HomeMy WebLinkAboutResolution 16-13RECORD OF RESOLUTIONS
Dayton Legal Blank, Inc Fonn No 30045
16 -13
Resolution No.. _ Passed __. _� 10
A RESOLUTION ACCEPTING THE LOWEST AND BEST
BID FOR THE DUBLIN ROAD SOUTH MULTI -USE
PATH - HERTFORD LANE TO RINGS ROAD PROJECT
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of
the Dublin Code, for the Dublin Road South Multi -Use Path — Hertford Lane to
Rings Road project; and
WHEREAS, Council has determined that the bid submitted by Decker
Construction Company, Inc. constitutes the lowest and best bid; and
WHEREAS, Council has determined that there may be a legitimate need to
declare the relocation of the utilities in connection with the above - referenced
project as a "single source" procurement, for reason that the company owning
the utilities in question has the exclusive rights to relocate such utilities.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
7 of its elected members concurring, that:
Section 1. The bid submitted by Decker Construction Company, Inc. in the
total amount of $299,171.58 is hereby accepted.
Section 2 . That the City Manager is hereby authorized to enter into
contracts with Decker Construction Company, Inc. for performance and
completion of the Dublin Road South Multi -Use Path — Hertford Lane to Rings
Road project pursuant to the Advertisement, Proposal and Contract
Documents for said project on file in the office of the City Engineer.
Section 3. That this Resolution shall take effect and be in force on the
earliest date permitted by law.
Passed this &M day of 2013.
� 0 &r. W_� PrI FA N A =
Officer
ATTEST:
i�p Clerk of uncil
I cityof Dublin
Office of the City Manager
5200 Emerald Parkway - Dublin, OH 43017 -1090
Phone: 614 - 410 -4400 - Fax: 614- 410 -4490
To: Members of Dublin City Council
From: Marsha I. Grigsby, City Manage
Date: April 4, 2013
Memo
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer
Kenneth B. Richardson, P.E., P.S., Engineering Manager — Design
Re: Resolution No. 16 -13 - Dublin Road South Multi -Use Path, Hertford Lane to
Rings Road, Bid Acceptance
Summary of Bids
On March 26, 2013, four (4) bids were received, publicly opened and read for the Dublin Road
South Multi -Use Path, Hertford Lane to Rings Road project. This project involves the
construction of approximately 1,230 feet of 8 -foot wide asphalt multi -use (shared -use) path,
concrete ramps, stone walls, and a pre- fabricated pedestrian bridge.
The Engineer's estimate was $320,000.00. The funds for the construction of this project are
from the Capital Improvement Tax Fund. Decker Construction Company, Inc. submitted the
lowest and best bid of $299,171.58. Staff has reviewed all bids, and a summary of the bids is
listed below.
Bidder
Bid as Read
Bid as Read
Over ( +) or under ( -)
Engineer's Estimate
Corrected
Bid
Decker Construction Company, Inc.
$299,171.58
-6.5%
Columbus Asphalt Paving, Inc.
$317,258.90
-0.9%
Strawser Paving Company, Inc.
$332,870.00
4.0%
B & C Blacktop Sealing, Inc.
$354,300.00
10.7%
For Council's reference and review, a reduced set of project construction drawings has been
placed in the Council Planning Room.
Although located mostly within the existing road right -of -way of Dublin Road with the exception
of the pedestrian bridge extending over Cramer Creek, the path extends along eight private
properties. In order to best transition the path into the driveways and front yards of six (of the
eight) private properties, temporary right -of -entry (ROE) agreements were necessary to allow
work beyond the existing right -of -way. As a result of being located to the west of the existing
right -of -way, the construction of the path bridge over Cramer Creek required both temporary
and permanent easements from two private properties. All of the ROE agreements and
easements were secured by the end of February of this year.
Resolution 16 -13 - Bid Acceptance - Dublin Road South Multi -Use Path - Hertford Land to Rings Road
April 4, 2013
Page 2 of 2
Staff anticipates the construction to commence on June 6, 2013. Dublin Road will be closed
between Hertford Lane and Rings Road for the duration of the construction. Tuttle Road,
Frantz Road, and Rings Road will be the posted detoured route. The scheduled completion
date for this project is August 16, 2013.
Recommendation
Staff has thoroughly reviewed the bid from Decker Construction Company, Inc. Previous
experience with Decker Construction Company, Inc. has been favorable, including the Dublin
Road South Multi -Use Path — Tuttle Road to Hertford Lane project constructed in the fall of
2012. Staff recommends Council approval of Resolution No. 16 -13 accepting the bid of Decker
Construction Company, Inc. in the amount of $299,171.58 and authorizing the City Manager to
enter into a contract with Decker Construction Company, Inc. for this project.