RECORD OF ORDINANCES
Dayton Legal Blank Co. Form No. 30043
Ordinance No. nn~!~~~_u_nn Passed m____ ----------- mnn19
AN ORDINANCE TO AMEND SECTION
1305.01 OF THE DUBLIN CODIFIED
ORDINANCES - CABO ONE AND TWO
FAMILY DWELLING CODE
WHEREAS, it has been determined that Section 1305.01 of the Dublin
Codified Ordinances be amended, said section which adopted the 1986
CABO One and Two-Family Dwelling Code, along with the 1987 and 1988
amendment s.
WHEREAS, the Dublin City Council, by reference on October 2, 1989
adopted the 1989 CABO One and Two Family Dwelling Code.
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin,
State of Ohio, 6 of the elected members concurring:
Section 1. That Section 1305.01 of the Dublin Codified Ordinances be
amended, the City of Dublin, by reference, adopting the 1990 Amendments
to the CABO One and Two Family Dwelling Code.
Section 2. That this Ordinance shall take effect and be in force from
and after the earliest period allowed by law.
Passed this 16th day of July , 1990.
Attest:
1~~ ~n~~~
r hereby certify that copies of t~is Ordfnance/Resolution were posted in th'
CIty of Dublin in accordance with Section 731,23 of the OhiQ Rtyiwd CQ~Q.
/l.
__Jl{4~
Clerk ef (
I
MEMORANDUM
TO: Council Members
FROM: Timothy C. Hansley
SUBJECT: Street Lighting Appropriation
DATE: July 11, 1990
Submitted by: Patrik Bowman, Planning Director
The 1990 capital budget includes $150,000 for the installation of street lights.
Staff intended that this sum be used exclusively for the Dublin Village Center
area as we have been working with the Drexel Development Corporation for
many years to install street light s. The project has grown slightly to
include the land developed and sold by State Savings Bank known as Dublin
City Center.
The $150,000 that was budgeted was always intended by staff to cover only
a portion of the project costs. It was expected that the developers
would cover a portion of the total cost. Due to the fact that the
installation of street lights must be "retro-fitted", the project cost is
much greater than if the lights had been installed with the street. The
total cost to do both projects is estimated to be $306,600 (see estimate
attached) .
Drexel has agreed to pay half the cost of installation for their project
providing they can pay it back over five years with interest. Drexel's
project accounts for two thirds of the total project. Staff intends to try
and strike the same deal with State Savings to cover half of the installation
costs for their portion of the project. If an agreement cannot be struck
with State Savings to pay up front or to be assessed, their portion of the
installation will be held off.
As the City of Dublin must initially put up all the money for the project,
an additional sum of $156,600 must be appropriated to cover the costs. Staff
has also respectfully requested that this Ordinance be an emergency to permit
time to firm up the payback agreements, bid the project and complete the
work this fall.
I
~~~~::MCMUlLEN
ENGINEERING CO., INC.
MECHANICAL & ELECTRICAL ENGINEERS
3814 MORSE RD. COLUMBUS, OHIO 43219 June 1, 1990
614-475-2850 FAX: 475-0259
Mr. Mark Jones
City of Dublin
5131 Post Road, suite #105
Dublin, Ohio 43017
Reference: Dublin Village Center - street Lighting
Subject: Project Cost Estimate
Dear Mark:
Per your request stated below is the cost estimate on the above
referenced project.
Dublin Village Center - Total Project Cost Estimate
Construction Cost (Based on 70 Units)
Base Material $124,160
Base Labor $ 82,770
Subtotal #1 $206,930
Contractor Overhead $31,040
Contractor Profit $23,800
Contractor Insurance $ 260
Contractor Performance Bond $ 5,240
Subtotal #2 $267,270
contingency $13,400
Subtotal #3 $280,670
Construction Cost $281,000
Design Cost $ 16,800
1 a TOTAL #4 I $297.800
lThis Total cost does not include any City of Dublin ministration
costs for managing this project.
aColumbus Southern Power to date has not submitted
If you have any questions, please contact us.
Respectfully,
4Jd}; ~ r~ ~ """reo ~
.( I -t..\vr~s.:;:. ~O(., ) 000
Will1am R. L gan AIA/IES
Project Man ger
MECI #9005-
WRL #9026
I
O-R-e-X-e-L
DEVELOPMENT CORPORATION
February 23, 1990
patrik G. Bowman
Planning Director
City of Dublin
5131 Post Road
Dublin, Ohio 43017
RE: street Lights
Dublin Village Center
Dear Pat:
Since we last met to discuss the installation of street lights
within the public right-of-ways abutting Dublin Village Center, I
have reviewed the City's proposal with Harlan Friedman. Based upon
unit pricing that was provided by Mark Jones, we would like to
formalize an Agreement with the City of Dublin based upon the
following economic parameters.
1. Purchase and installation of Kim $ 4,200.00
Lighting's Archetype, 400 watt, high
pressure sodium fixture (cost shown
on a per fixture basis)
2. Village Parkway - 20 fixtures $ 84,000.00
Tuller Road - 15 fixtures 63,000.00
Dublin Center Drive - 12 fixtures 50,500
TOTAL COST: $ 197,400.00
3. Total project cost to be shared on
an equal basis between the City and
Developer
City of Dublin's contribution $ 98,700.00
continental Sawmill Limited $ 98,700.00
Partnership's contribution
4. CSLP's cost of the project is to be
assessed to the development on a semi-
annual basis, for a five (5) year
period, at an interest rate not
to exceed eight (8) percent
(loan constant = .250456)
2C9 EAST STATE STREET COLUMBUS. OHIO 43215 (614) 228-2400
I
..
patrik K. Bowman
February 23, 1990
Page: 2
Annual Expense $ 24,720.01
Total payback over the five (5) $ 123,600.00
year period.
For ease of reference, I have attached the site plan that was
prepared on behalf of the City of Dublin by McMullen Engineering
indicating the areas that are to be included within this
improvement project.
As requested, the Partnership is willing to donate the 0.100 acre
parcel to the City of Dublin for the purpose of incorporating it
with the proposed right-of-way for Shamrock Boulevard.
As soon as possible, we would like to meet with you to review the
contractual arrangements that will be necessary between our two
organizations. Additionally, we would appreciate receiving a
detailed construction schedule for this project.
s~
william H. Adams
Director of Development
WHA:dt
cc: Mark W. Jones
Harlan S. Friedman
DVC DUB; street Lighting
HAND DELIVERED