. Columbus shall prepare all legal surveys,
legal descriptions and plats of real property necessary for
acquisition by Dublin,
3.1.4. Columbus shall prepare and update as
necessary a project schedule.
3.1.5. Columbus shall prepare and update an
estimate of the Construction Cost.
- 3.1.6. Columbus shall manage the bid letting and
bid award process. Columbus shall conduct a pre-bid meeting
- and such other meetings as the parties deem necessary and
appropriate. Columbus shall receive and open the bids,
prepare a tabulation of the bids, and forward the appropriate
bid documents to Dublin together with a recommendation for the
award of a contract. Columbus shall award and enter into a
contract with a qualified contractor subject to approval by
Dublin.
3.2. Duty of Dublin. Dublin shall acquire all real
and personal property interests wi thin the City of Dublin necessary
for the Project.
Section 4. Construction.
4.1. Duties of Columbus.
4.1.1. Columbus shall be responsible for
managing the Project and coordinating the work of the
Contractor to complete the Project in accordance with the
Contract Documents.
4.1.2. Columbus shall be responsible for
~ inspecting the work of the Contractor to ensure the quality
and workmanship of the work and to ensure that the work is
.,.",,* being performed in accordance with the Contract Documents. If
Columbus finds that the Contractor's work is defective, or
otherwise not in conformance with the Contract Documents,
Columbus shall promptly notify Dublin. Columbus is hereby
authorized to reject work which does not conform to the
Contract Documents.
4.1.3. Columbus, on a monthly basis, shall
submit a progress report to Dublin.
JWS/VLY/153890
035505.188
Revised June 27, 1995 3
-
_.,._~~~'''-===-~~~~~",.....~~~._~.~.,." .'--'-'-,
4.1.4. Columbus shall regularly review the
Project schedule and shall inform Dublin of any variances
between the project schedule and the actual progress of the
work and the reasons for such variances.
4.1.5. Within one (1) week of receipt of any
change orders, Columbus shall review and forward the change
orders with recommendations to Dublin. All change orders are
subject to approval by Dublin.
-- 4.1.6. Within two (2) weeks of receipt of the
Contractor's request for payment, Columbus shall review the
-- Contractor's request for payment and make a recommendation to
Dublin with respect to payment of the same. Columbus shall
certify requests for payments to Dublin if Columbus determines
that the work has progressed as indicated and is in accordance
with the Contract Documents.
4.1.7. Columbus shall be responsible for
clarifying and interpreting the Contract Documents. All such
clarifications and interpretations are subject to approval by
Dublin.
4.1.8. Columbus shall review and make
recommendations with respect to the Contractor's claims. The
disposition of the Contractor's claims are subject to the
approval of Dublin.
4.1.9. Columbus shall be responsible for
verifying that the Contractor has in place safety programs to
ensure that safety in the Project shall meet all federal,
state, and local laws, ordinances and regulations.
4.1.10. Columbus shall be responsible for
reviewing shop drawings, materials, and other submittals for
- conformance with the Contract Documents. All such reviews are
subject to approval by Dublin.
-...
4.1.11. When Columbus determines that the proj ect
is substantially complete and ready for operation, Columbus
shall promptly notify Dublin.
Section 5. Operation and Maintenance.
5.1. Routine Inspections and Maintenance.
5.1.1. Columbus, at its expense, shall inspect
the Dublin Segment at least annually or with such greater
frequency as Columbus deems necessary and appropriate.
JWS/VLY/153890
035505.188
Revised June 27, 1995 4
-
"'._........-""'.>..,_".~.,~.~__"<,,_." .~._~v~,.."'~"..""__.".~_..,.-,.-_._,,~,"" ," ..... .~.,_.~~~_..-.=.......w~.~....._
v~" ~
5.1.2. Columbus shall perform all preventive
maintenance. The scope of preventive maintenance shall be
clearly delineated in the Operations and Maintenance Manual
approved by both Dublin and Columbus.
5.1.3. Columbus, at its expense, shall provide
all labor, materials, and specialized access, communications
and safety equipment to perform the inspections and preventive
maintenance required by Sections 5.1.1. and 5.1.2.
....... 5.1.4. Whenever possible, Columbus shall provide
the Dublin City Engineer at least twenty-four (24) hours
- advance notice of any inspections and/or maintenance
activities.
