HomeMy WebLinkAbout76-80 Ordinance
.
~ "
,,:'...,...,,,.:,...,
... .
,
4""c ,.
. .
. . 7?-3tJ
ORDlNANCE lD.
AN ORDINl-\NCE .AI:X:Pl'J:!G AN msplr1'ICN FEE SCBED.JIZ
FQR BUIIDImS ~ S'1'RJCltJRES amER mAN 1, 2 and
3 ~ ~ UNITS, GAIW;E AND ~
lIJIIDnm. l\lItJ'~'AN ~.
I WHERFA'3, :the V;i:.llage of Dublin Bu';i..'l.d:tn: ~t has been oertifi
by the State of Ohio Deparb1ent of Industrial Relatims, Board of ~d 1 di:nJ
standal:ds as of November 1, 1980, and
WHERlllIS, it is necessary to establish fees and procedures for . . on
of buildings and structures other than l, 2 and 3 family residential units,
garages ani .~ bu;i:.lding~,
;;4,
1Ui TFJIl<EFORE BE IT ORJ:llUNED b!(' the COUncil of the Vi,llage of Dublin
5 members cxmcurring, ~t:
Secticm 1. The attached schedule of fees and p;ooeduz:es for an
.by the Village of Dublin Bui1.d;i,nJ Deparb1ent of ~ anet. st1:l.1ctures other
"
tban 1, 2 and 3fanU.ly residential structures, garages and acoessoxy bui~s
be and the same hereby is adopted and approved for the Village of Dublin.
, Sectioo 2. Hereafter, all dr~s, plans, diagrams, or bluepri.nb3
'fI;
for buildings and structures other than l, 2 and 3 family :residential units,
garages and acoessory buildin;rs shall be subnitted to the Village of Dublin
Buildi.n1 Department for inspectioo and ~l and all such w:awin;]s, plans,
diagrams, or blueprints sul:mitted fpr awroval shall CX>Iltain the seal of an
architect or err:Jineer registered in the state of Ohio.
Section 3. This ordinance shall supersede and repeal all other pri
ordinances or provisions of prior ordinances in oonfUct wi:th. this Ol'dinanoe.
section 4. By enact:mant of this ordinance and the establ.:isbnent of
fees and procedures for inspection of the buil.dinJs and structures ~
herein, the Village of Dublin assumes no liability for defects, errors or
anissims in plans approved.
Section 5. This ordinance ;is ~ dec.lal:ed to be an emergency
measure neoesscu:y for the in1red:i.ate preservattCl'l of the puIlU.c health, sa~~,
and welfare and shall take effect and be in force :tnmediately upon it passage.
I
ili
Ii
I ~
"
II' ,-
II " "
I ~ /.
II
I!
,ll'
"
'I
.
. .
~/ ~
.
,
~. :
<
Passed this .IN' day of ..IJ/(:illem~r, 1980.
1l~~'66J ~-'
. Mayor /
ATI'EST :
,
I
I
.:
.. . .'
. .
,
BUILDING CODE FEE SCHEDULE
This Fee Schedule applies to all buildings except one, two, and
three family structures, and includes the following Sections:
I 100 Fees Required
101 Plans Examination Fees
102 Building Permit Fees: New Building and Additions
103 Building Permit Fees: Alterations
104 Building Permit Fees: Industrial Units, Prefabricated
Assemblies and Relocated Buildings
105 Building Permit Fees: Rehabilitation
106 Fee for Inspection of Existing Buildings
107 Reinspection Fees
108 Warm Air Heating and Ventilation Permit Fees
,-1{)9. Environmental Comfort Systems Residential
110 Refrigeration Permit Fees
111~, Steam and Hot Water Heating Permit Fees
il 112 Prefabricated Fireplace, Wood or Coal Burning Stove Fees
113 ' ~Cei'ti ficate . ofOccupancyF ees
114 Fire :RrotectionFees
( 115 Advance Construction Starts
I
I
.
