Loading...
HomeMy WebLinkAboutResolution 64-25RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 64-25 Resolution No. Passed . ACCEPTANCE OF A PRELIMINARY PLAT FOR THE SUBDIVISION OF 12.79 ACRES INTO 7 SINGLE-FAMILY LOTS WITH 0.5 ACRES OF OPEN SPACE AND DEDICATION OF RIGHT-OF-WAY FOR LIU COURT (CASE 24-128PP) WHEREAS, application for approval of the preliminary plat for the Liu Court development, has been made under Chapter 152 of the Codified Ordinances of the City of Dublin; and WHEREAS, the Council has considered the recommendation of the Planning and Zoning Commission, the reports of staff, and the subdivision requirements of Chapter 152 of the Codified Ordinances of the City of Dublin, and desires to approve said plats and accept all rights of way, easements, and other interests dedicated to the City therein; NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, /__ of the elected members concurring that: Section 1. The City Council hereby approves and accepts the preliminary plat for the Liu Court development, attached hereto and incorporated by reference as Exhibit A. Section 2. The City Manager, Law Director, Clerk of Council, and any other required City employee or official are authorized to execute the plat on behalf of the City. Section 3. Pursuant to Section 4.04 of the Charter, this resolution shall take effect immediately upon passage. Passed this i= day of Ne , 2025. Lt Ca. Bo Mayor — Presiding Officer Aw fh /) ATIEST: of Covncil To: Members of Dublin City Council From: Megan D. O’Callaghan, City Manager Date: November 12, 2025 Initiated By: Jennifer M. Rauch, AICP, Director of Community Planning & Development Tammy Noble, Senior Planner Re: Resolutions 64-25 and 65-25 - Acceptance of a Preliminary Plat and Final Plat for the subdivision of 12.79 acres into seven lots with 0.5 acres of open space and dedication of right-of-way for Liu Court (Case 24-128PP and Case 25- 026FP). Request This is a request for a Preliminary Plat (PP) and Final Plat (FP) for a 12.79-acre site to establish 7 single-family residential lots and a reserve. The site currently features a single-family residential structure that will remain on site; however, all other amenities, including a tennis court and two detached structures, will be removed. The development includes a new public road, Liu Court, and 0.5 acres of open space. The site is zoned R-1, Restricted Suburban Residential District and will be developed under this standard zoning district. Process As provided by the Law Director’s Office, when City Council approves preliminary and final plats, the process is solely to identify property lines, establish easements, dedicate open space, and create public rights-of-way. Background The Planning and Zoning Commission heard the Preliminary Plat on April 17, 2025, and had significant discussion about the project, including the size of the existing and proposed houses, building orientation, density, and grading. The need for a left-turn lane along Dublin Road and the proposed fee-in-lieu options for a required shared use path were also discussed. The limited scope of PZC’s review was discussed in relation to the platting of a development under the standard zoning district requirements. The application was tabled at the applicant’s request to allow the applicant to respond to the Commission’s comments. The applicant subsequently addressed the Commission’s comments, including the conditions of approval recommended by staff, and filed Preliminary and Final Plat applications, which were heard by the Planning and Zoning Commission on October 23, 2025. The Planning Report provided to the Commission incorporated input from the Law Director’s Office and noted the following: Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614-410-4400 • Fax: 614-410-4490 Memo Memo re. Resolutions 64-25 and 65-25 – Liu Court November 12, 2025 Page 2 of 4 “These are preliminary and final plat applications in an R-1, Restricted Suburban Residential district. The review of the preliminary and final plats is governed exclusively by Section 152.019 in the subdivision code, and the R-1 district provides minimum lot and yard dimensions at Section 153.020(C) of the Zoning Code incorporated by reference in Section 152.019. Unlike preliminary and final plat applications accompanying Planned Development District (PUD) or Bridge Street District applications that the Commission frequently hears, the plat application in this case only considers whether the applicable code minimums have been depicted on the proposed plat. There is no discretion for the Commission to consider additional factors, including building form, architecture, or density (so long as the lot size minimums are met). If the plat meets the minimum conditions and is approved, any building upon the lots created will be subject to stormwater, engineering, and building staff review. The individual structures will also be required to meet the Residential Appearance Standards listed in Section 153.190 of the Zoning Code. These are reviewed administratively at the building permit stage.” Description This is a request to subdivide 12.79 acres into seven single-family lots, with 0.5 acres of open space designated as a private reserve, and to construct a new public street (Liu Court) to provide access to the development. The applicant intends to develop the proposal under the current R-1: Restricted Suburban Residential District. The proposal is required to meet the development standards outlined in the Code, which include a minimum lot size of 40,000 square feet and a minimum lot width of 60 feet at the right- of-way line and 150 feet and front building line, which are met. The proposed lots will have a minimum building line setback of 40 feet from Dublin Road, based on the 80-foot ROW, and a varied building line setback from Liu Court. The development standards are summarized in the table below: Lot Identification Lot Size (Minimum 40,000 square feet/0.918 acres) Lot Width at Front Building Line (Minimum 150 feet). Front Building Line Setback Lot 1 0.921 Acres 152.41 +/- feet 36 Lot 2 1.55 Acres 150.49 +/- feet 92 Lot 3 1.575 Acres 150.78 +/- feet 65 Lot 4 3.001 Acres 251.95 +/- feet 41 Lot 5 1.337 Acres 150.86 +/- feet 31 Lot 6 1.302 Acres 251.24 +/- feet 36 Lot 7 0.931 Acres 250 feet +/- feet 31 Transportation & Mobility To access the subdivision, a new left turn lane on Dublin Road and the construction of a new public street with associated infrastructure improvements are required. The new public street, Liu Court, is designated as a future Shared Street and will include a 58- foot ROW with a 24-foot paved street, 6-foot sidewalks, and 8-foot tree lawns with street trees. To promote mobility objectives, an 11-foot Shared Use Path (SUP) along the east side of Dublin Road is also required and accommodated in the plat. Memo re. Resolutions 64-25 and 65-25 – Liu Court November 12, 2025 Page 3 of 4 Utilities & Stormwater Water and sanitary sewer utilities are available on site. The existing water line is located on the west side of Dublin Road, and the sanitary sewer runs north/south through the middle of the site. The existing ditch along the north property line connects to an existing 24-inch culvert under Dublin Road and outlets to the Scioto River. This will be relocated 30 feet north and placed within an 83-foot storm easement. Stormwater from the development will outlet to the southern property line of lot 5. The subdivision will connect to the public sanitary sewer system and file a sanitary PTI sewer extension through the Ohio Environmental Protection Agency. Water quality control is provided through a proposed underground detention system beneath the Liu Court cul-de-sac. Per the City of Dublin Stormwater Design Manual, stormwater quantity control is not required. Open Space/Reserve Residential subdivisions are required to provide open space in proportion to the number of units proposed. Based on the proposed seven dwelling units, a total of 0.466 acres of open space is required. The proposal includes 0.598 acres of open space, which exceeds the minimum requirement. The proposed open space reserve will be privately owned and maintained by the HOA and is intended to provide shared visual and physical access to the Scioto River. The applicant has provided plans for the open space, which include a gravel path, retaining walls, benches, and landscaping. This space is designed for and intended for the use of the residents of Liu Court. Landscaping For a standard residential subdivision, street trees are required to be planted within the 8-foot tree lawn of the ROW, spaced 45 feet on center, which is met. The applicant proposes two types of large street trees: Swamp White Oaks along Dublin Road and Urban Elms along Liu Court. Additional deciduous trees - Scarlet Oak, Green Mountain Sugar Maple, and Swamp White Oak - will be planted within the landscape buffer along Dublin Road. All other landscaping, including front yard trees, will be finalized during building permitting as part of the final residential site design. Architecture The site is zoned R-1, Restricted Suburban Residential District and is required to meet the Residential Appearance standards in Section 153.190. The section outlines the minimum architectural requirements for residential homes. Some examples of the requirements are masonry chimneys, building materials finishes, exposed foundation cladding (must include brick, stone, or split face block, or patterned concrete). The section also requires four-sided architecture and includes requirements for garage doors based on the type of garage, minimum roof pitches, shutters or trim requirements on all windows. All building materials must meet industry standards and have 30-year life span. All building permits will be reviewed against these standards. Memo re. Resolutions 64-25 and 65-25 – Liu Court November 12, 2025 Page 4 of 4 Recommendation of the Planning and Zoning Commission At the October 23, 2025, Planning and Zoning Commission meeting, the Commission recommended approval of the Preliminary and Final Plat to City Council as outlined below. Preliminary Plat with no conditions. Final Plat with the following conditions: 1) The applicant adds evergreen trees within the landscape easement, subject to staff review and approval, as part of the Final Plat at City Council. 2) The applicant continues to work with Engineering on the final location and design of the Shared Use Path along Dublin Road, including the easement width necessary for the path maintenance and/or construction, prior to approval of the Final Plat at City Council. 3) The location of the driveway on Lot 1 is restricted to the most eastern location allowable based on setbacks, subject to staff approval. 4) The location of the driveway on Lot 7 is restricted to line up with the driveway on Lot 1 or located further to the east, subject to staff approval. 5) The applicant continues to work with the Engineering Division to resolve all comments provided on the plans and make any adjustments to the plat with the submission of the Final Plat at City Council. The applicant has addressed conditions one and five and will continue to work with staff to address the remaining conditions through the permitting process. Recommendation Approval of Resolutions 64-25 and 65-25 for a Preliminary and Final Plat for Liu Court. ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AECP900TBM1 CP947 CP9950 10 1 8 1 7 DUBLIN ROADPID: 273-001924-00 ZONING: R-1 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 ZONING: R-1 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001925-00 ZONING: R-1 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001926-00 ZONING: R-1 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 ZONING: PLR CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 ZONING: R-1 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-001793-00 ZONING: R-1 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001787-00 ZONING: R-1 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.78 ACRES LIU CO U R T SCIOTO RIVERRESERVE A 2 13 12 11 14 15 84 9 6 7 2772 2788 6 2789 2 3 4 Area: 130,733 SF (3.00 AC) 6 Area: 56,744 SF (1.30 AC) 7 Area: 40,531 SF (0.93 AC) 5 Area: 58,218 SF (1.34 AC) 9 1 Area: 40,116 SF (0.92 AC) 2 Area: 67,760 SF (1.56 AC) 3 Area: 68,609 SF (1.58 AC) 5 3 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:31 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 TS&GN.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES APPROVED: CITY OF DUBLIN: SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSE AND GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. REGISTERED ENGINEER E-86125 DATE DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE STANDARD CONSTRUCTION DRAWINGS THE STANDARD CONSTRUCTION DRAWINGS LISTED ON THESE PLANS SHALL BE CONSIDERED A PART THEREOF. UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 MD-02 MD-03 MD-05 PD-02 PD-03 PD-04 PD-06 RD-01 RD-02 RD-03 RD-05 RD-08 RD-10 RD-15 SA-04 ST-01 ST-03 ST-04 ST-05 ST-06 WA-01 CITY OF DUBLIN (2020 EDITION)ODOT BP-3.1 CITY OF COLUMBUS: APPROVAL ON THE PART OF THE CITY OF COLUMBUS IS GIVEN PURSUANT TO THE PROVISIONS OF THE WATER SERVICE AGREEMENT BETWEEN THE CITY OF DUBLIN AND THE CITY OF COLUMBUS, OHIO, ON APRIL 13, 1993 AND ALL SUBSEQUENT AMENDMENTS THEREOF. INDEX MAP SHEET INDEX 1 - TITLE SHEET 2 - GENERAL NOTES 3 - TYPICAL SECTIONS & DETAILS 4 - EXISTING CONDITIONS & DEMOLITION PLAN 5 - SITE PLAN 6 - UTILITY PLAN 7 - PLAN & PROFILE 8 - STORM PROFILE 9 - GRADING PLAN 10 - CUL-DE-SAC DETAIL 11 - DRIVEWAY DETAIL 12 - EROSION CONTROL PLAN 13 - EROSION CONTROL NOTES 14 - EROSION CONTROL DETAILS 15 - EROSION CONTROL DETAILS 16 - UNDERGROUND DETENTION DETAILS 17 - UNDERGROUND DETENTION DETAILS 18 - UNDERGROUND DETENTION DETAILS 19 - TREE PRESERVATION 20 - TREE PRESERVATION SCHEDULE 21 - LANDSCAPE PLAN 22 - LANDSCAPE DETAILS 23 - LANDSCAPE DETAILS 24 - LANDSCAPE SPECS 25 - LANDSCAPE SPECS ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM Ohio Utilities Protection Service Call 811before you dig PUBLIC STREET, STORM, AND WATER IMPROVEMENTS FOR LIU COURT CITY OF DUBLIN, FRANKLIN COUNTY, OHIO TITLE SHEET1/25 SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVERBASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 DATE DIRECTOR, DEPARTMENT OF PUBLIC UTILITIES CITY OF COLUMBUS, OHIO DATE ADMINISTRATOR, DIVISION OF WATER CITY OF COLUMBUS, OHIO SITE DATA ZONING: PROPERTY OWNER:GEORGE CRIMSON LLC PARCEL ID:273-001786-00 SITE ACREAGE:12.820 (REC) 12.793 (MEASURED) SITE ZONING R-1, RESTRICTED SUBURBAN RESIDENTIAL DISTRICT FEMA FLOODPLAIN:39049C0151K (6/17/2008) ZONE X SITE LAYOUT DATA: TOTAL LOTS:7 LOTS GROSS DENSITY (NET DENSITY):0.55 LOTS/ACRE MINIMUM DRIVE AISLE WIDTH:24' MINIMUM LOT WIDTH:150' AT THE FRONT LINE OF THE DWELLING MINIMUM FRONT YARD SETBACK:30' MINIMUM REAR YARD SETBACK:50' TOTAL SIDE YARD SETBACK:25', 8' MINIMUM ON ONE SIDE REAR YARD MINIMUM:20% OF THE LOT DEPTH BUILDING DATA: BUILDING HEIGHT:35' MAXIMUM HEIGHT LANDSCAPE DATA: EXISTING IMPERVIOUS AREA:1.04 AC PROPOSED IMPERVIOUS AREA:2.01 AC GREENSPACE:10.10 AC (79%) HORZ 1"=60'0 100 200 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 PROFE SSIONA L E N G INEERR EGIS T E R E DSTATE OF O H IOE-86125 MATTHEW LILIE J. 07/17/2025 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:31 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 TS&GN.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES GENERAL NOTES2/25 GENERAL NOTES 1.CITY OF COLUMBUS AND OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS, CURRENT EDITIONS, AND ANY SUPPLEMENTS THERETO (HEREAFTER REFERRED TO AS STANDARD SPECIFICATIONS), SHALL GOVERN ALL CONSTRUCTION ITEMS UNLESS OTHERWISE NOTED. IF A CONFLICT BETWEEN SPECIFICATIONS IS FOUND, THE MORE STRICT SPECIFICATION WILL APPLY AS DECIDED BY THE CITY ENGINEER. ITEM NUMBERS LISTED REFER TO CITY OF COLUMBUS ITEM NUMBERS UNLESS OTHERWISE NOTED. 2.THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION THAT ARE NOT SPECIFIED HEREIN. THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR SAFETY ON THE WORK SITE, OR FOR FAILURE BY THE CONTRACTOR TO PERFORM WORK ACCORDING TO CONTRACT DOCUMENTS. 3.THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS INCLUDING BUT NOT LIMITED TO OHIO EPA PERMITS TO INSTALL (PTI) AND NOTICES OF INTENT (NOI), BUILDING PERMITS, ETC. 4.THE CONTRACTOR SHALL NOTIFY THE CITY OF DUBLIN DIVISION OF ENGINEERING IN WRITING AT LEAST 3 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 5.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL SAFETY REQUIREMENTS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970. THE CONTRACTOR SHALL EXERCISE PRECAUTION ALWAYS FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT SHALL ALSO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, INCLUDING THE REQUIREMENTS FOR CONFINED SPACES PER 29 CFR 1910.146. 6.FOLLOWING COMPLETION OF CONSTRUCTION OF THE SITE IMPROVEMENTS AND BEFORE REQUESTING OCCUPANCY, A PROOF SURVEY SHALL BE PROVIDED TO THE DIVISION OF ENGINEERING THAT DOCUMENTS "AS_BUILT" ELEVATIONS, DIMENSIONS, SLOPES AND ALIGNMENTS OF ALL ELEMENTS OF THIS PROJECT. THE PROOF SURVEY SHALL BE PREPARED, SIGNED AND SUBMITTED BY THE PROFESSIONAL ENGINEER WHO SEALED THE CONSTRUCTIONS DRAWINGS. 7.THE CONTRACTOR SHALL RESTRICT CONSTRUCTION ACTIVITY TO PUBLIC RIGHT_OF_WAY AND AREAS DEFINED AS PERMANENT AND/OR TEMPORARY CONSTRUCTION EASEMENTS, UNLESS OTHERWISE AUTHORIZED BY THE CITY ENGINEER. 8.THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN OHIO PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. 9.NON_RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT THE WRITTEN PERMISSION OF THE CITY ENGINEER. 10.THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE GRADES AND CROSS_SECTIONS THAT EXISTED BEFORE CONSTRUCTION. 11.TRACKING OR SPILLING MUD, DIRT OR DEBRIS UPON STREETS, RESIDENTIAL OR COMMERCIAL DRIVES, SIDEWALKS OR BIKE PATHS IS PROHIBITED ACCORDING TO SECTION 97.38 OF THE DUBLIN CODE OF ORDINANCES. ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE CITY. IF THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS, OR SPILLAGE, THE CITY RESERVES THE RIGHT TO REMOVE THESE MATERIALS AND CLEAN AFFECTED AREAS, THE COST OF WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 12.DISPOSAL OF EXCESS EXCAVATION WITHIN SPECIAL FLOOD HAZARD AREAS (100-YEAR FLOODPLAIN) IS NOT PERMITTED. 13.ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES WITHIN RIGHT-OF-WAY DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 14.ALL FIELD TILE BROKEN OR ENCOUNTERED DURING EXCAVATION SHALL BE REPLACED OR REPAIRED AND CONNECTED TO THE PUBLIC STORM SEWER SYSTEM AS DIRECTED BY THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURE. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE CITY OF COLUMBUS. PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION. 16.BACKFILL WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES (HOUSES, GARAGES, ETC.) OR PUBLIC INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, BIKE PATHS, ETC.) SHALL BE COMPACTED GRANULAR BACKFILL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR FLOWABLE CDF, TYPE II ACCORDING TO ITEM 613. ITEM 911 OF THE STANDARD SPECIFICATIONS SHALL BE USED ELSEWHERE. 17.THE CONTRACTOR SHALL SUBMIT A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND A LIST OF PROPOSED PRECAST CONCRETE PRODUCT MANUFACTURERS TO THE CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION BEFORE COMMENCING CONSTRUCTION. SEND THE INFORMATION TO THE FOLLOWING ADDRESS: CONSTRUCTION INSPECTION DIVISION CITY OF COLUMBUS 1800 EAST 17TH AVENUE COLUMBUS, OHIO 43219 SEND A COPY OF THE TRANSMITTAL LETTER TO THE FOLLOWING ADDRESS: DIVISION OF ENGINEERING CITY OF DUBLIN 6555 SHIER RINGS ROAD DUBLIN, OHIO 43016 18.ALL TRENCHES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES OUTSIDE THESE AREAS SHALL BE BACKFILLED OR SHALL BE PROTECTED BY APPROVED TEMPORARY FENCING OR BARRICADES DURING NONWORKING HOURS. CLEAN UP SHALL FOLLOW CLOSELY BEHIND THE TRENCHING OPERATION. 19.ALL TREES WITHIN THE CONSTRUCTION AREA NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY FENCING PLACED A MINIMUM 15 FEET FROM THE TREE TRUNK. TREES 6 - INCHES OR GREATER AT DBH (DIAMETER BREAST HEIGHT) MUST BE PROTECTED WITH FENCING PLACED AT THE CRITICAL ROOT ZONE OR 15 FEET, WHICHEVER IS GREATER. TREES NOT INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS FOR REMOVAL MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE DIVISION OF ENGINEERING. 20.CONDUIT MUST BE DIRECTIONALLY BORED ACROSS STREETS INSTEAD OF OPEN CUT, UNLESS SPECIFICALLY APPROVED BY THE CITY ENGINEER. USE OF PNEUMATIC AIR RAM DEVICES IS NOT PERMITTED. PERMITS TO CONSTRUCT IN THE RIGHT-OF-WAY OF EXISTING STREETS MUST BE OBTAINED FROM THE CITY OF DUBLIN DIVISION OF ENGINEERING BEFORE COMMENCING CONSTRUCTION. SHOULD OPEN CUTTING OF EXISTING PAVEMENT BE PERMITTED, CONTROLLED DENSITY BACKFILL (TYPE II) SHALL BE USED IN PLACE OF COMPACTED GRANULAR BACKFILL, ACCORDING TO ITEM 613 OF THE STANDARD SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES WITHIN THE RIGHT-OF-WAY AND PUBLIC EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE CITY. 22.PAVEMENTS SHALL BE CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR AS REQUIRED BY THE CITY ENGINEER. PAVEMENT REPLACEMENT SHALL BE CONDUCTED ACCORDING TO CITY OF COLUMBUS STANDARD DRAWING 1441 DR. A AND APPLICABLE CITY OF DUBLIN STANDARD DRAWINGS. THE REPLACEMENT OF DRIVEWAYS, HANDICAPPED RAMPS, SIDEWALKS, BIKE PATHS, PARKING LOT PAVEMENT, ETC. SHALL BE PROVIDED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS AND CITY OF DUBLIN STANDARD CONSTRUCTION DRAWINGS. 23.TREE TRIMMING WITHIN THE CONSTRUCTION ZONE IS TO BE COMPLETED BY A CERTIFIED ARBORIST. AT THE COMPLETION OF THE PROJECT, THE ARBORIST IS TO RETURN AND TRIM ANY BROKEN BRANCHES AS NEEDED. 24.ANY MODIFICATION TO THE WORK SHOWN ON DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CITY ENGINEER, CITY OF DUBLIN. 25.ALL INLETS SHALL BE CHANNELIZED. 26.PARK AREAS SHALL BE FINE_GRADED AND SEEDED WITH THE FOLLOWING MIXTURE: IMPROVED KENTUCKY BLUEGRASS: 40% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) IMPROVED PERENNIAL RYE: 60% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) GERMINATION RATE: 85% APPLICATION RATE: 7 LBS PER 1000 SQ FT OR AS DIRECTED BY THE DIVISION OF PARKS AND RECREATION, CITY OF DUBLIN, OHIO. 27.TRAFFIC CONTROL AND OTHER REGULATORY SIGNS SHALL BE TYPE S WITH A SQUARE POST ANCHOR BASE INSTALLATION AND MEET ALL REQUIREMENTS OF ODOT TC-41.20 AND APPLICABLE CITY OF DUBLIN SPECIFICATIONS. 28. STREET SIGNS SHALL MEET ALL CITY OF DUBLIN SPECIFICATIONS WITH LETTERING COLORED IN WHITE DISPLAYED OVER A BROWN BACKGROUND. SIGN TUBING SHALL BE BROWN IN COLOR AND CONFORM WITH THE TYPE S, SQUARE POST ANCHOR BASE INSTALLATION REQUIREMENTS OF ODOT TC-41.20. UTILITIES 1.THE FOLLOWING UTILITIES ARE KNOWN TO BE LOCATED WITHIN THE LIMITS OF THIS PROJECT: AEP OHIO - ELECTRIC BREEZELINE - TELECOM COLUMBIA GAS OF OH-COLUMBUS - GAS DUBLIN SEWER - SANITARY SEWER DUBLIN WATER - WATER MAIN DUBLIN DIVISION OF ENGINEERING - STORMWATER AT&T - TELECOM CHARTER COMM - TELECOM 2.THE CONTRACTOR SHALL GIVE NOTICE OF INTENT TO CONSTRUCT TO OHIO UTILITIES PROTECTION SERVICE (TELEPHONE NUMBER 800_362_2764), PRODUCER'S UNDERGROUND PROTECTION SERVICE (TELEPHONE NUMBER 614_587_0486), AND TO OWNERS OF UNDERGROUND UTILITIES THAT ARE NOT MEMBERS OF A REGISTERED UNDERGROUND PROTECTION SERVICE. NOTICE SHALL BE GIVEN AT LEAST 2 WORKING DAYS BEFORE START OF CONSTRUCTION. 3.THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE OWNER OF THE UNDERGROUND UTILITY. THE CITY OF DUBLIN AND THE CITY ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. 4.LOCATION, SUPPORT, PROTECTION AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5.WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE CITY ENGINEER. 6.PUBLIC STREET LIGHTING MAY BE IN THE VICINITY OF THIS PROJECT. CONTACT THE CITY OF DUBLIN, DIVISION OF ENGINEERING AT 410-4637, TWO DAYS PRIOR TO BEGINNING WORK. TRAFFIC CONTROL 1.TRAFFIC CONTROL SHALL BE FURNISHED, ERECTED, MAINTAINED, AND REMOVED BY THE CONTRACTOR ACCORDING TO OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (OMUTCD), CURRENT EDITION. 2.ALL TRAFFIC LANES OF PUBLIC ROADWAYS SHALL BE FULLY OPEN TO TRAFFIC FROM 7:00 AM TO 9:00 AM AND FROM 4:00 PM TO 6:00 PM UNLESS AUTHORIZED DIFFERENTLY BY THE CITY ENGINEER. AT ALL OTHER HOURS THE CONTRACTOR SHALL MAINTAIN MINIMUM ONE_LANE TWO_WAY TRAFFIC. UNIFORMED, OFF-DUTY POLICE OFFICERS SHALL REPLACE FLAGMEN DESIGNATED BY THE OMUTCD, AND SHALL BE PRESENT WHENEVER ONE_LANE, TWO_WAY TRAFFIC CONTROL IS IN EFFECT. POLICE CRUISERS MAY BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 3.IF THE CITY ENGINEER DETERMINES THAT THE CONTRACTOR IS NOT PROVIDING PROPER PROVISIONS FOR TRAFFIC CONTROL, THE CITY ENGINEER SHALL ASSIGN UNIFORMED, OFF_DUTY POLICE OFFICERS TO THE PROJECT AT NO COST TO THE CITY. 4.STEADY_BURNING, TYPE "C" LIGHTS SHALL BE REQUIRED ON ALL BARRICADES, DRUMS, AND SIMILAR TRAFFIC CONTROL DEVICES IN USE AT NIGHT. 5.ACCESS FROM PUBLIC ROADWAYS TO ALL ADJOINING PROPERTIES FOR EXISTING RESIDENTS OR BUSINESSES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT FOR MAIL, PUBLIC WATER AND SANITARY SEWER SERVICE, AND EMERGENCY VEHICLES. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN DETAILING THE PROPOSED MAINTENANCE OF TRAFFIC PROCEDURES. THE TRAFFIC CONTROL PLAN MUST INCORPORATE ANY TRAFFIC CONTROL DETAILS CONTAINED HEREIN. THE TRAFFIC CONTROL PLAN PROPOSED BY THE CONTRACTOR MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL 1.THE CONTRACTOR OR DEVELOPER IS RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) TO BE REVIEWED AND APPROVED BY THE OHIO EPA. THE NOI MUST BE SUBMITTED TO OEPA 45 DAYS PRIOR TO THE START OF CONSTRUCTION AND MAY ENTITLE COVERAGE UNDER THE OHIO EPA GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. A PROJECT LOCATION MAP MUST BE SUBMITTED WITH THE NOI. A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL IF A SEDIMENT AND EROSION CONTROL PLAN HAS NOT ALREADY BEEN INCLUDED WITH THE APPROVED CONSTRUCTION DRAWINGS. THIS PLAN MUST BE MADE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE DESIGN OF EROSION CONTROL SYSTEMS SHALL FOLLOW THE REQUIREMENTS OF OHIO EPA, ITEM 207 OF OHIO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AND THE CITY ENGINEER. AN INDIVIDUAL NPDES STORMWATER DISCHARGE PERMIT MAY BE REQUIRED. THE CONTRACTOR SHALL BE CONSIDERED THE PERMITTEE. 2.THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL AT ALL POINTS WHERE STORM WATER RUNOFF LEAVES THE PROJECT, INCLUDING WATERWAYS, OVERLAND SHEET FLOW, AND STORM SEWERS. 3.ACCEPTED METHODS OF PROVIDING EROSION/SEDIMENT CONTROL INCLUDE BUT ARE NOT LIMITED TO: SEDIMENT BASINS, SILT FILTER FENCE, AGGREGATE CHECK DAMS, AND TEMPORARY GROUND COVER. HAY OR STRAW BALES ARE NOT PERMITTED. 4.THE CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OF THE WORK AREA AT ALL TIMES CONSISTENT WITH EROSION CONTROL PRACTICES. 5.DISTURBED AREAS THAT WILL REMAIN UNWORKED FOR 30 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN SEVEN CALENDAR DAYS OF THE DISTURBANCE. OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT THE CONCLUSION OF CONSTRUCTION BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER. BLASTING (IF PERMITTED) 1.THE CONTRACTOR MUST OBTAIN A BLASTING PERMIT FROM WASHINGTON TOWNSHIP FIRE DEPARTMENT PRIOR TO BLASTING FOR ROCK EXCAVATION. THE CONTRACTOR SHALL SUBMIT BLASTING REPORTS UPON COMPLETION OF BLASTING TO THE CITY ENGINEER, THE OWNER, AND THE OWNER'S ENGINEER. TOP OF ROCK ELEVATIONS SHALL BE SHOWN ON "AS_BUILT" CONSTRUCTION DRAWINGS. WATER LINE 1.ALL WATER LINE MATERIALS SHALL BE PROVIDED AND INSTALLED ACCORDING TO CURRENT SPECIFICATIONS OF THE CITY OF COLUMBUS DIVISION OF WATER. 2.ALL PUBLIC WATER PIPE WITH A DIAMETER 3 INCHES TO 8 INCHES SHALL BE DUCTILE IRON, CLASS 53. PUBLIC WATER PIPE 12 INCHES IN DIAMETER OR LARGER SHALL BE DUCTILE IRON, CLASS 54. PUBLIC WATER PIPE 20 INCHES IN DIAMETER OR LARGER MAY BE PRESTRESSED CONCRETE PIPE. PRIVATE WATER PIPE SHALL MEET THE APPROVAL OF THE CITY OF COLUMBUS DIVISION OF WATER PRIOR TO APPROVAL OF THE CONSTRUCTION DRAWINGS. 