5.1.5. Within one (1) week of inspection or
maintenance work, Columbus shall provide Dublin a report of
the results of such inspections or maintenance activities.
5.1.6. Columbus shall ensure that all fixed
equipment furnished in the Project is and remains mechanically
sound and safe.
5.2. Non-Routine Repairs.
5.2.1. If Columbus learns that the sewer system
in the Project requires repairs other than those specified in
Section 5.1, Columbus shall notify Dublin within one (1) week
after it learns of the necessity for such repairs. Columbus
shall provide Dublin with an estimate of the cost of such
inspections and repairs prior to performing the inspection or
repair.
5.2.2. In the event of an emergency, Columbus
shall, to the extent practicable, inform Dublin within twenty-
- four (24) hours prior to such inspections and/or repairs.
Columbus shall provide an estimate prior to commencing work to
~d the extent practicable.
5.2.3. Upon approval of the needed inspections
and/or repairs by DUblin, Columbus shall perform the necessary
inspections and make the necessary repairs. Columbus shall
provide all labor, materials, and specialized access,
communications and safety equipment to perform such
inspections and make such repairs.
5.2.4. Dublin agrees to pay and to reimburse
Columbus for the costs of those inspections and repairs
approved by Dublin as set forth in Section 5.2.3. Columbus
shall provide Dublin with documentation with respect to its
JWS/VLY/153890
035505.188
Revised June 27, 1995 5
-
~-=,"="",,._-.
- ^"'~"_. -~._.".,-,=. ~
.
charges for such inspections and repairs. Notwithstanding the
foregoing, Dublin shall not be responsible for the costs of
inspections and repairs resulting from the defective design or
construction of the sewer system or the failure of Columbus to
properly perform the reql1ired preventive maintenance.
5.3. Maintenance of Surface Areas. Dublin shall be
responsible for the maintenance of all surface areas of the Dublin
Segment. This duty shall include maintaining parking areas and
drives and performing such landscape maintenance as Dublin deems
-- necessary and appropriate. Dublin shall not be responsible for
maintaining any structural components of the Dublin Segment (such
-- as drop shafts, access shafts and main sewer lines).
5.4. Operation.
5.4.1. Columbus shall monitor the system and
make any necessary adjustments in order to ensure that the
infiltration/ inflow level from the sewer in the Project during
wet weather periods does not exceed design levels. The inflow
and infiltration shall be a maximum of 100 gallons per inch of
pipe diameter per mile per day.
5.4.2. Columbus shall ensure that the sewer
system meets design specifications and designed flow
conditions.
Section 6. EPA Certification.
6.1. The parties understand that within one (1) year
from the date of completion of the Project, Dublin is required to
submit a Certification of Performance to the State of Ohio
Environmental Protection Agency.
~ 6.2. Columbus shall reasonably cooperate with Dublin
so that Dublin may complete and submit the Certification of
_4 Performance to the State of Ohio Environmental Protection Agency
within one (1) year from the date of completion.
6.3. Within ten (10) months following completion of
the Project, Columbus shall prepare an Operations and Maintenance
Manual and provide Dublin at least three copies of the same.
6.4. Dublin shall review the Dublin user charge system
and associated user fees to assure that adequate operating and
replacement funds are being generated. Dublin shall prepare a
projection of the adequacy of the Dublin user charge system and
shall make any recommendations for necessary Dublin user charge
system and/or sewer use ordinance revisions.
JWS/VLY/153890
035505.188
Revised June 27, 1995 6
....
__O'_'__'_'_'~_'~ "
Section 7. Payments.
7.1. Fees for Services Rendered by Columbus.
7.1.1. Dublin shall pC'.y
($ ) to Columbus for engineering services
performed prior to the date of this Agreement. Payment for
these engineering services will be made in a lump sum payment
to Columbus.
- 7.1.2. Dublin shall pay Columbus for the
following services in amounts not to exceed the following:
- Construction Management and $
Inspection Services
Operational Phase Services $
7.1.3. Columbus shall provide to Dublin invoices
detailing work performed in connection with these charges.
7.2. Project Cost.
7.2.1. The parties agree that pursuant to
Section l(K) of the Sewer Service Agreement, Dublin shall pay
all of the Project Cost up to $10,100,000.
