HomeMy WebLinkAbout050-79 Ordinance
RECORD OF ORDINANCES 295
, .
National Graphics Corp.. Cols.. O. ~ Form No. 2806-A
Ordinance NO.n5:0_..._2~_____ JUN 4 1979
p assed_______n_______n_______________________________19 _____ n
AN ORDINANCE TO ENTER INTO A "WATER FACILITIES
AGREEMENT" WITH MUIRFIELD, LTD.
0 WHEREAS, Nuirfield has submitted a proposed "Water facilities
Agreement"; and
WHEREAS, Counc i I is of the opinion that said proposal is an ac-
ceptable agreement:
NOW, THEREFORE, BE IT ORD~NED by the Council of the Village of
Dublin, State of Ohio, of the elected members concurring:
SECT I ON I . That the proposed "Water Facilities Plan" as submit-
ted by Muirfield Ltd (attached hereto as Exhibit "A") be, and
hereby is, accepted.
SECTION 2. That this Ordinance shall be in force and take effec
from and after the earliest period allowed by law.
Passed this ~ day of J.,..,J , 1979.
0 ~/~ ~.:J ~~<!-'
Mayor - Presiding Officer President Pro'Tempore
ATTEST:
~a~
0
PROPOSED
~vATER FACILITIES AGREEHENT
0 tL
THIS AGREE!-1ENT, made and entered into this 5-
day of _. ~A/' ~__
, 1979 , by and between THE VILLAGE OF
DUBLIN, OHIO, an Ohio municipal corporation classified as a
Village (hereinafter called "Dublin"), and ~UIRFIBLD LTD.,
an Ohio limited partnership (hereinafter called "Muirfieldll) ,
\VITNESSETH:
toJHE REAS , Muirfield has been and is the developer
of a tract of land of approximately 1,600 acres situated in
Dublin and generally north o~ Brand noad and west of State
Route No. 745, \vhich tract of land is generally known and
hereinafter referred to as "Huirfield Village"; and
0 \\THEREAS , Muirfield constructed for Dublin, pursuant
to an agreement (hereinafter called the "1974 .l\greement") exe-
cuted by Dublin and Muirfield on October 21, 1974 and October 22,
1974, respectively, a 12-inch water main, pumps and related
facilities in order to provide water service to Huirfield Village
and those areas of northern Dublin immediately adjacent to the
said water main (hereinafter called the "service area"), ',.,hich
water main (hereinafter called the "\Ja ter main") extends from
water facilities of the City of Columbus, Ohio (hereinafter
called "Columbus" ) located at the intersection of Sawmill and
Summit View Roads a distance of approximately 13,500 feet in a
generally westerly and northerly direction to a point near an
C easterly property line of t1uirfield Village and the westerly
right-of-way line of State Route No. 745: and
WHEREAS, pursuant to the 1974 Aqreement, Dublin has
been and is reimbursing Muirfield for its direct costs, as de-
fined in the 1974 Agreement, incurred in constructinq the "'later
main and related facilities; and
I
,
WHEREAS, Columbus can supply to Dublin through the
water main for use by residents of Dublin water at the rate
of 2.5 million gallons per day, but the water main cannot
provide water at this rate (hereinafter called the "water
0 main capacity") to the service area and adequate water pres-
sure cannot be maintained in certain parts of the service
area without the construction of booster pumping stations
and other water facilities; and
WHEREAS, as development in the service area con-
tinues, storage of water will be required in order to maintain
adequate pressures in the water main and in the water system
served by it and a reserve supply of water for emergencies; and
WHEREAS, Dublin is presently without funds with
which to finance the cost of booster pumping stations, elevated
storage tanks and other water facilities to enable the water
main to provide water at more of the water main capacity than
( is presently possible and to maintain adequate pressures in the
water main and in the water system served by it; and
WHEREAS, Muirfield is willing, at its cost, to
construct for Dublin a booster pumping station, an elevated
storage tank and related facilities (sometimes hereinafter
collectively called the "new water facilities") if Dublin will
agree to reimburse Muirfield for such costs and will allocate
to Muirfield and its successors and assigns for use in Muir-
field Village a portion of the water main's capacity, all as
hereinafter provided;
NOW, THEREFORE, in consideration of the foregoing
and of the covenants and agreements hereinafter set forth,
C Dublin and Muirfield do hereby agree as follows:
1. Muirfield shall arrange and contract for and
cause to be done such engineering and construction work as
shall be necessary in order to design and construct the new
water facilities, which generally shall consist of a booster
-2-
pumping station located in an area between State Route No. 745
and the Clubhouse of Muirfield Village Golf Club,and containing
three 600 gallons-per-minute pumps with variable speed drives,
two of which shall be installed in parallel and the third of
C which shall be installed as a reserve pump, an elevated storage
tank or tanks with a maximum total capacity of 500,000 gallons
which shall be located in the northwest part of Muirfield Village
west of Muirfield Drive and other related controls, pipes, devices
and equipment. The precise location of the new water facilities
shall be jointly determined by Dublin and Muirfield, the design
plans and spec'ifications therefor shall be subject to the reason-
able approval of Dublin's engineer and such facilities shall be
constructed in accordance with such plans and specifications.
