Resolution No, 48-06
Passed .20_
A RESOLUTION ACCEPTING THE LOWEST AND BEST
BID FOR THE 2006 STREET MAINTENANCE PROGRAM
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Dublin Revised Charter and
Chapter 37 of the Dublin Codified Ordinances for the 2006 Street Maintenance
Program; and
WHEREAS, the Franklin County Engineer's Office will reimburse the City of
Dublin for resurfacing work associated with the S.R. 161 Bridge over the Scioto
River; and
WHEREAS, Council has determined that the bid submitted by Strawser Paving
Company, Inc. constitutes the lowest and best bid, as set forth in Exhibit "A",
Bid Opening Results.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
State of Ohio, !:l-- of the elected members concurring:
Section 1, That the bid submitted by Strawser Paving Company, Inc. in the
total amount of $2,124,567.33 is hereby accepted.
Section 2, That the City Manager is hereby authorized to enter into contracts
with Strawser Paving Company, Inc. for performance and completion of the
2006 Street Maintenance Program pursuant to the Advertisement, Proposal
and Contract Documents for said project on file in the office of the City
Engineer.
Section 3, That this Resolution shall take effect and be in force on the earliest
date permitted by law.
Passed this Isf day of 7hr~ ,2006.
~
Mayor - Presiding Officer
Attest:
~C!-~
Clerk of Council
I hereby certify that copies of this
Ordinance/Resolution were posted in the
City of Dublin in accordance with Section
731.25 of the Ohio Revised Code,
Office of the City Manager
5200 Emerald Parkway. Dublin, OH 43017
CITY OF DUBLIN~ Phone: 614-410-4400. Fax: 614-410-4490
Memo
To: Members of City Council
From: Jane S. Brautigam, City Manager1r f;,-..,
Date: April 26, 2006 VS ~
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer
Ken Richardson, P.E., Assistant City Engineer - Design
Fred Tennyson, P.E., Civil Engineer
Re: Resolution 48-06 - 2006 Street Maintenance Program - Bid Acceptance
Summary:
On April 26, 2006 five (5) bids were received, publicly opened and read for the 2006 Street
Maintenance Program. A summary of the bids is attached. Staff has reviewed all bids. The Engineer's
estimate was $2,130,000. Strawser Paving Company, Inc. submitted the lowest and best bid of
$2,124,567.33, which is outlined as follows:
Category 2006 Budget Bid Amount
Annual Street Maintenance $1,997,000 $1,743,258.28
Annual Roadside Improvement 85,000 102,831.35
Annual Bikeway Maintenance 40,000 12,627.15
Bikeway Connections/Additions 150,000 173,808.45
Franklin County SR 161 Bridge + 92,042.10
Total $2,272,000 $2,124,567.33
In cooperation with the Franklin County Engineer's Office, the City has included in the contract for the
2006 Street Maintenance Program milling, waterproofing the deck and asphalt overlay on the SR 161
Bridge over the Scioto River. Based on the Strawser Paving Company bid, Franklin County will
reimburse the City $92,042.10 and incidental costs estimated at $8,000.
The total bid amount is under the 2006 budget amount by more than $200,000. These funds will be
used for contingencies and to mill and overlay Tara Hill Drive as part of the Tara Hill Drive Traffic
Calming Project.
The 2006 Street Maintenance Program includes several streets to be rehabilitated. Please see attached
city map with those streets highlighted in red. Also attached is a detailed breakdown of costs for the
2006 Street Maintenance Program.
Memo to Dublin City Council
2006 Street Maintenance Program
April 26, 2006
Page 2
No paving or milling operations will be performed until after the Memorial Tournament. Major repair
work is planned for SR 161 (Bridge Street) between Corbins Mill Drive and Riverside Drive. Work on
SR 161 is scheduled between July 5 and August 3,2006. Due to heavy traffic volumes on SR 161, the
contract requires night work on SR 161 between 7 p.m. and 7 a.m. on weekdays and permission to work
all day on Saturday. During the night work and Saturday work, the contractor will be able to reduce
traffic lanes in each direction to one lane. Two-way traffic will be maintained at all times. Staff will
work closely with the contractor to ensure minimal disruption and backups to the traveling public and
to the Dublin Irish Festival.
As part of the SR 161 work, new concrete sidewalk, curb and gutter will be constructed on the south
side of SR 161 from Corbins Mill Drive to the traffic signal in front of Indian Run Elementary School.