.
'. "
-
I .
i -2-
f
I
t
I
100 FEES REQUIRED
Any person desiring to do or cause to be done any work for which
a permit is required by the Building Code, shall at the time the
permi t is issued therefore pay a fee in the amount fixed by
I this chapter.
When work for which a permit is required by the Building Code is
started prior to obtaining such permit, the fees may be doubled,
as required by the C.E.O., but the payment of such double fee
shall not relieve any persons from fully complying wi~b the re-
quirements of the Building Code in the execution of the work nor
from any other penalties prescribed. However, this double fee
shall not apply to any emergency or urgently necessary work if
a permit for such work is obtained as provided for.
101 PLANS EXAMINATION FEES
Plans examination fees shall be assessed according to the following
schedule:
Additions and alterations to existing apartment buildings not over
two stories high, and associated garages and accessory buildings--
$6.00 per building
New buildings and any additions and alterations to existing buildings--
$5.00 up through the first 1000 square feet of area, plus $.50 for
I each additional 100 square feet, or fraction thereof.
For buildings not more than two stories the fee shall not exceed
$500.00 per building.
102 BUILDING PERMIT FEE: NEW BUILDING AND ADDITIONS
(a) Building permits for new building and addition to existing
building shall be issued to include only the work shown
on the approved plans or specifications.
(b) Building permit fees for new buildings and additions to
existing buildings shall be based on floor or surface
area to be computed as follows:
(1) All floor or surface including garage, carport, base-
ment, cellar and sub cellar floors, measuring the side
dimensions at each floor level.
(2) Crawl spaces and attic areas shall not be included.
(3) In building or areas where there are no walls, the
area enclosed by the outside dimensions of the support-
I ing columns shall be included.
(4) In buildings or areas where a roof is supported by
a single row of columns the horizontal projected
area of the roof shall be included.
(c) Based on the computation of the floor or surface area the
building permit fees for new buildings and additions to
existing buildings shall be assessed according to the follow-
ing schedule:
.
-
.. .'
-
.
-3-
Garages and accessory buildings:
$20.00 for the first 1,000 square feet, plus $1.50 for
each additional 100 square feet or fraction thereof
I All other buildings:
$50.00 plus $2.25 'for each 100 square feet of area, or
fraction thereof; the maximum fee is $20,000 per building.
Parking lots or similar facilities for which separate permits
are required because the lots or facilities are not constructed
at the same time as, and under the permits originally issued for
the building associate with them:
$20.00 per lot or facility
103 BUILDING PERMIT FEE: ALTERATIONS
(a) Building permits for alterations of existing, multi-
story buildings shall ,require a separate permit for each
floor, except that all floors occupied by a single:tenant
shall require only one permit.
(b) Building permits for alterations of existing buildings
shall be issued to include only the work shown on the
approved plans or specifications.
I (c) Building permit fees for alterations shall be assessed
according to the square feet of remodeled,area as follows:
o through 1000 $ 50.00
1001 through 2000 $ 60.00
2001 through 3000 $ 70.00
3001 through 4000 $100.00
4001 through 5000 $125.00
5001 through 6000 $150.00
6001 through 7000 $175.,00
7001 through 8000 $200.00
8001 through 9000 $225.00
9001 through 10,000 $250.00
Over 10,000 $250.00 plus $1.50 for each
additional 100 square feet,
or portion thereof.
104 BUILDING PERMIT FEES
Industrial Units, Prefabricated Assemblies and Relocated
Buildings
, Building permit fees for industrialized units, prefabri-
cated assemblies and relocated buildings shall be assessed
according to the following schedule:
Industrialized units approved by the Ohio .. > 50% of the fees
-
Department of Industrial Relations required under
Sec. 102, 108, 111
Prefabricated Assemblies Same fees as required
under Sec. 102,108,
110, and 111
Relocated buildings 50% of the fees re-
quired in Sec. 102
,. ."
~ .
