HomeMy WebLinkAbout64-08 ResolutionRECORD OF RESOLUTIONS
30045
Resolution No.
64-08
Pcrs,red . ~0
A RESOLUTION AUTHORIZING THE CITY MANAGER TO SUBMIT AN
APPLICATION TO THE DISTRICT 3 INTEGRATED COMMITTEE OF THE
OHIO PUBLIC WORKS COMMISSION AND TO ENTER INTO AN
AGREEMENT WITH THE OHIO PUBLIC WORKS COMMISSION FOR
THE PURPOSE OF ACQUIRING GRANT FUNDS THROUGH THE STATE
CAPITAL IMPROVEMENT PROGRAM/ LOCAL TRANSPORTATION
IMPROVEMENT PROGRAM FOR THE EMERALD PARKWAY PHASE 8-
RIVERSIDE DRIVE TO BILLINGSLEY CREEK PROJECT
WHEREAS, pursuant to Article VIII, Section 2k of the Ohio Constitution, the State
of Ohio is authorized to issue bonds and other obligation of the state for the purpose of
financing public infrastructure capital improvements of political subdivisions as
designated by law; and
WHEREAS, pursuant to Section 164.06 of the Ohio Revised Code, the District Three
Public Works Integrating Committee has been created to accept, evaluate, and
recommend applications for state funding of capital infrastructure improvements
projects of political subdivisions in Franklin County; and
WHEREAS, pursuant to Section 164.05 of the Ohio Revised Code, the Ohio Public
Works Commission has been created to accept and approve application for state
financial assistance for capital infrastructure improvement projects of political
subdivisions in Franklin County; and
WHEREAS, the City of Dublin has conducted a capital inventory and needs
assessment and has determined that it is necessary to submit applications for financial
assistance for capital infrastructure improvement projects; and
WHEREAS, the City of Dublin desires to apply to the District 3 Integrating
Committee of the Ohio Public Works Commission for Round 23 State Capital
Improvements Program (SCIl') and/or Local Transportation Improvement Program
(LTIP) Grant Funds for the Emerald Parkway Phase 8- Riverside Drive to Billingsley
Creek Project.
NOW, THERFORE, BE IT RESOLVED, by the Council of the City of Dublin,
State of Ohio, ~ of the elected members concurring that:
Section 1: The City Manager is hereby authorized and directed to apply to the
District Three Public Works Integrating Committee and the Ohio Public Works
Commission for financial assistance for the following capital infrastructure
improvement project:
Emerald Parkway Phase 8- Riverside Drive to Billingsley Creek Project
Section 2: The City Manager is further authorized and directed to enter into any
agreements as may be necessary and appropriate for obtaining this financial assistance
in conjunction with the recommendation of the City Engineer, and approved as to
form by the City Law Director, in accordance with all authority granted to and
limitation upon by the City Director of Finance.
Mayor -
on 3: This Resolution is effective upon passage in accordance with Section
a) of the R f ised Charter. ~
Attest:
Clerk of Council
CITY OF DUBLIN.
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017-1006
Phone: 614-410-4400 • Fax: 614-410-4490
Memo
TO: Members of Council
FROM: Jane S. Brautigam, City Manage-- ~~.~ `S-S l~
DATE: August 13, 2008
INITIATED Jean-Ellen M. Willis, P.E., Engineering Manager- Transportation
BY: Caroline M. Wolter, P.E., Civil Engineer
RE: Resolution No. 64-08
Emerald Parkway Phase 8-Riverside Drive to Billingsley Creek Project
Ohio Public Works Commission Round 23 Grant Application
Summary
The District Three Public Works Integrating Committee of the Ohio Public Works Commission
has available grants and/or loans for infrastructure improvements through the State Capital
Improvement Program (SLIP) and/or the Local Transportation Improvement Program (LTIP).
Staff is presently preparing the necessary documentation to complete the required application for
Emerald Parkway Phase 8, Riverside Drive to Billingsley Creek Project, Project No. 07-008-CIP.
The application is due to the Mid-Ohio Regional Planning Commission (MORPC) on September
8, 2008.
The two funding sources available through this grant application are LTIP and SCIP. LTIP
funds are available through the federal government via the per gallon federal gas tax. This
money becomes available July l , 2009 and is distributed through grants only. SCIP funds are
supported by the sale of state bonds. This money is also available July 1, 2009 and is distributed
in the form of grants and loans. No local match is required with the LTIP application, whereas a
50°Io local match is required with the SCIP application.
The total estimated project cost is approximately $13,621,900 which includes final design,
bidding, construction, inspection services, right-of-way acquisition and contingences. To secure
the best possible scoring, staff is requesting approximately $667,473 in grant money under the
LTIP funding process and $2,000,000 as loan money under the SCIP process. The loan is a 0°Io
interest loan for 20-years. Funds received from either source will provide assistance with
upfront cash flow associated with this project. This project will be funded by the TIF districts
(McKitrick, Kroger Centre and Lifetime Fitness) that have designated Emerald Parkway as a
public infrastructure improvement benefiting the property within the districts.
Recommendation
Staff recommends Council approval of Resolution 64-08 authorizing and directing the City
Manager to apply to District Three Public Works Integrating Committee and the Ohio Public
Works Commission for financial assistance for the Emerald Parkway Phase 8, Riverside Drive to
Billingsley Creek Project. Further, Resolution 64-08 will authorize and direct the City Manager
to enter into any agreements as may be necessary and appropriate for obtaining this financial
assistance should the grant receive favorable consideration.