HomeMy WebLinkAbout29-09 ResolutionRECORD OF RESOLUTIONS Resolution No Form No.3 5 29 -09 Passed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE DUBLIN COMMUNITY RECREATION CENTER LOCKER ROOM RENOVATION PROJECT - AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT FOR SAID SERVICES WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Dublin Charter; and WHEREAS, Council has determined that the bid submitted by Memmer Construction in the amount of $180,300 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, r of the elected members concurring, that: Section 1 . The bid submitted by Memmer Construction of $180,300 is hereby accepted. Section 2 . The City Manager is hereby authorized to enter into a contract with Memmer Construction for said project as specified within the bid proposal and the City's bid documents. Section 3 . This Resolution shall take effect upon adoption in accordance with Section 4.04(a) of the Revised Charter. Passed this day of 2009 Mayor — Presiding Officer Attest: of Council I hereby certify that copies of this Ordinance/Resolution were posted in the City of Dublin in accordance with Section 731.25 of the Ohio Revised Code. Depupy lerk of Council, Dublin, Ohio CITY OF DUBLIN_ Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 -1090 Phone: 614- 410 -4400 • Fax: 614 -410 -4490 To: Members of Dublin City Council From: Terry Foegler, City Manager Date: June 25, 2009 / Initiated By: Michelle L Crandall, Director of Administrative Services Brian K. Ashford, Facilities Manager Memo Re: Resolution 29 -09 Accepting the Lowest and Best Bid for Dublin Recreation Center Locker Room Renovation Project Summary On Thursday June 18, 2009 bids were opened for the Dublin Community Recreation Center Locker Room Renovation Project. This project consists of: 1) modifications to the floor slope and drains to correct problems with standing water; 2) installation of new floor and wall tile with a color scheme that complements the rest of the facility; 3) modifications to the ventilation systems to improve air flow; 4) minor changes to the lighting systems; and 5) new ceiling tile. In the men's locker room, the multi - station shower assembly will be removed and replaced with two more individual shower stalls. This project will require that the men's and women's locker rooms be closed for an estimated period of 4 to 6 weeks. Our preliminary schedule is to close the locker rooms in early August and re -open after Labor Day. The entire facility will be closed for the annual shutdown period from August 29 ° ' through Labor Day, September 7" . The four family changing rooms will remain open. Current plans are to renovate the family changing rooms as well as the restrooms in the main lobby m2010. Staff is exploring ways to minimize the impact of the locker room closure on patrons. The total amount budgeted for this project is S225,000. Six bids were received and the low bidder for the base bid plus two alternates is Memmer Construction with a total bid of $180,300. An analysis of their bid and references indicates that the company possesses the skill and experience to successfully perform the work required in this project. The total cost of this project, including architectural and engineering fees, is 5208,700. Recommendation Staff recommends adoption of Resolution 29 -09 accepting Memmer Construction's total bid of $180,300. Attachment Bid Opening June 18, 2009, 2:00 p.m. DCRC Men's and Women's Locker Room Renovation Bidder Base Bid Alternate 1 Alternate 2 Combined Bid CP Construction $196,000. $22,734. $4,000. $222,734. Construction Systems, Inc. $204,000. $27,750. $3,440. $235,190. Contracting Solutions $181,183. $31,931. $213,114. General Maintenance & Engineerin $185,793. $36,900. $3,750. $226,443. Memmer Equity $159,000. $19,000. $2,300. $180,300. 2K General $158,500. $19,900. $3,500. $181,900.