3.ONLY FIRE HYDRANTS CONFORMING TO CITY OF COLUMBUS STANDARDS WILL BE APPROVED FOR USE. 4.PUBLIC WATER LINES SHALL BE DISINFECTED BY THE CITY OF COLUMBUS DIVISION OF WATER. REQUESTS FOR WATER LINE CHLORINATION SHALL BE MADE THROUGH THE CITY OF DUBLIN DIVISION OF ENGINEERING. THE COST FOR CHLORINATION SHALL BE PAID FOR BY THE CONTRACTOR. 5.ALL WATER LINES SHALL BE DISINFECTED ACCORDING TO ITEM 801.13 OF THE STANDARD SPECIFICATIONS. SPECIAL ATTENTION IS DIRECTED TO APPLICABLE SECTIONS OF AMERICAN WATER WORKS ASSOCIATION SPECIFICATION C_651, PARTICULARLY FOR FLUSHING (SECTION 5) AND FOR CHLORINATING VALVES AND FIRE HYDRANTS (SECTION 7). PRESSURE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 801.12 OF THE CITY OF COLUMBUS CONSTRUCTION AND MATERIAL SPECIFICATIONS. WHEN WATER LINES ARE READY FOR DISINFECTION, THE CITY OF DUBLIN SHALL SUBMIT TWO (2) SETS OF "AS-BUILT" PLANS, AND A LETTER STATING THAT THE WATER LINES HAVE BEEN PRESSURE TESTED AND NEED TO BE DISINFECTED, TO THE CITY OF COLUMBUS, DIVISION OF WATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE DISINFECTION OF ALL WATER LINES CONSTRUCTION PER THIS PLAN. PRESSURE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 801.12 OF THE CITY OF COLUMBUS CONSTRUCTION AND MATERIAL SPECIFICATIONS. 6.THE CONTRACTOR SHALL PAINT ALL FIRE HYDRANTS ACCORDING TO CITY OF DUBLIN STANDARDS. THE COST OF PAINTING FIRE HYDRANTS SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR FIRE HYDRANTS. 7.NO WATER TAPS OR SERVICE CONNECTIONS (E.G., TO CURB STOPS OR METER PITS) MAY BE ISSUED UNTIL ADJACENT PUBLIC WATER LINES SERVING THE CONSTRUCTION SITE HAVE BEEN DISINFECTED BY THE CITY OF COLUMBUS DIVISION OF WATER AND HAVE BEEN ACCEPTED BY THE CITY ENGINEER. A TAP PERMIT FOR EACH WATER SERVICE MUST BE OBTAINED FROM THE CITY OF DUBLIN AND THE CITY OF COLUMBUS DIVISION OF WATER BEFORE MAKING ANY TAPS INTO PUBLIC WATER LINES. 8.THE CONTRACTOR SHALL NOTIFY THE CITY OF COLUMBUS DIVISION OF WATER AT 645_7788 AND THE CITY OF DUBLIN DIVISION OF ENGINEERING AT LEAST 24 HOURS BEFORE TAPPING INTO EXISTING WATER LINES. 9.ALL WATER MAIN STATIONING SHALL BE BASED ON STREET CENTERLINE STATIONING. 10.ALL BENDS, JOINT DEFLECTIONS AND FITTINGS SHALL BE BACKED WITH CONCRETE PER CITY OF COLUMBUS STANDARDS. 11.THE CONTRACTOR SHALL GIVE WRITTEN NOTICE TO ALL AFFECTED PROPERTY OWNERS AT LEAST 1 WORKING DAY BUT NOT MORE THAN 3 WORKING DAYS PRIOR TO ANY TEMPORARY INTERRUPTION OF WATER SERVICE. INTERRUPTION OF WATER SERVICE SHALL BE MINIMIZED AND MUST BE APPROVED BY THE CITY ENGINEER. 12.WATER METERS SHALL BE INSTALLED INSIDE PROPOSED STRUCTURES UNLESS A METER PIT INSTALLATION IS APPROVED BY THE CITY OF COLUMBUS DIVISION OF WATER. METER PITS MUST CONFORM TO STANDARD DRAWINGS L-7103, A&B FOR 5/8" THROUGH 1" METERS OR L-6317, A, B, C&D FOR 1-1/2" OR LARGER METERS. 13.WATER LINES TO BE INSTALLED IN EMBANKMENT AREAS SHALL BE PLACED AFTER THE EMBANKMENT HAS BEEN PLACED AND COMPACTED ACCORDING TO THE STANDARD SPECIFICATIONS. 14.CURB STOP BOXES SHALL BE LOCATED AT LEAST 1 FOOT INSIDE THE RIGHT_OF_WAY AND SET AT FINISHED GRADE. 15.IF THE TOP OF THE OPERATING NUT OF ANY VALVE IS GREATER THAN 36 INCHES BELOW FINISHED GRADE, AN EXTENSION STEM SHALL BE FURNISHED TO BRING THE TOP OF THE OPERATING NUT TO WITHIN 24 INCHES OF FINISHED GRADE ELEVATION. 16.ALL WATER LINES SHALL BE PLACED AT A MINIMUM DEPTH OF 4 FEET MEASURED FROM TOP OF FINISHED GRADE TO TOP OF WATER LINE. WATER LINES SHALL BE SET DEEPER AT ALL POINTS WHERE NECESSARY TO CLEAR EXISTING OR PROPOSED UTILITY LINES OR OTHER UNDERGROUND RESTRICTIONS BY A MINIMUM OF 18 INCHES. 17.TWO ¾ INCH TAPS SHALL BE INSTALLED WITHIN 2 FEET OF THE END OF THE LINE ON ALL DEAD-END WATER LINES. STORM SEWER 1.ALL STORM WATER DETENTION AND RETENTION AREAS AND MAJOR FLOOD ROUTING SWALES SHALL BE CONSTRUCTED TO FINISH GRADE AND HYDRO_SEEDED AND HYDRO_MULCHED ACCORDING TO ITEMS 203 AND 659 OF THE STANDARD SPECIFICATIONS. 2.WHERE PRIVATE STORM SEWERS CONNECT TO PUBLIC STORM SEWERS, THE LAST RUN OF PRIVATE STORM SEWER CONNECTING TO THE PUBLIC STORM SEWER SHALL BE REINFORCED CONCRETE PIPE CONFORMING TO ASTM DESIGNATION C76, WALL B, CLASS IV FOR PIPE DIAMETERS 12 INCHES TO 15 INCHES, CLASS III FOR 18 INCHES TO 24 INCH PIPES, AND 27 INCHES AND LARGER PIPE SHALL BE CLASS II, UNLESS OTHERWISE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. INSPECTION IS REQUIRED BY THE CITY OF DUBLIN'S DIVISION OF ENGINEERING. 3.GRANULAR BACKFILL SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR CONTROLLED DENSITY BACKFILL ACCORDING TO ITEM 613, TYPE II OF THE STANDARD SPECIFICATIONS AS DIRECTED BY THE CITY ENGINEER. 4.ALL STORM SEWERS SHALL BE REINFORCED CONCRETE PIPE CONFORMING TO ASTM DESIGNATION C76, WALL B, CLASS IV FOR PIPE DIAMETERS 12 INCHES TO 15 INCHES, CLASS III FOR 18 INCHES TO 24 INCH PIPES, AND 27 INCHES AND LARGER PIPE SHALL BE CLASS II, UNLESS OTHERWISE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. 5.HEADWALLS SHALL BE REQUIRED AT ALL STORM SEWER INLETS OR OUTLETS TO AND FROM STORMWATER MANAGEMENT FACILITIES. NATURAL STONE AND/OR BRICK APPROVED BY THE CITY ENGINEER SHALL BE PROVIDED ON ALL VISIBLE HEADWALLS SURFACES. 6.STORM INLETS OR CATCH BASINS SHALL BE CHANNELIZED AND HAVE BICYCLE SAFE GRATES. MANHOLE LIDS SHALL INCLUDE CITY OF DUBLIN LOGO AND ALL CURB INLET AND CATCH BASIN GRATES SHALL INDLUCE ENGRAVED LETTERING: “DUMP NO WASTE; DRAINS TO RIVER.” 6.STORM SEWER OUTLETS GREATER THAN 18 INCHES IN DIAMETER ACCESSIBLE FROM STORMWATER MANAGEMENT FACILITIES OR WATERCOURSES SHALL BE PROVIDED WITH SAFETY GRATES, AS APPROVED BY THE CITY ENGINEER. 7.HP STORM AND HP SANITITE OR APPROVED EQUAL ARE APPROVED ALTERNATIVES TO REINFORCED CONCRETE PIPE IN PAVED AND NON PAVED AREAS AS APPROVED BY THE CITY ENGINEER. THIS INCLUDES APPLICATIONS INSIDE THE RIGHT-OF-WAY. 8.HP STORM AND HP SANITITE OR APPROVED EQUAL PIPE JOINTS SHALL BE WATERTIGHT ACCORDING TO REQUIREMENTS OF ASTM D3212. PIPES SHALL BE JOINED WITH A GASKETED INTEGRAL BELL & SPIGOT JOINT MEETING THE REQUIREMENTS OF ASTM F2881 (HP STORM) AND ASTM F2764 (HP SANITITE). GASKETS SHALL BE INSTALLED BY PIPE MANUFACTURER AND COVERED WITH REMOVABLE, PROTECTIVE WRAP TO ENSURE THE GASKET IS FREE FROM DEBRIS. A JOINT LUBRICANT AVAILABLE FROM THE MANUFACTURER SHALL BE USED ON THE GASKET AND BELL DURING JOINT ASSEMBLY. 9.ALL BEDDING MATERIAL SHALL BE IN ACCORDANCE WITH CITY OF COLUMBUS STANDARD CONSTRUCTION DRAWING AA-S149. 10.BACKFILL MATERIAL SHALL BE PLACED IN ACCORDANCE WITH ITEM 911 OR ITEM 912 OF THE CITY OF COLUMBUS CONSTRUCTION MATERIAL SPECIFICATIONS (CMS). 11.BACKFILL MATERIAL IN AREAS LOCATED OUTSIDE THE PUBLIC RIGHT-OF-WAY SHALL BE PLACED IN ACCORDANCE WITH ITEM 901 OF THE CITY OF COLUMBUS (CMS). ALL HP STORM AND HP SANITITE PIPE (FOR STORM SEWER) SHALL BE MANDREL TESTED IN ACCORDANCE WITH CITY OF COLUMBUS ITEM 901.21, WITH THE EXCEPTION THAT THE WAITING PERIOD PRIOR TO TESTING SHALL BE 30 DAYS. MAIL DELIVERY 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT US MAIL DELIVERY WITHIN THE PROJECT LIMITS IS NOT DISRUPTED BY CONSTRUCTION OPERATIONS. THIS RESPONSIBILITY IS LIMITED TO RELOCATION OF MAILBOXES TO A TEMPORARY LOCATION THAT WILL ALLOW THE COMPLETION OF THE WORK AND SHALL ALSO INCLUDE THE RESTORATION OF MAILBOXES TO THEIR ORIGINAL LOCATION OR APPROVED NEW LOCATION. ANY RELOCATION OF MAILBOX SERVICES MUST BE FIRST COORDINATED WITH THE US POSTAL SERVICE AND THE HOMEOWNER. 2.BEFORE RELOCATING ANY MAILBOXES, THE CONTRACTOR SHALL CONTACT THE U.S. POSTAL SERVICE AND RELOCATE MAILBOXES ACCORDING TO THE REQUIREMENTS OF THE POSTAL SERVICE. USE OF FIRE HYDRANTS 1.THE CONTRACTOR SHALL MAKE PROPER ARRANGEMENTS WITH THE DUBLIN SERVICE DEPARTMENT AND THE COLUMBUS DIVISION OF WATER FOR THE USE OF FIRE HYDRANTS WHEN USED FOR WORK PERFORMED UNDER THIS CONTRACT AND PROVIDE THE CITY OF DUBLIN A COPY OF THE HYDRANT USAGE PERMIT OBTAINED FROM THE CITY OF COLUMBUS. THE CONTRACTOR SHALL ALSO SEND A COPIES OF PERMITS OBTAINED FROM DUBLIN AND COLUMBUS TO THE WASHINGTON AND/OR PERRY TOWNSHIP FIRE DEPARTMENT. PERMITS SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. 2.BEFORE THE FINAL ESTIMATE IS PAID, THE CONTRACTOR SHALL SUBMIT A LETTER FROM THE CITY OF COLUMBUS DIVISION OF WATER TO THE CITY ENGINEER STATING THAT THE CONTRACTOR HAS RETURNED THE SIAMESE VALVE TO THE CITY OF COLUMBUS AND HAS PAID ALL COSTS ARISING FROM THE USE OF THE FIRE HYDRANTS. WATER COORDINATE TABLE DESCRIPTION 8"-11.25° BEND 8"-11.25° BEND 8"-11.25° BEND 8"x6" TEE 8"x6" TEE 8"-11.25° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 6"-22.5° BEND 6"-22.5° BEND 8"x6" TEE 8" PLUG & THRUST BLOCK 24"x8" TAPPING SLEEVE & VALVE STATION 10+38.36 10+62.02 11+75.21 11+89.66 14+16.98 14+75.32 15+15.59 15+51.75 15+70.41 15+89.84 16+12.81 16+35.24 16+48.41 16+64.81 16+67.06 16+67.95 94+57.29 OFFSET 14.30' L 19.33' L 19.32' L 19.34' L 19.31' L 18.77' L 17.54' L 20.86' L 26.54' L 42.71' L 49.85' L 47.79' L 40.87' L 21.17' L 13.93' L 11.07' L 19.57' L CL ELEVATION 848.49 848.28 844.42 843.77 834.59 833.02 832.12 831.32 830.86 830.22 829.60 829.60 829.60 829.60 829.60 829.60 848.96 AS-BUILT NORTHING AS-BUILT EASTING AS-BUILT CL ELEVATION WATER COORDINATE TABLE DESCRIPTION FIRE HYDRANT 6" GATE VALVE FIRE HYDRANT FIRE HYDRANT 6" GATE VALVE 8" GATE VALVE 8" GATE VALVE STATION 11+89.60 14+16.98 14+16.98 16+63.85 16+65.03 16+67.68 94+57.29 OFFSET 16.00' L 17.21' L 16.00' L 13.03' L 13.36' L 11.94' L 16.17' L CL ELEVATION 843.81 834.74 834.78 829.68 829.78 829.60 848.93 AS-BUILT NORTHING AS-BUILT EASTING AS-BUILT CL ELEVATION JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:31 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 TS&GN.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES℄1.56% 10234571 58' RIGHT-OF-WAY 6'-0'' WALK (RD-05) 28' B/C TO B/C 1'-0''1'-0'' (TYP)8'-0'' TREE LAWN6'-0'' WALK (RD-05) 3.13% 6'' MIN. TYPICAL SECTION LEGEND ITEM 441 - 1 1/4" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.075 GAL/S.Y. ITEM 441 - 1 3/4'' ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.10 GAL/S.Y. ITEM 301 - 3'' ASPHALT CONCRETE BASE ITEM 304 - 6" AGGREGATE BASE ITEM 204 - SUBGRADE COMPACTION ITEM 659 - SEEDING AND MULCHING, CLASS 1 AS PER PLAN (SEE NOTE 32 ON GENERAL NOTE PAGE) ITEM 608 - 4'' CONCRETE SIDEWALK ITEM 304 - 3'' AGGREGATE BASE ITEM 653 - 3" TOPSOIL FURNISHED AND PLACED 1 2 3 4 5 6 7 8 9 10 11 NOTE A TACK COAT (AC) FACE OF CURB (INCIDENTAL TO ITEM 441 ASPHALT CONCRETE.) ITEM 441 ASPHALT SURFACE COURSE IS TO BE MAXIMUM 1/4" ABOVE GUTTER PLATE. NOTE B NOTE A (TYP) NOTE B (TYP) 1/2''/1'1/2''/1' 1.56% 1.56%1.56% PROFILE ELEVATION 2'-0''14''12'' 8'-0'' TREE LAWN 4: 1 4:14:14: 1 11 98 TYPICAL SECTIONS &DETAILS3/25 NO. 57 AGGREGATE ODOT ITEM 605 4" PIPE UNDERDRAIN (720.01) (TYP) CITY OF DUBLIN CONCRETE COMBINATION CURB & GUTTER RD-02 (TYP) 6 TYPICAL SECTION - LIU COURT NOT TO SCALEA 3.13%3.13%3.13% ESTIMATE OF QUANTITIES THESE QUANTITIES HAVE BEEN PROVIDED ONLY AS AN ESTIMATE TO THE SCOPE OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO EVALUATE THE COMPLETE PROJECT AS DETAILED IN THE NOTES, PLANS, AND SPECIFICATIONS AND PROCEDURES NECESSARY FOR THE COMPLETION OF THE PLAN IMPROVEMENTS AND SUBMIT HIS TOTAL PROJECT COST ACCORDINGLY. DEMOLITION ITEM QUANTITY UNIT DESCRIPTION 201 LUMP SUM CLEARING AND GRUBBING 202 55 EA REMOVE TREE 202 2 EA REMOVE TREE STUMP 202 1356 SY DRIVE REMOVED 202 367 LF FENCE REMOVED 202 37 LF WALL REMOVED 202 3 EA BUILDING REMOVED 202 1 EA TENNIS COURT REMOVED SITE 203 CY EXCAVATION 203 CY EMBANKMENT 204 2,074 SY SUBGRADE COMPACTION 207 27 CY STABILIZED CONSTRUCTION ENTRANCE 207 1 EACH DESIGNATED CONCRETE WASHOUT AREA 207 8 EACH INLET PROTECTION 207 497 LF PERIMETER FILTER FABRIC FENCE 301 173 CY 3" ASPHALT CONCRETE BASE 304 346 CY 6" AGGREGATE BASE 407 156 GAL TACK COAT (0.075 GAL/SY) 407 207 GAL TACK COAT (0.10 GAL/SY) 441 72 CY 1.25" ASPHALT CONCRETE SURFACE COURSE 441 101 CY 1.75" ASPHALT CONCRETE INTERMEDIATE COURSE 608 7,751 SF 4" CONCRETE WALK 608 EACH TYPE "A" CURB RAMP 609 1,257 LF COMBINATION CURB AND GUTTER 630 4 EACH STREET SIGN (RD-10) 630 1 EACH STOP SIGN (RD-10) 659 1,129 SY SEEDING AND MULCHING STORM 601 CY ROCK CHANNEL PROTECTION, TYPE C WITH FILTER 604 5 EACH 48" TYPE "C" MANHOLE (AA-S102) W/ CITY OF DUBLIN LID (ST-03) 604 1 EACH 48" TYPE "C" MANHOLE (AA-S102) W/ CITY OF DUBLIN LID (ST-03) (OUTLET STRUCTURE) 604 6 EACH CURB & GUTTER INLET (AA-S125A) W/ GRATE (ST-04) 604 2 EACH CB (AA-S130) 604 1 EACH PRECAST HEADWALL (AA-S168) 901 44 LF 12" RCP STORM PIPE, WITH ITEM 911 BACKFILL 901 339 LF 12" RCP STORM PIPE, WITH ITEM 912 BACKFILL 901 LF 18" RCP STORM PIPE, WITH ITEM 911 BACKFILL 901 81 LF 18" RCP STORM PIPE, WITH ITEM 912 BACKFILL 901 LF 24" RCP STORM PIPE, WITH ITEM 912 BACKFILL 901 51 LF 24" RCP STORM PIPE, WITH ITEM 911 BACKFILL WATER 801 LF 6 INCH WATER PIPE AND FITTINGS 801 700 LF 8 INCH WATER PIPE AND FITTINGS 802 EACH 8" VALVE AND APPURTENANCES 802 4 EACH 6" VALVE AND APPURTENANCES 805 7 EACH 3/4" WATER TAP 809 3 EACH FIRE HYDRANT TYPE A SPEC LUMP SUM SURVEY COORDINATES CALCULATED BY: DATE: CHECKED BY: STA 10+68.60 TO 14+60.99 7192 AT&T BELL SYSTEMS 322A56 TOP=853.62' (3' LID) SW6959 FRONTIER 7192 w/ELEC.&COMM. DROPS w/RISER ICV OUTLET INTERCOM w/ELEC.&COMM. DROP 3 SIDED BARN ICV ICV ICV ICV LOW AREA ICV ICV ELEC. RISER OUTLET VACANT w/ELEC.&COMM. DROPS ICV ICV OUTLET 3" CAST IRON EXPOSED PIPE MOUNTED ON TREE 3" CAST IRON EXPOSED PIPE 3" CAST IRON EXPOSED PIPE TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) TOP=836.17' INV. 36" RCP N/S=819.42' (77-003-CIP) TOP=840.90' INV. 36" NE/S=819.90' (77-003-CIP) 2" 1" 2" 2" PUMP HOUSE 2" SPP TO BLD. 814.96 6 CMP 819.73 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66 6 CMP 829.17 TBOX WOWWAY 7177 DUBLIN RD ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRESinlet windowinlet window12" RCP12" CPP18" R C P 24" RCP cannot open12" RCPINV:851.28 DIRECTION ONLY EXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADINV:840.88 GALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES 825 8308 2 6 8 2 7 828829831831835840840 8 4 0 831832833834836837838 839 825 830835835 835840826827828829831832833 833 833834834 834 836836836 837838839841 8 4 0 8 4 5 83 9 8 4 1 8 4 2 8 4 3 8 4 4 8 4 6 8 4 7 8 4 8 8 4 9 85285382082 58308358 4 0 8458508198218 2 2 82 382 4 8 2 6 8 2 7 8 2 8 8 2 9 831 832 8338348368378378378388398 4 184 2 8438448 4 6847848849 835840 845831832833834836837838839841842843 8448468478488498408458418428438448468 4 7 825830830830 8218228238248268278288298318328338 3 4 800805810815820 79879980180280380480680780880981181281381481681781881 9 8258308358408458 2 18228238248268278288298318328338348 3 6837 8388398418428438448468478482 0 ' S A N I T A R Y E A S E M E N T D. B . 3 7 2 0 , P G . 5 3 6 20' SANITA R Y EASEMENT D.B. 3720, P G . 5 3 6 1 2 3 4 4 5 6 EX UTILITY POLE (TBR) EXISTING PAVEMENT TO BE SAWCUT PER CITY OF COLUMBUS STANDARD DRAWING 1441 & FULL PAVEMENT REPAIR 562.54'116.39'131.62'110.70'82.7 7 ' 190.67'118.79'343.43'800.40'645.82'180.3 ' 79.1 5' JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 11:41 AM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 DXTP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EXISTING CONDITIONS &DEMOLITION PLAN4/25 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION CODED NOTES EXISTING WALL TBR EXISTING FENCE TBR EXISTING TENNIS COURT TBR EXISTING BUILDING TBR EXISTING HOUSE TO REMAIN EXISTING OVERHEAD ELECTRIC POLE & GUY WIRE TBRO, COORDINATE WITH UTILITY PROVIDER TO RECONNECT TO EXISTING HOUSE 1 2 3 4 5 6 DEMOLITION LEGEND TBR TO BE REMOVED TBRO TO BE REMOVED AND RELOCATED BY OTHERS TBRR TO BE REMOVED AND REPLACED ASPHALT PAVEMENT TO BE REMOVED CONCRETE PAVEMENT TO BE REMOVED MILLING LIMITS ITEM TO BE REMOVED PAVEMENT TO BE SAWCUT EXISTING UTILITY TO BE REMOVED TREE TO BE REMOVED ALL SPRINKLER HEADS TO BE REMOVED SEE ROAD WIDENING PLANS FOR DEMOLITION WITHIN THE R/W HORZ 1"=40'0 40 80 NOTES 1.REFER TO TREE PRESERVATION SHEETS 19-20 FOR TREE REMOVAL INFORMATION 2" 1" 2" 2"ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRES EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 24' E/P TO E / P 12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5 ' S IDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' REAR YARDSETBACKE X 2 0 ' S A N I T A R Y E A S E M E N T EX 20' SAN I T A R Y EASEMENT 36' FRONT YARD SETBACK 40' DUB L I N RD BUIL D I N G SETBAC K50' REAR YARDSETBACK50' REAR YARDSETBACK50' REAR Y A R D SETBACK 50' RE A R Y A R D SETBA C K 50' REAR Y A R D SETBACK 40' DUBL I N RD BUIL D I N G SETBAC K 58' R/W LIU COU R T 50' REAR Y A R D SETBAC K PROP 10 ' R/W DED I C A T I O N 36' FRON T YARD SETBAC K 31' FRONT YARD SETBACK 31' FRONT YARD SETBACK 41' FRONT YARD SETBACK 12.5 ' S IDE YARDSETBACK50' SIDE YARDSETBACK50' SIDE Y A R D SETBACK 1 2 . 5 ' S IDE YARDSETBACKPROP 83' STORM EASEMENT 20' LANDSC A P E EASEME N T PROP 30' S A N I T A R Y EASEMENT P R O P 3 0 ' S A N I T A R Y E A S E M E N T PROP 20' STORM EASEMENT PROP 20' STORM EASEMENTPROP 20'SANITARYEASEMENTPROP 20' STORM EASEMENT PROP GRAVEL PATH, SEE LANDSCAPE PLANS FOR DETAILS N83°56'54"E - 152.47' N83°56'54"E - 389.84'S13°14'25"E - 116.39'N76°33'00 " E - 2 1 5 . 8 8 'N21°46'09"E - 140.77'N75°48'41 " E - 1 3 1 . 6 2 'S20°11'31"E - 110.70'S70 ° 2 3 ' 1 5 " E - 8 2 . 7 7 ' S70 ° 5 8 ' 2 4 " E - 9 5 . 9 3 ' N87°42'49"E - 190.67' N88°09'02"E - 192.68'S01°42'42"W20.60'N64°3 4' 2 0 " E - 3 6 7. 5 1'S01°42'42"W - 98.19'S06°54'37"W - 94.11'N88°12'27"E - 158.34' N50° 4 7' 0 7" E - 1 4 0. 9 0'S06°54'37"W - 106.85'S06°54'37"W - 142.46'N88°12'27"E - 404.04' N88°12'27"E - 167.57' S88°16'20"W - 435.20'N01°47'33"W - 51.68'S88°16'20"W - 355.09' N74°16'2 7 " E - 2 5 8 . 7 8 'S15°33'22"E - 147.11'S15°33'22"E - 150.37'N29°16'27"E33.40'S15°33'22"E - 167.79'S74°16'2 7 " W - 1 0 6 . 5 8 ' L=175.77,R=121.00 N22°29'41"W - 67 .71 'L=101.05,R=17 9 . 0 0 L = 3 8 . 3 4 ,R=60.00L=7 7 . 0 4, R =60.00 L=26.87, R=60.00 L=46.91, R=60.00L=62.64, R=60.00 L=38.98, R=121.00S22°29'41"E - 67 .87 'L=38.29,R=179.00L=10 4.5 9, R = 1 7 9 .0 0 L=95 .97 ,R=179.00 L=21.17, R=179.00 N74°16'2 7 " E - 1 0 6 . 5 8 'N13°25'56"W - 249.38'N08°41'06"W - 83.09'2 AREA: 67,760 SF (1.56 AC) 3 AREA: 68,609 SF (1.58 AC) 4 AREA: 130,733 SF (3.00 AC) 6 AREA: 56,744 SF (1.30 AC) 7 AREA: 40,531 SF (0.93 AC) 5 AREA: 58,218 SF (1.34 AC) R60' R46' B/CR75'B/C20' LANDSC A P E EASEME N T 12.5' SIDE Y A R D SETBACK 12.5' SIDE Y A R D SETBACK 92' FRONT YARD SETBACK 65' FRONT YARD SETBACK PROP 30' STORM EASEMENTPROP 20'SANITARYEASEMENTPROP SANITARY EASEMENT (VARIES)PROP 20'SANITARYEASEMENT RESERVE A AREA: 26,048 SF (0.60 AC)R162'R138'R77'R77' R162' R44' R44'PROP 20'SANITARYEASEMENT10+00 11+00 12+00 13 + 0 0 14+0015+0016 + 0 0 16 + 1 8BP: 10+00.00PC: 11+75.21PT: 13 + 9 3 . 1 1 PC: 14 + 6 0 . 9 9 PT: 15+63.05EP: 16+17.65L=124.12,R=60.002' SHARE D USE PAT H EASEME N T 2' SHAR E D USE PAT H EASEME N T N6 0 ° 4 3 ' 3 3 " W 32 . 9 6 ' 1 AREA: 40,116 SF (0.92 AC) PROP 20' STORM EASEMENT180.3 ' 79.1 5' STOP S I G N HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:15 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 SP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES SITE PLAN5/25 SITE LEGEND PROPERTY LINE EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY CURB AND GUTTER SIGN HATCH LEGEND CONCRETE SIDEWALK PER CITY OF DUBLIN STANDARD CONSTRUCTION DRAWING RD-05 TO BE CONSTRUCTED BY DEVELOPER AT THE TIME OF STREET CONSTRUCTION PROPOSED SWALE TOP=853.62' (3' LID) w/RISER TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) TOP=836.17' INV. 36" RCP N/S=819.42' (77-003-CIP) TOP=840.90' INV. 36" NE/S=819.90' (77-003-CIP) 2" 1" 2" 2" PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRESinlet windowinlet window12" RCP12" CPP18" R C P 24" RCP cannot openEXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)WV WV WV WV 4 2 10 124" STM 1 8 " S TM 12" STM 8" SAN 8 7 PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN 10+00 11+00 12+00 13 + 0 0 14+0015+0016 + 0 0 16 + 1 8 101 10012" STMEX 12 " S T M E X 2 0 ' S A N I T A R Y E A S E M E N T EX 20' SAN I T A R Y EASEMENTDUBLIN ROADLIU COU R T PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE 1 PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE 16 + 1 8 16 + 7 6 9+75 10+00 8" SAN PROPOSED 20' SANITARY SEWER EASEMENT 12" STM 12 " S T M 6 7 5 8 9 11 12" STM 12" STM 12 13 12" STM15 14 PROP 30' S A N I T A R Y EASEMENT PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE P R O P 3 0 ' S A N I T A R Y E A S E M E N T 12" STM15" STM PROP 83' STORM EASEMENT PROP 20' STORM EASEMENT PROP 20' STORM EASEMENT PROP 30' STORM EASEMENTPROP 20'SANITARYEASEMENT8" WM 8" W M 8" WM FIRE HYDRANT STA:11+89.60 CL ELEV:843.81 PROP 30' STORM EASEMENT PROP 20'STORM EASEMENT 2788 2772 PROP 6" SAN SERVICE @ 2.08% MIN 2 3 6 2789 8" SAN8" SAN 8" SAN8" SAN 2 AREA: 67,760 SF (1.56 AC) 3 AREA: 68,609 SF (1.58 AC) 4 AREA: 130,733 SF (3.00 AC) 6 AREA: 56,744 SF (1.30 AC) 7 AREA: 40,531 SF (0.93 AC) 5 AREA: 58,218 SF (1.34 AC)20' PROP SANITARY EASEMENT (WIDTH VARIES)PROP 20'SANITARYEASEMENT8" SAN 9 1 AREA: 40,116 SF (0.92 AC) FIRE HYDRANT STA:14+16.98 CL ELEV:834.78 PROP 20' STORM EASEMENT FIRE HYDRANT STA:16+63.85 CL ELEV:829.68 AS PER SANITARY PLANS AS PER SANITARY PLANS AS PER SANITARY PLANS PAD=852.00 PAD=852.00 REAR=842.00 PAD=847.00 REAR=837.00 PAD=837.00 REAR=827.00 PAD=842.00 PAD=852.00 10312" STM 102 104 36" S T M 105 12" STM106 HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 UP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UTILITY PLAN6/25 UTILITY LEGEND GAS SANITARY GRAVITY SANITARY SERVICE WATER DOMESTIC WATER SERVICE FIRE WATER SERVICE ELECTRIC TELECOMMUNICATION FIBER-OPTIC STORM SEWER CATCH BASIN SANITARY MANHOLE FIRE HYDRANT WATER VALVE FIRE DEPARTMENT CONNECTION WATER MAIN FIRE HYDRANT LIGHT POLE (BY OTHERS) STM WV FDC WM 7192 A T & T TOP = 8 5 3. 6 2' ( 3' LI D) SW6 9 5 9 INTER C O M ELEC. RI S E R OUTL E T TOP = 8 2 8. 9 3'INV. 1 2" S P P = 8 2 7. 3 8'(ACC O R DI N G T O G R O U N D S CRE W: PI P E O U T L E T S @ P T. 1 6 9 5) TOP = 8 3 6. 1 7'INV. 3 6" R C P N/ S = 8 1 9. 4 2'(77-0 0 3- CI P) TOP = 8 4 0. 9 0'INV. 3 6" N E/ S = 8 1 9. 9 0'(77-0 0 3- CI P) PID: 2 7 3- 0 0 1 7 8 7- 0 0 BOU L D E R S A T S CI O T O S H O R E S L L C 7118 D U B LI N R D R E A R 2.96 A C R E Scannot openEX D RI V E LOT 1 LUTH E R MI T C H E L L' S S CI O T O S H O R E S P.B. 1 8, P. G. 3 7 CP90 0 TBM 1 WV WV WV WV 10+0011+0012+ 0 0 13+00 1 4 + 0 0 15+ 0 0 16+00 16+18 4 5 10 2 1 24" S T M 18" S T M8" SAN16+18 16+76 9+7510+00ON-SITE PROJECT BEGIN 10+68.6, 0.0' D U B L I N RO A D LIU COURT 24'F/F12.5' SIDE Y A R D SET B A C K 12.5 ' S IDE YARDSETBACK12.5 ' S IDE YARDSETBACK1 2 . 5 ' S I D E Y A R D S E T B A C K 1 2 . 5 ' R E A R Y A R D S E T B A C K EX 20' S A NIT A R Y EAS E M E NT 36' FRONT YARD SETBACK 92' FRONT YARD SETBACK 65' FRONT YARD SETBACK 31' FRONT YARD SETBACK 36' FRONT YARD SETBACK 31' FRONT YARD SETBACK 40' YARD SIDE SETBACK PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN 58'R/WP A V EM E N T R E P L A C EM E N T L IM I T S ,MOT A S P E R CO C S T D DWG 1 5 1 0 8 7 16'8' PRO P 30' S A NIT A R Y EAS E M E NT 1312 14 15 11 9 8 6 7 12" STM 12" STM 12 " S T M 12" STM15" STM 12" STM 12" STM12" ST M 8" SAN E X 2 0 ' S A N I T A R Y E A S EM E N T PROP 10' R/W DE DICATI ON20'LANDSCAPE EASEMENT PROP 20' STORM EASEMENT PROP 20' STORM EASEMENT PROP 30' STORM EASEMENT LOT 2 67,760 SF (1.56 AC) LOT 3 68,609 SF (1.58 AC) LOT 4 130,733 SF (3.00 AC) RESERVE A Area:26,051 SF (0.60 AC) PROP 6" SAN SERVICE @ 2.08% MIN 8" WM8" WM 8"WM 8" WM 6 2 3 8" SAN 8" SAN8" SAN 8" SAN 9 8" SAN LOT 7 40,531 SF 0.93 AC LOT 6 56,744 SF 1.30 AC LOT 5 58,218 SF 1.34 AC LOT 1 40,116 SF 0.92 AC P RO P 2 0 ' S A N I T A R Y E A S EM E N T PRO P SANI T A R Y EASE M E N T (VARI E S) 3 PROP 20' STORM EASEMENT PAD=852.00 P AD = 8 5 2 . 0 0RE AR = 8 4 2 . 0 0 PAD=847.00 REAR=837.00 PAD=837.00 REAR=827.00 PAD=842.00 PAD=852.00 SCALE: H:1"=30', V:1"=8' LIU COURT 820 830 840 850 860 870 820 830 840 850 860 870 -2.00% -1.56%-1.56% -4.00%GRADE BREAK STA = 10+00.00ELEV = 853.93GRADE BREAK STA = 10+10.67ELEV = 853.77 HIGH POINT EL =853.02 HIGH POINT STA = 10+58.21 PVI STA = 10+83.21 PVI EL = 852.63 K = 20.49 50.0' VC BVCS: 10+58.21BVCE: 853.02EVCS: 11+08.21EVCE: 851.63 LOW POINT EL =837.67 LOW POINT STA = 14+76.13 PVI STA = 14+38.63 PVI EL = 838.42 K = 37.50 75.0' VC BVCS: 14+01.13BVCE: 839.92EVCS: 14+76.13EVCE: 837.67853.93851.85849.37847.69845.90844.48842.85841.65841.02840.09839.49839.24838.61838.21838.02837.46836.54836.65836.88836.26835.54834.26833.01831.55829.68853.93853.54853.15852.69851.95850.96849.96848.96847.96846.96845.96844.96843.96842.96841.96840.96839.96839.04838.28837.69837.19836.69836.19835.69835.199+75 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+25 EX GRADE EX GRADE 828.71828.52827.22825.70834.84834.72834.33834.8316+18 17+00853.84853.939+75 10+00 ON-SITE PROJECT (TYPICAL SECTION) BEGIN STA=10+68.60 ELEV = 852.83 24"x8" TAPPING SLEEVE & VALVE STA:9+84.06 CL ELEV:848.96 HORIZONTAL 8"-11.25° BEND STA:10+38.36 CL ELEV:848.49 HORIZONTAL 8"-11.25° BEND STA:10+62.02 CL ELEV:848.28 HORIZONTAL 8"-11.25° BEND STA:11+75.21 CL ELEV:844.42 8"x6" TEE STA:11+89.66 CL ELEV:843.77 HORIZONTAL 8"-11.25° BEND STA:14+75.32 CL ELEV:833.02 HORIZONTAL 8"-22.5° BEND STA:15+15.59 CL ELEV:832.12 HORIZONTAL 8"-22.5° BEND STA:15+51.75 CL ELEV:831.32 HORIZONTAL 8"-22.5° BEND STA:15+70.41 CL ELEV:830.86 12" STM 12" STM 8" WM @ 0.87% 8" WM @ 3. 4 6 % 8" WM @ 3 . 6 2 % 8" WM @ 3. 6 2 % 8" WM @ 2.55% 8" WM @ 2.55% HORIZONTAL 8"-22.5° BEND STA:15+89.84 CL ELEV:830.22 HORIZONTAL 8"-22.5° BEND STA:16+12.81 CL ELEV:829.60 HORIZONTAL 8"-22.5° BEND STA:16+35.24 CL ELEV:829.60 HORIZONTAL 6"-22.5° BEND STA:16+48.41 CL ELEV:829.60 HORIZONTAL 6"-22.5° BEND STA:16+64.81 CL ELEV:829.60 8"x6" TEE STA:16+67.06 CL ELEV:829.60 8" GATE VALVE STA:16+67.68 CL ELEV:829.60 8" PLUG & THRUST BLOCK STA:16+67.95 CL ELEV:829.604.5' MIN.COVER4.5' MIN.COVER4.5' MIN.COVER** 8"x6" TEE STA:14+16.98 CL ELEV:834.59 PROFILE GRADE VERT 1"=5' HORZ 1"=30' 0 0 5 30 10 60 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:17 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES PLAN & PROFILE7/25 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK CURB ROAD CENTERLINE STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION UTILITY LEGEND SANITARY MAIN SANITARY SERVICE WATER STORM SEWER MAINSTM CATCH BASIN HEADWALL STORM MANHOLE SANITARY MANHOLE XX XX XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM NOTES: 1.PROFILE VERTICAL DATUM NAVD '88. 2.THE WATER MAIN ALIGNMENT IS PROJECTED ONTO THE CENTERLINE ALIGNMENT OF THE ROAD. THE UTILITY CROSSINGS SHOWN DO NOT REPRESENT THE CROSSINGS AT THE WATER MAIN, RATHER THE CROSSING AT THE CENTERLINE (#). 3.SEE WATER COORDINATE TABLE ON SHEET 3. # # 7192 AT&T BELL SYSTEMS 322A56 TOP=853.62' (3' LID) SW6959 FRONTIER 7192 w/ELEC.&COMM. DROPS w/RISER OUTLET INTERCOM w/ELEC.&COMM. DROP ELEC. RISER OUTLET OUTLET MOUNTED ON TREE TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) TOP=836.17' INV. 36" RCP N/S=819.42' (77-003-CIP) TOP=840.90' INV. 36" NE/S=819.90' (77-003-CIP) 2" 1" 2" 2" PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66 TBOX WOWWAY 7177 DUBLIN RD ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRESinlet windowinlet window12" RCP12" CPP18" R C P 24" RCP cannot openEXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)WV WV WV WV PAD=852.50 PAD=852.00 PAD=847.00 PAD=837.00 PAD=842.00 PAD=852.50 825 8308 2 6 8 2 7 828829831831835840840 8 4 0 831832833834836837838 839 825 830835835 835840826827828829831832833 833 833834834 834 836836836 837838839841 8 4 0 8 4 5 83 9 8 4 1 8 4 2 8 4 3 8 4 4 8 4 6 8 4 7 8 4 8 8 4 9 852853820825 8308358 4 0 8458508198 2 182282 3824 826827 828 829 831 832 8338348368378378378388398 4 184 2 8438448 4 6847848849 835840 845831832833834836837838839841842843 8448468478488498408458418428438448468 4 7 8358408458508348368378388398418428438448468478488498518 5 2 825821822823824826827828 835 835836 836837838 825 830 83 5 82282282282282282282282282 2 823824826827828829 831832833 834835836 825830 835 826827828829 831 832 833 834 836 REAR PAD=842.00 825830830830 8218228238248268278288298318328338 3 4 800805810815820 79879980180280380480680780880981181281381481681781881 9 8258308358408458 2 18228238248268278288298318328338348 3 6837 8388398418428438448468478488 7 1 8" SAN 840840840 845 850838 839 841 842 843 844 846 847 848 849 84984 9 8518528 5 3 840845839841842843844846850 846847848849 851 852840845850 838839841842843844846847848849851 840845 850 84184284384484 6 84 7 84 8 849 851851852853 84083783883984184184184284284284384483 5 8 3 6837838839 830 83 5 829 831 832 833834 8 3 6 8 3 7 46.50 HP 38.71 TC 39.21 TC 38.24 TC 24" STM 2 10 5 1 850 849 851 852 853 850849851852853845 850 846 847 848 849 85185285385 3 85 0 84 784884985 1 8 5 2853DUBLIN ROADLIU COU R T PROP 20'SANITARYEASEMENT830 828829 831832833 79212 11 14 15 4 8 9 6 7 820825817818819821822823824826827SEE LANDSCAPE PLANS FOR PATH AND WALL DETAILS PROP 30' STORM EASEMENT E X 2 0 ' S A N I T A R Y E A S E M E N T PROP 83' STORM EASEMENT 20' LANDSC A P E EASEME N T P R O P 3 0 ' S A N I T A R Y E A S E M E N T PROP 20' STORM EASEMENT PROP 20' STORM EASEMENTPROP 20'SANITARYEASEMENTEX 20' SANI T A R Y EASEMENT PROP 30' S A N I T A R Y EASEMENT 13 12" STM 12" STM 12" STM 1 8 " S TM 12" STM 15" STM 12" STM12" STM 12" STM 8" SAN 34.28 TC 34.16 TC 34.02 TC 34.18 TC 35.22 TC 34.26 TC 31.98 TC 38.24 TC 42.64 TC 46.11 TC 46.12 TC 52.25 TC 48.19 TC 6 50.52 TC 2 83083 1832833834 3 34.11 TC 34.10 TC REAR PAD=837.00 REAR PAD=827.00 830 830 831 835 831832833834 34.47 TC 37.00 TC 34.18 TC 9 3 36.42 TC 33.86 33.48 33.25 30.84 27.00 24.83 51.08 51.50 HP 50.71 41.00 1.00%2.00%32.73%16.22%8508518521.32%15.35%35.48 37.00 37.00 36.602.00%2.00% 36.60 31.26 0.83% 20.8610.37% 41.10 HP 40.45 40.73 1.89%1.00%840 837838839841 36.60 2.10% 35.94 42.08 45.59 48.816.35%8 3 5 83283383483 6 837838840845 837838839841842843 844 84 6 835840845832PAD=847.0052.50 49.67 7.85%52.00 48.433.83%4 7 . 