,
-4-
105 BUILDING PERMIT fEES:
Rehabili tation
(a) Building permits for rehabilitation of existing buildings
I shall be required whenever any of the following conditions
apply:
(1) The proposed work will not involve any change, rearrange-
ment or other modi fication in the construction or exit
facilities, or the movement of any partitions from one
location to another.
(2) Only interior or exterior repair work, or both, is to
be done, and the work is due to, and usually involving,
one or more of the mechanical or electrical systems.
(3) The work to be done shall be to restore the building
exactly to its original design and shape, and shall
involve only the removal and replacement in kind of
structural or non-structural members, or both, damage
by factors including, but not limited to fire, storm,
termites or vandalism.
(b) Submission of a list of approved specifications indicating
the work to be done shall be sufficient to obtain a build-
ing permit for rehabilitation.
(c) If changed circumstances cause alteration of a building
, to be necessary or desirable after rehabilitation work has
begun, a building permit for the alteration shall be re-
quired in addition to the building permit for rehabilitation
already issued.
(d) Building permit fees for rehabilitation of existing build-
ing shall be assessed as follows, except that the permit fee
for rehabilitation of any building condemned by the Division
of Building Regulation shall not be less than $50.00.
o through 1000 $ 25.00
1001 through 2000 $ 30.00
2001 through 3000 $ 35.00
3001 through 4000 $ 50.00
4001 through 5000 $ 65.00
5001 through 6000 $ 75.00
6001 through 7000 $ 85.00
7001 through 8000 $100.00
8001 through 9000 $110.00
9001 through 10,000 $125.00
Over 10,000 $125.00 plus $1.00 for additional
100 square feet
I 106 fEE fOR INSPECTION Of EXISTING BUILDINGS
An inspection fee of fifty dollars ($50.00) is required to
~'''' inspect a building for the purpose of checking for conpliance with
,oJ;' ~. changing of the use group of, an existing building when
no work is proposed which would otherwise require a Building
Permi t. (Does not apply to one, two, or three family dwellings.)
.
.. .'
.
.
-5-
107 REINSPECTION fEES
In the event that work covered by any permit or inspec-
tion required by the Building Code is not installed or
J completed, or both, in accordance with the Code, thereby
requiring one or more inspections, the C.E.O. shall assess
a fee for each reinspection.
This reinspection fee shall equal the original permit or
inspection fee but shall not exceed $30.00 for each re-
inspection required to achieve Code compliance.
The C.E.O. may waive the requirement for a reinspection fee.
108 WARM AIR HEATING AND VENTILATION PERMIT fEES
(a) Warm air heating and ventilation permits shall be required
as follows:
(1) Residential
Only one warm air heating and ventilation permit shall
be required for' each residential building of: R-2 use
group, not over two stories' high.
(2) Non-Residential
for all other buildings not included above, a separate
I' warm air heating and ventilation permit shall be required
for each certified address.
(3) Permits for alterations of existing, multi-story build-
ings shall require a separate permit for each floor,
except that all floors occupied by a single tenant
shall require only one permit.
(4) Whenever repair of a warm air heating device necessi-
tates replacement of a heat exchanger or burner assembly
a minimum fee shall be required.
(b) The minimum warm air heating and ventilation permit fee shall
be $8.00.
(c) War~ air heating and ventilating permit fees shall be assessed
according to the following schedule:
(1) New and existing buildings
Warm air heating systems to include heating units, toilet
room exhaust fans not exceeding 100 CfM, and all duct out-
lets and inlets. The permit shall describe devices in-
stalled and capacities of each device and the fee shall be
based on the total installed BTU/hr. found in the following
chart.
I (2) Chart of BTU's Watts and fees
BTU/Hour Input Watts fee
o through 5000 o through 1500 no-permit or fees
5001 through 100,000 1501 through 29,300 $15.00
100,001 II 200,000 29,301 .11 58t600 $25.00
200,001 II 300,000 58,601 II 87,900 $35.00
Over 300,000 Over 87,900 $35.00, plus $5.00
for each additional
100,000 BTU/hr input
or 29,300 watts or
fraction thereof.