The existing four foot asphalt shoulder on SR 161 will be removed to provide an area for the sidewalk
and curb. Cost ofSR 161 work, excluding the bridge pavement work, is about $365,000.
The 2006 Street Maintenance Program includes major parking lot repair for the Dublin Justice Center
and entrance road repair off of Post Road to the Dublin Community Recreation Center. Costs to
improve these facilities are $116,000 and $36,000 respectively.
In preparation for ODOT resurfacing Dublin Road from Historic Dublin to Glick Road in 2007, we will
be upgrading bikepath ramps along Dublin Road to current ADA standards. The cost of these upgrades
is about $83,000.
Strawser Paving Company, Inc. successfully performed the City's 2003 and 2004 Street Maintenance
Programs. They completed the work in a timely manner and were very responsive to Engineering staff
and City residents. The work for this program is presently scheduled to commence the week of June 5,
2006 and be substantially complete by September 1, 2006.
Recommendation:
Staff recommends adoption by Council of Resolution 48-06, accepting the bid of Strawser Paving
Company, Inc. for the 2006 Street Maintenance Program.
RECORD OF RESOLUTIONS
O"y!"rl L"'Y<l1 Bld'1<<. IIIL, Forrr, No 30045 ---- -~---_.__._---
"-!' -.--- ---.--- ~
Resolution Nu. 48-06
Pt/ssed ,2(}~
A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR
THE 2006 STREET MAINTENANCE PROGRAM
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Dublin Revised Charter and
Chapter 37 of the Dublin Codified Ordinances for the 2006 Street Maintenance
Program; and
WHEREAS, the Franklin County Engineer's Office will reimburse the City of
Dublin for resurfacing work associated with the S.R. 161 Bridge over the Scioto
River; and
WHEREAS, Council has determined that the bid submitted by Strawser Paving
Company, Inc. constitutes the lowest and best bid, as set forth in Exhibit "A",
Bid Opening Results.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
State of Ohio, _ of the elected members concurring:
Section 1. That the bid submitted by Strawser Paving Company, Inc, in the
total amount of $2,124,567.33 is hereby accepted,
Section 2. That the City Manager is hereby authorized to enter into contracts
with Strawser Paving Company, Inc, for performance and completion of the
2006 Street Maintenance Program pursuant to the Advertisement, Proposal
and Contract Documents for said project on file in the office of the City
Engineer.
Section 3. That this Resolution shall take effect and be in force on the earliest
date permitted by law.
Passed this _ day of ,2006.
Mayor - Presiding Officer
Attest:
Clerk of Council
Bid Opening Results -- Project # 06-001.0-CIP Exhibit "A"
2006 Street Maintenance Program
Bids Opened: Wednesday, April 26, 2006 Engineer's Estimate: $2,130,000.00
Bidders Bid as Read Bid as Read Over or Under Corrected Bid
Engineer's Estimate
Strawser Paving $2,124,567.33 -0.3%
Decker Construction $2,178,957.02 2.3% $2,178,937.03
Kokosing Construction $2,185,505.66 2.6% $2,185,765.66
Shelly & Sands. Inc. $2,303,380.18 8.1%
Number of Bidders: 4
City of Dublin -- Division of Engineering
Printed 4/27/2006 5800 Shier-Rings Road Dublin OR 43016
Bid Opening Results 06.001,O.CIP -- Page 1 of 1 Phone (614) 410-4600 Fax (614) 761-6506
2006 Street Maintenance Program
Estimated Cost Summary
I ANNUAL STREET MAINTENANCE PROGRAM
,... Streets To Be Resurfaced Estimated Cost To Be Completed Actual Cost
I. ARYSHIRE DR 356,355.57 -
2, ARYSHIRE CT 13,355.56 -
3, AVERY RD 50,137.30
4, BRIDGE ST 364,570.65 -
5, DA VINGTON DR 117,008,94 -
6, FRANTZ RD 231,798,15 -
7, KILDOON CT 30,672.60 -
8, KlLLOCHAN CT 16,719.04 .