0 0 4 5 . 1 5 2.66% 37.00 34.85 4.56% 42.00 38.01 4.08%51.08 4.57%51.64 51.77 49.46 34.25 HP 34.51 29.51 831 832 833 SEE DRIVE DETAIL SHEET 11 SEE CUL-DE-SAC DETAIL SHEET 10 SWALE, SEE DETAIL A PROP 30' STORM EASEMENT HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:25 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 GP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES GRADING PLAN9/25 GRADING LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR FFE=835.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION MATCH EXISTING ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION SLOPE ARROW FLOW ARROW FLOOD ROUTE SWALE 835 834 835 834 10.00 100.00 TC 10.00 HP 10.00 ME 10.50 10.00 X.XX% GRADING NOTE ADD 800 TO ALL SPOT ELEVATIONS TO OBTAIN NAVD88 ELEVATIONS. 4 :1 MA X MINIMUM DEPTH = 2' 100 YR DEPTH = 1.22' TYPICAL SWALE SECTION NOT TO SCALE 6'8'8' 4:1 M A X A 2' SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 7-3 820 830 840 850 820 830 840 850 SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 2-1 815 820 830 840 815 820 830 840833.69835.04836.17837.07837.70837.62838.00838.99839.11839.61840.25839.96836.42836.93837.37837.74838.82839.72840.79841.94843.01844.24845.34845.76-0+200+001+002+003+003+20 SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 11-10 820 830 840 850 820 830 840 850 SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 8-4 820 830 840 850 820 830 840 850 5 T.C. 842.64COC TYPE "C" MHAA-S102N: 770749.39E: 1796357.136 T.C. 846.11COC AA-S125AN: 770791.69E: 1796290.787 T.C. 846.12COC AA-S125AN: 770819.04E: 1796296.77STA: 0+8118" INV (SE): 833.9812" INV (NW): 834.4812" INV (E): 834.4815" INV (W): 834.23STA: 1+9312" INV (SE): 838.8712" INV (NW): 838.87STA: 2+7212" INV (SE): 842.2412" INV (N): 842.24STA: 3+0012" INV (S): 842.384 T.C. 838.24COC AA-S125AN: 770650.44E: 1796410.45STA: 0+0018" INV (NW): 833.003 T.C. 836.42COC TYPE "C" MHAA-S102N: 770591.92E: 1796465.81SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 9-4 820 830 840 850 820 830 840 850 837.27836.17838.24837.88-0+250+000+45 28' ~ 12" STM @ 0.50%79' ~ 1 2 " S T M @ 4 . 2 8 % 112' ~ 1 2 " S T M @ 3 . 9 0 % 81' ~ 18" STM @ 1.22 %837.27838.27838.24837.57-0+250+000+45 4 T.C. 838.24COC AA-S125AN: 770650.44E: 1796410.45STA: 0+3015" INV (E): 834.359 T.C. 837.00COC CB AA-S133AN: 770638.95E: 1796382.7130' ~ 15" STM @ 0.40%STA: 0+0018" INV (SE): 833.9812" INV (NW): 834.4812" INV (E): 834.4815" INV (W): 834.234 T.C. 838.24COC AA-S125AN: 770650.44E: 1796410.4528' ~ 12" STM @ 0.50%STA: 0+2812" INV (W): 834.628 T.C. 838.34COC AA-S125AN: 770661.15E: 1796436.32STA: 0+0018" INV (SE): 833.9812" INV (NW): 834.4812" INV (E): 834.4815" INV (W): 834.23830.03830.95833.11835.22835.47834.76-0+150+000+70 STA: 0+0012" INV (SW): 830.4010 T.C. 835.22COC TYPE "C" MHAA-S102N: 770555.11E: 1796500.5756' ~ 12" STM @ 0.70%STA: 0+5612" INV (NE): 830.7911 T.C. 834.47COC CB AA-S133AN: 770506.50E: 1796472.42SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 15-14 820 830 840 850 820 830 840 850 827.13828.15834.30833.91-0+150+000+50 STA: 0+3212" INV (SW): 830.5632' ~ 12" STM @ 0.50%STA: 0+0012" INV (NE): 830.4014 T.C. 834.30COC TYPE "C" MHAA-S102N: 770537.87E: 1796569.4615 T.C. 834.18COC AA-S125AN: 770566.57E: 1796583.17SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 13-12 820 830 840 850 820 830 840 850 828.45834.16-0+300+000+30 STA: 0+1712" INV (NW): 830.4913 T.C. 834.18COC AA-S125AN: 770509.41E: 1796552.1117' ~ 12" STM @ 0.50%STA: 0+0012" INV (SE): 830.4012 T.C. 834.16COC AA-S102N: 770520.96E: 1796539.31828.19828.41827.97827.50832.48834.58-0+150+000+90 STA: 0+7024" INV (SE): 828.002 T.C. 834.02COC TYPE "C" MHAA-S102N: 770519.76E: 1796556.1160' ~ 24" STM @ 0.84%STA: 0+1024" INV (NW): 827.50STA: 0+1024" INV (NW): 827.501 COC HW AA-S168N: 770472.11E: 1796591.75********* ***** ** *** 8" SAN PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) STORM SEWER STRUCTURE TABLE STRUCTURE NO 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 STRUCTURE TYPE COC AA-S125A COC TYPE "C" MH AA-S102 COC AA-S125A COC AA-S102 COC CB AA-S133A COC TYPE "C" MH AA-S102 COC CB AA-S133A COC AA-S125A COC AA-S125A COC AA-S125A COC TYPE "C" MH AA-S102 COC AA-S125A COC TYPE "C" MH AA-S102 COC TYPE "C" MH AA-S102 COC HW AA-S168 LID/ GRATE TYPE AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 NORTHING 770566.5691 770537.8708 770509.4102 770520.9617 770506.4970 770555.1150 770638.9511 770661.1492 770819.0427 770791.6892 770749.3899 770650.4365 770591.9197 770519.7601 770472.1136 EASTING 1796583.1735 1796569.4584 1796552.1115 1796539.3101 1796472.4152 1796500.5652 1796382.7100 1796436.3153 1796296.7742 1796290.7781 1796357.1279 1796410.4457 1796465.8073 1796556.1072 1796591.7461 AS-BUILT NORTHING AS-BUILT EASTING VERT 1"=5' HORZ 1"=20' 0 0 5 20 10 40 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:21 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM PRF.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES STORM PROFILE8/25 FACE OF CURB BACK OF CURB INSERTION POINT OF CURB INLET = T.C. (TOP OF CASTING) STORM SEWER PROFILE NOTES: 1.PROFILE VERTICAL DATUM NAVD '88. 2.ALL STORM STRUCTURES ARE ODOT STANDARD STRUCTURES UNLESS OTHERWISE NOTED. 3.MAINTAIN A MINIMUM OF 18" VERTICAL AND 10' HORIZONTAL CLEARANCE FROM WATERLINES. 4.ALL BACKFILL SHALL BE COMPACTED TO THE DENSITY OF THE EXISTING GROUND UNLESS OTHERWISE NOTED: *COMPACTED BACKFILL PER ODOT CMS ITEM 611 **COMPACTED GRANULAR BACKFILL PER ODOT CMS ITEM 611 5.ALL FILLS ARE TO BE PLACED A MINIMUM OF 2.5' ABOVE THE PROPOSED STORM SEWER PER ODOT CMS ITEM 203 PRIOR TO THE START OF STORM SEWER CONSTRUCTION. HATCH BELOW FOR REFERENCE. 6.ALL STORM STRUCTURES WITHIN PAVEMENT LIMITS SHALL HAVE HEAVY DUTY TRAFFIC RATED GRATES. 7.NORTHING AND EASTING OF CURB AND GUTTER INLETS ARE IN REFERENCE TO THE BACK OF CURB UNLESS OTHERWISE NOTED. 8.T.C. (TOP OF CASTING) ELEVATION AND LOCATION FOR ALL CURB AND GUTTER INLETS IS IN REFERENCE TO THE BACK OF CURB ELEVATION. 9.PIPE RUNS DENOTED WITH A (++) ARE TO HAVE SANITARY GRADE PIPE PER ODOT CMS 611 WITH JOINTS PER ODOT CMS 748.01/748.02. GUTTER TOP OF CASTING ELEV.=834.02 (DUBLIN ST-03) 24" STM 12" INV =828.00 1.6"Ø WQ ORIFICE INV=828.00 24" INV =829.17 SIDE VIEW TOP OF WALL ELEV=830.30 100 YEAR PEAK ELEV=832.20 6' 1.6"Ø WQ ORIFICE 828.00 FRONT VIEW 6' 24" INV =828.00 SUMP ELEV. =826.00 STORMRAX FLAT ROOF RECTANGULAR RACK OR EQUIVALENT STORMRAX FLAT ROOF RECTANGULAR RACK OR EQUIVALENT 8" 24" STM OUTLET STRUCTURE DETAIL - MODIFIED COC AA-S102 MH - STRUCTURE (2) NOT TO SCALE TOP OF CASTING (SOLID LID FLUSH WITH TOP OF CATCH BASIN) TOP OF CASTING (SOLID LID FLUSH WITH TOP OF MANHOLE) STEPS 8" WIDE WEIR WALL 24" STM STEPS 24 " S T M TOP VIEW 24" STMB 1.5 6 %1.56%1.56%2 10 N:770553.52 E: 1796539.06 10' ( T Y P)1.56%1.55%34.18 TC 36. 4 3 34 . 8 4 35 . 4 0 34.5234.15 HP34.90 34. 1 5 34.19 1 5+ 0 0 16 + 0 0 16 + 1 8 16 + 1 8 16 + 7 6 1.56 % 37.5 0 37.4 6 37.2 8 1.55 % 37.3 1 37.0 9 36. 0 6 34.87 37.2 8 36. 6 8 36. 7 8 37.6 8 37.9 4 38.0 3 37.6 5 37.9 0 38.0 0 1.56 % 1.56 %2.00%1.56%1.56%2.00%2.18%2.18%1.86%1.84% 1 . 8 5% 37.0 9 36 . 4 9 36 . 7 4 36 . 8 3 36 . 1 1 36 . 3 0 2. 4 3% 3 2 1 3 12 13 14 15 2.39%2.44% 2.37% 1 . 0 0%1.00%1.00% 1.00% 2 . 2 3%34.7834.8734.18 TC 34. 5 2 34. 7 7 34. 8 7 34 . 1 5 34 . 5 3 34 . 7 8 34 . 8 7 2.0 0 % 2.0 0 % 2 . 0 0% 11 34.02 TC 34.30 TC 34.16 TC 34.47 TC 35.22 TC 36.42 TC 34.10 TC 34.11 TC 34.26 TC 36.85 36.61 36.36 35.88 35.64 35.40 35.16 34.92 34.69 34.45 34.08 33.98 33.88 33.83 33.93 34.03 34.07 33.97 33.87 33.84 33.94 34.04 34.35 34.58 34.80 35.03 35.28 35.52 35.77 36.01 36.22 36.41 36.59 36.78 36.96 1 0 ' ( T Y P ) 9. 1 2 ' 10.8 3 '8.24'11.71'7. 3 6 ' 12.5 9 '7.5' 12 . 4 8 ' 4. 0 9 ' 5. 9 1 ' 10' (TYP) 10' (TYP) LI U C O U R T 34.79 34.75 HORZ 1"=10'0 10 20 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 11:48 AM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 INT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES CUL-DE-SACDETAIL10/25 GRADING LEGEND FFE=110.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION SLOPE ARROW SWALE 10.00 100.00 TC 10.00 HP X.XX% GRADING NOTE ADD 800 TO ALL SPOT ELEVATIONS TO OBTAIN NAVD88 ELEVATIONS. TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) 36" OAK 2" 2" 2" 2" 36" BOXELDER MULCH & FLOWERS LANDSCAPING AREA EX DRIVE 14+0038.0 3 38.24 T C 38.24 T C4 8 38.79 38.69 39.01 39.10 38.31 38.21 38.09 38.01 38.44 38.53 40.20 40.30 39.45 39.95 37.69 38.19 4.50% 1.56% 36.16 35.04 32.54 ME 32.22 ME 31.18 ME 30.62 ME 32.72 34.15 35.76 38.25 38.99 3.42%4.79%2.06% 38.34 39.13 38.7338.7038.6138.3825'11' 37.89 38.39 37.97 38.05 38.56 38.65 38.66 39.16 38.25 38.34 2.00% 39.58 37.81 1.56% 1.56% 32.12 8 3 5 831832833 83483 6 8378388 3 5 83 3 8338 3 4 8 3 6 83083083583183283383483683 0 8358 3 1 832833834836837835836837838835831832833834836837835840832832833834836837838839841842843844 835840832 833834836837838839841842 843 844 840838839LIU COURT3'3'3.69% 1.97% 4.42%5.63%6.43%5.58% HORZ 1"=10'0 10 20 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 11:56 AM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 DRIVEWAY DETAIL.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DRIVEWAY DETAIL11/25 GRADING LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR FFE=835.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION MATCH EXISTING ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION SLOPE ARROW FLOW ARROW FLOOD ROUTE SWALE 835 834 835 834 10.00 100.00 TC 10.00 HP 10.00 ME 10.50 10.00 X.XX% DRIVEWAY DETAIL GRADING NOTE ADD 800 TO ALL SPOT ELEVATIONS TO OBTAIN NAVD88 ELEVATIONS. w/RISER ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRES EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 825 830835840 826 827 8 2 8 829831 83 2 833834836837 838839 841 8358 3 3833834 8 3 4836837 830 827828829 831832833834 850 8 5 0 84 8849849 851 851 852 852 853 853 85485485485 4 82082583083584084581982182282382682782882983183283383483 6837838839841842843844846847848 830 830 830 830835835 840840 845845850831 831832 8 3 2 833 833834834 836836837837838838839839 8418418428428438438448448468468478478488488498498518528538 2 0 825 8 3 0835840845 8188198198198 2 1 82 2823824826 8 2 7 8 2 8 8 2 9 8 3 1 8 3 2833834836837838839841842843844846847848849 820825830835840821822823824826827828829831831831832833834836837838839840 84 5 836 837 838 839 84 1 84 2 84 3 84 4 8 4 6 8 4 7 8 4 8 830 835 840 831 832 833 834 836 837 838 839 7657707757807857907958008058108158 20 765770775780785790795800805810815820765770775780785790795800805810815820765770775780785790795800805810 8158208258308358 4 0 845850829831 832 8338348368378378378388398 4 1 8 4 2 8438448 4 6847848849 851WV WV WV WV CWA A 14 B 14 D 14 8 1 7 6 2789 9 2772 2 3 5 10 2 1 9 3 12 14 11 BD BD BD BD BD BD 6 7 4 8 13 15 DB DB 845 850 850 844846847848 848848849849851 851 852 852 8 5 38538538 5 3 841841 842 842843 841842843840 836837838839841 835840836837838839841842840845850 838839841842843844846847848849851852 84 0 845850 8 3 9 84 1 842843844 84684784884985 1 8 5 2 8358408458508348368378388398418428438448468478488498518 5 2 82583083 5 821822823824826827828 829 831 832833 834 8 3 6 8 3 68368378388 3 5 832 83283383483 6 837838840845 841842 843 844 84 6 850 847848 849851852 830 835 840 845 850826827828829 831 832 833 834 836 837 838 839 841 842 843844 846 847 848 849 851852835 84084583 6 8 3 7 8388398418428438448 4 6 830835 831832833834 836 8 3 2 825 830 822823824826827 828829831 83 2 790 79580080581081582079282082581781881982182282382482683 5 831836837 838839835836837838 839836 830 828829 831832833834 CDCDCD8458448468478488 5 0 84 9 851SEDIMENT TRAP 83 1 832 833CD D 14 G 15CDCDCDE 14 E 14 817 820 823 LOT 7 40,531 SF 0.93 AC PAD=852.50 LOT 1 40,116 SF 0.92 AC PAD=852.50 LOT 2 67,760 SF (1.56 AC) PAD=852.00 REAR=842.00 LOT 3 68,609 SF 1.58 AC PAD=847.00 REAR=837.00 LOT 4 130,733 SF 3.00 AC LOT 5 58,218 SF 1.34 AC PAD=837.00 REAR=827.00 LOT 6 56,744 SF 1.30 AC PAD=842.00CD22'22'HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL PLAN12/25 EROSION CONTROL LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE SILT FENCE SWALE CONCRETE WASHOUT AREA CHECK DAM DANDY BAG INLET PROTECTION BEAVER DAM INLET PROTECTION SILT FENCE INLET PROTECTION INSTATURF SHEARFORCE 10 OR APPROVED EQUAL STABILIZED CONSTRUCTION ENTRANCE XXX XXX XXX XXX CWA CD DB BD JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL NOTES13/25 EROSION CONTROL NOTES: 1.ALL EROSION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO ANY SITE GRADING OPERATIONS. ALL APPLICABLE GOVERNING AGENCIES MUST BE NOTIFIED UPON COMPLETION OF THE INSTALLATION OF THE REQUIRED EROSION FACILITIES AND PRIOR TO ANY GRADING OPERATION BEING COMMENCED. IF DAMAGED OR REMOVED DURING CONSTRUCTION, ALL EROSION CONTROL FACILITIES SHALL BE RESTORED AND IN PLACE AT THE END OF EACH WORK DAY. 2.ANY EROSION CONTROL FACILITIES DEEMED NECESSARY BY THE GOVERNING AGENCIES; BEFORE, DURING OR AFTER THE GRADING ACTIVITIES, SHALL BE INSTALLED AT THEIR REQUEST. 3.FLOWS FROM DIVERSION CHANNELS OR PIPES (TEMPORARY OR PERMANENT) SHALL BE ROUTED TO SEDIMENTATION BASINS OR APPROPRIATE ENERGY DISSIPATERS TO PREVENT TRANSPORT OF SEDIMENT TO OUTFLOW TO LATERAL CONVEYORS AND TO PREVENT EROSION AND SEDIMENTATION WHEN RUNOFF FLOWS INTO THESE CONVEYORS. 4.SITE ACCESS ROADS SHALL BE GRADED OR OTHERWISE PROTECTED WITH SILT FENCES, DIVERSION CHANNELS, OR DIKES AND PIPES TO PREVENT SEDIMENT FROM EXITING THE SITE VIA THE ACCESS ROADS. SITE-ACCESS ROADS/DRIVEWAYS SHALL BE SURFACED WITH CRUSHED ROCK WHERE THEY ADJOIN EXISTING PAVED ROADWAYS. 5.SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES OR EQUIPMENT SHALL BE CLEANED DAILY FROM PAVED ROADWAY SURFACES, OR MORE FREQUENTLY IF REQUESTED BY GOVERNING AGENCIES, THROUGHOUT THE DURATION OF CONSTRUCTION. 6.DUST CONTROL MEASURES SHALL BE PERFORMED PERIODICALLY WHEN CONDITIONS REQUIRE AND/OR AS DIRECTED BY THE GOVERNING AGENCIES. 7.ALL EROSION CONTROL MEASURES SHALL BE USED AND MAINTAINED FOR THE DURATION OF SITE CONSTRUCTION. IF CONSTRUCTION OPERATIONS OR NATURAL EVENTS DAMAGE OR INTERFERE WITH THESE EROSION CONTROL MEASURES, THEY SHALL BE RESTORED TO SERVE THEIR INTENDED FUNCTION AT THE END OF EACH DAY OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. 8.ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AS SOON AS POSSIBLE. ANY AREAS WHICH HAVE BEEN FINISHED GRADED SHALL BE SODDED. AREAS THAT HAVE BEEN DISTURBED AND FOR WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY SHALL BE TEMPORARILY SEEDED AND MULCHED AS REQUIRED BY GOVERNING AGENCIES. 9.RUNOFF SHALL BE PREVENTED FROM ENTERING ALL STORM SEWER CATCH BASINS PROVIDING THEY ARE NOT NEEDED DURING CONSTRUCTION. WHERE STORM SEWER CATCH BASINS ARE NECESSARY FOR SITE DRAINAGE DURING CONSTRUCTION, A SILT FENCE OR SEDIMENT PROTECTION DEVICES SHALL BE INSTALLED AND MAINTAINED AROUND ALL CATCH BASINS UNTIL THE TRIBUTARY AREA TO THE CATCH BASIN IS RESTORED. 10.EROSION CONTROL FACILITIES SHALL BE INSTALLED AND MAINTAINED AROUND THE PERIMETER OF ALL LAKES, PONDS, AND WETLANDS, IF ANY WITHIN OR ADJACENT TO THE AREA TO BE GRADED UNTIL THE AREA TRIBUTARY TO THE LAKE, POND, OR WETLAND IS RESTORED. 11.TO MINIMIZE EROSION, ALL 3:1 SLOPES OR GREATER SHALL BE COVERED WITH A TEMPORARY EROSION CONTROL BLANKET OR STAKED SOD. 12.ACCUMULATION OF ALL SEDIMENT OCCURRING IN STORM SEWERS, DITCHES, LAKES, PONDS, WETLANDS SHALL BE REMOVED PRIOR TO, DURING AND AFTER COMPLETION OF GRADING ACTIVITIES, AT NO ADDITIONAL COST TO OWNER. 13.EROSION CONTROL ITEMS AND DEVICES SHALL BE REMOVED ONLY AFTER THE AREA HAS RECEIVED FINAL STABILIZATION. 14.THIS PLAN MUST BE POSTED ON SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON SITE AT ALL TIME. SEDIMENT AND EROSION CONTROL NOTES: MAINTENANCE & INSPECTION PROCEDURES: ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND WITHIN 24 HOURS FOLLOWING ANY STORM EVENT OF 0.5INCHES OR GREATER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE SEDIMENTATION AND EROSION CONTROL FEATURES ON THIS PROJECT. ANY SEDIMENT OR DEBRIS WHICH REDUCES THE EFFICIENCY OF A CONTROL FEATURE SHALL BE REMOVED IMMEDIATELY. SHOULD A STRUCTURE OR FEATURE BECOME DAMAGED, THE CONTRACTOR SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE OWNER AND IT SHALL BE INITIATED WITHIN 24 HOURS OF REPORT. TEMPORARY SEEDING AND PERMANENT SEEDING AND PLANTING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION, AND A WRITTEN LOG MUST BE KEPT. THIS LOG SHALL INDICATE THE DATE OF THE INSPECTION, NAME OF THE INSPECTOR, WEATHER CONDITIONS, OBSERVATIONS, ANY CORRECTIVE ACTIONS TAKEN, AND BE SIGNED IN ACCORDANCE WITH THE CONDITIONS OF THE NPDES PERMIT. ANY CONTROL MEASURE MUST BE REPAIRED/REPLACED WITHIN THREE DAYS OF INSPECTION. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL BE TRAINED IN ALL INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ONSITE IN GOOD WORKING ORDER. A WRITTEN DOCUMENT CONTAINING THE SIGNATURES OF ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED IN THE IMPLEMENTATION OF ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE MAINTAINED AS PROOF ACKNOWLEDGING THAT THEY REVIEWED AND UNDERSTAND THE CONDITIONS AND RESPONSIBILITIES OF THE PLAN. THE DOCUMENT SHALL BE CREATED BY THE CONTRACTOR SIGNED PRIOR TO THE START OF CONSTRUCTION. DISPOSAL OF SOLID/SANITARY/TOXIC WASTE: SOLID, SANITARY, AND TOXIC WASTE MUST BE DISPOSED OF IN A PROPER MANNER IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS IT IS PROHIBITED TO BURN, BURY, OR POUR OUT ONTO THE GROUND OR INTO A STORM SEWER WATER CONVEYANCE ANY SOLVENTS, PAINTS, STAINS, GASOLINE, DIESEL FUEL, USED MOTOR OIL, HYDRAULIC FLUID, ANTIFREEZE, CEMENT CURING COMPOUNDS, AND OTHER SUCH SOLID AND HAZARDOUS WASTES. ANY RINSE WATERS OF SUCH MATERIAL ARE ALSO PROHIBITED FROM BEING PLACED WHERE THEY MAY ENTER DRAINAGEWAYS. WASH OUT OF CEMENT TRUCKS SHOULD OCCUR IN A DIKED, DESIGNATED AREA, AWAY FROM ANY CONVEYANCE CHANNEL. COORDINATE WASH OUT AREA WITH CONSTRUCTION MANAGER. CONTRACTORS RESPONSIBILITIES: THIS PLAN MUST BE POSTED ON-SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON-SITE AT ALL TIMES. DETAILS HAVE BEEN PROVIDED ON THE PLANS IN AN EFFORT TO HELP THE CONTRACTOR PROVIDE EROSION AND SEDIMENTATION CONTROL. THE DETAILS SHOWN ON THE PLAN SHALL BE CONSIDERED A MINIMUM. ADDITIONAL OR ALTERNATE DETAILS MAY BE FOUND IN THE ODNR MANUAL "RAINWATER AND LAND DEVELOPMENT". THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING NECESSARY AND ADEQUATE MEASURES FOR PROPER CONTROL OF EROSION AND SEDIMENT RUNOFF FROM THE SITE ALONG WITH PROPER MAINTENANCE AND INSPECTION IN COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. THE SCHEDULE SHOULD INCLUDE A SEQUENCE OF THE PLACEMENT OF THE SEDIMENTATION AND EROSION CONTROL MEASURES THAT PROVIDES FOR CONTINUAL PROTECTION OF THE SITE THROUGHOUT EARTH MOVING ACTIVITIES. PRIOR TO CONSTRUCTION OPERATIONS IN A PARTICULAR AREA, ALL SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE IN PLACE. FIELD ADJUSTMENTS WITH RESPECT TO LOCATIONS AND DIMENSIONS MAY BE MADE BY THE ENGINEER AND/OR THE OHIO EPA. THE CONTRACTOR SHALL PLACE INLET PROTECTION FOR THE SEDIMENTATION CONTROL IMMEDIATELY AFTER CONSTRUCTION OF THE CATCH BASINS OR INLETS WHICH ARE NOT TRIBUTARY TO A SEDIMENT BASIN OR DAM. IT MAY BECOME NECESSARY TO REMOVE PORTIONS OF SEDIMENTATION CONTROLS DURING CONSTRUCTION TO FACILITATE THE GRADING OPERATIONS IN CERTAIN AREAS. HOWEVER, THE CONTROLS SHALL BE REPLACED UPON GRADING OR DURING ANY INCLEMENT WEATHER. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT OFFSITE TRACKING OF SEDIMENTS BY VEHICLES AND EQUIPMENT IS MINIMIZED. ALL SUCH OFFSITE SEDIMENT SHALL BE CLEANED UP DAILY. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT NO SOLID OR LIQUID WASTE IS DISCHARGED INTO STORM WATER RUNOFF. UNTREATED SEDIMENT-LADEN RUNOFF SHALL NOT FLOW OFFSITE WITHOUT BEING DIRECTED THROUGH A CONTROL PRACTICE. CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE INTO OR ALONG SIDE RIVERS, STREAMS, CREEKS, NATURAL OR MAN-MADE CHANNELS OR SWALES LEADING THERETO. CONCRETE WASH WATER AND SURPLUS CONCRETE SHALL BE CONFINED TO APPROVED AREAS. AFTER SOLIDIFYING THESE WASTED MATERIALS SHALL BE REMOVED FROM THE SITE. POST FLOOD EVENT SITE MAINTENANCE: FOLLOWING A FLOOD EVENT, INSPECT ALL MECHANICAL EQUIPMENT THAT ARE LOCATED ON THE SITE FOR ANY DAMAGES. WALLS AND WALL PENETRATIONS SHALL ALSO BE CHECKED FOR CRACKS AND LEAKS AND REPAIRED AS NECESSARY. ALL DEBRIS THAT MAY HAVE ACCUMULATED ALONG THE SITE SHALL BE GATHERED AND DISPOSED OF ACCORDING TO CITY STANDARDS. CHECK AND ENSURE THAT ALL DRAINAGE STRUCTURES ARE IN STANDARD OPERATION AND REPAIR ANY DAMAGES OR CLOGS THAT MAY HAVE OCCURRED DURING FLOODING. STABILIZATION PROCEDURES CONTRACTOR SHALL BE RESPONSIBLE TO KEEP A RECORD OF DATES WHEN MAJOR GRADING ACTIVITIES OCCUR, WHEN EARTH DISTURBANCE HAS TEMPORARILY OR PERMANENTLY CEASED ON A PORTION OF THE SITE, AND WHEN STABILIZATION MEASURES HAVE BEEN INITIATED. THE LIMITS OF SEEDING AND MULCHING ARE AS SHOWN WITHIN THE PLAN AS INDICATED BY THE LIMITS OF DISTURBANCE. ALL AREAS NOT DESIGNATED TO BE SEEDED SHALL REMAIN UNDER NATURAL GROUND COVER. THOSE AREAS DISTURBED OUTSIDE THE SEEDING LIMITS SHALL BE SEEDED AND MULCHED AT THE CONTRACTOR'S EXPENSE. TEMPORARY STABILIZATION TOPSOIL STOCKPILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY CEASES FOR AT LEAST 14 DAYS WILL BE STABILIZED WITH TEMPORARY SEED AND MULCH NO LATER THAN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY IN THAT AREA. DISTURBED AREAS WITHIN 50 FEET OF A STREAM, FIRST ORDER OR LARGER, SHALL BE STABILIZED WITHIN 2 DAYS OF INACTIVITY. TEMPORARY STABILIZATION MUST BE APPLIED TO ANY AREA OF THE SITE WHICH WILL REMAIN IDLE OVER THE WINTER. THE TEMPORARY SEED SHALL BE RYE (GRASS) APPLIED AT A RATE OF 25 LBS PER 1000 SY. PRIOR TO SEEDING, 900 LBS OF GROUND AGRICULTURAL LIMESTONE AND 200 LBS OF 10-20-20 FERTILIZER SHALL BE APPLIED TO EVERY 1000 SY STABILIZED. IMMEDIATELY AFTER ANY GIVEN AREA IS SEEDED, STRAW OR HAY SHALL BE EVENLY PLACED OVER ALL SEEDED AREAS. TWO TONS PER ACRE FOR STRAW, OR 3 TONS PER ACRE FOR HAY SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF MARCH 15 AND OCTOBER 15. THREE TONS PER ACRE STRAW, OR 4.5 TONS PER ACRE FOR HAY, SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF OCTOBER 15 AND MARCH 15 OF THE SUCCEEDING YEAR. IF DORMANT SEEDING IS BEING USED FOR STABILIZATION, SEED SHALL BE PLANTED AFTER NOVEMBER 20. AREAS TO BE PAVED SHALL BE TEMPORARILY STABILIZED BY APPLYING STONE BASE UNTIL BITUMINOUS PAVEMENT CAN BE APPLIED. IN ADDITION TO TEMPORARY SEEDING, THE CONTRACTOR SHALL PLACE A FILTER FABRIC BARRIER AROUND THE BASE OF ALL SOIL STOCKPILES. PERMANENT STABILIZATION DISTURBED PORTIONS OF THE SITE WHEN CONSTRUCTION HAS COMPLETED, OR PORTIONS THAT WILL REMAIN DORMANT FOR LONGER THAN ONE YEAR, SHALL BE STABILIZED WITH PERMANENT SEED NO LATER THAN 7 DAYS AFTER FINAL GRADE HAS BEEN ESTABLISHED. THE PERMANENT SEED MIX SHALL CONSIST OF 260 LBS/ACRE OF TURF TYPE TALL FESCUE. PRIOR TO SEEDING, APPLY COMMERCIAL FERTILIZER AT THE RATE OF 1 LB ACTUAL NITROGEN PER 1000 SF. FERTILIZER TO HAVE 20-22-14 ANALYSIS. AFTER SEEDING, EACH AREA SHALL BE MULCHED USING TURFIBER (OR EQUIVALENT) AT A RATE OF 2000 LBS PER ACRE WITH 50 LBS OF TURFIBER ADDED PER 100 GALLONS OF MACHINE CAPACITY. KEEP HYDROMULCH FROM NON-TARGET AREAS INCLUDING PAVEMENT, PLANT MATERIALS, CURBING, AND STRUCTURES. IF THESE SURFACES ARE HIT DURING HYDROMULCHING OPERATIONS, WASH THE SURFACE IMMEDIATELY. IF SEASONAL CONDITIONS PROHIBIT THE ESTABLISHMENT OF VEGETATIVE COVER, OTHER METHODS OF STABILIZATION, SUCH AS MULCHING WITH A TACKIFIER OR MATTING, MUST BE EMPLOYED AND MAINTAINED UNTIL A MORE PERMANENT METHOD CAN BE IMPLEMENTED. SITE NARRATIVE EXISTING SITE CONDITIONS:1 RESIDENTIAL BUILDING AND DRIVEWAY; GRASS. PROJECT DESCRIPTION:ACTIVITIES INCLUDE THE CONSTRUCTION OF A SINGLE FAMILY REDEVELOPMENT (7 DWELLING UNITS, 6 NEW HOMES, ASSOCIATED UTILITIES, DRIVES, SIDEWALK AND PAVEMENT IMPROVEMENTS, AND AN UNDERGROUND DETENTION SYSTEM. APPROXIMATELY 6.82 ACRES OF THE SITE WILL BE DISTURBED. RECEIVING STREAM:SCIOTO RIVER. DISTURBED AREA:6.54 ACRES SITE BMPS:FINAL LOCATIONS OF ALL SITE BMPS, INCLUDING DUMPSTERS, VEHICLE FUELING AREAS, CONCRETE TRUCK WASH, MATERIAL STORAGE, AND TOPSOIL STOCKPILES SHALL BE DETERMINED BY CONTRACTOR. IF FINAL LOCATION OF BMPS DIFFER FROM THE LOCATIONS SHOWN, CONTRACTOR SHALL MODIFY SWPPP AND INFORM OHIO EPA OF NEW LOCATIONS OF BMPS. ADJACENT AREAS:EAST: SCIOTO RIVER NORTH: RESIDENTIAL HOMES WEST: DUBLIN ROAD SOUTH: RESIDENTIAL HOMES GRADING REQUIREMENTS:DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE, ROCK CHECK DAMS, AND TEMPORARY SEDIMENT TRAPS AS SHOWN ON THE PLAN. AREAS WILL BE STABILIZED WHEN GRADED TO PREVENT EROSION ON THE SITE. EROSION & SEDIMENT A COMBINATION OF MEASURES WILL BE USED TO PROVIDE EROSION & SEDIMENT CONTROL MEASURES:CONTROL, INCLUDING SILT FENCE AND SEEDING. PROVIDE INLET PROTECTION AT ALL NEW AND EXISTING DRAINAGE STRUCTURES. ANY OFF SITE BORROW OR SPOIL AREAS SHALL BE SUBJECT TO THE REQUIREMENTS SET FORTH BY THE OHIO EPA. ALL EROSION AND SEDIMENT CONTROL MEASURES FOR OFF-SITE AREAS NOT COVERED BY A SEPARATE NOI OR SWPPP SHALL BE COORDINATED WITH THE OHIO EPA. ALL TRENCH OR EXCAVATION GROUNDWATER CONTAINING SEDIMENT MUST BE EFFECTIVELY TREATED PRIOR TO DISCHARGE INTO THE STORM SEWER SYSTEM. USE ALL MEANS NECESSARY TO CONTROL DUST ON THE SITE AND PREVENT TRACKING SOIL OFF SITE. PERMANENT STABILIZATION:THE SITE WILL BE STABILIZED BY THE USE OF SEEDING OR SODDING IN LAWN AREAS. MAINTENANCE:ALL EROSION CONTROL DEVICES ARE TO BE INSPECTED BY THE CONSTRUCTION SUPERINTENDENT WEEKLY AND AFTER SIGNIFICANT RAINFALLS. ANY DAMAGED FACILITIES ARE TO BE REPLACED OR REPAIRED IMMEDIATELY AS MAY BE NECESSARY. GENERAL CONSTRUCTION (UNLESS NOTED OTHERWISE, ALL EROSION AND SEDIMENT CONTROL MEASURES SEQUENCE:FROM THE BEGINNING OF EARTH DISTURBING ACTIVITIES TO FINAL COMPLETION OF THE PROJECT ARE THE RESPONSIBILITY OF THE CONTRACTOR) 1.ESTABLISH CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT CONSTRUCTION AREA. 2.CONSTRUCT TEMPORARY SEDIMENT CONTROLS AND PERIMETER EROSION CONTROL MEASURES, INCLUDING SEDIMENT BASINS, TEMPORARY OUTLET STRUCTURE, CONSTRUCTION ENTRANCE, AND SILT FENCE. MEASURES SHALL BE IMPLEMENTED AS THE FIRST STEP OF GRADING AND WITHIN 7 DAYS OF FIRST GRUBBING. 3.CLEAR AND GRUB 4.STRIP AND STOCKPILE TOPSOIL. SEED STOCKPILES. PROVIDE PERIMETER SILT FENCE AT TOE OF STOCKPILE SLOPE. 5.PERFORM ROUGH GRADING AND EXCAVATION. STABILIZE AREAS AS INDICATED HEREIN. 6.INSTALL STORM SEWERS, OUTLET STRUCTURE, AND INLET FILTERS. 7.COMPLETE ALL PAVEMENT ACTIVITIES. 8.COMPLETE FINE GRADING OF SEEDED AREAS AND STABILIZE DISTURBED AREAS. 9.ONCE FINAL SEED HAS BEEN ESTABLISHED, CONTRACTOR TO REMOVE TEMPORARY EROSION CONTROL MEASURES AND CLEAN ALL SEDIMENT FROM STRUCTURES AND PAVEMENT. SEDIMENT/WATER QUALITY BASIN SHALL BE CLEANED OF ALL ACCUMULATED SEDIMENT AND RESTORED TO THE ORIGINAL DESIGN CONTOURS SHOWN ON THESE PLANS. 