Muirfield shall cause such plans and specifications to be prepared
and submitted to Dublin's engineer on or before J)ec. 31 ,
1979, shall commence construction of the booster pumping station
r and related facilities within sixty (60 ) days after approval of
Ll such plans and specifications by Dublin's engineer and shall
thereafter diligently prosecute such construction to completion.
The elevated storage tank or tanks and related facilities shall be
constructed at such time or times as Dublin's engineer determines
it is or they are needed.
2. Muirfield shall solicit bids from responsible
contractors for the construction work to be done by Muirfield
in accordance with the provisions of section 1 hereof and shall
award contracts for construction work to the lowest and best
bidder or bidders determined by Muirfield. However, Muirfield
shall not be obligated to proceed with the construction of the
C new water facilities or to fulfill its other obligations here-
under if it determines prior to the commencement of construction
that the total cost of designing and constructing the new water
facilities will exceed $400,000. If Muirfield commences con-
struction of any part of the new water facilities, it shall be
-3-
obligated to commence and complete construction of all of the
new water facilities and to fulfill its other obligations here-
under in accordance with the provisions hereof, notwithstanding
0 the fact that it may have determined or may determine that the
total cost of designing and constructing the new water facilities
will exceed $400,000.
3. Upon completion of construction of the new water
facilities and acceptance thereof by Dublin, Muirfield shall
convey title to the new water facilities and the land upon which
the same are situated to Dublin and shall grant to Dublin such
easements as are necessary for ingress and egress thereto and
therefrom. Certification by Dublin's engineer that the new
water facilities have been constructed in accordance with the
plans and specifications shall constitute an acceptance thereof
by Dublin, and, upon delivery of the instruments conveying title
U to the new water facilities and the land upon which the same are
situated, the title to the new water facilities shall be vested
in Dublin and the same shall thereupon be and become a part of
Dublin's water distribution system. After acceptance of the new
water facilities by Dublin, Muirfield shall have no liability
or responsibility whatsoever in connection with the new water
facilities except that Muirfield shall make repairs to the same
necessitated by defects in the original construction which appear
within a period of one (1) year following the date of such
acceptance. Muirfield's said obligation to make repairs shall
be secured by a performance bond furnished by a surety acceptable
to Dublin or a letter of credit issued by a banking institution
0 acceptable to Dublin, said bond or letter of credit to be in an
amount equal to ten percent (10%) of the total cost of constructing
the new water facilities.
4. Dublin shall reimburse Muirfield for Muirfield's
total cost of designing and constructing the new water facilities,
which total cost shall include all direct costs paid by Muirfield
-4-
. .
to others in connection with designing and constructing the new
water facilities, including onsite supervision, but shall exclude
the costs of materials or completed construction damaged or de-
stroyed for which Muirfield receives reimbursement by an insurer
C for such damage or destruction and items which are normally
considered to be general overhead expense in accordance with
generally accepted accounting principles. Reimbursement by
Dublin to Muirfi~i~:d for herein shall be~_~~-~l}l..Y_from
------,-------~._---..,--.._,-,. --- ---., .<,
funds received by Dublin as fees or other charges for taps and
service connections into the water main or water line~
-..----- , ----
from or~erved by the water main and for oth~~~ter service
-------. --~"'--~---.- ~ ~ --~
conne w~th~n Muirfield Village and the remainder of the
- -'-'..-.- _.~--~._- .-
service area, shall be made only as such funds are received by
------
Dublin and, in any event, shall be made no more frequently than
quarterly. Until such time as Muirfield shall have received
reimbursement in full pursuant to the terms of this agreement,
C Dublin agrees that it will continue to maintain the "Village
of Dublin Northern Water Main Account" established pursuant to
the 1974 Agreement, will deposit therein all funds received by
it as fees or other charges for taps and service connections
into the water main and water lines extending from or served by
the water main and for other water service connections within
Muirfield Village and the remainder of the service area and will
make reimbursement to Muirfield therefrom in accordance with
the foregoing provisions of this section 4.