7.2.2. Columbus shall pay one-half of the
Project Cost in excess of $10,100,000. Once the Project Cost
reaches $10,100,000, Columbus will pay to Dublin one-half of
the cost reflected on the requests for payment submitted by
the Contractor at the time the requests for payment are
forwarded to Dublin. Dublin will then make payments or cause
payments to be made directly to the Contractor. Columbus will
also reflect a credit of one-half of the cost reflected on the
invoices for services performed by Columbus as detailed in
~ Section 7.1.2. The total amount paid by Columbus shall not
exceed $3,000,000.
.,,-.;<!j
7.2.3. Dublin shall pay all of the Project Cost
in excess of $16,100,000.
7.3. Authorization and Certification of Funds. The
parties agree that the financial obligations set forth in this
section are conditioned upon the prior authorization by the
Councils of Columbus and Dublin and the certification of
availability of funds by the Auditor of the City of Columbus and
the Finance Director of the City of Dublin.
JWS/VLY/153890
035505.188
Revised June 27, 1995 7
....
,,",~-~~'.'.-- ._-~""",,~...,..,~,,,,",-~"'~'"'"""-~'"'-'~'~'~ .,....~".
., "~.._-~=-.~~-
Section 8. compliance With Laws. Columbus shall comply with
all applicable federal, state, and local laws, rules, and
regulations, which in any manner affect those engaged or employed
on the work, or which in any way affect the conduct of the work and
shall ensure that the Project is designed, constructed, and
maintained i~ accordance with all applicable federal, state, and
local laws, rules, and regulations, specifically including, but not
limited to, the requirements of the United states Environmental
Protection Agency and the Ohio Environmental Protection Agency.
-
Section 9. Warranty. Columbus warrants that the sewer system
~ will be constructed in accordance with the Contract Documents and
free from defect in workmanship and materials for a period of one
(1) year, which period shall commence on the date of certificate of
substantial completion. This warranty shall be in addition to, and
not a limitation of, any other guarantee or remedy provided by law.
Should defects arise during the warranty period, Dublin shall
promptly notify Columbus in writing, and Columbus, at its expense,
shall repair the defective work.
Section 10. General.
10.1. Assignment and Binding Effect. Neither party may
assign any of the rights or obligations of this Agreement without
the prior written consent of the other party; provided, however,
that the terms of this Agreement shall be binding on the successors
and assigns of the parties.
10.2. Counterparts. This Agreement may be executed in
counterparts, each of which shall be an original; but such
counterparts together shall constitute but one and the same
instrument.
~- 10.3. Entire Agreement. This Agreement contains the
entire agreement between the parties and supersedes any prior
...",. understandings or agreements between them respecting the subj ect
matter. No changes, alterations, modifications, additions, or
qualifications to the terms of this Agreement shall be made or be
binding unless made in writing and signed by both parties.
10.4. Notices. All notices, reports, or other
documents pursuant to this Agreement shall be sent to the parties
at the following addresses:
JWS/VLY/153890
035505.188
Revised June 27, 1995 8
..
-",",---,,,,,,-~~~'-~--~,,,,-~-~,,,,,,,,,,-,,,,,,-,,,=,,,, ,.;--~",'
City of Columbus: Director of Public utilities
910 Dublin Road
Columbus, Ohio 43215-9060
City of Dublin: City Engineer
5800 Shier-Rings Road
DUblin, Ohio 43017
Either party may change such party's representative for
receiving notices, reports, or other documents or its mailing
- address by sending written notice of such change to the other
party.
-
IN WITNESS WHEREOF, the parties have executed this
Agreement as of the dates set forth opposite their signatures.
CITY OF DUBLIN, OHIO
Date: By:
Timothy C. Hansley, City Manager
APPROVED AS TO FORM:
Date:
Stephen J. Smith
Law Director, City of Dublin, Ohio
CITY OF COLUMBUS, OHIO
- Date: By:
James P. Joyce, P.E. , Director
........ of Public Utilities
APPROVED AS TO FORM:
Date:
Ronald J. O'Brien
City Attorney
City of Columbus, Ohio
JWS/VLY/153890
035505.188
Revised June 27, 1995 9
.....