10.PRIOR TO FINISHING WORK, ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION ACTIVITY (INCLUDING, BUT NOT LIMITED TO MATERIAL STORAGE AREAS, TRAILER AREAS, FUELING AREAS, TRUCK WASH AREAS, EQUIPMENT PATHS, HAUL ROADS, ETC.) SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS, OR IF IN AREAS OF PROPOSED IMPROVEMENTS, TO THEIR PROPOSED CONDITIONS. ALL STONE, TRASH, AND DEBRIS SHALL BE REMOVED FROM THE SOIL. THE UPPER 12" OF SOIL SHALL BE SCARIFIED, AND AREA SHALL BE GRADED TO SUBGRADE WITH SUITABLE MATERIALS. FURNISH 6" MINIMUM OF TOPSOIL AND SEED ALL AREAS. SCHEDULE:THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE PLACED IN ACCORDANCE WITH THIS SCHEDULE. JURISDICTION:ALL EROSION AND SEDIMENT CONTROL PRACTICES ARE SUBJECT TO FIELD MODIFICATIONS AT THE DISCRETION OF THE CITY OF DUBLIN AND/OR THE OHIO EPA. OEPA NOI:SUBMITTED, PENDING APPROVAL RUNOFF COEFFICIENTS:PRE-DEVELOPED:C = 0.44 POST-DEVELOPED:C = 0.54 PRE-DEVELOPED IMPERVIOUS AREA:0.47 ACRES POST-DEVELOPED IMPERVIOUS AREA:1.72 ACRES TEMPORARY SEEDING SEEDING DATES SPECIES LB/1,000 SF PER ACRE MARCH 1 TO AUGUST 15 OATS 3 4 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB AUGUST 16 TO NOVEMBER 1 RY 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB WHEAT 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB NOVEMBER 1 TO SPRING SEEDING USE MULCH ONLY, SODDING PRACTICES OR DORMANT SEEDING. NOTE: OTHER APPROVED SEED SPECIES MAY BE SUBSTITUTED PLAN DESIGNER AMERICAN STRUCTUREPOINT, INC. 2550 CORPORATE EXCHANGE DR., STE 300 COLUMBUS, OHIO 43231 CONTACT: MATT LILIE PHONE: (614) 901-2235 EMAIL: MLILIE@structurepoint.com OWNER & SITE CONTACT MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM TEMPORARY STABILIZATION AREA REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY DISTURBED AREA WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND NOT AT FINAL GRADE WITHIN 2 DAYS OF THE MOST RECENT DISTURBANCE IF THE AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS ANY DISTURBED AREAS THAT WILL BE DORMANT FOR MORE THAN 14 DAYS BUT LESS THAN ONE YEAR, AND NOT WITHIN 50 FEET OF A SURFACE WATER OF THE STATE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE WITHIN THE AREA. FOR RESIDENTIAL SUBDIVISIONS, DISTURBED AREAS MUST BE STABILIZED AT LEAST SEVEN DAYS PRIOR TO TRANSFER OF PERMIT COVERAGE FOR THE INDIVIDUAL LOT(S). DISTURBED AREAS THAT WILL BE IDLE OVER WINTER PRIOR TO THE ONSET OF WINTER WEATHER PERMANENT STABILIZATION AREA REQUIRING PERMANENT STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY AREAS THAT WILL LIE DORMANT FOR ONE YEAR OR MORE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE AN AREAS WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND AT FINAL GRADE WITHIN TWO DAYS OF REACHING FINAL GRADE OTHER AREAS AT FINAL GRADE WITHIN SEVEN DAYS OF REACHING FINAL GRADE IN THAT AREA 6.83 ACRES JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL DETAILS14/25 8" NOTES: 1.FENCE POST SHALL BE A MINIMUM LENGTH OF 32 INCHES LONG PLUS BURIAL DEPTH, COMPOSED OF NOMINAL DIMENSIONED 2x2 INCH HARDWOOD OF SOUND QUALITY. ALTERNATELY POST MATERIAL SHALL BE STEEL OR SYNTHETIC AND SHALL BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE DURING INSTALLATION, TO SUPPORT APPLIED LOADS, AND SO THE GEOTEXTILE CAN BE ADEQUATELY SECURED TO POST 2.FABRIC SHALL BE A NEEDLE PUNCHED NON-WOVEN GEOTEXTILE FABRIC CONSISTING OF STRONG, ROT RESISTANT, MATERIALS RESISTANT TO DETERIORATION FROM ULTRAVIOLET AND HEAT EXPOSURE. 3.MINIMUM 8" FABRIC BURY REQUIRED. 4.ENDS OF THE SILT FENCES SHALL BE BROUGHT UPSLOPE SO THAT WATER PONDED BY THE SILT FENCE WILL BE PREVENTED FROM FLOWING AROUND THE ENDS. 5.THE HEIGHT OF THE SILT FENCE SHALL BE A MINIMUM OF 16 INCHES ABOVE THE ORIGINAL GROUND SURFACE. 6.SILT FENCE SHALL BE PLACED ON THE FLATTEST AREA AVAILABLE. 7.SEDIMENT DEPOSITS SHALL BE ROUTINELY REMOVED WHEN THE DEPOSIT REACHES APPROXIMATELY HALF THE HEIGHT OF THE SILT FENCE. FENCE POST FLOW 16" MINEXTEND FABRIC TO 8" BELOW SURFACE FILTER FABRIC NON WOVEN GEOTEXTILE FABRIC SPACE POSTS PER MANUFACTURER RECOMMENDATIONS 16" MIN10' MAX SILT FENCE NOT TO SCALE WRAP GEOTEXTILE AROUND STAKES BEFORE DRIVING TRENCH TO BE BACKFILLED AND COMPACTED MINIMUM CRITERIA FOR SILT FENCE FABRIC (ODOT, 2002) MINIMUM TENSILE STRENGTH 120 lbs (535 N)ASTM D 4632 MAXIMUM ELONGATION AT 60 LBS 50%ASTM D 4632 MINIMUM PUNCTURE STRENGTH 50 lbs (220 N)ASTM D 4833 MINIMUM TEAR STRENGTH 40 lbs (180 N)ASTM D 4533 APPARENT OPENING SIZE <_ 0.84 mm ASTM D 4751 MINIMUM PERMITIVITY 1x10-2 sec. -1 ASTM D 4491 UV EXPOSURE STRENGTH RETENTION 70%ASTM D 4355 D BEAVER DAM INLET PROTECTION NOT TO SCALE DANDY BAG WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN MONOFILAMENT THAT MEETS OR EXCEEDS THE FOLLOWING SPEFICICATIONS GRAB TENSILE STRENGTH ASTM D 4632 GRAB TENSILE ELONGATION ASTM D 4632 PUNCTURE STRENGTH ASTM D 4833 MULLEN BURST STRENGTH ASTM D 3786 TRAPEZOID TEAR STRENGTH ASTM D 4533 UV RESISTANCE ASTM D 4355 APPARENT OPENING SIZE ASTM D 4751 FLOW RATE ASTM D 4491 PERMITIVITY ASTM D 4491 INSTALLATION: 1.STAND GRATE ON END. SLIDE THE BEAVER DAM BAG ON WITH DAM ON TOP OF THE GRATE. PULL ALL EXCESS DOWN. 2.LAY UNIT ON ITS SIDE. CAREFULLY TUCK FLAP IN. PRESS VELCRO STRIPS TOGETHER. 3.INSTALL THE UNIT MAKING SURE FRONT EDGE OF GRATE IS INSERTED IN FRAME FIRST, THEN LOWER BACK INTO PLACE. 4.PRESS VELCRO DOTS TOGETHER WHICH ARE LOCATED UNDER LIFTING STRAPS. THIS ENSURES STRAPS REMAIN FLUSH WITH GUTTER. MAINTENANCE: 1.WITH A STIFF BRISTLE BROOM, SWEEP SILT AND OTHER DEBRIS OFF SURFACE AFTER EACH STORM EVENT. MANHOLE CURB FILTER CURB OPENING WITHOUT GRATE OVERFLOW GAP AGGREGATE POUCH C CONCRETE WASHOUT AREA NOT TO SCALE10' MINIMUM10' MINIMUM 3' MIN.NOTE: BASIN SHOULD BE CLEARLY MARKED FOR CONCRETE WASHOUT. ORANGE SILT FENCE OR CONSTRUCTION FENCE PLAN SECTION NOTE: 1.CONCRETE WASHOUT AREA SHALL BE LOCATED A MINIMUM OF 100' FROM STORM SEWER INLETS, STREAMS, WETLANDS OR ANY OTHER SURFACE WATERS. 2.IF CONCRETE WASHOUT AREA IS LOCATED AWAY FROM A PAVED SURFACE, CONSTRUCT A GRAVEL ACCESS ROUTE EQUAL IN COMPOSITION TO A CONSTRUCTION ENTRANCE. 3.CONCRETE WASHOUT AREA SHALL BE SUFFICIENT SIZE TO CONTAIN CONCRETE WASTE GENERATED. LARGE SITES MAY REQUIRE MULTIPLE CONCRETE WASHOUT AREAS. 4.PLASTIC LINING SHALL BE DOUBLE-LINED, CONTINUOUS 10-ML POLYETHYLENE SHEETING FREE OF HOLES, TEARS OR OTHER DEFECTS INSTALLED ON A SMOOTH, LEVEL SURFACE, FREE OF LARGE ROCKS AND DEBRIS. 5.CONCRETE WASHOUT SIGNAGE SHALL BE CLEARLY VISIBLE AND LOCATED WITHIN 30 FEET OF EACH WASHOUT AREA. 6.CONCRETE WASHOUT AREA SHALL BE COVERED DURING INCLEMENT WEATHER TO PREVENT OVERFLOW. 7.PREFABRICATED, PORTABLE AND RE-USABLE CONCRETE WASHOUT CONTAINERS ARE ACCEPTABLE. 8.CONCRETE WASHOUT AREA SHALL BE INSPECTED DAILY TO CHECK FOR DAMAGE AND DETERMINE IF IT NEEDS CLEANED OR REPLACED. ANY DAMAGE TO THE SIDEWALLS OR PLASTIC LINING SHALL BE REPAIRED IMMEDIATELY. REPLACE THE ENTIRE CONCRETE WASHOUT AREA WHEN IT IS 75% FULL. ALL CONCRETE TRUCKS MUST WASHOUT HERE 6" MIN. NO. 2 CRUSHED STONE GRAVEL PAD 10 ML PLASTIC LINING 10 ML PLASTIC LINING B 20'20'10' MIN.14'EXISTING PAVEMENT 5: 1 3'EXISTING PAVEMENT PROFILE PLAN VIEW 6" MIN(STANDARD)18" MIN(HEAVY DUTY)FILTER CLOTH R/W DIVERSION AS NEEDED70' MIN. AS REQUIRED EXISTING GROUND CULVERT (AS NEEDED)18"CONSTRUCTION ENTRANCE NOT TO SCALE GEOTEXTILE SPECIFICATION FOR CONSTRUCTION ENTRANCE MINIMUM TENSILE STRENGTH 200 lbs MINIMUM PUNCTURE STRENGTH 80 psi MINIMUM TEAR STRENGTH 50 lbs MINIMUM BURST STRENGTH 320 psi MINIMUM ELONGATION 20% EQUIVALENT OPENING SIZE EOS<0.6 mm PERMITIVITY 1x10-3 cm/sec CONSTRUCTION SPECIFICATIONS: 1.STONE SIZE—ODOT # 2 (1.5-2.5 INCH) STONE SHALL BE USED, OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH—THE CONSTRUCTION ENTRANCE SHALL BE AS LONG AS REQUIRED TO STABILIZE HIGH TRAFFIC AREAS BUT NOT LESS THAN 70 FT. (EXCEPTION: APPLY 30 FT. MINIMUM TO SINGLE RESIDENCE LOTS). 3.THICKNESS -THE STONE LAYER SHALL BE AT LEAST 6 INCHES THICK FOR LIGHT DUTY ENTRANCES OR AT LEAST 10 INCHES FOR HEAVY DUTY USE. 4.WIDTH -THE ENTRANCE SHALL BE AT LEAST 14 FEET WIDE, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS 5.GEOTEXTILE -A GEOTEXTILE SHALL BE LAID OVER THE ENTIRE AREA PRIOR TO PLACING STONE. IT SHALL BE COMPOSED OF STRONG ROT-PROOF POLYMERIC FIBERS AND MEET THE FOLLOWING SPECIFICATIONS: 6.TIMING—THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED AS SOON AS IS PRACTICABLE BEFORE MAJOR GRADING ACTIVITIES. 7.CULVERT -A PIPE OR CULVERT SHALL BE CONSTRUCTED UNDER THE ENTRANCE IF NEEDED TO PREVENT SURFACE WATER FROM FLOWING ACROSS THE ENTRANCE OR TO PREVENT RUNOFF FROM BEING DIRECTED OUT ONTO PAVED SURFACES. 8.WATER BAR -A WATER BAR SHALL BE CONSTRUCTED AS PART OF THE CONSTRUCTION ENTRANCE IF NEEDED TO PREVENT SURFACE RUNOFF FROM FLOWING THE LENGTH OF THE CONSTRUCTION ENTRANCE AND OUT ONTO PAVED SURFACES. 9.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR PREVENT FLOWING SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND. MUD SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC ROADS, OR ANY SURFACE WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS, SHALL BE REMOVED IMMEDIATELY. REMOVAL SHALL BE ACCOMPLISHED BY SCRAPING OR SWEEPING. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. 10. CONSTRUCTION ENTRANCES SHALL NOT BE RELIED UPON TO REMOVE MUD FROM VEHICLES AND PREVENT OFF-SITE TRACKING. VEHICLES THAT ENTER AND LEAVE THE CONSTRUCTION-SITE SHALL BE RESTRICTED FROM MUDDY AREAS. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 11. REMOVAL—THE ENTRANCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREA IS STABILIZED OR REPLACED WITH A PERMANENT ROADWAY OR ENTRANCE. A INSTALLATION: 1.STAND GRATE ON END. PLACE DANDY BAG OVER GRATE. 2.FLIP GRATE OVER SO THAT OPEN END IS UP. PULL UP SLACK. TUCK FLAP IN. BE SURE END OF GRATE IS COMPLETELY COVERED BY FLAP OR DANDY BAG WILL NOT FIT PROPERLY. 3.HOLDING HANDLES, CAREFULLY PLACE DANDY BAG WITH THE GRATE INSERTED INTO CATCH BASIN FRAME SO THAT RED DOT ON THE TOP OF THE DANDY BAG IS VISIBLE. MAINTENANCE: AFTER EACH STORM EVENT AND SILT HAS DRIED, REMOVE ACCUMULATED DEBRIS FROM THE SURFACE OF DANDY BAG WITH BROOM. NOTE: PROVIDE FOR INLETS LOCATED IN PAVEMENT DANDY BAG INLET PROTECTION NOT TO SCALE DANDY BAG WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN MONOFILAMENT THAT MEETS OR EXCEEDS THE FOLLOWING SPEFICICATIONS GRAB TENSILE STRENGTH ASTM D 4632 GRAB TENSILE ELONGATION ASTM D 4632 PUNCTURE STRENGTH ASTM D 4833 MULLEN BURST STRENGTH ASTM D 3786 TRAPEZOID TEAR STRENGTH ASTM D 4533 UV RESISTANCE ASTM D 4355 APPARENT OPENING SIZE ASTM D 4751 FLOW RATE ASTM D 4491 PERMITIVITY ASTM D 4491 STORM SEWER GRATE VELCRO CLOSURE LIFT STRAPS MADE FOR EASY MOVEMENT AND INSPECTION OF UNIT STORM SEWER GRATE DANDY BAG F 12" MIN.6" MIN.4'-0" LOW CENTER SECTION- MUST CAUSE FLOW OVER NOT AROUND, CHECK DAM NOTES: 1.CONSTRUCT CHECK DAM SUCH THAT THE CENTER IS 6" LOWER THAN THE OUTER EDGES. 2.SPACE CHECK DAMS SUCH THAT THE TOE OF THE UPSTREAM DAM IS AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 3.SIDE SLOPES SHALL BE A MINIMUM OF 2:1 4"-8" DIAMETER ROCKAPRON 3' MAX. DITCH SECTION PROFILE FLOW POSITIVE SLO P EPOSITIVE SL O P E FLOW ROCK CHECK DAM NOT TO SCALEE JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL DETAILS15/25 ODOT #57 AGGREGATE 1' THICK LENGTH WIDTHWEIRLENGTH4' MIN SEDIMENTSTORAGE ZONEDEWATERINGZONENOTES: 1.FILL USED FOR THE EMBANKMENT SHALL BE EVALUATED TO ASSURE IT IS SUITABLE AND STABLE FOR THE SLOPES OF THE BASIN. IT IS TO BE FREE OF ANY DEBRIS AS A RESULT OF CLEARING AND GRUBBING (E.G. ROOTS, OTHER ORGANICS, ETC) 2.THE MAXIMUM HEIGHT OF THE EMBANKMENT SHALL BE FIVE FEET. ALL CUT AND FILL SLOPES SHALL BE 2:1 (H:V) OR FLATTER. 3.THE OUTLET SHALL BE CONSTRUCTED USING THE MATERIALS SPECIFIED ON THIS DRAWING. GEOTEXTILE SHALL BE KEYED IN AT LEAST 6" ON THE UPSTREAM SIDE OF THE OUTLET. 4.WARNING SIGNS AND SAFETY FENCE SHALL BE PLACED AROUND THE TRAPS AND MAINTAINED OVER THE LIFE OF THE BASIN. 5.AFTER THE BASIN IS NO LONGER NEEDED THE STRUCTURE AND ALL ASSOCIATED SEDIMENT SHALL BE REMOVED. THE BASIN SHALL BE FILLED WITH STABLE EARTH MATERIAL, COMPACTED, GRADED, AND SEEDED TO BLEND IN WITH ADJACENT LAND. OPERATION AND MAINTENANCE: 1.THE CAPACITY AND FUNCTION OF THE SEDIMENT TRAP SHALL BE MAINTAINED BY INSPECTING ON A WEEKLY BASIS AND AFTER EACH STORM EVENT BY PERFORMING THE ACTIVITIES BEFORE. 2.SHORE UP ANY ERODING SLOPES, REMOVE WOODY VEGETATED GROWTH ON THE EMBANKMENT AND SPILLWAY AREAS, AND REMOVE ANY TRASH OR DEBRIS THAT HAVE ACCUMULATED IN THE BASIN. 3.DEWATERING OUTLETS SHALL BE REGULARLY CHECK THAT THEY ARE PERFORMING AS INTENDED. 4.REMOVE SEDIMENT AND RESTORE BASIN BACK TO ITS INTENDED DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO THE TOP OF THE SEDIMENT STORAGE ZONE. THIS ELEVATION SHALL BE MARKED WITH A STAKE NEAR THE CENTER OF THE BASIN 2:1 MAX SLOPE ODOT TYPE D RIP RAP GEOTEXTILE 1.5' MIN HEIGHT 2:1 SLOPES 2:1 SLOPES BASIN SEDIMENT TRAP NOT TO SCALE SPILLWAY WEIR SIZED TO PASS 10 YEAR 24 HOUR STORM. A MAX FLOW DEPTH OF 1', A MINIMUM FREEBOARD OF 0.5', AND MAXIMUM SIDE SLOPES OF 2:1 REQUIRED. DRAINAGE AREA (ACRES)WEIR LENGTH 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 MINIMUM 4' WIDE EMBANKMENT 6" KEY SECTION VIEW PLAN VIEW OUTLET SECTION TEMPORARY SEDIMENT TRAP - DEWATERING VOLUME 1800 CF PER ACRE OF DRAINAGE AREA 1800 CF/AC * 4.31 AC = 7758 CF SEDIMENT STORAGE ELEVATION = 820.00 DEWATERING/SPILLWAY ELEVATION = 823.00 TOP OF BASIN ELEVATION = 824.50 VOLUME PROVIDED = 8,133 CF 3 2 1 3 4 2 1 TEMPORARY SEDIMENT TRAP - SEDIMENT STORAGE VOLUME 1000 CF PER ACRE OF DISTURBED AREA 1000 CF/AC * 3.76 AC = 3760 CF SEDIMENT STORAGE ELEVATION = 820.00 BOTTOM OF BASIN ELEVATION = 817.00 VOLUME PROVIDED = 4,243 CF 3 45' MAXG JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:05 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM ADS SPECS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UNDERGROUNDDETENTION DETAILS16/25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:05 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM ADS SPECS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UNDERGROUNDDETENTION DETAILS17/25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:05 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM ADS SPECS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UNDERGROUNDDETENTION DETAILS18/25 w/RISER ICV ICV ICV LOW AREA ICV ICV ICVICV 3" CAST IRON EXPOSED PIPE 3" CAST IRON EXPOSED PIPE 3" CAST IRON EXPOSED PIPE PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AEcannot openGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)TBM1 CP900 CP947 WV WV WV WV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 4445 46 47 4849 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 8283 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99100 101 102 103 104 105 106 107 108 109 110 111 112 113 114115 116 117 118 119 120 121 122 123 124 125 126 127128 129 130 131 132 133 134135 136137 138 139 140141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158159 160 161 162 163 164 165 166 167168 169 170 171 172 173 174 175 176 177 178179 180 181182 183 184185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200201202 203 204 205 206 207 208 209 210 211 212 213 214 216 215 3 HA 3 HK 3 HK 3 HA 5 HK 3 HA 5 HK 3 HA LANDSCAPE ENLARGEMENT 3/16" = 1'-0"00 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES TREE PRESERVATIONAND REPLACEMENT19/25 KAA PWJ TREE TO BE PRESERVED CIRCLE REPRESENTS THE CRITICAL ROOT ZONE. TREE PROTECTION FENCE TO BE PLACED AT CRITICAL ROOT ZONE. TREE TO BE REMOVED. REFER TO SCHEDULE ON SHEET 12.DUBLIN RD.ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 0 SCALE: feet4080120 1" = 40' NORTH 01.27.25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES TREE PRESERVATIONSCHEDULE & DETAILS20/25 KAA PWJ NTS TREE PROTECTION DETAIL3 CROWN DRIP LINE OR OTHER LIMIT OF TREE PROTECTION AREA. SEE TREE PRESERVATION PLAN FOR FENCE ALIGNMENT. MAINTAIN EXISTING GRADE WITH THE TREE PROTECTION FENCE UNLESS OTHERWISE INDICATED ON THE PLANS. 2" X 6' STEEL POSTS OR APPROVED EQUAL. TREE PROTECTION FENCE: HIGH DENSITY POLYETHYLENE FENCING WITH 3.5" X 1.5" OPENINGS; COLOR- ORANGE. STEEL POSTS INSTALLED AT EDGE OF CANOPY EXISTING MULCH LAYER GENERAL NOTES: 1.ALL TREES NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY TREE PROTECTION FENCING PLACED AT CRITICAL ROOT ZONE, OR 15' FROM THE TRUNK WHICHEVER IS GREATER. 2.OWNER SHALL BE RESPONSIBLE FOE THE CONSTRUCTION, ERECTION, AND MAINTENANCE OF THE PROTECTION FENCING. FENCING MUST REMAIN IN PLACE DURING ALL PHASES OF CONSTRUCTION. 3.ANY CHANGE IN PLACEMENT OF FENCING MUST BE APPROVED BY CITY STAFF. 4.IT IS UNLAWFUL TO FAIL TO ABIDE BY THE TREE PRESERVATION PLAN OR TREE REMOVAL PERMIT. 5.UTILITY LOCATIONS ARE AS IDENTIFIED. ANY FIELD CHANGES THAT AFFECTS THE LOCATION OF THE TREE PROTECTION FENCING WILL BE REFLECTED ON REVISED PLANS AND COORDINATED WITH THE DIVISION OF PLANNING. 6.CRITICAL ROOT ZONE IS THE AREA INSCRIBED BY AN IMAGINARY LINE ON THE GROUND BENEATH A TREE HAVING ITS CENTER POINT AT THE CENTER OF THE TRUNK AND HAVING A RADIUS EQUAL TO ONE FOOT FOR EVERY INCH OF DIAMETER CHEST HEIGHT. 7.A TREE REMOVAL PERMIT MUST BE OBTAINED FROM THE PLANNING DIVISION PRIOR TO THE REMOVAL OF ANY TREES. 8.ROOT PRUNING WILL BE PERFORMED ON ANY ROOT DAMAGED WITHIN THE CRITICAL ROOT ZONE AS PER THE INTERNATIONAL SOCIETY OF ARBORICULTURE ACCEPTED STANDARDS. 9.NO WORK SHALL BEGIN UNTIL PLAN APPROVAL AND FIELD VERIFICATION BY CITY STAFF. 10.STREET TREES AND FRONT YARD TREES ARE TO BE FIELD COORDINATED WITH CITY ARBORIST. KEEP OUT TREE PROTECTION AREA 8.5" X 11" SIGN LAMINATED IN PLASTIC SPACED EVERY 50' ALONG THE FENCE. ZONING NOTES: NTS TREE PLANTING - LEVEL AREA1 1'-0"6"MIN.SPADE EDGE COMPACT EXCAVATED FILL TO CREATE SAUCER 3" MULCH LAYER (SEE GENERAL NOTES) ROOTBALL (LOOSEN BURLAP ON TOP 1/2) NOTES: 1. SEE NOTES FOR DRAINAGE REQUIREMENTS PROIR TO PLANTING 2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING 3. IMMEDIATELY SOAK WITH WATER 4. DO NOT BREAK ROOTBALL FINISHED GRADE PLANTING SOIL TYPE 1 ADD EXCAVATED SOIL AS NEEDED TO BRING TREE TO FINISHED GRADE. TAMP LIGHTLY BUT THOROUGHLY PRIOR TO SETTING TREE TO PREVENT SETTLING. SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH & LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE) KEEP MULCH OFF TRUNK OF TREE 1.EXCAVATE ROOTBALL PIT 2.SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3" HIGHER THAN FINISH GRADE. 3.REMOVE ALL TWINE, ROPE, WIRE BASKET, AND BURLAP FROM TOP 1/3 OF ROOTBALL & EXPOSE ROOT FLARE. 4.BACKFILL WITH SOIL MIX & "WATER IN" 5.COMPLETE BACKFILLING, CONSTRUCT SAUCER, SPADE-EDGE & ADD MULCH 6.STAKE & GUY SECURELY (AS REQUIRED) 7.INSTALL WATERING DEVICE (AS REQUIRED) PLANTING PROCEDURE 2-3" NTS TREE PLANTING - ON SLOPE2 Use Requirement Single-Family Front yard trees are required on every single family lot at the quantity and size specified in the following table. The trees to be planted shall be an approved front yard tree as listed in Appendix H (Approved Front Yard Trees for Dublin, Ohio) and have a minimum truck caliper of no less than 2 inches. Trees shall be located in front of or along any front-facing facade of the home, no closer than three feet to a side property line. Corner and through lots shall meet these requirements on all street frontages. Lot Width Front Building Setback Tree Size and Quantity Up to 59.9 feet Less than 20 feet 1 small tree 20 feet or more 1 medium tree 60-90.9 feet Less than 20 feet 1 medium tree plus 1 small tree 20 feet or more 1 large tree plus 1 medium tree 91 feet or more Less than 20 feet 1 large tree plus 2 trees of any size 20 feet or more 2 large tree plus 1 tree of any size 153.133 (D)(2)(b) 153.133 (C) Screening For Service Structures. Service structures shall be screened in all zoning districts. For the purposes of this section, service structures shall include but not be limited to loading docks, storage tanks, dumpsters, electrical transformers, utility vaults which extend above the surface, cooling towers, roof top units and other equipment or elements providing service to a building or a site. Structures may be grouped together; however, screening height shall be based upon the tallest of the structures. Roof top mechanical units must be screened to the full height of the unit SERVICE UNITS ARE NOT SCREENED AS PART OF THIS SUBMISSION BUT NOTED TO BE PROVIDED AS NEEDED. 153.134 STREET TREE AND PUBLIC TREE REQUIREMENTS. The planting of street trees shall be required at the time a parcel is developed or redeveloped, in all zoning districts, and in accordance with the following regulations. (Ord. 66-93, passed 9-20-93) (A) Requirements for trees located on city-owned public property. The following are requirements for the planting, pruning and removal of trees within city-owned property. For the purposes of this section, city-owned property shall include all public ways, streets, alleys, parks or other property owned by the Municipality. (1) Requirements. It shall be required that all subdividers or developers plant trees along public streets of their developments in such a manner, type, quantity and location as approved by the Planning and Zoning Commission and as defined by the following conditions, and that any undeveloped street or existing street with undeveloped frontage shall conform to these requirements at the time of the development. Final tree locations may be adjusted by the city as unusual conditions may warrant. (a) The tree to be planted shall be an approved street tree as listed in Appendix E (Approved Street Trees for Dublin, Ohio). (b) The minimum spacing between this and other trees shall be 40 feet for large trees, 30 feet for medium trees and 20 feet for small trees. See definition below. (c) The maximum spacing between trees shall be 45 feet for large trees, 35 feet for medium trees, and 25 feet for small trees. Spacing may be adjusted for columnar trees, as approved by City Forestry Division. TREE REPLACEMENT NOTES: TREE PROTECTION FENCE TO BE LOCATED WHERE THE LIMIT OF CONSTRUCTION IS ADJACENT TO TREES TO BE PRESERVED. THE TREE PROTECTION FENCE IS TO BE LOCATED TO PROTECT THE CRITICAL ROOT ZONE AS DEFINED AS THE AREA INSCRIBED BY AN IMAGINARY LINE ON THE GROUND BENEATH A TREE HAVING ITS CENTER POINT AT THE CENTER OF THE TRUNK OF THE TREE AND HAVING A RADIUS EQUAL TO ONE FOOT FOR EVERY INCH OF DIAMETER BREAST HEIGHT. PRIORITY 3 TREES REPLACE AT 1 TO 1 BASIS WITH A 2" CAL TREE. (7) TREES REQUIRED (7) 2" CALTREES TO BE TREES PROVIDED PRIORITY 2 TREES REPLACE AT 2 TO 1 BASIS WITH A 2" CAL. TREE. (58) 2" TREES REQUIRED (58) 2" CAL. TREES TO BE PROVIDED PRIORITY 1 TREES REPLACE AT 3 TO 1 BASIS WITH A 2" CAL. TREE (39) 2" CAL. TREES REQUIRED. (39) 2" CAL. TREES TO BE PROVIDED LANDMARK TREES REPLACE INCH FOR INCH WITH 2.5" CAL TREES. 672 / 2.5 = 269 TREES REQUIRED. ( 26) TREES PLANTED ON SITE AND REMAINDER TO BE PAID INTO THE DUBLIN TREE FUND. FRONT YARD TREES ARE SHOWN FOR ZONING PURPOSES ONLY AND ARE TO BE LOCATED WITH THE FINAL RESIDENTIAL SITE DESIGN.ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 1.EXCAVATE ROOTBALL PIT 2.SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3" HIGHER THAN FINISH GRADE. 3.REMOVE ALL TWINE, ROPE, WIRE BASKET, AND BURLAP FROM TOP 1/3 OF ROOTBALL & EXPOSE ROOT FLARE. 4.BACKFILL WITH SOIL MIX & "WATER IN" 5.COMPLETE BACKFILLING, CONSTRUCT SAUCER, SPADE-EDGE & ADD MULCH 6.STAKE & GUY SECURELY (AS REQUIRED) 7.INSTALL WATERING DEVICE (AS REQUIRED) SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH & LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE) PLANTING SOIL TYPE 1 12"12" 12" MIN. 8" NOTES: 1.DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. 2.IMMEDIATELY SOAK WITH WATER. 3.DO NOT BREAK ROOTBALL. 2-3" SPADE EDGE 3" SHREDDED HARDWOOD MULCH LAYER EARTH SAUCER RING 1-1/2" MULCH LAYER FINISHED GRADE BEFORE PLANTING PLANTING PROCEDURE KEEP MULCH OFF TRUNK OF TREE REMOVE ALL ROPE, BURLAP, AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL EXISTING TREES 7192 Dublin Road - Dublin TREE NUMBER SIZE SPECIES CONDITION STATUS PRIORITY 3 PRIORITY 2 PRIORITY 1 LANDMARK REMARKS PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE 1 18 DOGWOOD GOOD REMOVE 18 2 20 RED CEDAR FAIR REMOVE 20 3 15 RED CEDAR POOR REMOVE 4 30 SPRUCE GOOD REMOVE 30 5 22 CATALPA GOOD REMOVE 22 6 29 MAPLE FAIR REMOVE 29 MULTI-STEM 7 60 MAPLE FAIR REMOVE 60 MULTI-STEM 8 15 MAPLE FAIR REMOVE 15 9 8 MAPLE POOR REMOVE 10 17 HACKBERRY FAIR REMOVE 17 11 21 WALNUT FAIR REMOVE 21 12 10 CHERRY POOR REMOVE 13 22 CATALPA GOOD REMOVE 22 14 16 ELM FAIR REMOVE 16 15 102 HACKBERRY FAIR REMOVE 102 16 15 HACKBERRY FAIR REMOVE 15 17 8 CATALPA FAIR REMOVE 8 18 6 CATALPA FAIR REMOVE 6 19 24 CATALPA FAIR REMOVE 24 20 11 LOCUST FAIR REMOVE 11 21 6 CATALPA FAIR REMOVE 6 22 7 WALNUT FAIR PRESERVE 7 23 14 CATALPA FAIR PRESERVE 14 24 23 OAK FAIR REMOVE 23 25 24 OAK FAIR REMOVE 24 26 44 MAPLE GOOD PRESERVE 44 27 27 HICKORY GOOD PRESERVE 27 28 35 HICKORY GOOD PRESERVE 35 29 20 OAK GOOD PRESERVE 20 30 80 MAPLE FAIR PRESERVE 80 31 17 MULBERRY FAIR PRESERVE 17 32 17 MAPLE FAIR PRESERVE 17 33 15 HACKBERRY POOR PRESERVE 34 15 MAPLE POOR PRESERVE 35 13 SPRUCE FAIR PRESERVE 13 36 19 PINE GOOD PRESERVE 19 37 15 MULBERRY FAIR PRESERVE 15 38 14 PINE FAIR PRESERVE 14 39 34 WALNUT FAIR PRESERVE 34 40 28 MAPLE FAIR PRESERVE 28 41 17 MAPLE FAIR PRESERVE 17 42 14 WALNUT FAIR PRESERVE 14 43 15 MAPLE FAIR PRESERVE 15 44 15 WALNUT FAIR PRESERVE 15 45 11 PINE FAIR PRESERVE 11 46 10 MAPLE FAIR PRESERVE 10 47 14 PINE GOOD PRESERVE 14 48 19 SPRUCE POOR PRESERVE 49 17 MAPLE FAIR PRESERVE 17 50 25 SPRUCE FAIR PRESERVE 25 51 11 MAPLE POOR PRESERVE 52 12 BOXELDER POOR PRESERVE 12 53 12 SPRUCE POOR PRESERVE 54 16 PINE POOR PRESERVE 55 27 HICKORY GOOD PRESERVE 27 56 13 PINE FAIR REMOVE 13 57 6 HACKBERRY FAIR REMOVE 6 58 7 MAPLE FAIR REMOVE 7 59 16 CHERRY FAIR PRESERVE 16 60 13 MAPLE FAIR REMOVE 13 61 7 MAPLE FAIR REMOVE 7 62 9 MAPLE FAIR REMOVE 9 63 6 MAPLE FAIR PRESERVE 6 64 8 PINE POOR REMOVE 65 7 MAPLE FAIR REMOVE 7 66 9 PINE POOR REMOVE 67 34 WALNUT FAIR REMOVE 34 68 20 MAPLE FAIR REMOVE 20 69 46 MAPLE FAIR REMOVE 46 70 36 MAPLE FAIR REMOVE 36 71 21 LOCUST GOOD REMOVE 21 72 19 LOCUST GOOD REMOVE 19 73 21 LOCUST GOOD REMOVE 21 74 22 LOCUST GOOD PRESERVE 22 75 7 WALNUT GOOD PRESERVE 7 76 26 MAPLE FAIR REMOVE 26 77 16 MAPLE GOOD REMOVE 16 78 27 MAPLE GOOD PRESERVE 27 79 46 CHERRY FAIR PRESERVE 46 MULTI-STEM 80 8 CHERRY POOR REMOVE 81 14 PINE FAIR REMOVE 14 82 11 WALNUT FAIR REMOVE 11 83 11 PINE POOR REMOVE 84 19 MAPLE GOOD PRESERVE 19 85 27 WALNUT FAIR PRESERVE 27 86 10 HACKBERRY FAIR REMOVE 10 87 9 HACKBERRY FAIR REMOVE 9 88 17 HACKBERRY POOR PRESERVE 89 6 MAPLE FAIR PRESERVE 6 90 13 MAPLE FAIR PRESERVE 13 91 8 MAPLE FAIR PRESERVE 8 92 7 MAPLE FAIR PRESERVE 7 93 11 MAPLE GOOD PRESERVE 11 94 42 HACKBERRY POOR PRESERVE 95 18 HACKBERRY POOR PRESERVE 96 16 MAPLE FAIR REMOVE 16 97 19 HACKBERRY FAIR REMOVE 19 98 12 MAPLE FAIR REMOVE 12 99 10 MAPLE POOR REMOVE 100 47 HACKBERRY POOR REMOVE 101 21 WALNUT FAIR REMOVE 21 102 10 MAPLE FAIR REMOVE 10 103 10 HACKBERRY POOR REMOVE 104 10 HACKBERRY FAIR REMOVE 10 105 8 MAPLE POOR REMOVE 106 19 MAPLE FAIR REMOVE 19 107 11 MAPLE FAIR REMOVE 11 108 11 HACKBERRY FAIR PRESERVE 11 109 15 MAPLE FAIR PRESERVE 15 110 16 MAPLE FAIR PRESERVE 16 111 16 WALNUT FAIR PRESERVE 16 112 41 HACKBERRY FAIR PRESERVE 41 MULTI-STEM 113 26 MAPLE FAIR PRESERVE 26 114 24 HACKBERRY FAIR PRESERVE 24 115 8 MAPLE FAIR REMOVE 8 116 14 MAPLE FAIR PRESERVE 14 117 21 MAPLE POOR REMOVE 118 13 MAPLE FAIR PRESERVE 13 119 8 MAPLE POOR PRESERVE 8 120 12 MAPLE FAIR PRESERVE 12 121 16 MAPLE FAIR PRESERVE 16 122 7 HACKBERRY FAIR PRESERVE 7 123 8 HACKBERRY FAIR PRESERVE 8 124 11 MAPLE FAIR REMOVE 11 125 21 HACKBERRY FAIR PRESERVE 21 126 20 HACKBERRY FAIR PRESERVE 20 127 24 HACKBERRY FAIR PRESERVE 24 128 22 HACKBERRY FAIR PRESERVE 22 129 46 HICKORY POOR REMOVE 130 39 SPRUCE GOOD REMOVE 39 131 27 SPRUCE FAIR REMOVE 27 132 30 SPRUCE FAIR REMOVE 30 133 15 PINE FAIR REMOVE 15 134 17 PINE FAIR REMOVE 17 135 10 PINE FAIR REMOVE 10 136 14 PINE FAIR REMOVE 14 137 15 PINE DEAD REMOVE 138 39 ELM POOR REMOVE 139 26 PEAR FAIR REMOVE 26 140 90 MAPLE FAIR REMOVE 90 MULTI-STEM 141 14 CATALPA FAIR PRESERVE 14 142 14 WALNUT FAIR PRESERVE 14 143 8 MULBERRY POOR PRESERVE 144 9 WALNUT POOR PRESERVE 145 9 CATALPA POOR PRESERVE 146 11 WALNUT FAIR PRESERVE 11 147 12 WALNUT FAIR