.. ,"
.
.
-6-
(3) Ventilation permit fees for all types of ventilation
systems, including but not limited to fans with no
ducts, ducting systems, air handling systems, dust
collecting systems, and makeup air systems shall be
I assessed according to the total CFM installed (except)
as excluded in Section 108 C (1) and the following
schedule:
$ 8.00
o through 1000 CFM
1001 through 10,000 $18.00
Over 10,000 CFM $18.00 plus $8.00 for
each additional 10,000
CFM. or fraction thereof;
the maximum fee is $100.00.
(d) Warm air heating and ventilating permits shall be required
for alteration or extension of supply and retuwQ ducts where
heating and ventilating systems are existing. Permit fees
for the duct work shall be assessed according to the following
schedule:
DUCIOUTlETS FEE
1 through 10 $8.00
11 through 30 $18.00
Over 30 $18.00 plus $5.00 for each additional
10 openings or portion thereof
r (e) Warm air heating and ventilation permits shall be required for
gas or oil conversion burners and the fees for said permits shall
be assessed according to part c(2) of this Section.
( f) Warm air heating and ventilating permits shall be required for
duel....fuel burners where equipment is and has been existing but
was installed and fired with one fuel on original permit. The
permit shall be for installation and firing with the standby
fuel and the fees for said permit shall be assessed according
to part C(2) of this Section.
(g) Warm air heating and ventilation permits shall be required for
infrared heaters and the fees for said permits shall be assessed
for the total BTU's according to part C(2) of this Section.
(h) Warm air heating and ventilation permits shall be required for
stokers and shall be assessed according to the following
schedul e:
30 pounds per hour of feed or less $25.00
Over 30 pounds per hour of feed $25.00, plus $5.00 for
each additional 10 pounds
of feed per hour, or portion
thereof; the maximum fee is
$500.00
I (i) Warm air heating and ventilation permits shall be required
for commercial clothes dryers and the fees for said permits
shall be assessed according to part C(2) of this Section. No
warm air heating and ventilation permit shall be required for
domestic clothes dryers under 30,000 BTU/hr. or 9,000 watts.
(j) Warm air heating and ventilation permits for warm air heating
devices with variable input burners shall be assessed on the
maximum inputs of the device.
",
,
-7-
(k) Warm air heating and ventilation permits shall be required
for incinerators and crematories and the fees for said per-
mits shall be assessed according to part C(2) of this section.
(1) Warm air heating and ventilation permits shall be required
I for solar warm air heating systems and the fees for said per-
mits shall be based upon BTU's at 400 BTU per square feet of
solar panel and shall be assessed according to part C(2) of
this Section.
(m) Warm air heating and ventilation permits shall be required
for retrofit automatic flue dalTl>ers on warm air heating de-
vices and domestic hot water heaters and the fee for said
permits shall be assessed at $10.00 per unit.
(n) Warm air heating and ventilating permits shall be required
for wood or coal burning stoves connected to a central heating
system and the fee for said permits shall be $18.00 per unit.
109 ENVIRONMENTAL COMFORT SYSTEMS RESIDENTIAL
(a) Permits shall be required as follows: -'
(1) Residential
Only one permit shall be required for each residential
building of: R-2 use group not over two stories high,
" (2) Non-Residential
For all other buildings not included above, a separate
heating, air conditioning, and refrigeration permit shall
be required in accordance with Sections 108 and 110.
(b) For the purpose of this section, environmental comfort systems
shall include heating, air conditioning, hllJmidification, air
cleaning, ventilation devices~ and all ducts outlets and in-
lets in each dwelling unit.
(c) Whenever repair of any environmental comfort system or heat
pUITl> necessitates replacement of a major component, a permit
shall be required and a fee shall be assessed in accordance
with the appropriate heating or refrigeration schedule
'" (Sections 108 or 110).
