Loading...
HomeMy WebLinkAbout28-10 ResolutionRECORD OF RESOLUTIONS Oaylgn Legal Blank. Inc.. Form No, 30045 Resolution No. 28-10 Passed 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE METRO PLACE NORTH AND SOUTH BIKE PATH AND STREET LIGHT IMPROVEMENTS PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of the Dublin Code, for the Metro Place North and South Bike Path and Street Light Improvements project; and WHEREAS, Council has determined that the bid submitted by Columbus Asphalt Paving, Inc. constitutes the lowest and best bid; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above- referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, 4 — of its elected members concurring, that: Section 1. The bid submitted by Columbus Asphalt Paving, Inc. in the total amount of $1,138,799.80 is hereby accepted. Section 2 . The City Manager is hereby authorized to enter into contracts with Columbus Asphalt Paving, Inc. for performance and completion of the Metro Place North and South Bike Path and Street Light Improvements project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall take effect and be in force on the earliest date permitted by law. Passed this day of 0 , 2010. .iding • ATTEST: a""", 0' L241 Clerk of Council CITY OF DUBLIN_ Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017 -1090 Phone: 614 - 410 -4400 • Fax: 614- 410 -4490 To: Members of Dublin City Council From: Terry Foegler, City Manager `1 1 a Date: April 22, 2010 l Initiated By: Paul A. Hammersmith, P.E., Director of Engineering /City Engineer Kenneth B. Richardson, P.E., Engineering Manager - Design Memo Re: Resolution 28 -10 Metro Place North and South Bike Path and Street Light Improvements Bid Acceptance Background On April 8, 2010 six (6) bids were received, publicly opened and read for the Metro Place North and South Bike Path and Street Light Improvements Project, which involves the construction of approximately 5,300 linear feet of asphalt bike path and 34 street lights. In addition, the work will include curb and gutter replacement at several locations and resurfacing of the roadway. Staff has reviewed all bids. The Engineer's estimate was $1,300,000.00. The 2010 budgeted funds for construction of this project are 5750,000 for the bike path and street lighting improvements, along with an additional S550,000.00 in budgeted funds from the 2010 Street Maintenance Program for curb and gutter repairs and street resurfacing. Columbus Asphalt Paving, Inc. submitted the lowest and best bid of $1,138,779.80. A summary of the bids is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over( +) orlinder( -) Engineer's Estimate Columbus Asphalt Paving, Inc. $1,138,779.80 -12.4% N/C Strawser Paving Company, Inc. $1,165,665.00 - 103% N/C The Shelly Company $1,199,100.00 -7.8% N/C Decker Construction Company $1,214,925.07 -6.5% N/C Shelly & Sands, Inc. $1,229,262.45 -5.4% N/C McDaniel's Construction Corp. $1,249,445.40 -3.9% N/C For Council reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. Staff has thoroughly reviewed the Columbus Asphalt Paving, Inc. bid. Previous experience with Columbus Asphalt Paving, Inc. has been favorable, including these projects: Southwest Area Traffic Calming Phase 2 (2001), Phase 3 (2003) and Phase 4 (2004); and Hirth Road Roundabout (2008). Staff anticipates the construction to commence on or after July 12, 2010 following the end of the annual Arthritis Foundation Classic Auto Show and Cruise -In scheduled for July 9 and 10, 2010. No work shall be performed during the Dublin Irish Festival, and all hotel entrances are required to be open to traffic during that time. The completion date for the project will be October 15, 2010. Memo re. Resolution 28 -10 — Bid - Metro Place North and South Bike Path and Street Lights April 22, 2010 Page 2 of 2 Recommendation Staff recommends approval of Resolution 28 -10, accepting the bid of Columbus Asphalt Paving, Inc and authorizing the City Manager to enter into a contract with Columbus Asphalt Paving, Inc. for this project. CITY OF DUBLIN DEPARTMENT OF DEVELOPMENT DIVISION OF ENGINEERING 5800 Shier Rings Road • Dublin, Ohio 43016 -1236 Phone (614)410 -4600 • Fax (614)761 -6506 07- 010 —CIP METRO PLACE NORTH & SOUTH BIKE PATH & STREET LIGHT IMPROVEMENTS S.R. 161 i. ,r ;), dn Q� so I c d CD 0 0 0 p� / -fL j 600 'A� 472 570 '� 500 600 w� 655 y �1 565 Tv— �� o J — 54 5 cp — � 0— ' 450 �' G 7' cr ° — 0 0 I 400 ,� I 495 ®I o 0 0 ® ®�4L 485 0 1 0 DRAWN CHECKED DATE: JOB NO. MSS KBR 10 -23 -09 07- 010 —CIP ,._ 4W 2W 0 4W 0 a 0 z LL- a 455 L