PRESERVE 12 148 11 HACKBERRY FAIR PRESERVE 11 149 21 CATALPA FAIR PRESERVE 21 150 8 HACKBERRY FAIR PRESERVE 8 151 8 HACKBERRY FAIR PRESERVE 8 152 49 COTTONWOOD FAIR REMOVE 49 153 14 COTTONWOOD FAIR REMOVE 14 154 39 ELM POOR REMOVE 155 46 ELM POOR REMOVE 156 8 WALNUT FAIR PRESERVE 8 157 11 WALNUT FAIR PRESERVE 11 158 11 WALNUT FAIR PRESERVE 11 TREE NUMBER SIZE SPECIES CONDITION STATUS PRIORITY 3 PRIORITY 2 PRIORITY 1 LANDMARK REMARKS PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE 159 11 CHERRY POOR PRESERVE 160 25 MAPLE POOR REMOVE 161 19 MAPLE FAIR PRESERVE 19 162 23 MAPLE FAIR PRESERVE 23 163 23 MAPLE GOOD REMOVE 23 164 30 HICKORY GOOD PRESERVE 30 165 31 MAPLE GOOD PRESERVE 31 166 11 PINE FAIR REMOVE 11 167 24 PINE FAIR PRESERVE 24 168 39 MAPLE FAIR PRESERVE 39 169 21 PINE GOOD REMOVE 21 170 15 MAPLE FAIR PRESERVE 15 171 15 MAPLE FAIR PRESERVE 15 172 8 HACKBERRY FAIR PRESERVE 8 173 22 MAPLE FAIR PRESERVE 22 174 6 MAPLE GOOD PRESERVE 6 175 13 MAPLE GOOD PRESERVE 13 176 17 HACKBERRY FAIR PRESERVE 17 177 12 MAPLE FAIR PRESERVE 12 178 9 MAPLE FAIR PRESERVE 9 179 8 MAPLE FAIR PRESERVE 8 180 22 CHERRY FAIR PRESERVE 22 181 7 HACKBERRY FAIR PRESERVE 7 182 12 MAPLE FAIR PRESERVE 12 183 14 WALNUT FAIR PRESERVE 14 184 10 MAPLE FAIR PRESERVE 10 185 11 MAPLE FAIR PRESERVE 11 186 19 MAPLE FAIR PRESERVE 19 187 16 LOCUST GOOD PRESERVE 16 188 9 HACKBERRY GOOD PRESERVE 9 189 8 MAPLE GOOD PRESERVE 8 190 22 WALNUT FAIR PRESERVE 22 191 18 WALNUT FAIR PRESERVE 18 192 11 HACKBERRY FAIR PRESERVE 11 193 10 MAPLE GOOD PRESERVE 10 194 19 MAPLE FAIR PRESERVE 19 195 18 SPRUCE FAIR PRESERVE 18 196 21 SPRUCE FAIR PRESERVE 21 197 21 SPRUCE FAIR PRESERVE 21 198 15 HACKBERRY FAIR PRESERVE 15 199 11 WALNUT FAIR PRESERVE 11 200 18 WALNUT GOOD PRESERVE 18 201 14 HACKBERRY FAIR PRESERVE 14 202 9 MAPLE GOOD PRESERVE 9 203 18 WALNUT GOOD PRESERVE 18 204 6 REDBUD GOOD PRESERVE 6 205 14 PEAR FAIR PRESERVE 14 206 20 PEAR GOOD PRESERVE 20 207 22 PEAR FAIR PRESERVE 22 208 32 ELM POOR PRESERVE 209 18 COTTONWOOD FAIR REMOVE 18 210 26 HACKBERRY GOOD PRESERVE 26 211 52 OAK GOOD PRESERVE 52 212 24 SYCAMORE GOOD PRESERVE 24 213 32 OAK GOOD PRESERVE 32 214 27 OAK GOOD PRESERVE 27 215 23 OAK GOOD PRESERVE 23 216 18 OAK GOOD PRESERVE 18 TOTALS 4111 442 266 773 672 7 TREE 29 TREES 13 TREES 672 INCHES w/RISER PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AEcannot openGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)TBM1 CP900 CP947 WV WV WV WV 22 23 26 27 28 29 30 3132 35 36 38 40 41 42 43 4445 47 51 53 54 55 59 63 74 75 78 79 84 85 88 89 90 91 92 9394 95108 109 110 111 112 113 114 116 118 119 120 121 122 123 125 126 127128 141 142 143 144 145 146 147 148 149 150 151 156 157 158159 161 162 164 165 167168 169 170 171 172 173 174 175 176 177 178179 180 181182 183 184185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200201202 203 204 205 206 207 208 210 211 212 213 214 216 215 7 QB 29 UX 2 ASG 2 QC 2 NSW 2 ASG 2 NSW 2 QC 2 ASG 3 QC 3 QB 3 ASG 3 QC JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPE PLAN21/25 KAA PWJDUBLIN RD.CODE QTY BOTANICAL NAME COMMON NAME COND.SIZE SPACING SHADE TREES ASG 9 Acer saccharum `Green Mountain` TM Green Mountain Sugar Maple B&B 2" Cal.As shown NSW 4 Nyssa sylvatica `Wildfire`Wildfire Tupelo B&B 2" Cal.As Shown QB 15 Quercus bicolor STREET TREES ARE TO BE FIELD ADJUSTED AS NEEDED BY CITY ARBORIST. Swamp White Oak B&B 2.5" Cal. QC 10 Quercus coccinea Scarlet Oak B&B 2" Cal. UX 29 Ulmus x 'Urban'Urban Elm B&B 2.5" Cal. PLANT SCHEDULE ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 0 SCALE: feet4080120 1" = 40' NORTH 5 QB SEE ENLARGMENT 1 PAGE 19 04.2.25 SEE ENLARGMENT 1 PAGE 12 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPE DETAILS22/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 DRAIN DETAILS MOSAIC-WALLS OVER 4' TALL SCALE: NONE VERSA-LOK DRAIN 1" = 20' OUTLET AT 40' CENTERS OUTLET AT 40' CENTERS PERFORATED DRAIN PIPE PERFORATED DRAIN PIPE MOSAIC PANEL MOSAIC PANELOUTLET DRAIN PIPE THRU 4" HIGH UNITS OUTLET DRAIN PIPE THRU 6" HIGH UNITS 4" CUT IN ACCENT UNITS 6"X6" GRATE 6" CUT IN STANDARD UNIT 1 P-24-DUB-07 MOSAIC PANEL HEIGHT VERSA-LOK UNREINFORCED SECTION 1" = 20' 12" THICK MIN. DRAINAGE AGGREGATE 4" DIA. (MIN.) DRAIN PIPE OUTLET @ END OF WALL OR @ 40' CENTER MAX. SLOPE TO DRAIN (1/8"/FT.) IMPERVIOUS FILL GRANULAR LEVELING PAD 6" MIN. IMPERVIOUS FILL 12" DEEP CAP UNIT ADHERES TO TOP UNIT W/VERSA-LOK CONCRETE ADHESIVE VERSA-LOK MOSAIC CONCRETE UNITS FACING UNITS VERSA-LOK STANDARD UNIT (BASE COURSE) UNDISTURBED SOIL 2 P-24-DUB-08 SLOPE PAVEMENT AWAY FROM WALL VERSA-LOK PAVEMENT AT BASE 1/16" = 1'-0" VERSA-LOK STANDARD UNIT (BASE COURSE)GRANULAR LEVELING PAD MIN.6" THICK PAVEMENT EXPANSION JOINT DRAIN PIPE 3 P-24-DUB-09 VERSA-LOK MOSAIC PINNING DETAIL 1 1/2" = 1'-0" SNAP OFF REMAINDER OF PIN ABOVE UNIT PINHOLE VERA-TUFF SNAP OFF PIN, 2 PER UNIT VERA-TUFF SNAP OFF PIN, 2 PER UNIT RECEIVING SLOT NOTE IN SOME REGIONS, ALL UNITS OF THE MOSAIC RETAINING WALL SYSTEM (COBBLE, ACCENT AND STANDARD) HAVE 1/4" SETBACK OPTION, ALLOWING A NEW VERTICAL SETBACK MOSAIC WALL. CONTACT THE LOCAL VERSA-LOK MANUFACTURER NEAREST TO YOU FOR INFORMATION. 4 P-24-DUB-04 VERSA-LOK CAPPING DETAIL 1/2" = 1'-0" B-CAP A-CAP FOR STRAIGHT WALLS, ALTERNATE A-CAP AND B-CAP SPLIT STANDARD UNIT SPLIT CAP SPLIT CAP 5 P-24-DUB-03 VERSA-LOK CURVED WALL CAP 1/2" = 1'-0" NOTES FOLLOW GEOGRID MANUFACTURER'S INSTRUCTIONS AND REINFORCEMENT PLACEMENT AT CURVES AND CORNERS MINIMUM RADIUS 8' AT TOP OF WALL RECOMMENDED MINIMUM RADIUS 6' BOTTOM OF WALL 6 P-24-DUB-05 VERSA-LOK MOSAIC UNITS 1/8" = 1'-0" PINNING SLOTS FOR FREESTANDING WALLS SPLITTING GROOVE FOR FREESTANDING WALLS SPLITTING GROOVE FOR HALF UNIT PINHOLES FOR VERTICAL WALLS PIN HOLES AND SLOTS FOR 3 4" SETBACK WALL CONSTRUCTION STRAIGHT SPLIT FACE TYPICAL PAVER UNIT PAVER UNIT ALTERNATE A PAVER UNIT ALTERNATE B 7 P-24-DUB-06 BASE STEPPING DETAIL MOSAIC-10" STEP NOTE: ·LIMIT CHANGES IN BASE ELEVATION TO 10" PER STEP TO AVOID DIFFERENTIAL SETTLEMENT ·STEP AS NEEDED TO MINIMIZE BURIED UNITS AND MAINTAIN MINIMUM REQUIRED EMBEDMENT ·FOR EASE OF INSTALLATION, USE VERSA-LOK STANDARD UNITS FOR THE BASE COURSEVERSA-LOK BASE STEPPING 1/16" = 1'-0" 6" LEVELING PAD VERSA-LOK STANDARD UNITS FINISH GRADE 8 P-24-DUB-10 3 HA 3 HK 3 HK 3 HA 5 HK 3 HA JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPE DETAILS23/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 NATURAL CLEFT SLAB LIMESTONE STAIR 3/8" = 1'-0" ODOT 304 STONE FINISHED TREAD IS 13 1 4" WITH 1 1 2" RESTING ON PREVIOUS TREAD LIMESTONE BLOCK GEO-TEXTILE 3 1 2" (89 MM) DECOMPOSED AGGREGATE 3 P-24-DUB-14 SUBGRADE 3 1 2" (89 MM) DECOMPOSED AGGREGATE LANDSCAPE BED SOIL ODOT 304 TOP OF EDGING TO BE MAX. OF 1 4" (6.4 MM) ABOVE SURFACE MATERIAL 12" (305 MM) ALUMINUM STAKES TO LOCK INTO PERFORMED LOOPS ON THE EDGING PERMALOC PERMASTRIP ALUMINUM EDGING 3 16" X 3 1 2" (4.8 MM X 89 MM) WEED BARRIER FABRIC DECOMPOSED GRANITE MEETS GRASS FRINGE 3/4" = 1'-0" 2 P-24-DUB-11 LANDSCAPE ENLARGEMENT 1 3 HA 3 HK 3 HK 3 HA 5 HK 3 HA LANDSCAPE ENLARGEMENT 3/16" = 1'-0" SEGMENTED RETAINING WALL GRAVEL SEATING AREA GRAVEL PATH 4 P-24-DUB-15 CODE QTY BOTANICAL NAME COMMON NAME COND.SIZE DECIDUOUS SHRUBS HA 9 Hydrangea macrophylla 'All Summer Beauty'All Summer Beauty Hydrangea CONT 3 Gal. PERENNIALS HK 11 Hosta x 'Krossa Regal'Krossa Regal Hosta CONT 1 GAL PLANT SCHEDULE REPLACEMENT TREE 5 RETAINING_WALL 6 DECOMPOSED_AGGREGATE_PATH 0 SCALE: feet102030 1" = 10' NORTH JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPESPECIFICATIONS24/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPESPECIFICATIONS25/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AECP9950 TBM1 CP900 CP947DUBLIN ROADPID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.82 ACRES LIU CO U R T SCIOTO RIVER2 Area: 67,760 SF (1.56 AC) 3 Area: 68,609 SF (1.58 AC) 4 Area: 130,733 SF (3.00 AC) 6 Area: 56,744 SF (1.30 AC) 7 Area: 40,531 SF (0.93 AC) 5 Area: 58,218 SF (1.34 AC) RESERVE A Area: 26,048 SF (0.60 AC) 1 Area: 40,116 SF (0.92 AC) JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPRELIMINARY PLATFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 9/29/2025 DA MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 9/29/25 - 2:00 PM EDITED BY: DANUGERAH DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\PRELIMINARY PLAT\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 INDEX MAP SHEET INDEX 1 - TITLE SHEET 2 - PRELIMINARY PLAT ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM Ohio Utilities Protection Service Call 811before you dig ARCHITECT BASS STUDIO ARCHITECTS 36 KING AVENUE COLUMBUS, OHIO 43201 CONTACT: TIMOTHY A. BASS, AIA, LEED AP PHONE: (614) 294-4893 EMAIL: WWW.BASSSTUDIOARCHITECTS.COM PRELIMINARY PLAT FOR LIU COURT CITY OF DUBLIN, FRANKLIN COUNTY, OHIO TITLE SHEET1/2 BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVEROWNER MAINTENANCE DESCRIPTION RESERVE A HOA HOA PRIVATE OPEN SPACE WITH PROPOSED GRAVEL PATH TO PROVIDE ACCESS TO SEATING AREA AND WATERFRONT. SANITARY EASEMENT CITY OF DUBLIN CITY OF DUBLIN EASEMENT FOR SANITARY SEWER. STORM EASEMENT CITY OF DUBLIN CITY OF DUBLIN EASEMENT FOR STORM SEWER AND SWALE. LANDSCAPE EASEMENT HOA HOA EASEMENT FOR LANDSCAPE BUFFER BETWEEN DUBLIN RD AND LOTS 1, 6, AND 7. SITE DATA ZONING: PROPERTY OWNER:GEORGE CRIMSON LLC PARCEL ID:273-001786-00 SITE ACREAGE:12.820 (REC) 12.793 (MEASURED) SITE ZONING R-1, RESTRICTED SUBURBAN RESIDENTIAL DISTRICT FEMA FLOODPLAIN:39049C0151K (6/17/2008) ZONE X SITE LAYOUT DATA: TOTAL LOTS:7 LOTS GROSS DENSITY (NET DENSITY):0.55 LOTS/ACRE MINIMUM DRIVE AISLE WIDTH:24' MINIMUM LOT WIDTH:150' AT THE FRONT LINE OF THE DWELLING MINIMUM FRONT YARD SETBACK:30' MINIMUM REAR YARD SETBACK:50' TOTAL SIDE YARD SETBACK:25', 8' MINIMUM ON ONE SIDE REAR YARD MINIMUM:20% OF THE LOT DEPTH BUILDING DATA: BUILDING HEIGHT:35' MAXIMUM HEIGHT LANDSCAPE DATA: EXISTING IMPERVIOUS AREA:1.04 AC PROPOSED IMPERVIOUS AREA:2.01 AC GREENSPACE:10.10 AC (79%) HORZ 1"=100'0 100 200 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 THIS SURVEY IS BASED ON AN ACTUAL SURVEY PERFORMED OF THE PREMISES IN AUGUST, 2024 AND IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. AMERICAN STRUCTUREPOINT,INC. ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRES EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP9950 TBM1 CP900 CP947 24' F/F P R O P 3 0 ' S A N I T A R Y E A S E M E N T PROP 30' S A N I T A R Y EASEMENT 36' FRON T YARD SETBACK 92' FRONT YARD SETBACK 65' FRONT YARD SETBACK 31' FRONT YARD SETBACK 36' FRONT YARD SETBACK 31' FRON T YARD SETBACK 10+00 11+00 12+00 13 + 0 0 14+0015+0016 + 0 0 16 + 1 8 58' R/W LIU COU R T PROP 10 ' R/W DED I C A T I O N 40' DUB L I N R D BUILDIN G LINE SE T B A C K 40' DUBL I N R D BUILDIN G LINE SE T B A C K 58'20'N74°16'2 7 " E - 1 3 0 . 2 2 ' L=130.74,R=90.00 S22°29'41"E - 64 .04 ' L=22.61, R=215.00 L=140.46,R=91.00N01°47'33"W 22.64' 20' LANDSC A P E EASEME N T PROP 10 ' R/W DED I C A T I O N PROP 20'SANITARYEASEMENT41' FRONT YARD SETBACK 20' LANDSC A P E EASEME N T PROP 83' STORM EASEMENT EX 20' SAN I T A R Y EASEMENT PROP 20' STORM EASEMENT E X 2 0 ' S A N I T A R Y E A S E M E N T D. B . 3 7 2 0 , P G . 5 3 6 PROP 20' STORM EASEMENT PROP 30' STORM EASEMENT PROP 30' STORM EASEMENT PROP 20' STORM EASEMENT 2 AREA: 67,760 SF (1.56 AC) 3 AREA: 68,609 SF (1.58 AC) 4 AREA: 130,733 SF (3.00 AC) 6 AREA: 56,744 SF (1.30 AC) 7 AREA: 40,531 SF (0.93 AC) 5 AREA: 58,218 SF (1.34 AC) RESERVE A AREA: 26,048 SF (0.60 AC) N83°56'54"E - 152.47' N83°56'54"E - 389.84'S13°14'25"E - 116.39'N75°48'41 " E - 1 3 1 . 6 2 'S20°11'31"E - 110.70'S70 ° 2 3 ' 1 5 " E - 8 2 . 7 7 ' S70 ° 5 8 ' 2 4 " E - 9 5 . 9 3 ' N87°42'49"E - 190.67' N88°09'02"E - 192.68'S01°42'42"W20.60'S01°42'42"W - 98.19'S06°54'37"W - 94.11'S06°54'37"W - 106.85'N88°12'27"E - 158.34' N50° 4 7' 0 7" E - 1 4 0. 9 0' N88°12'27"E - 167.57' N88°12'27"E - 404.04'S06°54'37"W - 142.46'S88°16'20"W - 435.20'N01°47'33"W - 51.68'S88°16'20"W - 355.09'S15°33'22"E - 147.11'S15°33'22"E - 150.37'S15°33'22"E - 167.79'N74°16'2 7 " E - 2 5 8 . 7 8 ' N64°3 4' 2 0 " E - 3 6 7. 5 1' N76°33'00 " E - 2 1 5 . 8 8 'N21°46'09"E - 140.77'N13°25'56"W - 249.38'S6 0 ° 4 3 ' 3 3 " E 32 . 9 6 'S29°16'27"W33.40'N74°16'2 7 " E - 1 0 6 . 5 8 ' L=175.77,R=121.00 L=101.05,R=1 7 9 . 0 0 L = 3 8 . 3 4 ,R=60.00L=7 7 .0 4, R =60.00 L =1 24.12,R=60.00L=26.87, R=60.00 L =4 6 .91,R=60.00 L = 6 2.64, R=60.00L=38.98,R=121. 0 0S22°29'41"E - 67 .87 'L=38.29,R=179.00L=10 4.5 9, R = 1 7 9 .0 0 L=9 5 .97 ,R=179.00L=2 1 .1 7 ,R =1 7 9 .0 0 N74°16'2 7 " E - 1 0 6 . 5 8 'S08°41'06"E - 83.09'2' SHAR E D USE PAT H EASEME N T 2' SHAR E D USE PAT H EASEME N T 1 AREA: 40,116 SF (0.92 AC) S01°47'33"E 26.12' L =1 5 2 .5 0 ,R =271.0 0 L = 1 5 3 .2 1, R = 2 4 4 . 0 0 S22°29'41"E - 67 .87 'PROP 20'SANITARYEASEMENTPROP 20'SANITARYEASEMENTPROP SANITARY EASEMENT (VARIES) 11' SHAR E D USE PAT H 11' SHAR E D USE PAT H PROPOSED DRIVE PROP 20'SANITARYEASEMENT L=121.38,R=2 1 5 . 0 0 L=15.34, R=24.00 L=86.36,R= 9 6 .0 0 S74°16'2 8 " W - 1 2 9 . 8 5 ' PROP 30' STORM EASEMENT 161.27 ' 37.14' 24.61' 79.1 5'76.09'65.67'30.55'PROP 20' STORM EASEMENT L = 2 1 7 .9 0 ,R= 1 5 0 . 0 0L=102 . 0 6 ,R=15 0 .0 0N22°29'41"W - 67 .87 ' N6 1 ° 2 8 ' 4 4 " W 54 . 6 0 ' S74°16'2 7 " W 171.58'N22°29'41"W67.87 ' HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPRELIMINARY PLATFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 9/29/2025 DA MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 9/29/25 - 1:54 PM EDITED BY: DANUGERAH DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\PRELIMINARY PLAT\2024.00690 PRELIM PLAT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES PRELIMINARYPLAT2/2 SITE LEGEND PROPERTY LINE EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY CURB AND GUTTER SIGN PROJECT LIMITS LIU COURTPID: 273-001793-00 ZONING: R-1 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001792-00 ZONING: R-1 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 ZONING: PLR CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001926-00 ZONING: R-1 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT PID: 273-001787-00 ZONING: R-1 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES DUBLIN ROAD CP900 TBM1CP947 CP9950 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 108+89 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 1/24TITLE SHEETINDEX MAP SHEET INDEX 1 - TITLE SHEET 2 - GENERAL NOTES 3 - TYPICAL SECTIONS 4 - DEMOLITION PLAN 5 - MAINTENANCE OF TRAFFIC PLAN PHASE 1 6 - MAINTENANCE OF TRAFFIC PLAN PHASE 2 7 - MAINTENANCE OF TRAFFIC PLAN PHASE 3 8 - SCHEMATIC PLAN 9-10 - PLAN & PROFILE 11 - MULTI-USE PATH PROFILE 12-19 - DUBLIN RD CROSS SECTIONS 20 - SIGNAGE AND STRIPING PLAN 21 - SIGHT DISTANCE PLAN 22 - EROSION CONTROL PLAN 23 - EROSION CONTROL NOTES 24 - INTERSECTION & DRIVEWAY DETAILS Ohio Utilities Protection Service Call 811before you dig PUBLIC ROADWAY WIDENING PLANS FOR DUBLIN ROAD CITY OF DUBLIN, FRANKLIN COUNTY, OHIO APPROVED: CITY OF DUBLIN: SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSE AND GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. REGISTERED ENGINEER E-86125 DATE DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE STANDARD CONSTRUCTION DRAWINGS THE STANDARD CONSTRUCTION DRAWINGS LISTED ON THESE PLANS SHALL BE CONSIDERED A PART THEREOF. MD-02 MD-03 MD-05 PD-02 PD-03 PD-04 PD-06 RD-01 RD-02 RD-03 RD-05 RD-09 RD-10 SA-04 ST-01 ST-03 ST-04 ST-05 ST-06 WA-01 CITY OF DUBLIN (2020 EDITION)ODOT BP-3.1 DESIGN CRITERIA DESIGN SPEED POSTED SPEED DUBLIN ROAD 50 MPH 45 MPH SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVERHORZ 1"=60'0 60 120 UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM ARCHITECT BASS STUDIO ARCHITECTS 36 KING AVENUE COLUMBUS, OHIO 43201 CONTACT: TIMOTHY A. BASS, AIA, LEED AP PHONE: (614) 294-4893 EMAIL: WWW.BASSSTUDIOARCHITECTS.COM PROFE SSIONA L E N G INEERR E GIS T E R E DSTATE OF O H IOE-86125 MATTHEW LILIE J. 07/17/2025 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 2/24GENERAL NOTESGENERAL NOTES 1.CITY OF COLUMBUS AND OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS, CURRENT EDITIONS, AND ANY SUPPLEMENTS THERETO (HEREAFTER REFERRED TO AS STANDARD SPECIFICATIONS), SHALL GOVERN ALL CONSTRUCTION ITEMS UNLESS OTHERWISE NOTED. IF A CONFLICT BETWEEN SPECIFICATIONS IS FOUND, THE MORE STRICT SPECIFICATION WILL APPLY AS DECIDED BY THE CITY ENGINEER. ITEM NUMBERS LISTED REFER TO CITY OF COLUMBUS ITEM NUMBERS UNLESS OTHERWISE NOTED. 2.THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION THAT ARE NOT SPECIFIED HEREIN. THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR SAFETY ON THE WORK SITE, OR FOR FAILURE BY THE CONTRACTOR TO PERFORM WORK ACCORDING TO CONTRACT DOCUMENTS. 3.THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS INCLUDING BUT NOT LIMITED TO OHIO EPA PERMITS TO INSTALL (PTI) AND NOTICES OF INTENT (NOI), BUILDING PERMITS, ETC. 4.THE CONTRACTOR SHALL NOTIFY THE CITY OF DUBLIN DIVISION OF ENGINEERING IN WRITING AT LEAST 3 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 5.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL SAFETY REQUIREMENTS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970. THE CONTRACTOR SHALL EXERCISE PRECAUTION ALWAYS FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT SHALL ALSO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, INCLUDING THE REQUIREMENTS FOR CONFINED SPACES PER 29 CFR 1910.146. 6.FOLLOWING COMPLETION OF CONSTRUCTION OF THE SITE IMPROVEMENTS AND BEFORE REQUESTING OCCUPANCY, A PROOF SURVEY SHALL BE PROVIDED TO THE DIVISION OF ENGINEERING THAT DOCUMENTS "AS_BUILT" ELEVATIONS, DIMENSIONS, SLOPES AND ALIGNMENTS OF ALL ELEMENTS OF THIS PROJECT. THE PROOF SURVEY SHALL BE PREPARED, SIGNED AND SUBMITTED BY THE PROFESSIONAL ENGINEER WHO SEALED THE CONSTRUCTIONS DRAWINGS. 7.THE CONTRACTOR SHALL RESTRICT CONSTRUCTION ACTIVITY TO PUBLIC RIGHT_OF_WAY AND AREAS DEFINED AS PERMANENT AND/OR TEMPORARY CONSTRUCTION EASEMENTS, UNLESS OTHERWISE AUTHORIZED BY THE CITY ENGINEER. 8.THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN OHIO PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. 9.NON_RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT THE WRITTEN PERMISSION OF THE CITY ENGINEER. 10.THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE GRADES AND CROSS_SECTIONS THAT EXISTED BEFORE CONSTRUCTION. 11.TRACKING OR SPILLING MUD, DIRT OR DEBRIS UPON STREETS, RESIDENTIAL OR COMMERCIAL DRIVES, SIDEWALKS OR BIKE PATHS IS PROHIBITED ACCORDING TO SECTION 97.38 OF THE DUBLIN CODE OF ORDINANCES. ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE CITY. IF THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS, OR SPILLAGE, THE CITY RESERVES THE RIGHT TO REMOVE THESE MATERIALS AND CLEAN AFFECTED AREAS, THE COST OF WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 12.DISPOSAL OF EXCESS EXCAVATION WITHIN SPECIAL FLOOD HAZARD AREAS (100-YEAR FLOODPLAIN) IS NOT PERMITTED. 13.ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES WITHIN RIGHT-OF-WAY DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 14.ALL FIELD TILE BROKEN OR ENCOUNTERED DURING EXCAVATION SHALL BE REPLACED OR REPAIRED AND CONNECTED TO THE PUBLIC STORM SEWER SYSTEM AS DIRECTED BY THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURE. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE CITY OF COLUMBUS. PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION. 16.BACKFILL WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES (HOUSES, GARAGES, ETC.) OR PUBLIC INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, BIKE PATHS, ETC.) SHALL BE COMPACTED GRANULAR BACKFILL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR FLOWABLE CDF, TYPE II ACCORDING TO ITEM 613. ITEM 911 OF THE STANDARD SPECIFICATIONS SHALL BE USED ELSEWHERE. 17.THE CONTRACTOR SHALL SUBMIT A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND A LIST OF PROPOSED PRECAST CONCRETE PRODUCT MANUFACTURERS TO THE CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION BEFORE COMMENCING CONSTRUCTION. SEND THE INFORMATION TO THE FOLLOWING ADDRESS: CONSTRUCTION INSPECTION DIVISION CITY OF COLUMBUS 1800 EAST 17TH AVENUE COLUMBUS, OHIO 43219 SEND A COPY OF THE TRANSMITTAL LETTER TO THE FOLLOWING ADDRESS: DIVISION OF ENGINEERING CITY OF DUBLIN 6555 SHIER RINGS ROAD DUBLIN, OHIO 43016 18.ALL TRENCHES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES OUTSIDE THESE AREAS SHALL BE BACKFILLED OR SHALL BE PROTECTED BY APPROVED TEMPORARY FENCING OR BARRICADES DURING NONWORKING HOURS. CLEAN UP SHALL FOLLOW CLOSELY BEHIND THE TRENCHING OPERATION. 19.ALL TREES WITHIN THE CONSTRUCTION AREA NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY FENCING PLACED A MINIMUM 15 FEET FROM THE TREE TRUNK. TREES 6 - INCHES OR GREATER AT DBH (DIAMETER BREAST HEIGHT) MUST BE PROTECTED WITH FENCING PLACED AT THE CRITICAL ROOT ZONE OR 15 FEET, WHICHEVER IS GREATER. TREES NOT INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS FOR REMOVAL MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE DIVISION OF ENGINEERING. 20.CONDUIT MUST BE DIRECTIONALLY BORED ACROSS STREETS INSTEAD OF OPEN CUT, UNLESS SPECIFICALLY APPROVED BY THE CITY ENGINEER. USE OF PNEUMATIC AIR RAM DEVICES IS NOT PERMITTED. PERMITS TO CONSTRUCT IN THE RIGHT-OF-WAY OF EXISTING STREETS MUST BE OBTAINED FROM THE CITY OF DUBLIN DIVISION OF ENGINEERING BEFORE COMMENCING CONSTRUCTION. SHOULD OPEN CUTTING OF EXISTING PAVEMENT BE PERMITTED, CONTROLLED DENSITY BACKFILL (TYPE II) SHALL BE USED IN PLACE OF COMPACTED GRANULAR BACKFILL, ACCORDING TO ITEM 613 OF THE STANDARD SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES WITHIN THE RIGHT-OF-WAY AND PUBLIC EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE CITY. 22.PAVEMENTS SHALL BE CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR AS REQUIRED BY THE CITY ENGINEER. PAVEMENT REPLACEMENT SHALL BE CONDUCTED ACCORDING TO CITY OF COLUMBUS STANDARD DRAWING 1441 DR. A AND APPLICABLE CITY OF DUBLIN STANDARD DRAWINGS. THE REPLACEMENT OF DRIVEWAYS, HANDICAPPED RAMPS, SIDEWALKS, BIKE PATHS, PARKING LOT PAVEMENT, ETC. SHALL BE PROVIDED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS AND CITY OF DUBLIN STANDARD CONSTRUCTION DRAWINGS. 23.TREE TRIMMING WITHIN THE CONSTRUCTION ZONE IS TO BE COMPLETED BY A CERTIFIED ARBORIST. AT THE COMPLETION OF THE PROJECT, THE ARBORIST IS TO RETURN AND TRIM ANY BROKEN BRANCHES AS NEEDED. 24.ANY MODIFICATION TO THE WORK SHOWN ON DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CITY ENGINEER, CITY OF DUBLIN. 25.ALL INLETS SHALL BE CHANNELIZED. 26.PARK AREAS SHALL BE FINE_GRADED AND SEEDED WITH THE FOLLOWING MIXTURE: IMPROVED KENTUCKY BLUEGRASS: 40% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) IMPROVED PERENNIAL RYE: 60% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) GERMINATION RATE: 85% APPLICATION RATE: 7 LBS PER 1000 SQ FT OR AS DIRECTED BY THE DIVISION OF PARKS AND RECREATION, CITY OF DUBLIN, OHIO. 27.TRAFFIC CONTROL AND OTHER REGULATORY SIGNS SHALL BE TYPE S WITH A SQUARE POST ANCHOR BASE INSTALLATION AND MEET ALL REQUIREMENTS OF ODOT TC-41.20 AND APPLICABLE CITY OF DUBLIN SPECIFICATIONS. 28. STREET SIGNS SHALL MEET ALL CITY OF DUBLIN SPECIFICATIONS WITH LETTERING COLORED IN WHITE DISPLAYED OVER A BROWN BACKGROUND. SIGN TUBING SHALL BE BROWN IN COLOR AND CONFORM WITH THE TYPE S, SQUARE POST ANCHOR BASE INSTALLATION REQUIREMENTS OF ODOT TC-41.20. UTILITIES 1.THE FOLLOWING UTILITIES ARE KNOWN TO BE LOCATED WITHIN THE LIMITS OF THIS PROJECT: AEP OHIO - ELECTRIC BREEZELINE - TELECOM COLUMBIA GAS OF OH-COLUMBUS - GAS DUBLIN SEWER - SANITARY SEWER DUBLIN WATER - WATER MAIN DUBLIN DIVISION OF ENGINEERING - STORMWATER AT&T - TELECOM CHARTER COMM - TELECOM 2.THE CONTRACTOR SHALL GIVE NOTICE OF INTENT TO CONSTRUCT TO OHIO UTILITIES PROTECTION SERVICE (TELEPHONE NUMBER 800_362_2764), PRODUCER'S UNDERGROUND PROTECTION SERVICE (TELEPHONE NUMBER 614_587_0486), AND TO OWNERS OF UNDERGROUND UTILITIES THAT ARE NOT MEMBERS OF A REGISTERED UNDERGROUND PROTECTION SERVICE. NOTICE SHALL BE GIVEN AT LEAST 2 WORKING DAYS BEFORE START OF CONSTRUCTION. 3.THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE OWNER OF THE UNDERGROUND UTILITY. THE CITY OF DUBLIN AND THE CITY ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. 4.LOCATION, SUPPORT, PROTECTION AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5.WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE CITY ENGINEER. 6.PUBLIC STREET LIGHTING MAY BE IN THE VICINITY OF THIS PROJECT. CONTACT THE CITY OF DUBLIN, DIVISION OF ENGINEERING AT 410-4637, TWO DAYS PRIOR TO BEGINNING WORK. TRAFFIC CONTROL 1.TRAFFIC CONTROL SHALL BE FURNISHED, ERECTED, MAINTAINED, AND REMOVED BY THE CONTRACTOR ACCORDING TO OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (OMUTCD), CURRENT EDITION. 2.ALL TRAFFIC LANES OF PUBLIC ROADWAYS SHALL BE FULLY OPEN TO TRAFFIC FROM 7:00 AM TO 9:00 AM AND FROM 4:00 PM TO 6:00 PM UNLESS AUTHORIZED DIFFERENTLY BY THE CITY ENGINEER. AT ALL OTHER HOURS THE CONTRACTOR SHALL MAINTAIN MINIMUM ONE_LANE TWO_WAY TRAFFIC. UNIFORMED, OFF-DUTY POLICE OFFICERS SHALL REPLACE FLAGMEN DESIGNATED BY THE OMUTCD, AND SHALL BE PRESENT WHENEVER ONE_LANE, TWO_WAY TRAFFIC CONTROL IS IN EFFECT. POLICE CRUISERS MAY BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 3.IF THE CITY ENGINEER DETERMINES THAT THE CONTRACTOR IS NOT PROVIDING PROPER PROVISIONS FOR TRAFFIC CONTROL, THE CITY ENGINEER SHALL ASSIGN UNIFORMED, OFF_DUTY POLICE OFFICERS TO THE PROJECT AT NO COST TO THE CITY. 4.STEADY_BURNING, TYPE "C" LIGHTS SHALL BE REQUIRED ON ALL BARRICADES, DRUMS, AND SIMILAR TRAFFIC CONTROL DEVICES IN USE AT NIGHT. 5.ACCESS FROM PUBLIC ROADWAYS TO ALL ADJOINING PROPERTIES FOR EXISTING RESIDENTS OR BUSINESSES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT FOR MAIL, PUBLIC WATER AND SANITARY SEWER SERVICE, AND EMERGENCY VEHICLES. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN DETAILING THE PROPOSED MAINTENANCE OF TRAFFIC PROCEDURES. THE TRAFFIC CONTROL PLAN MUST INCORPORATE ANY TRAFFIC CONTROL DETAILS CONTAINED HEREIN. THE TRAFFIC CONTROL PLAN PROPOSED BY THE CONTRACTOR MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL 1.THE CONTRACTOR OR DEVELOPER IS RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) TO BE REVIEWED AND APPROVED BY THE OHIO EPA. THE NOI MUST BE SUBMITTED TO OEPA 45 DAYS PRIOR TO THE START OF CONSTRUCTION AND MAY ENTITLE COVERAGE UNDER THE OHIO EPA GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. A PROJECT LOCATION MAP MUST BE SUBMITTED WITH THE NOI. A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL IF A SEDIMENT AND EROSION CONTROL PLAN HAS NOT ALREADY BEEN INCLUDED WITH THE APPROVED CONSTRUCTION DRAWINGS. THIS PLAN MUST BE MADE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE DESIGN OF EROSION CONTROL SYSTEMS SHALL FOLLOW THE REQUIREMENTS OF OHIO EPA, ITEM 207 OF OHIO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AND THE CITY ENGINEER. AN INDIVIDUAL NPDES STORMWATER DISCHARGE PERMIT MAY BE REQUIRED. THE CONTRACTOR SHALL BE CONSIDERED THE PERMITTEE. 2.THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL AT ALL POINTS WHERE STORM WATER RUNOFF LEAVES THE PROJECT, INCLUDING WATERWAYS, OVERLAND SHEET FLOW, AND STORM SEWERS. 3.ACCEPTED METHODS OF PROVIDING EROSION/SEDIMENT CONTROL INCLUDE BUT ARE NOT LIMITED TO: SEDIMENT BASINS, SILT FILTER FENCE, AGGREGATE CHECK DAMS, AND TEMPORARY GROUND COVER. HAY OR STRAW BALES ARE NOT PERMITTED. 4.THE CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OF THE WORK AREA AT ALL TIMES CONSISTENT WITH EROSION CONTROL PRACTICES. 5.DISTURBED AREAS THAT WILL REMAIN UNWORKED FOR 30 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN SEVEN CALENDAR DAYS OF THE DISTURBANCE. OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT THE CONCLUSION OF CONSTRUCTION BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER. BLASTING (IF PERMITTED) 1.THE CONTRACTOR MUST OBTAIN A BLASTING PERMIT FROM WASHINGTON TOWNSHIP FIRE DEPARTMENT PRIOR TO BLASTING FOR ROCK EXCAVATION. THE CONTRACTOR SHALL SUBMIT BLASTING REPORTS UPON COMPLETION OF BLASTING TO THE CITY ENGINEER, THE OWNER, AND THE OWNER'S ENGINEER. TOP OF ROCK ELEVATIONS SHALL BE SHOWN ON "AS_BUILT" CONSTRUCTION DRAWINGS. SANITARY SEWERS 1.CONNECTIONS TO THE SANITARY SEWER WILL BE PERMITTED UPON RECEIVING AN OEPA PERMIT TO INSTALL (PTI), AND UPON RECEIVING A SATISFACTORY LETTER FROM THE DESIGN ENGINEER STATING THAT THE PROJECT HAS BEEN CONSTRUCTED AS PER THE PLANS, AND ALL OF THE CONDITIONS OF THE PTI HAVE BEEN MET. THE DEVELOPER IS RESPONSIBLE FOR OBTAINING ALL REQUIRED OHIO EPA APPROVALS AND PAYING REVIEW FEES. 2.SANITARY SEWAGE COLLECTION SYSTEMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE RULES, REGULATIONS, STANDARDS AND SPECIFICATIONS OF THE CITY OF DUBLIN, OHIO EPA, OHIO DEPARTMENT OF HEALTH AND THE CURRENT EDITION OF THE GREAT LAKES-UPPER MISSISSIPPI RIVER BOARD (TEN STATES) - RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES. 3.