9, LOCH LEVEN CT 48,652,69 -
10, MARTIN RD 37,121.72 -
II. MUIRKIRK DR 32,276.99 -
12, OLD FRANTZ RD 59,324,24 -
13- ROTHBURY CT 29,137,24 -
-
14, JUSTICE CENTER PARKING LOT 115,678.35
15, RECREATION CENTER DRIVEWAY 35,654.34
TOTAL 1,538,463.38 - -
ANNUAL STREET MAINTENANCE PROGRAM (Continued)
Estimated Cost To Be Completed Actual Cost
Curb & Gutter Repairs 28,724,00 -
Total 28,724.00 -
C. Miscellaneous Repairs
I. WINDWOOD SIDEWALK IMPROVEMENT 7,185,00
2, DUBLIN RD ADA RAMPS 83,371,90
3, BLAZER PKWY HEADWALL FENCE 7,119,00
Total 97,675.90 -
D. Incidentals
Maintaining Traffic 21,650,00 -
Off-Duty Police Officer w/Cruiser 10,000,00 -
Construction Layout Stakes 12,945,00 -
Mobilization 33,800,00
Total 78,395.00
ANNUAL ROADSIDE IMPROVEMENTS Estimated Cost To Be Completed Actual Cost
I. TUTTLE CROSSING BL VDIDUBLlN RD DITCH 14,783,20
2, STANLEY STEAMER PKWY DITCH ENCLOSURE 5,580,85
3, DUBLIN RD DITCH IMPROVEMENTS 82,467.30
Total 102,831.35
ANNUAL BlKEPATH MAINTENANCE Estimated Cost To Be Completed Actual Cost
I. BIKE PATH PATCHES 12,627,15
Total 12,627.]5 - -
.KEW A Y CONNECTIONS / ADDITIONS Estimated Cost To Be Completed Actual Cost
L SUMMIT VIEW DR BIKE PATH 17,924,95
2, SUMMITVIEW BIKEP A TH CROSSING 5,867.75
3, POST RD BIKE PATH 15,305.80
4, OLD FRANTZ RD BIKE PATH 134,709,95
Total 173,808.45
.
2006 Street Maintenance Program
" Estimated Cost Summary
Summary
ANNUAL STREET MAINTENANCE PROGRAM Estimated Cost To Be Completed Actual Cost
A. Streets To Be Resurfaced 1,538,463,38
B. Curb & Gutter Repairs 28,724,00
C. Miscellaneous Repairs 97,675,90
D. Incidentals 78,395,00
Total 1,743,258.28
NNUAL ROADSIDE IMPROVEMENTS 102,831.35
ANNUAL BIKEPATH MAINTENANCE 12,627.15
BIKEWAY CONNECTIONS I ADDITIONS 173,808.45
Franklin County Bridge 92,042.10
Total 2,124,567.33
Budget Summary
Budget Estimated To Be Completed Actual Cost
I. Annual Street Maintenance Program 1,997,000,00 1,743,258,28 -
2, Annual Roadside Improvement Program 85,000,00 102,831.35
1, Annual Bikeway Maintenance 40,000,00 12,627,15 -
4, Bikeway Connections I Additions 150,000,00 173,808.45 -
Total 2,272,000.00 2,032,525.23
Franklin County Bridge 92,042.10
Total 2,124,567.33
2006 STREET MAINTENANCE PROGRAM
STREETS TO BE RESURFACED
CD
@
CD
@ @
@
@
@)
AV~ COUNTy
f'IlANCLIN COUNTy
@ i!
I
~
@ @
0)
~
@
0
STREETS TO BE RESURFACED
SIBEEI FROM IQ
1, ARYSHIRE DR CARNOUSTIE DR CUL DE SAC SOUTH
2. ARYSHIRE CT ARYSHIRE DR CUL DE SAC
3, A VERY RD CITY LIMITS SOUTH SOUTH OF WOERNER TEMPLE RD
4, BRIDGE ST CORBINS MILL DR RIVERSIDE DR
5. DAVINGTON DR PVT CHANGE @ 8240 GLICK RD
6. FRANTZ RD MONTEREY DR METRO PLACE NORTH
7. KILDOON CT ARYSHIRE DR CUL DE SAC
8, KILLOCHAN CT ... ARYSHIRE DR CUL DE SAC
9. LOCH LEVEN CT ARYSHIRE DR CUL DE SAC
10, MARliN RD DUBLIN CENTER DR SAWMILL RD
11. MUIRKIRK DR ARYSHIRE DR GLICK RD
~~,~~~~~~~~BLIN 12, OLD FRANTZ RD POST RD PRIVA TE DRIVE
13, RECREATION CENTER DW POST RD BRIDGE
i
14, ROTHBURY CT DA VINGTON DR CUL DE SAC " j
DEPARlMENT or DEVELOPMENT / DIVISION OF ENGINEERING
DAn:: February 12, 2003
SCALE: Nat To Scale
.,- ~~ ----------- ._.._~