Loading...
HomeMy WebLinkAboutResolution 10-26RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 Resolution No. 10-26 Passed P ACCEPTING THE LOWEST AND BEST BID FOR THE SHARED USE PATH AND PARKING LOT MAINTENANCE 2026 PROJECT, (26-003-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the Shared Use Path and Parking Lot Maintenance 2026 Project (26-003-CIP); and WHEREAS, Council has determined that the bid submitted by Breck’s Paving on February 11, 2026 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, __“/__ of the elected members concurring, that: Section 1. The bid submitted by Breck’s Paving in the total amount of $530,634.37 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Breck’s Paving for performance and completion of the Shared Use Path and Parking Lot Maintenance 2026 Project (26-003-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 9" day of March, 2026. Ue A S Mayor — Presiding Officer L Ug. Clerk of Gguncil ATTEST: To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: March 3, 2026 Initiated By: Michael E. Barker, Deputy City Manager Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Director – Capital Projects Jared A. Groves, P.E., Civil Engineer II Re: Resolution 10-26 – Accepting the Lowest and Best Bid for the Shared Use Path and Parking Lot Maintenance 2026 Project (26-003-CIP) Summary On February 11, 2026, seven (7) bids were received and publicly opened for the Shared Use Path and Parking Lot Maintenance 2026 Project, 26-003-CIP (Project). The scope of work for this Project provides annual maintenance in various locations on the shared use path network and City parking lots. Please see the attached exhibit for general work locations. For Council’s reference, a copy of the construction drawings for this Project can be provided upon request. The 2026 budgeted funds for this Project in the 2026-2030 Capital Improvements Program (CIP) are $530,000 from accounts MB26M01, Annual Shared Use Path Maintenance ($369,000) and ST26M02, Annual Parking Lot Maintenance ($161,000). The engineer’s estimate for this Project is $670,000. Breck’s Paving submitted the lowest and best bid of $530,634.37. By fund account, the bid is $366,876.10 for MB26M01, Annual Shared Use Path Maintenance and $163,758.27 for ST26M02, Annual Parking Lot Maintenance. The low bid received is 20.80% below the engineer’s estimate and $634.37 greater than the budgeted funds. Engineering has consulted with Finance, and staff anticipates being able to cover the additional Project costs using other unencumbered budgeted funds in the CIP. Staff has reviewed all bids, and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Responsive? Over (+) or Under (-) Engineer’s Estimate Breck’s Paving $530,634.37 -20.80% Yes B&C Blacktop $683,299.59 +1.99% Yes Byrne & Jones $712,839.10 +6.39% Yes Strawser Paving Company $722,067.17 +7.77% Yes Chemcote Inc $794,260.01 +18.55% Yes Decker Construction Company $794,991.63 +18.66% Yes Premier Asphalt and Paving $443,536.05 -33.80% No The bid submitted by Premier Asphalt and Paving missed several key components (bid/performance/payment bond, addendum acknowledgement, etc.) and as a result was considered a non-responsive bid. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Resolution 10-26 – Accepting the Lowest and Best Bid for the Shared Use Path and Parking Lot Maintenance 2026 Project (26-003-CIP) March 3, 2026 Page 2 of 2 The work for this Project is expected to commence in May 2026 and be completed by October 2026. Engineering staff has coordinated with Parks and Events staff to verify that work on the Project will not interfere with major City events, park related events, or holidays throughout the year. The typical and customary communication methods will be used to convey construction information to residents and any impacted property owners throughout the duration of this work. The City will have a designated Engineering Project Inspector assigned to the work for this Project who will provide coordination, be available to answer any questions, and manage access needs throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by Breck’s Paving. Previous experience with Breck’s Paving has been favorable and includes previous work on the South High Utility Burial Project – Phase 2 as an asphalt paving subcontractor. Staff is confident Breck’s Paving has the capacity, capability and experience to perform well on this Project. Staff recommends Council approve Resolution 10-26 accepting as lowest and best the bid of Breck’s Paving in the amount of $530,634.37 and authorizing the City Manager to enter into a contract with Breck’s Paving for this Project. Shared Use Path and Parking Lot Maintenance 2024 Shared Use Path and Parking Lot Maintenance 2025 Shared Use Path and Parking Lot Maintenance 2024 Shared Use Path and Parking Lot Maintenance 20252026 Shared Use Path Maintenance Parking Lot Maintenance