Loading...
HomeMy WebLinkAbout067-90 Ordinance I RECORD OF ORDINANCES Dayton Legal Blank Co. Form No. 30043 Ordinance No. nn~!~~~_u_nn Passed m____ ----------- mnn19 AN ORDINANCE TO AMEND SECTION 1305.01 OF THE DUBLIN CODIFIED ORDINANCES - CABO ONE AND TWO FAMILY DWELLING CODE WHEREAS, it has been determined that Section 1305.01 of the Dublin Codified Ordinances be amended, said section which adopted the 1986 CABO One and Two-Family Dwelling Code, along with the 1987 and 1988 amendment s. WHEREAS, the Dublin City Council, by reference on October 2, 1989 adopted the 1989 CABO One and Two Family Dwelling Code. NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, State of Ohio, 6 of the elected members concurring: Section 1. That Section 1305.01 of the Dublin Codified Ordinances be amended, the City of Dublin, by reference, adopting the 1990 Amendments to the CABO One and Two Family Dwelling Code. Section 2. That this Ordinance shall take effect and be in force from and after the earliest period allowed by law. Passed this 16th day of July , 1990. Attest: 1~~ ~n~~~ r hereby certify that copies of t~is Ordfnance/Resolution were posted in th' CIty of Dublin in accordance with Section 731,23 of the OhiQ Rtyiwd CQ~Q. /l. __Jl{4~ Clerk ef ( I MEMORANDUM TO: Council Members FROM: Timothy C. Hansley SUBJECT: Street Lighting Appropriation DATE: July 11, 1990 Submitted by: Patrik Bowman, Planning Director The 1990 capital budget includes $150,000 for the installation of street lights. Staff intended that this sum be used exclusively for the Dublin Village Center area as we have been working with the Drexel Development Corporation for many years to install street light s. The project has grown slightly to include the land developed and sold by State Savings Bank known as Dublin City Center. The $150,000 that was budgeted was always intended by staff to cover only a portion of the project costs. It was expected that the developers would cover a portion of the total cost. Due to the fact that the installation of street lights must be "retro-fitted", the project cost is much greater than if the lights had been installed with the street. The total cost to do both projects is estimated to be $306,600 (see estimate attached) . Drexel has agreed to pay half the cost of installation for their project providing they can pay it back over five years with interest. Drexel's project accounts for two thirds of the total project. Staff intends to try and strike the same deal with State Savings to cover half of the installation costs for their portion of the project. If an agreement cannot be struck with State Savings to pay up front or to be assessed, their portion of the installation will be held off. As the City of Dublin must initially put up all the money for the project, an additional sum of $156,600 must be appropriated to cover the costs. Staff has also respectfully requested that this Ordinance be an emergency to permit time to firm up the payback agreements, bid the project and complete the work this fall. I ~~~~::MCMUlLEN ENGINEERING CO., INC. MECHANICAL & ELECTRICAL ENGINEERS 3814 MORSE RD. COLUMBUS, OHIO 43219 June 1, 1990 614-475-2850 FAX: 475-0259 Mr. Mark Jones City of Dublin 5131 Post Road, suite #105 Dublin, Ohio 43017 Reference: Dublin Village Center - street Lighting Subject: Project Cost Estimate Dear Mark: Per your request stated below is the cost estimate on the above referenced project. Dublin Village Center - Total Project Cost Estimate Construction Cost (Based on 70 Units) Base Material $124,160 Base Labor $ 82,770 Subtotal #1 $206,930 Contractor Overhead $31,040 Contractor Profit $23,800 Contractor Insurance $ 260 Contractor Performance Bond $ 5,240 Subtotal #2 $267,270 contingency $13,400 Subtotal #3 $280,670 Construction Cost $281,000 Design Cost $ 16,800 1 a TOTAL #4 I $297.800 lThis Total cost does not include any City of Dublin ministration costs for managing this project. aColumbus Southern Power to date has not submitted If you have any questions, please contact us. Respectfully, 4Jd}; ~ r~ ~ """reo ~ .( I -t..\vr~s.:;:. ~O(., ) 000 Will1am R. L gan AIA/IES Project Man ger MECI #9005- WRL #9026 I O-R-e-X-e-L DEVELOPMENT CORPORATION February 23, 1990 patrik G. Bowman Planning Director City of Dublin 5131 Post Road Dublin, Ohio 43017 RE: street Lights Dublin Village Center Dear Pat: Since we last met to discuss the installation of street lights within the public right-of-ways abutting Dublin Village Center, I have reviewed the City's proposal with Harlan Friedman. Based upon unit pricing that was provided by Mark Jones, we would like to formalize an Agreement with the City of Dublin based upon the following economic parameters. 1. Purchase and installation of Kim $ 4,200.00 Lighting's Archetype, 400 watt, high pressure sodium fixture (cost shown on a per fixture basis) 2. Village Parkway - 20 fixtures $ 84,000.00 Tuller Road - 15 fixtures 63,000.00 Dublin Center Drive - 12 fixtures 50,500 TOTAL COST: $ 197,400.00 3. Total project cost to be shared on an equal basis between the City and Developer City of Dublin's contribution $ 98,700.00 continental Sawmill Limited $ 98,700.00 Partnership's contribution 4. CSLP's cost of the project is to be assessed to the development on a semi- annual basis, for a five (5) year period, at an interest rate not to exceed eight (8) percent (loan constant = .250456) 2C9 EAST STATE STREET COLUMBUS. OHIO 43215 (614) 228-2400 I .. patrik K. Bowman February 23, 1990 Page: 2 Annual Expense $ 24,720.01 Total payback over the five (5) $ 123,600.00 year period. For ease of reference, I have attached the site plan that was prepared on behalf of the City of Dublin by McMullen Engineering indicating the areas that are to be included within this improvement project. As requested, the Partnership is willing to donate the 0.100 acre parcel to the City of Dublin for the purpose of incorporating it with the proposed right-of-way for Shamrock Boulevard. As soon as possible, we would like to meet with you to review the contractual arrangements that will be necessary between our two organizations. Additionally, we would appreciate receiving a detailed construction schedule for this project. s~ william H. Adams Director of Development WHA:dt cc: Mark W. Jones Harlan S. Friedman DVC DUB; street Lighting HAND DELIVERED