(d) Permit fees shall be assessed as follows:
(1) Residential - Each New and Existing Building
Multiple Family Dwelling $18.00 per unit
, 110 REFRIGERATION .PERMIT FEES
(a) Refrigeration permits shall be required as follows:
(1) Residential
Only one refrigeration permit shall be required for
each residential building of: R-2 use group, not over
two stories high. ~.;,"'" 4
(2) Non-Residential
For all other buildings not included above, a separate
refrigeration permit shall be required for each certified
address.
.> ~. -" ~-~';' ..~~",,.',",,-
.
"
.
.
-8-
(3) Whenever repair of environmental or product
refrigeration systems necessitates replacement of
component parts, a major component part shall be
a non-hermetically sealed compressor, condenser,
receiver, accumulator or evaporator.
I (b) The minimum refrigeration permit shall be $15.00
(c) For all refrigeration permit calculations 12,000 BTU
shall be equal to one ton of refrigeration or one horse-
power.
(d) Refrigeration permit fees shall be assessed as follows:
(1) Residential refrigeration - Each New Building
Per dwelling unit $10.00
.
(2) Non-Residential refrigeration - New and Existing
Buildings.
BTU/HOUR
o through 60,000 $15.00
60,001 through 120,000 $20.00
120,001 through 180,000 $25.00
180,001 through 300,000 $35.00
Over 300,001 $35.00 plus $2.00 for each
additional 60,000 BTU/hr.,
or portion thereof.
Refrigeration system shall include all condensing uni ts,
" evaporators, and refrigeration accessories. Replacement of
condensing units, evaporators, and refrigeration accessories.
Replacement of condensing units shall be assessed fees in accord-
ance with this schedule and to include the electrical inspection
of the final connection, not to exceed five feet beyond equipment.
(e) Refrigeration permit fees for cooling towers shall be
assessed according to the following schedule:
Up to and including 50 tons $18.00
Over 50 tons $18.00, plus $10.00
for each additional 100
tons or portion thereof.
(f) Refrigeration permit fees for evaporative coolers shall
be assessed according to the following schedule:
o through 4000 CFM $18.00
Over 4000 CFM $18.00, plus $10.00 for
each additional 5,000
CFM or portion thereof.
(g) Refrigeration permits for installation of product refrig-
I eration shall be required as follows:
Whenever repair of non-residential environmental product
refrigeration systems necessitates replacement of com-
I ponent parts, a major component part shall be a non-
hermetically sealed compressor, condenser receiver, accumu-
lator or evaporator.
(h) Refrigeration permit fees for installation of product refrig-
eration systems shall be assessed according to the following
schedule:
,
.
.
'. .
.
.
-9-
BTU/HOUR
o through 12,000 $18.00
12,001 through 120,000 $35.00
120,001 through 360,000 $55.00
Over 360,000 (30 ton) $55.00/plus $1.00 for each
C additional 12,000 BTU (ton)
or portion thereof.
Refrigeration systems shall include all condensing units,
evaporators, and refrigeration accessories. The p ermi t
shall describe devices installed and capacities of each
device and the fee shall be based on the total installed
BTU/HR.
One evaporator shall be included with each condensing
unit listed as a device on the permit schedule. A fee
of $1.00 for each additional evaporator listed on the same
permit shall be assessed. Heat reclamation coil in con-
junction with refrigeration system shall be assessed a
feeGOf $18.00
(i) Refrigeration permit fees for alteration of environmental
or product refrigeration systems shall be assessed accord-
ing to the schedule for installation of such system.
(j) Refrigeration permit fees for repair of non-tesidential
environmental or product refrigeration systems shall be
assessed according to the following schedule:
r, o through 300,000 BTU/HOUR $15.00
Over 300,000 BTU1HOUR $35.00
(k) Refrigeration permits shall be required for solar refrig-
eration systems and said permits shall be based on 400
BTU per square foot of solar panel assessed according to
schedule for installation df such systems set forth in
part 2(D) of this Section.