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPE WITH DIAMETERS 8 INCHES TO 10 INCHES SHALL BE PVC SEWER PIPE ASTM D3034, SDR 35. PIPE FOR 6 INCH DIAMETER HOUSE SERVICE LINES SHALL BE PVC PIPE ASTM D3034, SDR 35. PVC PIPE SHALL NOT BE USED AT DEPTHS GREATER THAN 28 FEET. PIPE MATERIALS AND RELATED STRUCTURES SHALL BE SHOP TESTED IN ACCORDANCE WITH CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION QUALITY CONTROL REQUIREMENTS. 4.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPES WITH DIAMETERS 12 INCHES TO 30 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2736. SANITARY SEWER PIPES WITH DIAMETERS 30 INCHES TO 60 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2764. 5.ALL IN_LINE WYE AND TEE CONNECTIONS IN CONCRETE SEWERS, 18-INCH DIAMETER AND LARGER, SHALL BE EITHER KOR_N_TEE OR KOR_N_SEAL CONNECTIONS CONFORMING TO THE MANUFACTURER'S RECOMMENDATIONS. 6.GRANULAR BACKFILL SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR CONTROLLED DENSITY BACKFILL ACCORDING TO ITEM 613, TYPE II OF THE STANDARD SPECIFICATIONS AS DIRECTED BY THE CITY ENGINEER. 7.ALL MANHOLE LIDS SHALL BE PROVIDED WITH CONTINUOUS SELF_SEALING GASKETS. THE APPROVED CONSTRUCTION DRAWINGS SHALL SHOW WHERE BOLT_DOWN LIDS ARE REQUIRED. SANITARY SEWER MANHOLES SHALL BE PRECAST CONCRETE OR AS APPROVED BY THE CITY ENGINEER AND CONFORM TO THE CITY OF DUBLIN SANITARY MANHOLE STANDARD DRAWING. MANHOLE LIDS SHALL INCLUDE CITY OF DUBLIN LOGO. 8.ALL PVC SEWER PIPES SHALL BE DEFLECTION TESTED NO LESS THAN 60 DAYS AFTER COMPLETION OF BACKFILLING OPERATIONS. ALL OTHER REQUIREMENTS SHALL BE ACCORDING TO ITEM 901.21 OF THE STANDARD SPECIFICATIONS. 9.TEMPORARY BULKHEADS SHALL BE PLACED IN PIPES AT LOCATIONS SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AND SHALL REMAIN IN PLACE UNTIL THE PERMIT TO INSTALL (PTI) HAS BEEN ISSUED BY THE OEPA AND THE SEWERS HAVE BEEN APPROVED FOR USE BY THE CITY ENGINEER. THE COST FOR FURNISHING, INSTALLING, MAINTAINING, AND REMOVING BULKHEADS SHALL BE INCLUDED IN THE CONTRACT UNIT BID PRICE FOR THE VARIOUS SANITARY SEWER ITEMS. 10.ALL SANITARY SEWERS INCLUDING SANITARY SEWER SERVICE LINES SHALL BE SUBJECTED TO AND PASS INFILTRATION OR EXFILTRATION TESTS ACCORDING TO ITEM 901 OF THE STANDARD SPECIFICATIONS AND MUST BE APPROVED FOR USE BY THE CITY ENGINEER BEFORE ANY SERVICE CONNECTIONS ARE TAPPED INTO SEWERS. 11.FOR SANITARY SEWER INFILTRATION, LEAKAGE THROUGH JOINTS SHALL NOT EXCEED 100 GALLONS PER INCH OF TRIBUTARY SEWER DIAMETER PER 24 HOURS PER MILE OF LENGTH OR THE COMPUTED EQUIVALENT. ALL SANITARY SEWERS SHALL BE TESTED. 12.AT THE DETERMINATION OF THE CITY ENGINEER, THE CONTRACTOR MAY BE REQUIRED TO PERFORM A TV INSPECTION OF THE SANITARY SEWER SYSTEM PRIOR TO FINAL ACCEPTANCE BY THE CITY. THIS WORK SHALL BE COMPLETED BY THE CONTRACTOR AT HIS EXPENSE. 13.VISIBLE LEAKS OR OTHER DEFECTS OBSERVED OR DISCOVERED DURING TV INSPECTION SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER. 14.ROOF DRAINS, FOUNDATION DRAINS, FIELD TILE OR OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER SYSTEM ARE STRICTLY PROHIBITED ACCORDING TO SECTION 51.23 OF THE DUBLIN CODE OF ORDINANCES. 15.ALL WATER LINES SHALL BE LOCATED AT LEAST 10 FEET HORIZONTALLY AND 18 INCHES VERTICALLY, FROM SANITARY SEWERS AND STORM SEWERS, TO THE GREATEST EXTENT PRACTICABLE. WHERE SANITARY SEWERS CROSS WATER MAINS OR OTHER SEWERS OR OTHER UTILITIES, TRENCH BACKFILL SHALL BE PLACED BETWEEN THE PIPES CROSSING AND SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS. IN THE EVENT THAT A WATER LINE MUST CROSS WITHIN 18 INCHES OF A SANITARY SEWER, THE SANITARY SEWER SHALL BE CONCRETE ENCASED OR CONSIST OF DUCTILE IRON PIPE MATERIAL. 16.SERVICE RISERS SHALL BE INSTALLED WHERE THE DEPTH FROM WYES TO PROPOSED GROUND ELEVATION EXCEEDS 10 FEET. TOPS OF RISERS SHALL BE NO LESS THAN 9 FEET BELOW PROPOSED GROUND ELEVATION IF BASEMENT SERVICE IS INTENDED. 17.WHERE SERVICE RISERS ARE NOT INSTALLED, A MINIMUM 5_FOOT LENGTH OF SANITARY SEWER SERVICE PIPE OF THE SAME SIZE AS THE WYE OPENING SHALL BE INSTALLED. 18.THE CONTRACTOR SHALL FURNISH AND PLACE, AS DIRECTED, APPROVED WYE POLES MADE OF 2 INCHES X 2 INCHES LUMBER AT ALL WYE LOCATIONS, ENDS OF EXTENDED SERVICES, OR AT THE END OF EACH RISER WHERE RISERS ARE REQUIRED. WYE POLES SHALL BE VISIBLE BEFORE ACCEPTANCE BY THE CITY. THE COST OF THESE POLES SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR THE VARIOUS SEWER ITEMS. 19.EXISTING SANITARY SEWER FLOWS SHALL BE MAINTAINED AT ALL TIMES. COSTS FOR PUMPING AND BYPASSING SHALL BE INCLUDED IN THE CONTRACTOR'S UNIT PRICE BID FOR THE RELATED ITEMS. 20.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, EQUIPMENT, AND LABOR TO MAKE CONNECTIONS TO EXISTING MANHOLES. THE SEWER PIPE TO MANHOLE CONNECTIONS FOR ALL SANITARY SEWERS SHALL BE FLEXIBLE AND WATERTIGHT. ALL HOLES SHALL BE NEATLY CORED. THE SEWER PIPE BARREL AT THE SPRINGLINE SHALL NOT EXTEND MORE THAN 1 INCH BEYOND THE INSIDE FACE OF THE MANHOLE. TO MAINTAIN FLEXIBILITY IN THE CONNECTION, A 1_INCH SPACE SHALL BE LEFT BETWEEN THE END OF THE PIPE INSIDE THE MANHOLE AND THE CONCRETE CHANNEL; THIS SPACE SHALL BE FILLED WITH A WATERPROOF FLEXIBLE JOINT FILLER. ANY METAL THAT IS USED SHALL BE TYPE 300 SERIES STAINLESS STEEL. THE CONNECTION MAY BE ANY OF THE FOLLOWING TYPES: A.RUBBER SLEEVE WITH STAINLESS STEEL BANDING. 1)KOR_N_SEAL AS MANUFACTURED BY NATIONAL POLLUTION CONTROL SYSTEMS, INC. 2)LOCK JOINT FLEXIBLE MANHOLE SLEEVE AS MANUFACTURED BY INTERPACE CORPORATION. 3)OR EQUAL AS APPROVED BY THE CITY ENGINEER. B.RUBBER GASKET COMPRESSION. 1)PRESS WEDGE II AS MANUFACTURED BY PRESS_SEAL GASKET CORPORATION. 2)DURA SEAL III AS MANUFACTURED BY DURA TECH, INC. 3)LINK_SEAL AS MANUFACTURED BY THUNDERLINE CORPORATION. 4)OR EQUAL AS APPROVED BY THE CITY ENGINEER. THE COST FOR THIS WORK ALONG WITH A NEW CHANNELIZED BASE FOR THE MANHOLE SHALL BE INCLUDED IN THE UNIT BID PRICE FOR THE RELATED ITEMS OF WORK. WATER LINE 1-17 DELETED STORM SEWER 1-11 DELETED MAIL DELIVERY 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT US MAIL DELIVERY WITHIN THE PROJECT LIMITS IS NOT DISRUPTED BY CONSTRUCTION OPERATIONS. THIS RESPONSIBILITY IS LIMITED TO RELOCATION OF MAILBOXES TO A TEMPORARY LOCATION THAT WILL ALLOW THE COMPLETION OF THE WORK AND SHALL ALSO INCLUDE THE RESTORATION OF MAILBOXES TO THEIR ORIGINAL LOCATION OR APPROVED NEW LOCATION. ANY RELOCATION OF MAILBOX SERVICES MUST BE FIRST COORDINATED WITH THE US POSTAL SERVICE AND THE HOMEOWNER. 2.BEFORE RELOCATING ANY MAILBOXES, THE CONTRACTOR SHALL CONTACT THE U.S. POSTAL SERVICE AND RELOCATE MAILBOXES ACCORDING TO THE REQUIREMENTS OF THE POSTAL SERVICE. USE OF FIRE HYDRANTS 1.THE CONTRACTOR SHALL MAKE PROPER ARRANGEMENTS WITH THE DUBLIN SERVICE DEPARTMENT AND THE COLUMBUS DIVISION OF WATER FOR THE USE OF FIRE HYDRANTS WHEN USED FOR WORK PERFORMED UNDER THIS CONTRACT AND PROVIDE THE CITY OF DUBLIN A COPY OF THE HYDRANT USAGE PERMIT OBTAINED FROM THE CITY OF COLUMBUS. THE CONTRACTOR SHALL ALSO SEND A COPIES OF PERMITS OBTAINED FROM DUBLIN AND COLUMBUS TO THE WASHINGTON AND/OR PERRY TOWNSHIP FIRE DEPARTMENT. PERMITS SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. 2.BEFORE THE FINAL ESTIMATE IS PAID, THE CONTRACTOR SHALL SUBMIT A LETTER FROM THE CITY OF COLUMBUS DIVISION OF WATER TO THE CITY ENGINEER STATING THAT THE CONTRACTOR HAS RETURNED THE SIAMESE VALVE TO THE CITY OF COLUMBUS AND HAS PAID ALL COSTS ARISING FROM THE USE OF THE FIRE HYDRANTS. JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 3/24TYPICAL SECTIONS℄ DUBLIN ROAD6 40' 1.56% EX. GRADE 1.56% PROFILE ELEVATION EDGE OF PAVEMENT TO CONSTRUCTION CL VARIES 2'-0'' PAVED SHOULDER E X G R A D E 4:14: 1 798 10' R/W DEDICATION 11' SHARED USE PATH TYPICAL SECTION LEGEND ITEM 442 - 1 1/4" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.075 GAL/S.Y. ITEM 441 - 1 3/4'' ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.10 GAL/S.Y. ITEM 301 - 6" BITUMINOUS AGGREGATE BASE ITEM 304 - 6" AGGREGATE BASE ITEM 204 - SUBGRADE COMPACTION ITEM 659 - SEEDING AND MULCHING, AS PER PLAN (SEE NOTE 32 ON GENERAL NOTE PAGE) ITEM 441 - 2 1/2" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), MEDIUM TRAFFIC, PG. 64-22 ITEM 653 - 3" TOPSOIL FURNISHED AND PLACED ITEM 254 - PAVEMENT PLANING, 1 1/4" TYP ITEM 442 - THICKNESS VARIES, ASPHALT CONCRETE INTERMEDIATE COURSE (WEDGE COURSE), 12.5MM, TYPE A (449), SEE VARIABLE THICKNESS TABLE BELOW ITEM 254 - PAVEMENT PLANING, 2 1/2" TYP ITEM 441 - 1 1/4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG. 64-22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2 3 4 5 7 1 6℄ CONSTRUCTION11 12 10 30' CONSTRUCTION CL TO DUBLIN ROAD CL VARIES EDGE OF TRAVELED WAY2'-0'' GRASS SHOULDER 4:1 MAX4:1 MA X 8.33% 10 3'-0'' MILLED STRIP FROM SAWCUT LINE 1 CONSTRUCTION CL TO SAWCUT LINE VARIES SAWCUT LINE TO EDGE OF PAVEMENT VARIES VARIES FROM 2.45'-4.74' VARIES FROM 2.45'-4.74' 1 14 13111EXISTING EDGE OFPAVEMENTSTATION DATA NAME BEGIN STA END STA DUBLIN ROAD 100+38.29 104+05.0 DUBLIN ROAD 105+13.2 107+95.49 TYPICAL SECTION - DUBLIN ROAD NOT TO SCALEA EX G R A D E 1' SHARED USE PATH EASEMENT ESTIMATE OF QUANTITIES THESE QUANTITIES HAVE BEEN PROVIDED ONLY AS AN ESTIMATE TO THE SCOPE OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO EVALUATE THE COMPLETE PROJECT AS DETAILED IN THE NOTES, PLANS, AND SPECIFICATIONS AND PROCEDURES NECESSARY FOR THE COMPLETION OF THE PLAN IMPROVEMENTS AND SUBMIT HIS TOTAL PROJECT COST ACCORDINGLY. ROADWAY ITEM QUANTITY UNIT DESCRIPTION 201 LUMP SUM CLEARING AND GRUBBING 202 580 SF ASPHALT REMOVAL 202 1140 SF CONCRETE REMOVAL 202 345 LF GUARDRAIL REMOVAL 202 12 EA REMOVE TREE 202 1 EA 12" CULVERT REMOVAL 203 CY EXCAVATION 203 CY EMBANKMENT 203 17,662 SF 1.25" MILL AND OVERLAY 203 2,272 SF 2.5" MILL AND OVERLAY 204 998 SY SUBGRADE COMPACTION 207 27 CY STABILIZED CONSTRUCTION ENTRANCE 301 166 CY 6" BITUMINOUS AGGREGATE BASE 304 166 CY 6' AGGREGATE BASE 407 75 GAL TACK COAT (0.075 GAL/SY) 407 100 GAL TACK COAT (0.10 GAL/SY) 448*35 CY 1 1/4" ASPHALT CONCRETE SURFACE COURSE, TYPE I, MEDIUM TRAFFIC, PG64-22 448*35 CY 1 1/4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE II, MEDIUM TRAFFIC, PG64-22 448*48 CY 1 3/4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE II, MEDIUM TRAFFIC, PG64-22 659 589 SY SEEDING & MULCHING SPEC 1 LUMP PROOF SURVEY, A.P.P. STORM 604 2 EA PRECAST HEADWALL (AA-S168) 901 59 LF 12" STORM PIPE, WITH ITEM 912 BACKFILL EROSION CONTROL 207 SY TEMPORARY SEEDING AND MULCHING SPEC 6 EA NO. 2 STONE CHECK DAM SPEC 1 EA CONCRETE WASHOUT AREA SPEC x EA INLET PROTECTION MAINTENANCE OF TRAFFIC* 614 1 LUMP MAINTAINING TRAFFIC CALCULATED BY: MTR DATE: 06/21/2022 CHECKED BY: JRP 06/21/2022 1'-0" 8 7192 AT&TBELL SYSTEMS322A56TOP=853.62' (3' LID)SW6959FRONTIER 7192w/ELEC.&COMM. DROPSw/RISERICVOUTLETINTERCOMw/ELEC.&COMM. DROPTBOXWOWWAY 7177 DUBLIN RDcannot open INV:840.88EX 24" WATER MAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900TBM1CP947CP9950EX 16" FORCE MAIN (19-025-CIP) EX 16" FORCE MAIN (19-025-CIP) EX LIGHT POLE EX FIRE HYRDANT EX LIGHT POLE EX FIRE HYRDANT EX LIGHT POLE EX TELECOM & OVERHEAD ELECTRIC EX FENCE EX WATER VALVE EX WATER MAIN EX DOP OHE EX WATER VALVE EX GAS VALVE EX GAS MAIN EX ELECTRIC BOX EX LIGHT POLE EX GAS MARKER EX DRIVE EX HYDRANTEX WATER METER EX WATER VALVE PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES EX GAS MAIN EX GAS VALVE EX LIGHT POLE EX STM EX DRIVE EX PWR & TELE POLE EX GUY WIRE (TYP) EX GUY WIRE (TYP) EX UTIL MISC EX LIGHT POLE 1 2 33 4 4 5 6 5 6 24" BOXELDER 24" BOXELDER 2" 2" 2" 2" 24"24" 6"42" DUBLIN LANDMARK TREE 4440 4"4"4"4"4"4"4"4" MULCH-9 BUSHES & FLOWERS MULCH-11 BUSHES & FLOWERS GUARD SHACK MULTI-USE PATH INTERSECTION AHEAD MULTI-USE PATH MULTI-USE PATH MULTI-USE PATH 369691 conc 369692 322a56 7192 sw-6959 columbia energy group 7177 conc conc WHITE LAYERED STONE WALL ASPH ASPH WHITE 16" 16" 14" 8" 8" WOODEN ASPH ASPH ASPH ASPH ASPH ASPH ASPH DOUBLE YELLOW ASPH ASPH LAYERED STONE W A L L LAYERED STONE WALL LAYERED STONE WALL TBM#1 2" 1" 1 PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES DUBLIN RD PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.78 ACRES 12" RCP 12" RCP EXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 18" RCP12" RC P 24" RCPINV:840.88 12" CPP DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX GUARDRAIL EX MAILBOX 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00PI: 97+54.31PROJECT LIMITS 7 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:57 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 EC&DP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 4/24DEMOLITION PLANHORZ 1"=30'0 30 60 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION DEMOLITION LEGEND TBR TO BE REMOVED TBRO TO BE REMOVED BY OTHERS TBRR TO BE REMOVED AND REPLACED ASPHALT PAVEMENT TO BE REMOVED CONCRETE PAVEMENT TO BE REMOVED MILLING LIMITS ITEM TO BE REMOVED PAVEMENT TO BE SAWCUT TREE TO BE REMOVED SPRINKLER HEAD TO BE REMOVED CODED NOTES EXISTING 12" CULVERT TBR EXISTING INTERSECTION SIGN TO BE RELOCATED EXISTING GUARDRAIL (345' TBR) EXISTING PAVEMENT TO BE SAWCUT (2'-2.5' FROM EOP) EXISTING PAVEMENT TO BE MILLED 1.25" EXISTING PAVEMENT WITHIN 3' OF SAWCUT LINE TO BE MILLED 2.5" EXISTING POLE TO BE RELOCATED, COORDINATE WITH UTILITY PROVIDER 1 2 3 4 5 6 7 NOTES: CONTRACTOR TO PROTECT ALL UTILITY POLES DURING CONSTRUCTION. 135' TAPER 350'W20-1-48W1-H16(L)-3640' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 40' 20'W20-1-4813'12'W1-H16(R)-36R4-7B-18W1-H16(R)R6-2R DUBLIN ROAD 88+00 89+00 90+00 91+00 92+00 93+00 88+29.5, 20.0' L 89+02.0, 2.5' L 90+22.0, 1.2' L 91+02.0, 2.2' L 93+02.0, 3.2' L 88+87.3, 22.5' R88+31.1, 23.8' R PROJECT LIMITS INV:840.88W20-1-4820' SPACING CENTER OF DRUM TO CENTER OF DRUM 40' SPACING CENTER OF DRUM TO CENTER OF DRUM 350' PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES 40' 20'W20-1-48DUBLIN ROAD 12'12'R4-7B-18W1-H16(R)-36R6-2R 94+00 95+00 96+00 97+00 98+00 99+00PI: 97+54.3195+02.0, 6.4' L 97+79.5, 4.0' L 97+99.2, 4.1' L 98+73.5, 13.5' R 98+72.5, 24.9' L W2-2 & W16-8aP94+62.1, 8.8' R CONTRACTOR TO PROVIDE TEMPORARY INTERSECTION SIGN DURING CONSTRUCTION PROJECT LIMITS JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 MOT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 5/24MAINTENANCE OFTRAFFIC PLAN PHASE 1MATCHLINE SEE ABOVE (STA: 93+83.00)MATCHLINE SEE BELOW (STA: 93+83.00)HORZ 1"=20'0 20 40 NOTES: CONTRACTOR TO MAINTAIN ACCESS TO ALL DRIVES DURING CONSTRUCTION NO PEDESTRIAN TRAVEL IS PERMITTED WITHIN WORK ZONE AREAS RAISED PAVEMENT MARKER REFLECTORS TO BE REMOVED DURING PHASE 1 PER COC ITEM 621. LEGEND WORK ZONE DRUM SIGN PHASE 1: MOT DURING INSTALLATION OF TURN LANE. W20-1-4840' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 40' 20'W20-1-4813'13.5'DUBLIN ROAD 88+00 89+00 90+00 91+00 92+00 93+00 89+21.8, 20.5' L PROJECT LIMITS 100' TAPER W20-4-48W20-7-48350'350'350' BEGIN CONSTRUCTION STA: 100+38.29NOT TO SCALE EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) 20' SPACING CENTER OF DRUM TO CENTER OF DRUM 40' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES 40'DUBLIN ROAD 14'12'94+00 95+00 96+00 97+00 98+00 99+00 PROJECT LIMITS END CONSTRUCTION STA: 107+95.49 20'W20-1-48W20-4-48W20-7-48350'350'100' TAPER W20-1-4898+79.7, 13.5' R 350' NOT TO SCALE JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 MOT P2.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 6/24MAINTENANCE OFTRAFFIC PLAN PHASE 2HORZ 1"=20'0 20 40MATCHLINE SEE ABOVE (STA: 93+83.00)MATCHLINE SEE BELOW (STA: 93+83.00)NOTES: CONTRACTOR TO MAINTAIN ACCESS TO ALL DRIVES DURING CONSTRUCTION NO PEDESTRIAN TRAVEL IS PERMITTED WITHIN WORK ZONE AREAS RAISED PAVEMENT MARKER REFLECTORS TO BE REMOVED DURING PHASE 1 PER COC ITEM 621. LEGEND WORK ZONE DRUM SIGN TRAFFIC FLOW PHASE 2: MILL AND OVERLAY EAST PORTION OF DUBLIN RD. W20-1-4840' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 40'W20-1-4813'13.5'DUBLIN ROAD 88+00 89+00 90+00 91+00 92+00 93+00 89+21.8, 20.5' L PROJECT LIMITS W20-4-48W20-7-48350'350'350' BEGIN CONSTRUCTION STA: 100+38.29NOT TO SCALE 20' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) 40' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES 40'DUBLIN ROAD 14'12'94+00 95+00 96+00 97+00 98+00 99+00 PROJECT LIMITS END CONSTRUCTION STA: 107+95.49 W20-1-48W20-4-48W20-7-48350'350'100' TAPER W20-1-4898+79.7, 13.5' R 350' NOT TO SCALE 20' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 MOT P2.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 7/24MAINTENANCE OFTRAFFIC PLAN PHASE 3HORZ 1"=20'0 20 40MATCHLINE SEE ABOVE (STA: 93+83.00)MATCHLINE SEE BELOW (STA: 93+83.00)NOTES: CONTRACTOR TO MAINTAIN ACCESS TO ALL DRIVES DURING CONSTRUCTION NO PEDESTRIAN TRAVEL IS PERMITTED WITHIN WORK ZONE AREAS RAISED PAVEMENT MARKER REFLECTORS TO BE REMOVED DURING PHASE 1 PER COC ITEM 621. LEGEND WORK ZONE DRUM SIGN TRAFFIC FLOW PHASE 3: MILL AND OVERLAY WEST PORTION OF DUBLIN RD. w/RISERDUBLIN ROAD EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD PROP STRIPING EX LIGHT POLE PROP E/P EX FIRE HYRDANT EX LIGHT POLE EX LIGHT POLE EX TELECOM & OVERHEAD ELECTRIC EX WALK EX FENCE EX WATER VALVE EX WATER MAIN EX DOP OHE EX WATER VALVE 12'11'EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) EX GAS MAIN EX ELECTRIC BOX EX LIGHT POLE EX GAS MARKER EX DRIVE PROP STRIPING 10+0011+00101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA: 100+38.29 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES EX GAS MAIN EX GAS VALVE EX LIGHT POLE EX STM EX DRIVE EX GUY WIRE (TYP) EX UTIL MISC 101100 12" STM 11'11'11'PROP E/P PROP E/P 11' MULTI-USE PATH LIU COURT27.22'10'30'12'6 Area: 56,805 SF (1.30 AC)TOP=853.62' (3' LID)w/ELEC.&COMM. DROPcannot open EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD EX FIRE HYRDANT 12'11'EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) PROP STRIPING 10+0011+00105+00 106+00 107+00 108+00 END CONSTRUCTION STA: 107+95.49EX 24" STM EX HYDRANT EX 18" S T M EX 18" STMEX WATER METER EX WATER VALVE PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES EX PWR & TELE POLE EX GUY WIRE (TYP) EX LIGHT POLE11'PROP E/P PROP E/PPROP E/P LIU COURT27.22'30'1 Area: 40,065 SF (0.92 AC) 11' MULTI-USE PATH 106 105 10412" STM 102 103 36" STM12" STM JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:59 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 SP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 8/24SCHEMATIC PLANHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE BELOWMATCHLINE: SEE ABOVESITE LEGEND PROPERTY LINE RIGHT-OF-WAY STRAIGHT CURB CURB AND GUTTER SIGN PAVEMENT MARKINGS w/RISERDUBLIN ROAD EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD EX LIGHT POLE PROP EOP EX FIRE HYRDANT EX LIGHT POLE EX LIGHT POLE EX TELECOM & OVERHEAD ELECTRIC EX WALK EX FENCE EX WATER VALVE EX WATER MAIN EX DOP OHE EX WATER VALVE EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) EX GAS MAIN EX ELECTRIC BOX EX LIGHT POLE EX GAS MARKER EX DRIVE 10+0011+00101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA: 100+38.29 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES EX GAS MAIN EX GAS VALVE EX LIGHT POLE EX STM EX DRIVE EX GUY WIRE (TYP) EX UTIL MISC 101100 12" STM PROP E/P 11' MULTI-USE PATH LIU COURT10'30'EOP 100+38.3, 15.2' R EOP 100+48.4, 16.0' R EOP 100+54.6, 16.2' R EOP 101+08.8, 17.5' R EOP 103+63.0, 25.2' R EOP 104+16.8, 25.3' R HEADWALL 100+47.0, 24.7' R HEADWALL 101+06.0, 26.0' R SAWCUT 104+82.8, 10.5' R EOP 105+00.7, 24.8' R PROP DRIVEWAY ADJUST TO GRADE11'12'11'6 Area: 56,805 SF (1.30) PROJECT LIMITS 6+00 7+00 8+00 9+00 10+00 REMOVE AND RELOCATE COORDINATE WITH UTILITY PROVIDER 103+41.1, 27.5' R SCALE: H:1"=20', V:1"=5' DUBLIN ROAD CROWN 830 840 850 860 EXISTING GRADE EXISTING GRADE 843.40843.91845.34846.89848.34849.47850.53851.60852.49852.92853.33853.65853.96854.10854.23854.11853.98853.96853.94853.92853.91100+15 101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA=100+38.29 ELEV = 844.65 100 COC AA-S168N: 770367.05E: 1796188.8759' ~ 12" STM @ 3 . 3 5 % 101 COC AA-S168N: 770424.19E: 1796174.07STA: 101+0612" INV (S): 845.75STA: 100+4712" INV (N): 843.77PROFILE CL EAST DITCH PROFILE CL EAST DITCH 847.36848.37849.39850.40851.41851.79852.17852.55852.71852.88853.04853.21JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:58 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 9/24PLAN & PROFILEHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE SHEET 10SITE LEGEND STRAIGHT CURB CURB AND GUTTER SIGN PROPOSED MILL & OVERLAY (1.25" DEPTH) PROPOSED MILL & OVERLAY (2.5" DEPTH) PROPOSED NEW ASPHALT PAVEMENT PAVEMENT MARKINGS MATCHLINE: SEE SHEET 10EX GAS UTILITY LEGEND SANITARY MAIN WATER STORM SEWER MAINSTM HEADWALL SANITARY MANHOLE XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM TOP=853.62' (3' LID)w/ELEC.&COMM. DROPcannot open EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD EX FIRE HYRDANT EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) PROP STRIPING 10+0011+00105+00 106+00 107+00 108+00 END CONSTRUCTION STA: 107+95.49 EX 24" STM EX HYDRANT EX 18" S T M EX 18" STMEX WATER METER EX WATER VALVE PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES EX PWR & TELE POLE EX GUY WIRE (TYP) EX LIGHT POLE PROP E/P PROP E/PPROP E/P LIU COURT10'30'SAWCUT 104+82.8, 10.5' R EOP 105+00.7, 24.8' R EOP 106+29.3, 23.3' R EOP 107+51.8, 18.8' R EOP 107+95.8, 16.2' R ADJUST TO GRADE 12'11'11'1 Area: 40,065 SF (0.92) 11' MULTI-USE PATH PROJECT LIMITS 10+00 11+00 12+00 12 + 8 5 12" STM 36" STM12" STM 102 103 104 105 106 HEADWALL 107+00.4, 58.7' R HEADWALL 107+36.5, 61.2' R CONTRACTOR TO RESET GUY WIRES SCALE: H:1"=20', V:1"=5' DUBLIN ROAD CROWN 830 840 850 860 EXISTING GRADE EXISTING GRADE 853.96853.94853.92853.91853.89853.87853.38852.85851.68850.46849.62848.78848.62848.47848.71848.98849.95850.95852.58853.55852.74852.24851.75851.26850.13848.95847.77847.70847.95847.75847.07105+00 106+00 107+00 108+00 108+89 END CONSTRUCTION STA=107+95.49 ELEV = 848.93 PROFILE CL EAST DITCH EX 24" STM JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:58 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 10/24PLAN & PROFILEHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE SHEET 9SITE LEGEND STRAIGHT CURB CURB AND GUTTER SIGN PROPOSED MILL & OVERLAY (1.5" DEPTH) PROPOSED MILL & OVERLAY (2.5" DEPTH) PROPOSED NEW ASPHALT PAVEMENT PAVEMENT MARKINGS UTILITY LEGEND SANITARY MAIN WATER STORM SEWER MAINSTM HEADWALL SANITARY MANHOLE XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM MATCHLINE: SEE SHEET 9 WVinlet window inlet window 12" RC P12" CPP 18" RCP24" RCPEXIST DRAINAGE INLETTR:847.08INV(N):844.79INV(S):844.89DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX 24" WATER MAIN (90-009-CIP)CP9950EX 16" FORCE MAIN (19-025-CIP) 600'18'0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+02 DUBLIN ROAD BROWNING CTLIU COURTSCALE: H:1"=30', V:1"=10' DUBLIN RD - NORTH SIGHT DISTANCE 840 850 860 870 840 850 860 870 EXISTING GRADE EXISTING GRADEPROPOSED GRADE 850.44850.26850.40850.73850.98850.29850.05849.50847.96846.58846.77848.00848.00848.01849.18850.16851.27853.04854.54856.01856.91857.97858.66859.37859.93853.21853.60853.70853.27852.82851.70850.90850.20849.50848.85848.40848.29848.34848.48-0+25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+253.5'3.5'SIGHT DISTANCE LINE DRIVER'S EYE OBJECT WVw/RISERDUBLIN ROAD DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX 24" WATER MAIN (90-009-CIP)CP900TBM1CP947EX 16" FORCE MAIN (19-025-CIP)18'600' 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+01 DUBLIN ROAD LIU COURTSCALE: H:1"=30', V:1"=10' DUBLIN RD SOUTH SIGHT DISTANCE 830 840 850 860 870 830 840 850 860 870 PROPOSED GRADE PROPOSED GRADE EXISTING GRADE EXISTING GRADE EXISTING GRADE 850.44850.10850.94851.75854.00853.85853.24852.68852.36852.28852.33852.01850.69850.00848.63847.36845.59843.97842.74841.06840.30840.04840.03839.87838.70853.21853.29853.68853.55853.39853.22853.06852.81852.47851.95851.04849.88848.95848.27847.53847.50846.07-0+250+001+002+003+004+005+006+006+25 3.5'3.5'DRIVER'S EYE SIGHT DISTANCE LINE OBJECT JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/15/25 - 2:28 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 SIGHT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 21/24SIGHT DISTANCEPLANVERT 1"=10' HORZ 1"=30' 0 0 10 30 20 60 SCALE: H:1"=20', V:1"=5' MULTI-USE PATH 830 840 850 860 870 EXISTING GRADE EXISTING GRADE 851.37850.91850.46850.19850.02850.38850.65851.39850.09848.67847.39846.16844.91844.54843.00844.72853.58853.15853.37853.51853.65853.25852.85852.45851.75850.58849.40848.61848.40848.40848.40848.389+00 10+00 11+00 12+00 13+00 -1.60% -4.73% +0.00%+0.00%+0.00%GRADE BREAK STA = 10+00.00ELEV = 853.65GRADE BREAK STA = 12+26.24ELEV = 848.40GRADE BREAK STA = 12+46.00ELEV = 848.40GRADE BREAK STA = 12+84.90ELEV = 848.40 HIGH POINT EL =852.40 HIGH POINT STA = 10+78.23 PVI STA = 10+90.73 PVI EL = 852.20 K = 7.98 25.0' VC BVCS: 10+78.23BVCE: 852.40EVCS: 11+03.23EVCE: 851.61 LOW POINT EL =848.40 LOW POINT STA = 11+95.97 PVI STA = 11+70.97 PVI EL = 848.40 K = 10.56 50.0' VC BVCS: 11+45.97BVCE: 849.58EVCS: 11+95.97EVCE: 848.40PI: 10+00.00ELEV = 853.65PC: 11+62.92ELEV = 848.92PT: 11+70.97ELEV = 848.70PC: 12+16.42ELEV = 848.40PT: 12+26.24ELEV = 848.40PC: 12+37.73ELEV = 848.40PT: 12+64.27ELEV = 848.40-1.60% -4.73% +0.00%+0.00%+0.00%GRADE BREAK STA = 10+00.00ELEV = 853.65GRADE BREAK STA = 12+26.24ELEV = 848.40GRADE BREAK STA = 12+46.00ELEV = 848.40GRADE BREAK STA = 12+84.90ELEV = 848.40 HIGH POINT EL =852.40 HIGH POINT STA = 10+78.23 PVI STA = 10+90.73 PVI EL = 852.20 K = 7.98 25.0' VC BVCS: 10+78.23BVCE: 852.40EVCS: 11+03.23EVCE: 851.61 LOW POINT EL =848.40 LOW POINT STA = 11+95.97 PVI STA = 11+70.97 PVI EL = 848.40 K = 10.56 50.0' VC BVCS: 11+45.97BVCE: 849.58EVCS: 11+95.97EVCE: 848.40PI: 10+00.00ELEV = 853.65PC: 11+62.92ELEV = 848.92PT: 11+70.97ELEV = 848.70PC: 12+16.42ELEV = 848.40PT: 12+26.24ELEV = 848.40PC: 12+37.73ELEV = 848.40PT: 12+64.27ELEV = 848.40GRADE BREAK STA = 8+95.51ELEV = 853.58GRADE BREAK STA = 8+95.51ELEV = 853.58SCALE: H:1"=20', V:1"=5' MULTI-USE PATH 830 840 850 860 870 EXISTING GRADE EXISTING GRADE 849.74850.64851.29851.81852.04852.22852.09852.86853.23852.76852.03851.37850.91850.46850.19848.67849.61850.55851.50852.16852.47852.79853.03853.17853.32853.46853.58853.15853.37853.515+75 6+00 7+00 8+00 9+00 +3.77% +1.26% +0.58%GRADE BREAK STA = 6+00.37ELEV = 847.74GRADE BREAK STA = 7+88.86ELEV = 852.96GRADE BREAK STA = 8+95.51ELEV = 853.58 HIGH POINT EL =852.33 HIGH POINT STA = 7+38.92 PVI STA = 7+13.92 PVI EL = 852.02 K = 19.90 50.0' VC BVCS: 6+88.92BVCE: 851.08EVCS: 7+38.92EVCE: 852.33+3.77% +1.26% +0.58%GRADE BREAK STA = 6+00.37ELEV = 847.74GRADE BREAK STA = 7+88.86ELEV = 852.96GRADE BREAK STA = 8+95.51ELEV = 853.58 HIGH POINT EL =852.33 HIGH POINT STA = 7+38.92 PVI STA = 7+13.92 PVI EL = 852.02 K = 19.90 50.0' VC BVCS: 6+88.92BVCE: 851.08EVCS: 7+38.92EVCE: 852.33JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:58 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 11/24MULTI-USE PATHPROFILEHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION SITE LEGEND STRAIGHT CURB CURB AND GUTTER SIGN PROPOSED MILL & OVERLAY (1.5" DEPTH) PROPOSED MILL & OVERLAY (2.5" DEPTH) PROPOSED NEW ASPHALT PAVEMENT PAVEMENT MARKINGS UTILITY LEGEND SANITARY MAIN WATER STORM SEWER MAINSTM HEADWALL SANITARY MANHOLE XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM MATCHLINE: SEE SHEET 9 100+50.00 830 835 840 845 850 855 830 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 101+00.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT OFF:0.00' ELEV:845.34OFF:12.48' R ELEV:845.14OFF:12.48' R ELEV:845.14OFF:16.09' R ELEV:845.08OFF:-16.61' L ELEV:844.98-1.56%-1.56%-2.14%OFF:0.00' ELEV:848.34OFF:11.96' R ELEV:848.16OFF:11.96' R ELEV:848.16OFF:17.26' R ELEV:848.08OFF:-15.02' L ELEV:847.96-1.56%-1.56%-2.57% 12" STM EX GAS EX 24" WM EX 16" SAN 12" STM EX GAS EX 24" WM EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS12/24 101+50.00 835 840 845 850 855 860 835 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:30.20' R ELEV:849.18OFF:41.20' R ELEV:849.35OFF:30.20' R ELEV:849.18OFF:29.20' R ELEV:849.15OFF:41.20' R ELEV:849.35OFF:42.20' R ELEV:849.32OFF:42.20' R ELEV:849.32OFF:42.81' R ELEV:849.523.15%-3.11%3:1 102+00.