HomeMy WebLinkAboutResolution 15-11RECORD OF RESOLUTIONS
Day" Legal Blank. Inc.. Form No 3000.5
Resolution No. 15 -11
Passed 20
A RESOLUTION ACCEPTING THE LOWESTBEST BID FOR
THE 2011 PAVEMENT MARKING SERVICES PROJECT
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the
Dublin Code, for the 2011 Pavement Marking Services project; and
WHEREAS, Council has determined that the bid submitted by Griffin Pavement
Striping, Inc. constitutes the lowest and best bid.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
of its elected members concurring, that:
Section 1. The bid submitted by Griffin Pavement Striping, Inc. in the total amount
of $113,930.30 is hereby accepted.
Section 2 . The City Manager is hereby authorized to enter into contracts with
Griffin Pavement Striping, Inc. for performance and completion of the 2011 Pavement
Marking Services project, pursuant to the Advertisement, Proposal and Contract
Documents for said project on file in the office of the City Engineer.
Section 3. This Resolution shall take effect and be in force immediately upon
passage in accordance with Section 4.04(a) of the Revised Charter.
Passed this /(: f4 day of 2011.
Mayor - a " ng Officer
ATTEST:
Clerk of Council
CITY OF DUBLIN_
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017 -1090
Phone: 614 - 410 -4400 • Fax: 614 -410 -4490
To: Members of Dublin City Council
From: Marsha Grigsby, City Manager \(kc
Date: April 7, 2011
•
J
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer
Background
Re: Resolution 15 -11 - 2011 Pavement Marking Services Bid Acceptance
On Tuesday, March 29, 2011 two (2) bids were received, publicly opened and read for the 2011
Pavement Marking Services project. Staff has reviewed all bids. The Engineer's estimate was
$115,000. Griffin Pavement Striping, Inc. submitted the lowest and best bid of $113,930.30. A
summary of the bids is listed below.
The 2011 Operating Budget included an allocation of $100,000 for this project. As a result of price
increases in thermoplastic and paint products over the past several months, the engineer's estimate was
increased to $115,000. It is anticipated that the additional funds of $13,930.30 beyond those allocated
for this project will be available from other accounts (i.e. Repair and Maintenance). An internal
amendment will be processed as required.
This contract is to perform the annual long-line pavement marking maintenance program. This work
maintains pavement markings such as lane lines and centerlines. This is a one -year contract with an
optional renewal period for two additional years. Extension of the contract will be based on the
satisfaction of the City Engineer with the service provided by the contractor.
Staff has thoroughly reviewed the Griffin Pavement Striping, Inc. bid. Previous experience with Griffin
Pavement Striping has been favorable, including the following projects: 2010 Pavement Striping
project; 2009 Street Maintenance Program; Avery Road Widening; Avery- Muirfield/Post Road
Roundabout; and Emerald Parkway /Innovation Drive Intersection Improvements.
Recommendation
Staff recommends approval of Resolution 15 -11, accepting the bid of Griffin Pavement Striping, Inc. in
the amount of $113,930.30 and authorizing the City Manager to enter into a contract with Griffin
Pavement Striping, Inc. for this project.
Bid as Read
Corrected
Bidder
Bid as Read
Over (—) or Under (-)
Bid
Enweer's Estimate
Griffin Pavement Striping, Inc.
$113,930.30
-0.9%
A& A Safety Inc.
$126,485.50
10.0%
The 2011 Operating Budget included an allocation of $100,000 for this project. As a result of price
increases in thermoplastic and paint products over the past several months, the engineer's estimate was
increased to $115,000. It is anticipated that the additional funds of $13,930.30 beyond those allocated
for this project will be available from other accounts (i.e. Repair and Maintenance). An internal
amendment will be processed as required.
This contract is to perform the annual long-line pavement marking maintenance program. This work
maintains pavement markings such as lane lines and centerlines. This is a one -year contract with an
optional renewal period for two additional years. Extension of the contract will be based on the
satisfaction of the City Engineer with the service provided by the contractor.
Staff has thoroughly reviewed the Griffin Pavement Striping, Inc. bid. Previous experience with Griffin
Pavement Striping has been favorable, including the following projects: 2010 Pavement Striping
project; 2009 Street Maintenance Program; Avery Road Widening; Avery- Muirfield/Post Road
Roundabout; and Emerald Parkway /Innovation Drive Intersection Improvements.
Recommendation
Staff recommends approval of Resolution 15 -11, accepting the bid of Griffin Pavement Striping, Inc. in
the amount of $113,930.30 and authorizing the City Manager to enter into a contract with Griffin
Pavement Striping, Inc. for this project.