111 STEAM AND HOT WATER HEATING PERMIT FEES
(a) Steam and hot water permits shall be required as follows:
(1) Residential
Only one steam and hot water perffift shall be required for
each residential building of: R-2 use group, not over
two stories high.
(2) Non-Residential
For all other building not included above, a separate
steam and hot water permit shall be required for each
, certified address. .
(b) Minimum Fee
For any steam and hot water heating permit the minimum
fee shall be $8.00. Whenever modification of a steam or
hot water boiler necessitates revision of the safety con-
trol sequence a minimum permit fee shall not be assessed.
.
" .
.
.
.
-10-
(c) Steam and hot water heating permit fees for new and
replacement boilers connected to a system shall be
assessed according to the following schedule:
:c BTU/HOUR INPUT WATTS FEE
o through 5000 o through 1500 no p ermi t required
5001 through 100,000 1501 through 29,300 $12.00
100,001 through 200,000 29,301 through 58,600 $15.00
200.001 through 300,000 58,601 through 87,900 $20.00
Over 300,000 Over 87,900 $20.00, plus $5.00 for
each addi tional 100,000
BTU/HOUR INPUT or 29,300
watts, or portion thereof;
the maximum fee is $500
(d) Steam and hot water heating permit fees for heating fixtures
or devices to be attached to steam or hot water boilers
shall be assessed according to the following schedule:
First fixture or device $8.00
Additional fixtures or devices $1.00 each
(e) Steam and hot water heating permit fees for heating fixtures
or devices described in schedule (D) shall include, but are
, not limited to the following:
Unit vents Vulcanizing machine
Cabinet unit heaters 10 ft. 1 section base
Ceiling radiators Board radiation
Consol e heaters 300 sq. ft. radiant heat
Cabinet heaters or fraction thereof
300 sq. ft snow
mel ting ovens pressing machine
hot wat~r unit blower offset pressing machine
audi torium uni t puff-iron set
domestic hot water coil
boil er cleaning machine
water and steam coils spot board
air conpressors sol vent still
vacuum machine
(f) Steam and hot water heating permits shall be required for
gas and oil domestic and commercial conversion burners on
boilers and the fees for said permits shall be assessed
according to the BTU/HOUR INPUT set forth in Section 111 (c).
(g) Steam and hot water heating permits shall be required for
, duel fuel burners where equipment is or has been existing
on boilers but was installed and fired with one fuel on
original permit. This permit shall be for installation
and firing with the standby or second fuel and the fee for
said permit shall be assessed according to the schedule
set forth in Section 111.
(h) Steam and hot water heating permits for boilers with vari-
able input burners shall be assessed on the maximum inputs.
. .
.. .
.
.
-11-
(i) Steam and hot water heating permits shall be required
for stokers and the fees for said permits shall be
assessed according to the following schedule.
I 30 pounds per hour of feed or less $25.00
Over 30 pounds per hour feed $25.00, plus $5.00
for each additional 10
pounds of feed per hour,
or portion thereof;
the maximum fee is $500.00.
(j) Steam and hot water heating permits shall be required
for retrofit automatic flue dalfl>ers on boilers and the
fee for said permits shall be assessed at $10.00 per unit.
(k) Steam and Hot water heating permits shall be required for
soiar panels or systems connected to hot water heating
systems and the fees for said permits shall be based upon
BTU's at 400 BTU per square feet of solar panel and shall
be assessed according to Section 111 (c).
112 PREFABRICATED FIREPLACE, WOOD OR COAL BURNING STOVE FEES
The permit fee for a permit to install a non-electric heating
device not interconnected or not to be interconnected with central
heating systems such as prefabricated fireplaces, or wood or coal
, burning stoves shall be $15.00. This permit shall be subject to
regular heating inspection procedures. Installations requiring
interconnection with central heating systems are covered in Section 108.