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:30.58' R ELEV:851.07OFF:41.58' R ELEV:851.24OFF:30.58' R ELEV:851.07OFF:29.58' R ELEV:851.04OFF:41.58' R ELEV:851.24OFF:42.58' R ELEV:851.21OFF:42.58' R ELEV:851.21OFF:44.59' R ELEV:850.543.16%-3.10%3:1 850.53 852.49 OFF:0.00' ELEV:850.53OFF:-14.60' L ELEV:850.31OFF:11.46' R ELEV:850.35OFF:11.46' R ELEV:850.35OFF:18.43' R ELEV:850.25OFF:20.43' R ELEV:850.08OFF:25.09' R ELEV:848.37OFF:26.09' R ELEV:848.37OFF:29.20' R ELEV:849.15-1.54%-1.56%-1.56%-8.33% 3:1 4:1OFF:0.00' ELEV:852.49OFF:-14.13' L ELEV:852.17OFF:11.07' R ELEV:852.32OFF:11.07' R ELEV:852.32OFF:19.72' R ELEV:852.19OFF:21.72' R ELEV:852.02OFF:26.00' R ELEV:850.39OFF:27.00' R ELEV:850.39OFF:29.58' R ELEV:851.04-2.29%-1.56%-1.56%-8.33% 3:1 4:1 EX GAS EX GAS EX 16" SAN EX 16" SAN EX 24" WM EX 24" WM VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS13/24 102+50.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:31.43' R ELEV:852.33OFF:42.44' R ELEV:852.51OFF:31.43' R ELEV:852.33OFF:30.43' R ELEV:852.30OFF:42.44' R ELEV:852.51OFF:43.44' R ELEV:852.48OFF:43.44' R ELEV:852.48OFF:45.58' R ELEV:851.763.15%3.15%-3.11%3:1 103+00.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:32.17' R ELEV:852.96OFF:43.17' R ELEV:853.13OFF:32.17' R ELEV:852.96OFF:31.17' R ELEV:852.93OFF:43.17' R ELEV:853.13OFF:44.17' R ELEV:853.103.15%-3.12% 853.33 853.96 OFF:0.00' ELEV:853.33OFF:-12.88' L ELEV:853.17OFF:11.14' R ELEV:853.15OFF:11.14' R ELEV:853.15OFF:21.49' R ELEV:852.99OFF:23.49' R ELEV:852.83OFF:27.38' R ELEV:851.79OFF:28.38' R ELEV:851.79OFF:30.43' R ELEV:852.30-1.21%-1.56%-1.56%-8.33% 4:1 4:1OFF:0.00' ELEV:853.96OFF:-12.18' L ELEV:854.01OFF:11.11' R ELEV:853.79OFF:11.11' R ELEV:853.79OFF:23.13' R ELEV:853.60OFF:25.13' R ELEV:853.43OFF:28.65' R ELEV:852.55OFF:29.65' R ELEV:852.55OFF:31.17' R ELEV:852.930.38%-1.56%-1.56%-8.33% 4:1 4:1 EX GAS EX 24" WM EX GAS EX 16" SAN EX 16" SANEX 24" WM VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS14/24 103+50.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:32.88' R ELEV:853.25OFF:43.88' R ELEV:853.42OFF:32.88' R ELEV:853.25OFF:31.88' R ELEV:853.22OFF:43.88' R ELEV:853.42OFF:44.88' R ELEV:853.393.14%-3.12% 104+00.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:33.63' R ELEV:853.54OFF:44.63' R ELEV:853.71OFF:33.63' R ELEV:853.54OFF:32.63' R ELEV:853.51OFF:44.63' R ELEV:853.71OFF:45.63' R ELEV:853.683.14%-3.12% 854.23 853.98 OFF:0.00' ELEV:854.23OFF:-11.72' L ELEV:854.17OFF:11.05' R ELEV:854.05OFF:11.05' R ELEV:854.05OFF:24.75' R ELEV:853.84OFF:26.75' R ELEV:853.67OFF:29.51' R ELEV:852.88OFF:30.51' R ELEV:852.88OFF:31.88' R ELEV:853.22-0.49%-1.56%-1.56%-8.33% 3:1 4:1OFF:0.00' ELEV:853.98OFF:-13.04' L ELEV:853.76OFF:11.03' R ELEV:853.81OFF:11.03' R ELEV:853.81OFF:25.31' R ELEV:853.59OFF:27.31' R ELEV:853.42OFF:30.41' R ELEV:853.21OFF:31.41' R ELEV:853.21OFF:32.63' R ELEV:853.51-1.67%-1.56%-1.56%-8.33%14:1 4:1 EX GAS EX 24" WM EX GAS EX 24" WM EX 16" SAN EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS15/24 104+50.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 105+00.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 853.94 853.91 OFF:0.00' ELEV:853.94OFF:10.73' R ELEV:853.77OFF:-14.14' L ELEV:853.76-1.56%-1.27%OFF:0.00' ELEV:853.91OFF:10.79' R ELEV:853.74OFF:-15.14' L ELEV:853.83-1.56%-0.49% EX GAS EX 24" WM EX 16" SAN EX 24" WM EX GAS EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS16/24 105+50.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT 106+00.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:34.78' R ELEV:853.03OFF:45.78' R ELEV:853.20OFF:34.78' R ELEV:853.03OFF:33.78' R ELEV:853.00OFF:45.78' R ELEV:853.20OFF:46.78' R ELEV:853.173.12%-3.14%OFF:0.00' ELEV:853.87OFF:-15.75' L ELEV:853.46OFF:11.38' R ELEV:853.69OFF:11.38' R ELEV:853.69OFF:24.23' R ELEV:853.49OFF:26.23' R ELEV:853.33OFF:30.02' R ELEV:852.24OFF:31.02' R ELEV:852.24OFF:33.78' R ELEV:853.00-2.63%-1.56%-1.56%-8.33% 3:1 4:1 OFF:34.93' R ELEV:852.17OFF:45.93' R ELEV:852.34OFF:34.93' R ELEV:852.17OFF:33.93' R ELEV:852.13OFF:45.93' R ELEV:852.34OFF:46.93' R ELEV:852.303.12%-3.14%OFF:0.00' ELEV:852.85OFF:-15.45' L ELEV:852.45OFF:11.88' R ELEV:852.67OFF:11.88' R ELEV:852.67OFF:23.52' R ELEV:852.49OFF:25.52' R ELEV:852.32OFF:29.75' R ELEV:851.26OFF:30.75' R ELEV:851.26OFF:33.93' R ELEV:852.13-2.60%-1.56%-1.56%-8.33% 4:1 4:1 EX GAS EX 24" WM EX GAS EX 24" WM EX 16" SAN EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS17/24 106+50.00 835 840 845 850 855 860 835 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT 107+00.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:35.44' R ELEV:849.93OFF:46.44' R ELEV:850.09OFF:35.44' R ELEV:849.93OFF:34.44' R ELEV:849.90OFF:46.44' R ELEV:850.09OFF:47.44' R ELEV:850.063.08%-3.18%OFF:0.00' ELEV:850.46OFF:-15.21' L ELEV:850.20OFF:12.74' R ELEV:850.27OFF:12.74' R ELEV:850.27OFF:22.70' R ELEV:850.11OFF:24.70' R ELEV:849.94OFF:29.49' R ELEV:848.94OFF:30.49' R ELEV:848.94OFF:34.44' R ELEV:849.90-1.73%-1.56%-1.56%-8.33% 5:1 4:1OFF:32.02' R ELEV:848.43OFF:43.16' R ELEV:848.61OFF:32.02' R ELEV:848.43OFF:31.00' R ELEV:848.40OFF:43.16' R ELEV:848.61OFF:44.17' R ELEV:848.583.22%-2.96%OFF:0.00' ELEV:848.78OFF:-15.53' L ELEV:848.46OFF:13.14' R ELEV:848.58OFF:13.14' R ELEV:848.58OFF:20.80' R ELEV:848.46OFF:22.80' R ELEV:848.29OFF:26.77' R ELEV:847.70OFF:27.77' R ELEV:847.70OFF:31.00' R ELEV:848.40-2.06%-1.56%-1.56%-8.33% 7:1 5:1 EX GAS EX 24" WM EX GAS EX 24" WM EX 16" SAN EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS18/24 108+00.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX ℄ CONSTEX R/W 107+50.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 848.98 OFF:26.86' R ELEV:848.40OFF:37.86' R ELEV:848.57OFF:26.86' R ELEV:848.40OFF:25.86' R ELEV:848.37OFF:37.86' R ELEV:848.57OFF:38.86' R ELEV:848.543.13%-3.13%OFF:0.00' ELEV:848.47OFF:-16.22' L ELEV:848.07OFF:13.54' R ELEV:848.26OFF:13.54' R ELEV:848.26OFF:18.90' R ELEV:848.18OFF:20.90' R ELEV:848.01OFF:22.65' R ELEV:847.75OFF:23.65' R ELEV:847.75OFF:25.86' R ELEV:848.37-2.46%-1.56%-1.56%-8.33%7:1 4:1 EX GAS EX 24" WM EX 16" SAN 36" STM EX GAS EX 16" SAN EX 24" WM VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS19/24 DUBLIN ROAD EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD PROP STRIPING PROP E/P EX WALK 12'11'PROP STRIPING 10+0011+00101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA: 100+38.29 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 11'11'11'PROP E/P PROP E/P 11' MULTI-USE PATH LIU COURT27.22'10'30'12'6 Area: 56,805 SF (1.30 AC)W2-2RW16-2aPPROJECT LIMITS R1-1 104+78.9, 52.4' R 101+09.2, 20.5' R WE WE WE WE WE WE YT YT CL CL LA1 375.33' PROP DIAGONAL STRIPING PER ODOT TC-71.10 BEGIN CHANNELIZING LINES,SOLID WHITEEND CENTER LINES,DOUBLE SOLID YELLOW,℄BEGIN CENTER LINES,DOUBLE SOLID YELLOW,℄BEGIN CHANNELIZING LINES,SOLID WHITE, LTSTA 100+38.3, 0.00 TSTA 104+13.6, 6.29 RTSTA 104+70.5, 0.09 RTEX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD 12'11'PROP STRIPING 10+0011+00105+00 106+00 107+00 108+00 108+89 END CONSTRUCTION STA: 107+95.49 PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES 11'PROP E/P LIU COURT27.22'30'11' MULTI-USE PATH EXISTING SIGN TOBE RELOCATED HEREW2-1W16-H8PW16-H8PW2-2LW16-H8PR3-H8baR1-1 106+95.9, 20.3' L 104+78.9, 52.4' R 108+87.4, 24.8' L 106+65.5, 25.9' R WE WE WE WE YT YTCH CL CL LA1 LA1 BEGIN CENTER LINES,DOUBLE SOLID YELLOW,℄END CHANNELIZING LINES,SOLID WHITEEND CENTER LINES,DOUBLE SOLID YELLOW,℄END EDGE LINESWHITE, LTEND CHANNELIZING LINES,SOLID WHITE, LTPROP DIAGONAL STRIPING PER ODOT TC-71.10 150'50'125'BEGIN CHANNELIZING LINES,SOLID WHITESTA 104+70.5, 0.09 RTSTA 105+95.5, 1.42 LTSTA 105+95.6, 10.58 RTSTA 107+95.5, 0.00 T→→→JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 4:06 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 SIGNAGE.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 20/24SIGNAGE ANDSTRIPING PLANHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE BELOWMATCHLINE: SEE ABOVESITE LEGEND PROPERTY LINE RIGHT-OF-WAY STRAIGHT CURB CURB AND GUTTER SIGN CONCRETE BOLLARD HEAVY DUTY ASPHALT PAVEMENT STANDARD DUTY ASPHALT PAVEMENT HEAVY DUTY CONCRETE CONCRETE WALK GRAVEL PATH PAVEMENT MARKINGS STRIPING LEGEND ITEM 644 CENTER LINE, DOUBLE YELLOW 4" ITEM 644 TRANSVERSE/ DIAGONAL LINE, YELLOW 24" ITEM 644 CHANNELIZING LINE, WHITE 8" ITEM 644 EDGE LINE, WHITE 4" ITEM 644 LANE ARROW, 72" CL YT CH WE LA1 WVTOP=853.62' (3' LID)w/RISERHEGENDERFER JUSTIN L & ABIGAIL MWAGNER KATHRYN LTROLSON ZACHARY MICHAEL & RACHEL LUCKHARTinlet window inlet window 12" RC P12" CPP 18" RCP24" RCPcannot open EXIST DRAINAGE INLETTR:847.08INV(N):844.79INV(S):844.89DUBLIN ROADLOT 42RESERVE "D"DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX 24" WATER MAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900TBM1CP947CP9950EX 16" FORCE MAIN (19-025-CIP) EX 16" FORCE MAIN (19-025-CIP) 101100 12" STM CDCWA8458508508468478488498498518518528528 5 3 8538 4 5 85084 6 847 848848849851852853850847 847 848 848 8488488498518528 5 3 848 848 849 853CDCDCDCDCD8458508508448468478488498498518518528528538 5 3 8548548458 5 0 8508558558558 5 5855855 8468478488 4 8 84884 9 8 4 9 8 5 1 851 85 2 8528538 5 3 853 8538 5 4 85485485 4 856856857857858858840845850850 850 839841 842 843 844846847 848 849 851 852 853 845 850 850846847848849851 851 8518518 5 2 852 8 5 2 85284 5 85 0 84 3 84 4 84 6 8 4 7 848 8 4 9 85 1 852852 A 22 B 22 C 22C 22 12" STM36" STM12" STM 48'21' ODOT TYPE C 1.5' DEEP RCP, WIDTH & DEPTH PER PLAN10'5' 27' JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:00 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 22/24EROSION CONTROLPLANHORZ 1"=30'0 30 60 CONCRETE WASHOUT AREA NOT TO SCALE10' MINIMUM10' MINIMUM 3' MIN.NOTE: BASIN SHOULD BE CLEARLY MARKED FOR CONCRETE WASHOUT. ORANGE SILT FENCE OR CONSTRUCTION FENCE PLAN SECTION NOTE: 1.CONCRETE WASHOUT AREA SHALL BE LOCATED A MINIMUM OF 100' FROM STORM SEWER INLETS, STREAMS, WETLANDS OR ANY OTHER SURFACE WATERS. 2.IF CONCRETE WASHOUT AREA IS LOCATED AWAY FROM A PAVED SURFACE, CONSTRUCT A GRAVEL ACCESS ROUTE EQUAL IN COMPOSITION TO A CONSTRUCTION ENTRANCE. 3.CONCRETE WASHOUT AREA SHALL BE SUFFICIENT SIZE TO CONTAIN CONCRETE WASTE GENERATED. LARGE SITES MAY REQUIRE MULTIPLE CONCRETE WASHOUT AREAS. 4.PLASTIC LINING SHALL BE DOUBLE-LINED, CONTINUOUS 10-ML POLYETHYLENE SHEETING FREE OF HOLES, TEARS OR OTHER DEFECTS INSTALLED ON A SMOOTH, LEVEL SURFACE, FREE OF LARGE ROCKS AND DEBRIS. 5.CONCRETE WASHOUT SIGNAGE SHALL BE CLEARLY VISIBLE AND LOCATED WITHIN 30 FEET OF EACH WASHOUT AREA. 6.CONCRETE WASHOUT AREA SHALL BE COVERED DURING INCLEMENT WEATHER TO PREVENT OVERFLOW. 7.PREFABRICATED, PORTABLE AND RE-USABLE CONCRETE WASHOUT CONTAINERS ARE ACCEPTABLE. 8.CONCRETE WASHOUT AREA SHALL BE INSPECTED DAILY TO CHECK FOR DAMAGE AND DETERMINE IF IT NEEDS CLEANED OR REPLACED. ANY DAMAGE TO THE SIDEWALLS OR PLASTIC LINING SHALL BE REPAIRED IMMEDIATELY. REPLACE THE ENTIRE CONCRETE WASHOUT AREA WHEN IT IS 75% FULL. ALL CONCRETE TRUCKS MUST WASHOUT HERE 6" MIN. NO. 2 CRUSHED STONE GRAVEL PAD 10 ML PLASTIC LINING 10 ML PLASTIC LINING B20'20'10' MIN.14'EXISTING PAVEMENT 5: 1 3'EXISTING PAVEMENT PROFILE PLAN VIEW 6" MIN(STANDARD)18" MIN(HEAVY DUTY)FILTER CLOTH R/W DIVERSION AS NEEDED70' MIN. AS REQUIRED EXISTING GROUND CULVERT (AS NEEDED)18"CONSTRUCTION ENTRANCE NOT TO SCALE GEOTEXTILE SPECIFICATION FOR CONSTRUCTION ENTRANCE MINIMUM TENSILE STRENGTH 200 lbs MINIMUM PUNCTURE STRENGTH 80 psi MINIMUM TEAR STRENGTH 50 lbs MINIMUM BURST STRENGTH 320 psi MINIMUM ELONGATION 20% EQUIVALENT OPENING SIZE EOS<0.6 mm PERMITIVITY 1x10-3 cm/sec CONSTRUCTION SPECIFICATIONS: 1.STONE SIZE—ODOT # 2 (1.5-2.5 INCH) STONE SHALL BE USED, OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH—THE CONSTRUCTION ENTRANCE SHALL BE AS LONG AS REQUIRED TO STABILIZE HIGH TRAFFIC AREAS BUT NOT LESS THAN 70 FT. (EXCEPTION: APPLY 30 FT. MINIMUM TO SINGLE RESIDENCE LOTS). 3.THICKNESS -THE STONE LAYER SHALL BE AT LEAST 6 INCHES THICK FOR LIGHT DUTY ENTRANCES OR AT LEAST 10 INCHES FOR HEAVY DUTY USE. 4.WIDTH -THE ENTRANCE SHALL BE AT LEAST 14 FEET WIDE, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS 5.GEOTEXTILE -A GEOTEXTILE SHALL BE LAID OVER THE ENTIRE AREA PRIOR TO PLACING STONE. IT SHALL BE COMPOSED OF STRONG ROT-PROOF POLYMERIC FIBERS AND MEET THE FOLLOWING SPECIFICATIONS: 6.TIMING—THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED AS SOON AS IS PRACTICABLE BEFORE MAJOR GRADING ACTIVITIES. 7.CULVERT -A PIPE OR CULVERT SHALL BE CONSTRUCTED UNDER THE ENTRANCE IF NEEDED TO PREVENT SURFACE WATER FROM FLOWING ACROSS THE ENTRANCE OR TO PREVENT RUNOFF FROM BEING DIRECTED OUT ONTO PAVED SURFACES. 8.WATER BAR -A WATER BAR SHALL BE CONSTRUCTED AS PART OF THE CONSTRUCTION ENTRANCE IF NEEDED TO PREVENT SURFACE RUNOFF FROM FLOWING THE LENGTH OF THE CONSTRUCTION ENTRANCE AND OUT ONTO PAVED SURFACES. 9.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR PREVENT FLOWING SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND. MUD SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC ROADS, OR ANY SURFACE WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS, SHALL BE REMOVED IMMEDIATELY. REMOVAL SHALL BE ACCOMPLISHED BY SCRAPING OR SWEEPING. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. 10. CONSTRUCTION ENTRANCES SHALL NOT BE RELIED UPON TO REMOVE MUD FROM VEHICLES AND PREVENT OFF-SITE TRACKING. VEHICLES THAT ENTER AND LEAVE THE CONSTRUCTION-SITE SHALL BE RESTRICTED FROM MUDDY AREAS. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 11. REMOVAL—THE ENTRANCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREA IS STABILIZED OR REPLACED WITH A PERMANENT ROADWAY OR ENTRANCE. A 12" MIN.6" MIN.4'-0" LOW CENTER SECTION- MUST CAUSE FLOW OVER NOT AROUND, CHECK DAM NOTES: 1.CONSTRUCT CHECK DAM SUCH THAT THE CENTER IS 6" LOWER THAN THE OUTER EDGES. 2.SPACE CHECK DAMS SUCH THAT THE TOE OF THE UPSTREAM DAM IS AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 3.SIDE SLOPES SHALL BE A MINIMUM OF 2:1 4"-8" DIAMETER ROCKAPRON 3' MAX. DITCH SECTION PROFILE FLOW POSITIVE SLO P EPOSITIVE SL O P E FLOW ROCK CHECK DAM NOT TO SCALEC EROSION CONTROL LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE SILT FENCE SWALE CONCRETE WASHOUT AREA CHECK DAM EROSION CONTROL MATTING ODOT TYPE B STABILIZED CONSTRUCTION ENTRANCE XXX XXX XXX XXX CWA CD JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:00 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 23/24EROSION CONTROLNOTESEROSION CONTROL NOTES: 1.ALL EROSION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO ANY SITE GRADING OPERATIONS. ALL APPLICABLE GOVERNING AGENCIES MUST BE NOTIFIED UPON COMPLETION OF THE INSTALLATION OF THE REQUIRED EROSION FACILITIES AND PRIOR TO ANY GRADING OPERATION BEING COMMENCED. IF DAMAGED OR REMOVED DURING CONSTRUCTION, ALL EROSION CONTROL FACILITIES SHALL BE RESTORED AND IN PLACE AT THE END OF EACH WORK DAY. 2.ANY EROSION CONTROL FACILITIES DEEMED NECESSARY BY THE GOVERNING AGENCIES; BEFORE, DURING OR AFTER THE GRADING ACTIVITIES, SHALL BE INSTALLED AT THEIR REQUEST. 3.FLOWS FROM DIVERSION CHANNELS OR PIPES (TEMPORARY OR PERMANENT) SHALL BE ROUTED TO SEDIMENTATION BASINS OR APPROPRIATE ENERGY DISSIPATERS TO PREVENT TRANSPORT OF SEDIMENT TO OUTFLOW TO LATERAL CONVEYORS AND TO PREVENT EROSION AND SEDIMENTATION WHEN RUNOFF FLOWS INTO THESE CONVEYORS. 4.SITE ACCESS ROADS SHALL BE GRADED OR OTHERWISE PROTECTED WITH SILT FENCES, DIVERSION CHANNELS, OR DIKES AND PIPES TO PREVENT SEDIMENT FROM EXITING THE SITE VIA THE ACCESS ROADS. SITE-ACCESS ROADS/DRIVEWAYS SHALL BE SURFACED WITH CRUSHED ROCK WHERE THEY ADJOIN EXISTING PAVED ROADWAYS. 5.SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES OR EQUIPMENT SHALL BE CLEANED DAILY FROM PAVED ROADWAY SURFACES, OR MORE FREQUENTLY IF REQUESTED BY GOVERNING AGENCIES, THROUGHOUT THE DURATION OF CONSTRUCTION. 6.DUST CONTROL MEASURES SHALL BE PERFORMED PERIODICALLY WHEN CONDITIONS REQUIRE AND/OR AS DIRECTED BY THE GOVERNING AGENCIES. 7.ALL EROSION CONTROL MEASURES SHALL BE USED AND MAINTAINED FOR THE DURATION OF SITE CONSTRUCTION. IF CONSTRUCTION OPERATIONS OR NATURAL EVENTS DAMAGE OR INTERFERE WITH THESE EROSION CONTROL MEASURES, THEY SHALL BE RESTORED TO SERVE THEIR INTENDED FUNCTION AT THE END OF EACH DAY OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. 8.ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AS SOON AS POSSIBLE. ANY AREAS WHICH HAVE BEEN FINISHED GRADED SHALL BE SODDED. AREAS THAT HAVE BEEN DISTURBED AND FOR WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY SHALL BE TEMPORARILY SEEDED AND MULCHED AS REQUIRED BY GOVERNING AGENCIES. 9.RUNOFF SHALL BE PREVENTED FROM ENTERING ALL STORM SEWER CATCH BASINS PROVIDING THEY ARE NOT NEEDED DURING CONSTRUCTION. WHERE STORM SEWER CATCH BASINS ARE NECESSARY FOR SITE DRAINAGE DURING CONSTRUCTION, A SILT FENCE OR SEDIMENT PROTECTION DEVICES SHALL BE INSTALLED AND MAINTAINED AROUND ALL CATCH BASINS UNTIL THE TRIBUTARY AREA TO THE CATCH BASIN IS RESTORED. 10.EROSION CONTROL FACILITIES SHALL BE INSTALLED AND MAINTAINED AROUND THE PERIMETER OF ALL LAKES, PONDS, AND WETLANDS, IF ANY WITHIN OR ADJACENT TO THE AREA TO BE GRADED UNTIL THE AREA TRIBUTARY TO THE LAKE, POND, OR WETLAND IS RESTORED. 11.TO MINIMIZE EROSION, ALL 3:1 SLOPES OR GREATER SHALL BE COVERED WITH A TEMPORARY EROSION CONTROL BLANKET OR STAKED SOD. 12.ACCUMULATION OF ALL SEDIMENT OCCURRING IN STORM SEWERS, DITCHES, LAKES, PONDS, WETLANDS SHALL BE REMOVED PRIOR TO, DURING AND AFTER COMPLETION OF GRADING ACTIVITIES, AT NO ADDITIONAL COST TO OWNER. 13.EROSION CONTROL ITEMS AND DEVICES SHALL BE REMOVED ONLY AFTER THE AREA HAS RECEIVED FINAL STABILIZATION. 14.THIS PLAN MUST BE POSTED ON SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON SITE AT ALL TIME. SEDIMENT AND EROSION CONTROL NOTES: MAINTENANCE & INSPECTION PROCEDURES: ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND WITHIN 24 HOURS FOLLOWING ANY STORM EVENT OF 0.5INCHES OR GREATER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE SEDIMENTATION AND EROSION CONTROL FEATURES ON THIS PROJECT. ANY SEDIMENT OR DEBRIS WHICH REDUCES THE EFFICIENCY OF A CONTROL FEATURE SHALL BE REMOVED IMMEDIATELY. SHOULD A STRUCTURE OR FEATURE BECOME DAMAGED, THE CONTRACTOR SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE OWNER AND IT SHALL BE INITIATED WITHIN 24 HOURS OF REPORT. TEMPORARY SEEDING AND PERMANENT SEEDING AND PLANTING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION, AND A WRITTEN LOG MUST BE KEPT. THIS LOG SHALL INDICATE THE DATE OF THE INSPECTION, NAME OF THE INSPECTOR, WEATHER CONDITIONS, OBSERVATIONS, ANY CORRECTIVE ACTIONS TAKEN, AND BE SIGNED IN ACCORDANCE WITH THE CONDITIONS OF THE NPDES PERMIT. ANY CONTROL MEASURE MUST BE REPAIRED/REPLACED WITHIN THREE DAYS OF INSPECTION. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL BE TRAINED IN ALL INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ONSITE IN GOOD WORKING ORDER. A WRITTEN DOCUMENT CONTAINING THE SIGNATURES OF ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED IN THE IMPLEMENTATION OF ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE MAINTAINED AS PROOF ACKNOWLEDGING THAT THEY REVIEWED AND UNDERSTAND THE CONDITIONS AND RESPONSIBILITIES OF THE PLAN. THE DOCUMENT SHALL BE CREATED BY THE CONTRACTOR SIGNED PRIOR TO THE START OF CONSTRUCTION. DISPOSAL OF SOLID/SANITARY/TOXIC WASTE: SOLID, SANITARY, AND TOXIC WASTE MUST BE DISPOSED OF IN A PROPER MANNER IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS IT IS PROHIBITED TO BURN, BURY, OR POUR OUT ONTO THE GROUND OR INTO A STORM SEWER WATER CONVEYANCE ANY SOLVENTS, PAINTS, STAINS, GASOLINE, DIESEL FUEL, USED MOTOR OIL, HYDRAULIC FLUID, ANTIFREEZE, CEMENT CURING COMPOUNDS, AND OTHER SUCH SOLID AND HAZARDOUS WASTES. ANY RINSE WATERS OF SUCH MATERIAL ARE ALSO PROHIBITED FROM BEING PLACED WHERE THEY MAY ENTER DRAINAGEWAYS. WASH OUT OF CEMENT TRUCKS SHOULD OCCUR IN A DIKED, DESIGNATED AREA, AWAY FROM ANY CONVEYANCE CHANNEL. COORDINATE WASH OUT AREA WITH CONSTRUCTION MANAGER. CONTRACTORS RESPONSIBILITIES: THIS PLAN MUST BE POSTED ON-SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON-SITE AT ALL TIMES. DETAILS HAVE BEEN PROVIDED ON THE PLANS IN AN EFFORT TO HELP THE CONTRACTOR PROVIDE EROSION AND SEDIMENTATION CONTROL. THE DETAILS SHOWN ON THE PLAN SHALL BE CONSIDERED A MINIMUM. ADDITIONAL OR ALTERNATE DETAILS MAY BE FOUND IN THE ODNR MANUAL "RAINWATER AND LAND DEVELOPMENT". THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING NECESSARY AND ADEQUATE MEASURES FOR PROPER CONTROL OF EROSION AND SEDIMENT RUNOFF FROM THE SITE ALONG WITH PROPER MAINTENANCE AND INSPECTION IN COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. THE SCHEDULE SHOULD INCLUDE A SEQUENCE OF THE PLACEMENT OF THE SEDIMENTATION AND EROSION CONTROL MEASURES THAT PROVIDES FOR CONTINUAL PROTECTION OF THE SITE THROUGHOUT EARTH MOVING ACTIVITIES. PRIOR TO CONSTRUCTION OPERATIONS IN A PARTICULAR AREA, ALL SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE IN PLACE. FIELD ADJUSTMENTS WITH RESPECT TO LOCATIONS AND DIMENSIONS MAY BE MADE BY THE ENGINEER AND/OR THE OHIO EPA. THE CONTRACTOR SHALL PLACE INLET PROTECTION FOR THE SEDIMENTATION CONTROL IMMEDIATELY AFTER CONSTRUCTION OF THE CATCH BASINS OR INLETS WHICH ARE NOT TRIBUTARY TO A SEDIMENT BASIN OR DAM. IT MAY BECOME NECESSARY TO REMOVE PORTIONS OF SEDIMENTATION CONTROLS DURING CONSTRUCTION TO FACILITATE THE GRADING OPERATIONS IN CERTAIN AREAS. HOWEVER, THE CONTROLS SHALL BE REPLACED UPON GRADING OR DURING ANY INCLEMENT WEATHER. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT OFFSITE TRACKING OF SEDIMENTS BY VEHICLES AND EQUIPMENT IS MINIMIZED. ALL SUCH OFFSITE SEDIMENT SHALL BE CLEANED UP DAILY. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT NO SOLID OR LIQUID WASTE IS DISCHARGED INTO STORM WATER RUNOFF. UNTREATED SEDIMENT-LADEN RUNOFF SHALL NOT FLOW OFFSITE WITHOUT BEING DIRECTED THROUGH A CONTROL PRACTICE. CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE INTO OR ALONG SIDE RIVERS, STREAMS, CREEKS, NATURAL OR MAN-MADE CHANNELS OR SWALES LEADING THERETO. CONCRETE WASH WATER AND SURPLUS CONCRETE SHALL BE CONFINED TO APPROVED AREAS. AFTER SOLIDIFYING THESE WASTED MATERIALS SHALL BE REMOVED FROM THE SITE. POST FLOOD EVENT SITE MAINTENANCE: FOLLOWING A FLOOD EVENT, INSPECT ALL MECHANICAL EQUIPMENT THAT ARE LOCATED ON THE SITE FOR ANY DAMAGES. WALLS AND WALL PENETRATIONS SHALL ALSO BE CHECKED FOR CRACKS AND LEAKS AND REPAIRED AS NECESSARY. ALL DEBRIS THAT MAY HAVE ACCUMULATED ALONG THE SITE SHALL BE GATHERED AND DISPOSED OF ACCORDING TO CITY STANDARDS. CHECK AND ENSURE THAT ALL DRAINAGE STRUCTURES ARE IN STANDARD OPERATION AND REPAIR ANY DAMAGES OR CLOGS THAT MAY HAVE OCCURRED DURING FLOODING. STABILIZATION PROCEDURES CONTRACTOR SHALL BE RESPONSIBLE TO KEEP A RECORD OF DATES WHEN MAJOR GRADING ACTIVITIES OCCUR, WHEN EARTH DISTURBANCE HAS TEMPORARILY OR PERMANENTLY CEASED ON A PORTION OF THE SITE, AND WHEN STABILIZATION MEASURES HAVE BEEN INITIATED. THE LIMITS OF SEEDING AND MULCHING ARE AS SHOWN WITHIN THE PLAN AS INDICATED BY THE LIMITS OF DISTURBANCE. ALL AREAS NOT DESIGNATED TO BE SEEDED SHALL REMAIN UNDER NATURAL GROUND COVER. THOSE AREAS DISTURBED OUTSIDE THE SEEDING LIMITS SHALL BE SEEDED AND MULCHED AT THE CONTRACTOR'S EXPENSE. TEMPORARY STABILIZATION TOPSOIL STOCKPILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY CEASES FOR AT LEAST 14 DAYS WILL BE STABILIZED WITH TEMPORARY SEED AND MULCH NO LATER THAN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY IN THAT AREA. DISTURBED AREAS WITHIN 50 FEET OF A STREAM, FIRST ORDER OR LARGER, SHALL BE STABILIZED WITHIN 2 DAYS OF INACTIVITY. TEMPORARY STABILIZATION MUST BE APPLIED TO ANY AREA OF THE SITE WHICH WILL REMAIN IDLE OVER THE WINTER. THE TEMPORARY SEED SHALL BE RYE (GRASS) APPLIED AT A RATE OF 25 LBS PER 1000 SY. PRIOR TO SEEDING, 900 LBS OF GROUND AGRICULTURAL LIMESTONE AND 200 LBS OF 10-20-20 FERTILIZER SHALL BE APPLIED TO EVERY 1000 SY STABILIZED. IMMEDIATELY AFTER ANY GIVEN AREA IS SEEDED, STRAW OR HAY SHALL BE EVENLY PLACED OVER ALL SEEDED AREAS. TWO TONS PER ACRE FOR STRAW, OR 3 TONS PER ACRE FOR HAY SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF MARCH 15 AND OCTOBER 15. THREE TONS PER ACRE STRAW, OR 4.5 TONS PER ACRE FOR HAY, SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF OCTOBER 15 AND MARCH 15 OF THE SUCCEEDING YEAR. IF DORMANT SEEDING IS BEING USED FOR STABILIZATION, SEED SHALL BE PLANTED AFTER NOVEMBER 20. AREAS TO BE PAVED SHALL BE TEMPORARILY STABILIZED BY APPLYING STONE BASE UNTIL BITUMINOUS PAVEMENT CAN BE APPLIED. IN ADDITION TO TEMPORARY SEEDING, THE CONTRACTOR SHALL PLACE A FILTER FABRIC BARRIER AROUND THE BASE OF ALL SOIL STOCKPILES. PERMANENT STABILIZATION DISTURBED PORTIONS OF THE SITE WHEN CONSTRUCTION HAS COMPLETED, OR PORTIONS THAT WILL REMAIN DORMANT FOR LONGER THAN ONE YEAR, SHALL BE STABILIZED WITH PERMANENT SEED NO LATER THAN 7 DAYS AFTER FINAL GRADE HAS BEEN ESTABLISHED. THE PERMANENT SEED MIX SHALL CONSIST OF 260 LBS/ACRE OF TURF TYPE TALL FESCUE. PRIOR TO SEEDING, APPLY COMMERCIAL FERTILIZER AT THE RATE OF 1 LB ACTUAL NITROGEN PER 1000 SF. FERTILIZER TO HAVE 20-22-14 ANALYSIS. AFTER SEEDING, EACH AREA SHALL BE MULCHED USING TURFIBER (OR EQUIVALENT) AT A RATE OF 2000 LBS PER ACRE WITH 50 LBS OF TURFIBER ADDED PER 100 GALLONS OF MACHINE CAPACITY. KEEP HYDROMULCH FROM NON-TARGET AREAS INCLUDING PAVEMENT, PLANT MATERIALS, CURBING, AND STRUCTURES. IF THESE SURFACES ARE HIT DURING HYDROMULCHING OPERATIONS, WASH THE SURFACE IMMEDIATELY. IF SEASONAL CONDITIONS PROHIBIT THE ESTABLISHMENT OF VEGETATIVE COVER, OTHER METHODS OF STABILIZATION, SUCH AS MULCHING WITH A TACKIFIER OR MATTING, MUST BE EMPLOYED AND MAINTAINED UNTIL A MORE PERMANENT METHOD CAN BE IMPLEMENTED. SITE NARRATIVE EXISTING SITE CONDITIONS:PUBLIC ROAD, 2 DRIVE ENTRANCES; GRASS. PROJECT DESCRIPTION:ACTIVITIES INCLUDE THE WIDENING OF DUBLIN ROAD, ADDING A TURN LANE, AND INTERSECTION TO THE PROPOSED CUL-DE-SAC. CONSTRUCTION OF A SINGLE FAMILY REDEVELOPMENT (7 DWELLING UNITS, 6 NEW HOMES, ASSOCIATED UTILITIES, DRIVES, SIDEWALK AND PAVEMENT IMPROVEMENTS, AND AN UNDERGROUND DETENTION SYSTEM. APPROXIMATELY 1.12 ACRES OF THE SITE WILL BE DISTURBED. RECEIVING STREAM:SCIOTO RIVER. DISTURBED AREA:1.12 ACRES SITE BMPS:FINAL LOCATIONS OF ALL SITE BMPS, INCLUDING DUMPSTERS, VEHICLE FUELING AREAS, CONCRETE TRUCK WASH, MATERIAL STORAGE, AND TOPSOIL STOCKPILES SHALL BE DETERMINED BY CONTRACTOR. IF FINAL LOCATION OF BMPS DIFFER FROM THE LOCATIONS SHOWN, CONTRACTOR SHALL MODIFY SWPPP AND INFORM OHIO EPA OF NEW LOCATIONS OF BMPS. ADJACENT AREAS:EAST: SCIOTO RIVER NORTH: RESIDENTIAL HOMES WEST: RESIDENTIAL HOMES SOUTH: RESIDENTIAL HOMES GRADING REQUIREMENTS:DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE, AND ROCK CHECK DAMS. AREAS WILL BE STABILIZED WHEN GRADED TO PREVENT EROSION ON THE SITE. EROSION & SEDIMENT A COMBINATION OF MEASURES WILL BE USED TO PROVIDE EROSION & SEDIMENT CONTROL MEASURES:CONTROL, INCLUDING SILT FENCE AND SEEDING. PROVIDE INLET PROTECTION AT ALL NEW AND EXISTING DRAINAGE STRUCTURES. ANY OFF SITE BORROW OR SPOIL AREAS SHALL BE SUBJECT TO THE REQUIREMENTS SET FORTH BY THE OHIO EPA. ALL EROSION AND SEDIMENT CONTROL MEASURES FOR OFF-SITE AREAS NOT COVERED BY A SEPARATE NOI OR SWPPP SHALL BE COORDINATED WITH THE OHIO EPA. ALL TRENCH OR EXCAVATION GROUNDWATER CONTAINING SEDIMENT MUST BE EFFECTIVELY TREATED PRIOR TO DISCHARGE INTO THE STORM SEWER SYSTEM. USE ALL MEANS NECESSARY TO CONTROL DUST ON THE SITE AND PREVENT TRACKING SOIL OFF SITE. PERMANENT STABILIZATION:THE SITE WILL BE STABILIZED BY THE USE OF SEEDING OR SODDING IN LAWN AREAS. MAINTENANCE:ALL EROSION CONTROL DEVICES ARE TO BE INSPECTED BY THE CONSTRUCTION SUPERINTENDENT WEEKLY AND AFTER SIGNIFICANT RAINFALLS. ANY DAMAGED FACILITIES ARE TO BE REPLACED OR REPAIRED IMMEDIATELY AS MAY BE NECESSARY. GENERAL CONSTRUCTION (UNLESS NOTED OTHERWISE, ALL EROSION AND SEDIMENT CONTROL MEASURES SEQUENCE:FROM THE BEGINNING OF EARTH DISTURBING ACTIVITIES TO FINAL COMPLETION OF THE PROJECT ARE THE RESPONSIBILITY OF THE CONTRACTOR) 1.ESTABLISH CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT CONSTRUCTION AREA. 2.CONSTRUCT TEMPORARY SEDIMENT CONTROLS AND PERIMETER EROSION CONTROL MEASURES, INCLUDING SEDIMENT BASINS, TEMPORARY OUTLET STRUCTURE, CONSTRUCTION ENTRANCE, AND SILT FENCE. MEASURES SHALL BE IMPLEMENTED AS THE FIRST STEP OF GRADING AND WITHIN 7 DAYS OF FIRST GRUBBING. 