Loading...
31-08 ResolutionRECORD OF RESOLUTIONS Dayton Legai Bunk. Inc .Form No 30015 31-OS Re.cnlvtion Nn. Pursed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR PHASE II OF THE HVAC IMPROVEMENT PROJECT AT THE DUBLIN RECREATION CENTER LEISURE POOL AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT FOR SAID SERVICES. WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Dublin Charter; and WHEREAS, Council has determined that the bid submitted by General Temperature Control in the amount of $509,000 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, ~_ of the elected members concurring, that: Section 1. The bid submitted by General Temperature Control in the total amount of $509,000 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with General Temperature Control for said project as specified within the bid proposal and the City's bid documents. Section 3. This Resolution shall take effect and be in force upon on the earliest date permitted by law. Passed this day of , 2008 Mayor -Presiding Officer Attest: ~~~q Clerk Council Office of the City Manager 5200 Emerald Parkl~~ay • Dublin, OH 43017-1090 CITY OF DUBLIN. Phone: 614-410-4400 • Fax: 614-410-4490 TO: IVlembers of the Dublin City Council FROM: Jane S. Brautigam, City Manager DATE: 1VIay 1, 2008 INITIATED BV : Brian K. Ashford, Facilities Manager Michelle L Crandall, Director of Administrative Services Memo RE: Resolution 31-08 Bid for Phase II of the HVAC Improvement Project at the Dublvi Recreation Center Suimnary On Thursday April 3, 2008, bids were opened for Phase II of the HVAC improvement project at the Recreation Center. The heating, ventilation and air conditioning system for the Leisure Pool will be upgraded to increase the circulation of fresh air, reduce humidity levels and add an energy-saving heat recovery system. The leisure pool area «~~ill also be painted. A similar project was successfully competed last fall for the competition pool. Unlike the competition pool project which involved modifying the existing air handling unit, the leisure pool will receive a new, larger air handling unit. These air handling units are located in a mechanical room above the pools. Because of the need to replace the unit, the timeline for Phase II «~ill be extended by several weeks. The leisure pool will close in mid August and reopen in early October. This construction schedule was chosen due to the fact that the summer swim programs will be concluded, and attendance at the pool normally decreases once school is back in session. One of the outdoor pools will remain open beyond Labor Day until the leisure pool is reopened. It should also be noted that except for the annual shutdown period for the Recreation Center in late August, the competition pool will remain open, and every effort will be made to minimize the impact on patrons. However, some disruption, particularly noise, is inevitable. The total amount budgeted for Phase II is $530,000. Three bids were received and the low bidder was Farber Mechanical. However, Farber withdrew their bid after determining that they made a mathematical error in formulating their bid. The A/E firm for this project evaluated the ner~~ lowest bidder, General Temperature Control, and determined that the company possesses the skill and experience to successfully perform the work required for Phase II. Compank Bid Farber Mechanical $459,900 {Withdrawn) General Temperature Control $509,000 J. A. Guy $515,000 Memo to Council -Resolution 31-08 Phase II HVAC Bid at DCRC May 1, 2008 Page 2 of 2 Reconmiendation Staff recommends adoption of Resolution 31-08 accepting General Temperature Control's bid of $509,000. APR-14-2008 MON 04 52 PM FARBER CORP FAX No. 614 294 4825 P. 002 April 11, 2008 City of Dublin Facilities 6555 Shier-Rings Road Dublin, Ohio 43016-8716 Attention: Brian Ashford Ref: Renovation of Pool HVAC Systems Phase 2 Leisure Pool Dear Mr. Ashford: Regretfully, I would like to formally withdraw our bid for the above mentioned project in the amount of $459,900.00 due to a mathematical error on our part. This is something that we have considered very carefully and is not common practice at Farber Corporation as we have only withdrawn bids three other times in the last 38 years. We appreciated having the opportunity to submit our bid and look forward to your consideration on future projects. Sincerely, Rick Buck Project Manager Farber Cor~ot^ation • 800 East 12th Avenue • Cotumb~.u, Ohio 4327 1-2670 Phone (6X4) 294-X62& • PAX (614) 294-4$25