113 CERTIFICATE OF OCCUPANCY FEES
Certificate of Occupancy fees shall be assessed according to the
following schedule:
Certificate of Occupancy (partial or final) $10.00 each
30 day telfl>orary certificate of Occupancy
for apartment building not over two stories $25.00 each
All other buildings $75.00 each
114 FIRE PROTECTION SYSTEMS
(a) Fire Protection System permits shall be required as follows:
(1) Residential
(a) Exelfl>tion: Except as required by Section 114(c) (1),
, low vol tage systems installed in residential building of
R~3, :use ,gtoUpshall;")lle:-'exenflb}fromvthe'proSlfsions of,;this,
Section.
(b) Only one Fire Protection System permit shall be re-
quired for each residential building of: R-2 use group,
not over two stories high.
(2) Non-Residential
For all other buildings not included above a separate Fire
Protection System permit shall be required for each certi-
fied address.
.
-
.
"" -
.
-12-
(b) The minimum fee for a Fire Protection System permit shall
be $8.00
(c) Fire Protection permit - fire detection and alarm systems.
I (1) Fire Protection permits shall be required for fire
detectionandalarm:systemsas follows:
(a) Fire detection and alarm systems include line
>, voltage (over 49 volts) and low voltage (49 volts
or less) system.
(b) Only a licensed electrical contractor shall be
issued a permit to install a line voltage system.
(c) All line voltage connections of a low voltage
system shall be by a licensed electrical con-
tractor, and shall require an electrical permit.
(2) Fire Protection permit fees for fire detection and
alarm systems shall be assessed according to the
following schedule:
(a) Fire detection and alarm systems in all occupan-
cies, outlets, detectors, alarms horns, audible
signaling appliances, loudspeakers, manual fire
alarm boxes, or similar devices or fire detection
and alarm systems.
, - Through the first 1,000 $.25 each
-
Over 1000 .10 each
(d) Fire Protection Permit - automatic fire suppression systems.
(1) Fire Protection permits shall be required for automatic
fire suppression systems as follows:
(a) Construction of accessory on-site eater sapply
and fire pump buildings or structures shall re-
quire separate building permits and fees, in
addition to Fire Protection permits and fees.
(b) On-site water supply piping shall be included ".,> ,~
in the fire protection system permit issued
for the building.
(c) No permits or fees shall be required for portable
fire extinguishers or fire protection systems
within kitchen range hoods, and ducts.
( 2) Fire Protection permit fees for automatic fire suppres-
sion, systems shall be assessed according to the following
schedule:
" (a) Standpipe $10.00
(b) On-site water supply piping beyond
the water meter installation $18.00 per/bldg.
(c) Installation of new automatic fire
suppression system or alteration of
existing system $1.00 per sprinkler
head. Maximum fee
$500.00
.
'..... .....
" ~
"
r _ A
-13-
115 ADVANCE CONSTRUCTION STARTS
(a) The C.E.O. may issue a permit to start construction prior
to the issuance of a Building Permit, or before the entire
I plans and specifications for the building or structure
have been submitted or approved, provided that adequate
information and details have been submitted, which corrply
with the pertinent requirements of this Code.
,
(b) These permits shall not be issued until after final zoning
approval has been obtained for the new construction.
(c) The holder of a permit to start construction prior to the
issuance of a Building Permit, may proceed only to the point
of construction for which that permit has been given and
at his own risk, and without any expressed or implied assur-
ances that the approval for the entire building or structure
will be granted.
(d) ftJundation'.P.ermi t
The C.LO. may issue a foundation permit to start the con-
struction of the foundation.
(e) Removal Permit
The C.E.O. may issue a removal permit to start the removal
of existing construction.
(f) There shall be no permit fee for the permits described
in this Section.
I
r PLUMBING PERMIT FEES
Collected by Franklin County Board of Health
ELECTRICAL PERMIT FEES
Collected by Electrical Inspection Bureau
II
r'r~
......
~ ~'.