5. At any time during the period of construction of
the new water facilities and for a period of one (1) year after
acceptance thereof by Dublin, as hereinbefore provided, Dublin
C may, during normal business hours and through its duly authorized
agents, attorneys or accountants, examine the books and records
of Muirfield pertaining to the costs incurred by Muirfield in
causing the new water facilities to be designed and constructed.
-5-
.'
6. Muirfield shall cause its agents and the con-
tractors and subcontractors engaged in construction of the new
water facilities to comply with the Workers' Compensation Law
of the State of Ohio and shall indemnify and hold harmless
0 Dublin from any and all claims, demands, actions or liabilities
arising out of personal injury, death or property damage re-
sulting from the construction work performed or caused to be
performed by Muirfield pursuant to this agreement.
7. Since the water main was originally constructed
by Muirfield at its expense, subject to later reimbursement of
such expense by Dublin, and was intended to provide water
service principally to Muirfield Village and in consideration
of Muirfield's causing the new water facilities to be designed
and constructed as hereinbefore provided in this agreement,
Dublin agrees that a portion of the water main capacity will
be made available to Muirfield and its successors and assigns
( for use within Muirfield Village equivalent to the rate at which
water can be supplied to Muirfield Village through the water main
after construction of the new water facilities. After construc-
tion of the new water facilities the parties anticipate that
Columbus will be able to supply water to Dublin through the
water main (pursuant and subject to the contract relating
thereto between Columbus and Dublin) at a rate equivalent to
the water main capacity and that the new water facilities will
enable the water main to supply water at a rate sufficient to
provide water service to 3,300 residential dwelling units or
their equivalent in Muirfield Village and to 800 residential
dwelling units or their equivalent in the remainder of the
service area. Therefore, Muirfield and its successors and
0 assigns will have the right to make taps and service connections
into the water main or water lines extending from or served by
the water main and obtain water service from Dublin (subject to
-6-
.
'.'
.
the payment of such normal fees and charges for such taps,
service connections and service as are imposed by Dublin)
until such time as service connections shall have been made
and water service shall have been provided to a total of 3,300
0 residential dwelling units (or their equivalent) in Muirfield
Village, including those residential dwelling units and other
structures in Muirfield Village presently receiving water
service from Dublin. Dublin shall have the right to permit
others to make taps and service connections into the water main
or water lines extending from or served by the water main and
obtain water service from Dublin (subject to the payment of
such normal fees and charges for such taps, service connections
and service as are imposed by Dublin) until service connections
shall have been made and water service shall have been provided
to a total of 800 residential dwelling units (or their equivalent)
in the remainder of the service area, including those residential
dwelling units and other structures in the remainder of the
L
...., service area presently receiving water service from Dublin.
The parties understand and agree that within Muirfield Village
and the remainder of the service area service connections have
been or will be made into and water service has been or will be
provided for the Muirfield Village Golf Club Clubhouse and Villas,
commercial establishments and other structures which are not
residential dwelling units. Accordingly, in order to ascertain
the extent to which either Dublin or Muirfield has utilized the
service connections and water service allocated to it by the
foregoing provisions of this section 7, the parties jointly
shall make determinations in good faith with respect to the
0 number of residential dwelling units equivalent to each non-
residential dwelling unit service connection made and water
service provided within the service area.
IN WITNESS WHEREOF, the parties hereto have caused
-7-
.
.,
this agreement to be executed by their duly authorized officials
or agents as of the day and year first above written.
VILLAGE OF DUBLIN, OHIO
0
" J ~~~
By
!-iayor
BY~~
elk-Treasurer
MUIRFIELD LTD.
By A
Authorl.zed Agen
By ~{- b'.- ~~.
U ' Authorited Agent
0