3.CLEAR AND GRUB 4.STRIP AND STOCKPILE TOPSOIL. SEED STOCKPILES. PROVIDE PERIMETER SILT FENCE AT TOE OF STOCKPILE SLOPE. 5.PERFORM ROUGH GRADING AND EXCAVATION. STABILIZE AREAS AS INDICATED HEREIN. 6.INSTALL STORM SEWERS, OUTLET STRUCTURE, AND INLET FILTERS. 7.COMPLETE ALL PAVEMENT ACTIVITIES. 8.COMPLETE FINE GRADING OF SEEDED AREAS AND STABILIZE DISTURBED AREAS. 9.ONCE FINAL SEED HAS BEEN ESTABLISHED, CONTRACTOR TO REMOVE TEMPORARY EROSION CONTROL MEASURES AND CLEAN ALL SEDIMENT FROM STRUCTURES AND PAVEMENT. SEDIMENT/WATER QUALITY BASIN SHALL BE CLEANED OF ALL ACCUMULATED SEDIMENT AND RESTORED TO THE ORIGINAL DESIGN CONTOURS SHOWN ON THESE PLANS. 10.PRIOR TO FINISHING WORK, ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION ACTIVITY (INCLUDING, BUT NOT LIMITED TO MATERIAL STORAGE AREAS, TRAILER AREAS, FUELING AREAS, TRUCK WASH AREAS, EQUIPMENT PATHS, HAUL ROADS, ETC.) SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS, OR IF IN AREAS OF PROPOSED IMPROVEMENTS, TO THEIR PROPOSED CONDITIONS. ALL STONE, TRASH, AND DEBRIS SHALL BE REMOVED FROM THE SOIL. THE UPPER 12" OF SOIL SHALL BE SCARIFIED, AND AREA SHALL BE GRADED TO SUBGRADE WITH SUITABLE MATERIALS. FURNISH 6" MINIMUM OF TOPSOIL AND SEED ALL AREAS. SCHEDULE:THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE PLACED IN ACCORDANCE WITH THIS SCHEDULE. JURISDICTION:ALL EROSION AND SEDIMENT CONTROL PRACTICES ARE SUBJECT TO FIELD MODIFICATIONS AT THE DISCRETION OF THE CITY OF DUBLIN AND/OR THE OHIO EPA. OEPA NOI:SUBMITTED, PENDING APPROVAL RUNOFF COEFFICIENTS:PRE-DEVELOPED:C = 0.43 POST-DEVELOPED:C = 0.56 PRE-DEVELOPED IMPERVIOUS AREA:0.07 ACRES POST-DEVELOPED IMPERVIOUS AREA:0.32 ACRES TEMPORARY SEEDING SEEDING DATES SPECIES LB/1,000 SF PER ACRE MARCH 1 TO AUGUST 15 OATS 3 4 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB AUGUST 16 TO NOVEMBER 1 RY 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB WHEAT 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB NOVEMBER 1 TO SPRING SEEDING USE MULCH ONLY, SODDING PRACTICES OR DORMANT SEEDING. NOTE: OTHER APPROVED SEED SPECIES MAY BE SUBSTITUTED PLAN DESIGNER AMERICAN STRUCTUREPOINT, INC. 2550 CORPORATE EXCHANGE DR., STE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: bschilling@structurepoint.com OWNER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM SITE CONTACT NAME TITLE PHONE: (XXX) XXX-XXXX EMAIL: EMAIL ADDRESS TEMPORARY STABILIZATION AREA REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY DISTURBED AREA WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND NOT AT FINAL GRADE WITHIN 2 DAYS OF THE MOST RECENT DISTURBANCE IF THE AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS ANY DISTURBED AREAS THAT WILL BE DORMANT FOR MORE THAN 14 DAYS BUT LESS THAN ONE YEAR, AND NOT WITHIN 50 FEET OF A SURFACE WATER OF THE STATE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE WITHIN THE AREA. FOR RESIDENTIAL SUBDIVISIONS, DISTURBED AREAS MUST BE STABILIZED AT LEAST SEVEN DAYS PRIOR TO TRANSFER OF PERMIT COVERAGE FOR THE INDIVIDUAL LOT(S). DISTURBED AREAS THAT WILL BE IDLE OVER WINTER PRIOR TO THE ONSET OF WINTER WEATHER PERMANENT STABILIZATION AREA REQUIRING PERMANENT STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY AREAS THAT WILL LIE DORMANT FOR ONE YEAR OR MORE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE AN AREAS WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND AT FINAL GRADE WITHIN TWO DAYS OF REACHING FINAL GRADE OTHER AREAS AT FINAL GRADE WITHIN SEVEN DAYS OF REACHING FINAL GRADE IN THAT AREA cannot open53.2753.37 53.27 53.37 53.51 53.54 53.75 53.63 53.58 53.51 53.58 53.14 53.03 53.02 53.17 53.31 53.46 53.57 52.88 53.52 53.43 53.30 53.16 53.03 52.89 53.62 53.75 53.54 53.45 53.05 53.16 7.36' 10' ( T Y P ) 6.68'10' (T Y P ) Δ=089.18, CH=42.1 L=46.69, R=30.0 Δ=090.49, CH=42.6 L=47.38, R=30.0 53.91 53.8530'40'30'40'52.6552.65 14'13'N:770730.25 E: 1796114.98 N:770811.32 E: 1796091.01 1.56%1.55%1.57%1.56%53.71 53.77 1.56%1.56%0.33%0.27%53.740.06%0.07% 53.881.56%53.41 52.83 1.56%1.64%DUBLIN RD 53.42 53.421.79%1.88%94+0095+00 1.5 6 % 7.6 9 % 7.66 % 1.56 %1.56%1.44%1.56% 1.56% 52.91 52.91 52.89 53.39 53.02 53.02 53.03 53.53 52.90 53.40 52.92 52.92 53.04 53.04 53.06 53.56 53.46 LIU COURT1"16"16"DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) 91+00 0+000+3648.42 48.45 47.91 47.96 ME 45.36 45.39 47.12 47.18 ME47.51 ME 46.98 48.51 48.70 47.25 45.64 45.4347.05 1.71%1.69%1.67%1.67%1.69%1.71%3.61%5.49%6.17% 3.69%2.80% 101 12" STM 100 N:770425.49 E: 1796176.53 N:770375.60 E: 1796192.81 48.18 46.26 Δ=070.55, CH=16.2 L=17.24, R=14.0 Δ=084.23, CH=18.8 L=20.58, R=14.0 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES SCALE: H:1"=10', V:1"=5' STORM SEWER PROFILE 100-101 830 840 850 860 830 840 850 860 844.43846.81847.77843.77846.92847.98-0+250+000+75 STA: 0+5912" INV (S): 845.75101 COC AA-S168N: 770424.19E: 1796174.0759' ~ 12" STM @ 3.35%STA: 0+0012" INV (N): 843.77100 COC AA-S168N: 770367.05E: 1796188.87EX GRADE EX GRADE PROP GRADE PROP GRADE +3.61% SCALE: H:1"=10', V:1"=5' 7118 DUBLIN RD DRIVEWAY PROFILE 830 840 850 860 830 840 850 860 847.24847.25847.25847.29-0+25 0+00 0+50 EX GRADE ℄ DUBLIN RD CENTERLINE STA=0+01.30 ELEV = 847.23 PROP EDGE OF PAVEMENT STA=0+16.12 ELEV = 846.92 R/W STA=0+31.30 ELEV = 847.51 -1.69% JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 4:02 PM EDITED BY: DANUGERAH DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 INT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 24/24INTERSECTION &DRIVEWAY DETAILSGRADING LEGEND FFE=110.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION MATCH EXISTING ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION SLOPE ARROW 10.00 100.00 TC 10.00 HP 10.00 ME 10.50 10.00 X.XX% HORZ 1"=10'0 10 20 ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AECP900TBM1 CP947 CP9950 PROJECT LIMITS 2.37 AC TRIB TO MH 8 1.41 AC TRIB TO MH 2 TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) EXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 INV:843.75 18" R C P 12" RCP12" CPPTOP=853.62' (3' LID) 24" RCP INV:840.88 EX SAN MH 2789 TOP=840.90' INV. 36" NE/S=819.90' EX SAN MH 2772 TOP=836.17' INV. 36" RCP N/S=819.42' 3.84 AC TRIB TO MH 38 1 7 TOTAL TRIBUTARY AREA: 12.36 AC LIU COURTEX SAN (77-003-CIP)EX SAN (77-003-CIP)OPEN SPACE A PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.78 ACRES SCIOTO RIVEREX SAN MH 2788 6 2 3 9 1.61 AC TRIB TO MH 6 1.64 AC TRIB TO MH 9 1.50 AC TRIB TO EX MH 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 INDEX AND TRIBUTARY AREA MAP SHEET INDEX 1 - TITLE SHEET 2 - GENERAL NOTES 3 - PLAN & PROFILE 4 - SANITARY DETAILS Ohio Utilities Protection Service Call 811before you dig SANITARY SEWER PLANS FOR LIU COURT CITY OF DUBLIN, FRANKLIN COUNTY, OHIO TITLE SHEET1/4 STANDARD CONSTRUCTION DRAWINGS THE STANDARD CONSTRUCTION DRAWINGS LISTED ON THESE PLANS SHALL BE CONSIDERED A PART THEREOF. CITY OF DUBLIN (2020 EDITION) CITY OF COLUMBUS SA-01 SA-02 SA-03 SA-04 AA-S102 AA-S106 AA-S107 AA-S110 AA-S117 AA-S119 AA-S149 AA-S150 AA-S161 AA-S162 APPROVED: CITY OF DUBLIN: SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSE AND GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. REGISTERED ENGINEER E-86125 DATE DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE CITY OF COLUMBUS: APPROVAL ON THE PART OF THE CITY OF COLUMBUS IS GIVEN PURSUANT TO THE PROVISIONS OF THE SEWER (AND/OR WATER) SERVICE AGREEMENT BETWEEN THE CITY OF DUBLIN, OHIO, DATED APRIL 13, 1993. DATE DIRECTOR, DEPARTMENT OF PUBLIC UTILITIES CITY OF COLUMBUS, OHIO DATE ADMINISTRATOR, DIVISION OF SEWERAGE & DRAINAGE CITY OF COLUMBUS, OHIO SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVERJOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690.TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES HORZ 1"=100'0 100 200 UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM ARCHITECT BASS STUDIO ARCHITECTS 36 KING AVENUE COLUMBUS, OHIO 43201 CONTACT: TIMOTHY A. BASS, AIA, LEED AP PHONE: (614) 294-4893 EMAIL: WWW.BASSSTUDIOARCHITECTS.COM BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 PROFE SSIONA L E N G INEERR E GIS T E R E DSTATE OF O H IOE-86125 MATTHEW LILIE J. 07/17/2025 GENERAL NOTES2/4 GENERAL NOTES 1.CITY OF COLUMBUS AND OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS, CURRENT EDITIONS, AND ANY SUPPLEMENTS THERETO (HEREAFTER REFERRED TO AS STANDARD SPECIFICATIONS), SHALL GOVERN ALL CONSTRUCTION ITEMS UNLESS OTHERWISE NOTED. IF A CONFLICT BETWEEN SPECIFICATIONS IS FOUND, THE MORE STRICT SPECIFICATION WILL APPLY AS DECIDED BY THE CITY ENGINEER. ITEM NUMBERS LISTED REFER TO CITY OF COLUMBUS ITEM NUMBERS UNLESS OTHERWISE NOTED. 2.THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION THAT ARE NOT SPECIFIED HEREIN. THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR SAFETY ON THE WORK SITE, OR FOR FAILURE BY THE CONTRACTOR TO PERFORM WORK ACCORDING TO CONTRACT DOCUMENTS. 3.THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS INCLUDING BUT NOT LIMITED TO OHIO EPA PERMITS TO INSTALL (PTI) AND NOTICES OF INTENT (NOI), BUILDING PERMITS, ETC. 4.THE CONTRACTOR SHALL NOTIFY THE CITY OF DUBLIN DIVISION OF ENGINEERING IN WRITING AT LEAST 3 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 5.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL SAFETY REQUIREMENTS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970. THE CONTRACTOR SHALL EXERCISE PRECAUTION ALWAYS FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT SHALL ALSO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, INCLUDING THE REQUIREMENTS FOR CONFINED SPACES PER 29 CFR 1910.146. 6.FOLLOWING COMPLETION OF CONSTRUCTION OF THE SITE IMPROVEMENTS AND BEFORE REQUESTING OCCUPANCY, A PROOF SURVEY SHALL BE PROVIDED TO THE DIVISION OF ENGINEERING THAT DOCUMENTS "AS_BUILT" ELEVATIONS, DIMENSIONS, SLOPES AND ALIGNMENTS OF ALL ELEMENTS OF THIS PROJECT. THE PROOF SURVEY SHALL BE PREPARED, SIGNED AND SUBMITTED BY THE PROFESSIONAL ENGINEER WHO SEALED THE CONSTRUCTIONS DRAWINGS. 7.THE CONTRACTOR SHALL RESTRICT CONSTRUCTION ACTIVITY TO PUBLIC RIGHT_OF_WAY AND AREAS DEFINED AS PERMANENT AND/OR TEMPORARY CONSTRUCTION EASEMENTS, UNLESS OTHERWISE AUTHORIZED BY THE CITY ENGINEER. 8.THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN OHIO PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. 9.NON_RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT THE WRITTEN PERMISSION OF THE CITY ENGINEER. 10.THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE GRADES AND CROSS_SECTIONS THAT EXISTED BEFORE CONSTRUCTION. 11.TRACKING OR SPILLING MUD, DIRT OR DEBRIS UPON STREETS, RESIDENTIAL OR COMMERCIAL DRIVES, SIDEWALKS OR BIKE PATHS IS PROHIBITED ACCORDING TO SECTION 97.38 OF THE DUBLIN CODE OF ORDINANCES. ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE CITY. IF THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS, OR SPILLAGE, THE CITY RESERVES THE RIGHT TO REMOVE THESE MATERIALS AND CLEAN AFFECTED AREAS, THE COST OF WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 12.DISPOSAL OF EXCESS EXCAVATION WITHIN SPECIAL FLOOD HAZARD AREAS (100-YEAR FLOODPLAIN) IS NOT PERMITTED. 13.ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES WITHIN RIGHT-OF-WAY DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 14.ALL FIELD TILE BROKEN OR ENCOUNTERED DURING EXCAVATION SHALL BE REPLACED OR REPAIRED AND CONNECTED TO THE PUBLIC STORM SEWER SYSTEM AS DIRECTED BY THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURE. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE CITY OF COLUMBUS. PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION. 16.BACKFILL WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES (HOUSES, GARAGES, ETC.) OR PUBLIC INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, BIKE PATHS, ETC.) SHALL BE COMPACTED GRANULAR BACKFILL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR FLOWABLE CDF, TYPE II ACCORDING TO ITEM 613. ITEM 911 OF THE STANDARD SPECIFICATIONS SHALL BE USED ELSEWHERE. 17.THE CONTRACTOR SHALL SUBMIT A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND A LIST OF PROPOSED PRECAST CONCRETE PRODUCT MANUFACTURERS TO THE CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION BEFORE COMMENCING CONSTRUCTION. SEND THE INFORMATION TO THE FOLLOWING ADDRESS: CONSTRUCTION INSPECTION DIVISION CITY OF COLUMBUS 1800 EAST 17TH AVENUE COLUMBUS, OHIO 43219 SEND A COPY OF THE TRANSMITTAL LETTER TO THE FOLLOWING ADDRESS: DIVISION OF ENGINEERING CITY OF DUBLIN 6555 SHIER RINGS ROAD DUBLIN, OHIO 43016 18.ALL TRENCHES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES OUTSIDE THESE AREAS SHALL BE BACKFILLED OR SHALL BE PROTECTED BY APPROVED TEMPORARY FENCING OR BARRICADES DURING NONWORKING HOURS. CLEAN UP SHALL FOLLOW CLOSELY BEHIND THE TRENCHING OPERATION. 19.ALL TREES WITHIN THE CONSTRUCTION AREA NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY FENCING PLACED A MINIMUM 15 FEET FROM THE TREE TRUNK. TREES 6 - INCHES OR GREATER AT DBH (DIAMETER BREAST HEIGHT) MUST BE PROTECTED WITH FENCING PLACED AT THE CRITICAL ROOT ZONE OR 15 FEET, WHICHEVER IS GREATER. TREES NOT INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS FOR REMOVAL MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE DIVISION OF ENGINEERING. 20.CONDUIT MUST BE DIRECTIONALLY BORED ACROSS STREETS INSTEAD OF OPEN CUT, UNLESS SPECIFICALLY APPROVED BY THE CITY ENGINEER. USE OF PNEUMATIC AIR RAM DEVICES IS NOT PERMITTED. PERMITS TO CONSTRUCT IN THE RIGHT-OF-WAY OF EXISTING STREETS MUST BE OBTAINED FROM THE CITY OF DUBLIN DIVISION OF ENGINEERING BEFORE COMMENCING CONSTRUCTION. SHOULD OPEN CUTTING OF EXISTING PAVEMENT BE PERMITTED, CONTROLLED DENSITY BACKFILL (TYPE II) SHALL BE USED IN PLACE OF COMPACTED GRANULAR BACKFILL, ACCORDING TO ITEM 613 OF THE STANDARD SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES WITHIN THE RIGHT-OF-WAY AND PUBLIC EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE CITY. 22.PAVEMENTS SHALL BE CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR AS REQUIRED BY THE CITY ENGINEER. PAVEMENT REPLACEMENT SHALL BE CONDUCTED ACCORDING TO CITY OF COLUMBUS STANDARD DRAWING 1441 DR. A AND APPLICABLE CITY OF DUBLIN STANDARD DRAWINGS. THE REPLACEMENT OF DRIVEWAYS, HANDICAPPED RAMPS, SIDEWALKS, BIKE PATHS, PARKING LOT PAVEMENT, ETC. SHALL BE PROVIDED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS AND CITY OF DUBLIN STANDARD CONSTRUCTION DRAWINGS. 23.TREE TRIMMING WITHIN THE CONSTRUCTION ZONE IS TO BE COMPLETED BY A CERTIFIED ARBORIST. AT THE COMPLETION OF THE PROJECT, THE ARBORIST IS TO RETURN AND TRIM ANY BROKEN BRANCHES AS NEEDED. 24.ANY MODIFICATION TO THE WORK SHOWN ON DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CITY ENGINEER, CITY OF DUBLIN. 25.ALL INLETS SHALL BE CHANNELIZED. 26.PARK AREAS SHALL BE FINE_GRADED AND SEEDED WITH THE FOLLOWING MIXTURE: IMPROVED KENTUCKY BLUEGRASS: 40% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) IMPROVED PERENNIAL RYE: 60% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) GERMINATION RATE: 85% APPLICATION RATE: 7 LBS PER 1000 SQ FT OR AS DIRECTED BY THE DIVISION OF PARKS AND RECREATION, CITY OF DUBLIN, OHIO. 27.TRAFFIC CONTROL AND OTHER REGULATORY SIGNS SHALL BE TYPE S WITH A SQUARE POST ANCHOR BASE INSTALLATION AND MEET ALL REQUIREMENTS OF ODOT TC-41.20 AND APPLICABLE CITY OF DUBLIN SPECIFICATIONS. 28. STREET SIGNS SHALL MEET ALL CITY OF DUBLIN SPECIFICATIONS WITH LETTERING COLORED IN WHITE DISPLAYED OVER A BROWN BACKGROUND. SIGN TUBING SHALL BE BROWN IN COLOR AND CONFORM WITH THE TYPE S, SQUARE POST ANCHOR BASE INSTALLATION REQUIREMENTS OF ODOT TC-41.20. UTILITIES 1.THE FOLLOWING UTILITIES ARE KNOWN TO BE LOCATED WITHIN THE LIMITS OF THIS PROJECT: AEP OHIO - ELECTRIC BREEZELINE - TELECOM COLUMBIA GAS OF OH-COLUMBUS - GAS DUBLIN SEWER - SANITARY SEWER DUBLIN WATER - WATER MAIN DUBLIN DIVISION OF ENGINEERING - STORMWATER AT&T - TELECOM CHARTER COMM - TELECOM 2.THE CONTRACTOR SHALL GIVE NOTICE OF INTENT TO CONSTRUCT TO OHIO UTILITIES PROTECTION SERVICE (TELEPHONE NUMBER 800_362_2764), PRODUCER'S UNDERGROUND PROTECTION SERVICE (TELEPHONE NUMBER 614_587_0486), AND TO OWNERS OF UNDERGROUND UTILITIES THAT ARE NOT MEMBERS OF A REGISTERED UNDERGROUND PROTECTION SERVICE. NOTICE SHALL BE GIVEN AT LEAST 2 WORKING DAYS BEFORE START OF CONSTRUCTION. 3.THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE OWNER OF THE UNDERGROUND UTILITY. THE CITY OF DUBLIN AND THE CITY ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. 4.LOCATION, SUPPORT, PROTECTION AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5.WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE CITY ENGINEER. 6.PUBLIC STREET LIGHTING MAY BE IN THE VICINITY OF THIS PROJECT. CONTACT THE CITY OF DUBLIN, DIVISION OF ENGINEERING AT 410-4637, TWO DAYS PRIOR TO BEGINNING WORK. TRAFFIC CONTROL 1.TRAFFIC CONTROL SHALL BE FURNISHED, ERECTED, MAINTAINED, AND REMOVED BY THE CONTRACTOR ACCORDING TO OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (OMUTCD), CURRENT EDITION. 2.ALL TRAFFIC LANES OF PUBLIC ROADWAYS SHALL BE FULLY OPEN TO TRAFFIC FROM 7:00 AM TO 9:00 AM AND FROM 4:00 PM TO 6:00 PM UNLESS AUTHORIZED DIFFERENTLY BY THE CITY ENGINEER. AT ALL OTHER HOURS THE CONTRACTOR SHALL MAINTAIN MINIMUM ONE_LANE TWO_WAY TRAFFIC. UNIFORMED, OFF-DUTY POLICE OFFICERS SHALL REPLACE FLAGMEN DESIGNATED BY THE OMUTCD, AND SHALL BE PRESENT WHENEVER ONE_LANE, TWO_WAY TRAFFIC CONTROL IS IN EFFECT. POLICE CRUISERS MAY BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 3.IF THE CITY ENGINEER DETERMINES THAT THE CONTRACTOR IS NOT PROVIDING PROPER PROVISIONS FOR TRAFFIC CONTROL, THE CITY ENGINEER SHALL ASSIGN UNIFORMED, OFF_DUTY POLICE OFFICERS TO THE PROJECT AT NO COST TO THE CITY. 4.STEADY_BURNING, TYPE "C" LIGHTS SHALL BE REQUIRED ON ALL BARRICADES, DRUMS, AND SIMILAR TRAFFIC CONTROL DEVICES IN USE AT NIGHT. 5.ACCESS FROM PUBLIC ROADWAYS TO ALL ADJOINING PROPERTIES FOR EXISTING RESIDENTS OR BUSINESSES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT FOR MAIL, PUBLIC WATER AND SANITARY SEWER SERVICE, AND EMERGENCY VEHICLES. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN DETAILING THE PROPOSED MAINTENANCE OF TRAFFIC PROCEDURES. THE TRAFFIC CONTROL PLAN MUST INCORPORATE ANY TRAFFIC CONTROL DETAILS CONTAINED HEREIN. THE TRAFFIC CONTROL PLAN PROPOSED BY THE CONTRACTOR MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL 1.THE CONTRACTOR OR DEVELOPER IS RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) TO BE REVIEWED AND APPROVED BY THE OHIO EPA. THE NOI MUST BE SUBMITTED TO OEPA 45 DAYS PRIOR TO THE START OF CONSTRUCTION AND MAY ENTITLE COVERAGE UNDER THE OHIO EPA GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. A PROJECT LOCATION MAP MUST BE SUBMITTED WITH THE NOI. A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL IF A SEDIMENT AND EROSION CONTROL PLAN HAS NOT ALREADY BEEN INCLUDED WITH THE APPROVED CONSTRUCTION DRAWINGS. THIS PLAN MUST BE MADE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE DESIGN OF EROSION CONTROL SYSTEMS SHALL FOLLOW THE REQUIREMENTS OF OHIO EPA, ITEM 207 OF OHIO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AND THE CITY ENGINEER. AN INDIVIDUAL NPDES STORMWATER DISCHARGE PERMIT MAY BE REQUIRED. THE CONTRACTOR SHALL BE CONSIDERED THE PERMITTEE. 2.THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL AT ALL POINTS WHERE STORM WATER RUNOFF LEAVES THE PROJECT, INCLUDING WATERWAYS, OVERLAND SHEET FLOW, AND STORM SEWERS. 3.ACCEPTED METHODS OF PROVIDING EROSION/SEDIMENT CONTROL INCLUDE BUT ARE NOT LIMITED TO: SEDIMENT BASINS, SILT FILTER FENCE, AGGREGATE CHECK DAMS, AND TEMPORARY GROUND COVER. HAY OR STRAW BALES ARE NOT PERMITTED. 4.THE CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OF THE WORK AREA AT ALL TIMES CONSISTENT WITH EROSION CONTROL PRACTICES. 5.DISTURBED AREAS THAT WILL REMAIN UNWORKED FOR 30 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN SEVEN CALENDAR DAYS OF THE DISTURBANCE. OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT THE CONCLUSION OF CONSTRUCTION BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER. BLASTING (IF PERMITTED) 1.THE CONTRACTOR MUST OBTAIN A BLASTING PERMIT FROM WASHINGTON TOWNSHIP FIRE DEPARTMENT PRIOR TO BLASTING FOR ROCK EXCAVATION. THE CONTRACTOR SHALL SUBMIT BLASTING REPORTS UPON COMPLETION OF BLASTING TO THE CITY ENGINEER, THE OWNER, AND THE OWNER'S ENGINEER. TOP OF ROCK ELEVATIONS SHALL BE SHOWN ON "AS_BUILT" CONSTRUCTION DRAWINGS. SANITARY SEWERS 1.CONNECTIONS TO THE SANITARY SEWER WILL BE PERMITTED UPON RECEIVING AN OEPA PERMIT TO INSTALL (PTI), AND UPON RECEIVING A SATISFACTORY LETTER FROM THE DESIGN ENGINEER STATING THAT THE PROJECT HAS BEEN CONSTRUCTED AS PER THE PLANS, AND ALL OF THE CONDITIONS OF THE PTI HAVE BEEN MET. THE DEVELOPER IS RESPONSIBLE FOR OBTAINING ALL REQUIRED OHIO EPA APPROVALS AND PAYING REVIEW FEES. 2.SANITARY SEWAGE COLLECTION SYSTEMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE RULES, REGULATIONS, STANDARDS AND SPECIFICATIONS OF THE CITY OF DUBLIN, OHIO EPA, OHIO DEPARTMENT OF HEALTH AND THE CURRENT EDITION OF THE GREAT LAKES-UPPER MISSISSIPPI RIVER BOARD (TEN STATES) - RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES. 3.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPE WITH DIAMETERS 8 INCHES TO 10 INCHES SHALL BE PVC SEWER PIPE ASTM D3034, SDR 35. PIPE FOR 6 INCH DIAMETER HOUSE SERVICE LINES SHALL BE PVC PIPE ASTM D3034, SDR 35. PVC PIPE SHALL NOT BE USED AT DEPTHS GREATER THAN 28 FEET. PIPE MATERIALS AND RELATED STRUCTURES SHALL BE SHOP TESTED IN ACCORDANCE WITH CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION QUALITY CONTROL REQUIREMENTS. 4.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPES WITH DIAMETERS 12 INCHES TO 30 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2736. SANITARY SEWER PIPES WITH DIAMETERS 30 INCHES TO 60 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2764. 5.ALL IN_LINE WYE AND TEE CONNECTIONS IN CONCRETE SEWERS, 18-INCH DIAMETER AND LARGER, SHALL BE EITHER KOR_N_TEE OR KOR_N_SEAL CONNECTIONS CONFORMING TO THE MANUFACTURER'S RECOMMENDATIONS. 6.GRANULAR BACKFILL SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR CONTROLLED DENSITY BACKFILL ACCORDING TO ITEM 613, TYPE II OF THE STANDARD SPECIFICATIONS AS DIRECTED BY THE CITY ENGINEER. 7.ALL MANHOLE LIDS SHALL BE PROVIDED WITH CONTINUOUS SELF_SEALING GASKETS. THE APPROVED CONSTRUCTION DRAWINGS SHALL SHOW WHERE BOLT_DOWN LIDS ARE REQUIRED. SANITARY SEWER MANHOLES SHALL BE PRECAST CONCRETE OR AS APPROVED BY THE CITY ENGINEER AND CONFORM TO THE CITY OF DUBLIN SANITARY MANHOLE STANDARD DRAWING. MANHOLE LIDS SHALL INCLUDE CITY OF DUBLIN LOGO. 8.ALL PVC SEWER PIPES SHALL BE DEFLECTION TESTED NO LESS THAN 60 DAYS AFTER COMPLETION OF BACKFILLING OPERATIONS. ALL OTHER REQUIREMENTS SHALL BE ACCORDING TO ITEM 901.21 OF THE STANDARD SPECIFICATIONS. 9.TEMPORARY BULKHEADS SHALL BE PLACED IN PIPES AT LOCATIONS SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AND SHALL REMAIN IN PLACE UNTIL THE PERMIT TO INSTALL (PTI) HAS BEEN ISSUED BY THE OEPA AND THE SEWERS HAVE BEEN APPROVED FOR USE BY THE CITY ENGINEER. THE COST FOR FURNISHING, INSTALLING, MAINTAINING, AND REMOVING BULKHEADS SHALL BE INCLUDED IN THE CONTRACT UNIT BID PRICE FOR THE VARIOUS SANITARY SEWER ITEMS. 10.ALL SANITARY SEWERS INCLUDING SANITARY SEWER SERVICE LINES SHALL BE SUBJECTED TO AND PASS INFILTRATION OR EXFILTRATION TESTS ACCORDING TO ITEM 901 OF THE STANDARD SPECIFICATIONS AND MUST BE APPROVED FOR USE BY THE CITY ENGINEER BEFORE ANY SERVICE CONNECTIONS ARE TAPPED INTO SEWERS. 11.FOR SANITARY SEWER INFILTRATION, LEAKAGE THROUGH JOINTS SHALL NOT EXCEED 100 GALLONS PER INCH OF TRIBUTARY SEWER DIAMETER PER 24 HOURS PER MILE OF LENGTH OR THE COMPUTED EQUIVALENT. ALL SANITARY SEWERS SHALL BE TESTED. 12.AT THE DETERMINATION OF THE CITY ENGINEER, THE CONTRACTOR MAY BE REQUIRED TO PERFORM A TV INSPECTION OF THE SANITARY SEWER SYSTEM PRIOR TO FINAL ACCEPTANCE BY THE CITY. THIS WORK SHALL BE COMPLETED BY THE CONTRACTOR AT HIS EXPENSE. 13.VISIBLE LEAKS OR OTHER DEFECTS OBSERVED OR DISCOVERED DURING TV INSPECTION SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER. 14.ROOF DRAINS, FOUNDATION DRAINS, FIELD TILE OR OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER SYSTEM ARE STRICTLY PROHIBITED ACCORDING TO SECTION 51.23 OF THE DUBLIN CODE OF ORDINANCES. 15.ALL WATER LINES SHALL BE LOCATED AT LEAST 10 FEET HORIZONTALLY AND 18 INCHES VERTICALLY, FROM SANITARY SEWERS AND STORM SEWERS, TO THE GREATEST EXTENT PRACTICABLE. WHERE SANITARY SEWERS CROSS WATER MAINS OR OTHER SEWERS OR OTHER UTILITIES, TRENCH BACKFILL SHALL BE PLACED BETWEEN THE PIPES CROSSING AND SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS. IN THE EVENT THAT A WATER LINE MUST CROSS WITHIN 18 INCHES OF A SANITARY SEWER, THE SANITARY SEWER SHALL BE CONCRETE ENCASED OR CONSIST OF DUCTILE IRON PIPE MATERIAL. 16.SERVICE RISERS SHALL BE INSTALLED WHERE THE DEPTH FROM WYES TO PROPOSED GROUND ELEVATION EXCEEDS 10 FEET. TOPS OF RISERS SHALL BE NO LESS THAN 9 FEET BELOW PROPOSED GROUND ELEVATION IF BASEMENT SERVICE IS INTENDED. 17.WHERE SERVICE RISERS ARE NOT INSTALLED, A MINIMUM 5_FOOT LENGTH OF SANITARY SEWER SERVICE PIPE OF THE SAME SIZE AS THE WYE OPENING SHALL BE INSTALLED. 18.THE CONTRACTOR SHALL FURNISH AND PLACE, AS DIRECTED, APPROVED WYE POLES MADE OF 2 INCHES X 2 INCHES LUMBER AT ALL WYE LOCATIONS, ENDS OF EXTENDED SERVICES, OR AT THE END OF EACH RISER WHERE RISERS ARE REQUIRED. WYE POLES SHALL BE VISIBLE BEFORE ACCEPTANCE BY THE CITY. THE COST OF THESE POLES SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR THE VARIOUS SEWER ITEMS. 19.EXISTING SANITARY SEWER FLOWS SHALL BE MAINTAINED AT ALL TIMES. COSTS FOR PUMPING AND BYPASSING SHALL BE INCLUDED IN THE CONTRACTOR'S UNIT PRICE BID FOR THE RELATED ITEMS. 20.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, EQUIPMENT, AND LABOR TO MAKE CONNECTIONS TO EXISTING MANHOLES. THE SEWER PIPE TO MANHOLE CONNECTIONS FOR ALL SANITARY SEWERS SHALL BE FLEXIBLE AND WATERTIGHT. ALL HOLES SHALL BE NEATLY CORED. THE SEWER PIPE BARREL AT THE SPRINGLINE SHALL NOT EXTEND MORE THAN 1 INCH BEYOND THE INSIDE FACE OF THE MANHOLE. TO MAINTAIN FLEXIBILITY IN THE CONNECTION, A 1_INCH SPACE SHALL BE LEFT BETWEEN THE END OF THE PIPE INSIDE THE MANHOLE AND THE CONCRETE CHANNEL; THIS SPACE SHALL BE FILLED WITH A WATERPROOF FLEXIBLE JOINT FILLER. ANY METAL THAT IS USED SHALL BE TYPE 300 SERIES STAINLESS STEEL. THE CONNECTION MAY BE ANY OF THE FOLLOWING TYPES: A.RUBBER SLEEVE WITH STAINLESS STEEL BANDING. 1)KOR_N_SEAL AS MANUFACTURED BY NATIONAL POLLUTION CONTROL SYSTEMS, INC. 2)LOCK JOINT FLEXIBLE MANHOLE SLEEVE AS MANUFACTURED BY INTERPACE CORPORATION. 3)OR EQUAL AS APPROVED BY THE CITY ENGINEER. B.RUBBER GASKET COMPRESSION. 1)PRESS WEDGE II AS MANUFACTURED BY PRESS_SEAL GASKET CORPORATION. 2)DURA SEAL III AS MANUFACTURED BY DURA TECH, INC. 3)LINK_SEAL AS MANUFACTURED BY THUNDERLINE CORPORATION. 4)OR EQUAL AS APPROVED BY THE CITY ENGINEER. THE COST FOR THIS WORK ALONG WITH A NEW CHANNELIZED BASE FOR THE MANHOLE SHALL BE INCLUDED IN THE UNIT BID PRICE FOR THE RELATED ITEMS OF WORK. WATER LINE 1-17 DELETED STORM SEWER 1-11 DELETED MAIL DELIVERY 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT US MAIL DELIVERY WITHIN THE PROJECT LIMITS IS NOT DISRUPTED BY CONSTRUCTION OPERATIONS. THIS RESPONSIBILITY IS LIMITED TO RELOCATION OF MAILBOXES TO A TEMPORARY LOCATION THAT WILL ALLOW THE COMPLETION OF THE WORK AND SHALL ALSO INCLUDE THE RESTORATION OF MAILBOXES TO THEIR ORIGINAL LOCATION OR APPROVED NEW LOCATION. ANY RELOCATION OF MAILBOX SERVICES MUST BE FIRST COORDINATED WITH THE US POSTAL SERVICE AND THE HOMEOWNER. 2.BEFORE RELOCATING ANY MAILBOXES, THE CONTRACTOR SHALL CONTACT THE U.S. POSTAL SERVICE AND RELOCATE MAILBOXES ACCORDING TO THE REQUIREMENTS OF THE POSTAL SERVICE. USE OF FIRE HYDRANTS 1.THE CONTRACTOR SHALL MAKE PROPER ARRANGEMENTS WITH THE DUBLIN SERVICE DEPARTMENT AND THE COLUMBUS DIVISION OF WATER FOR THE USE OF FIRE HYDRANTS WHEN USED FOR WORK PERFORMED UNDER THIS CONTRACT AND PROVIDE THE CITY OF DUBLIN A COPY OF THE HYDRANT USAGE PERMIT OBTAINED FROM THE CITY OF COLUMBUS. THE CONTRACTOR SHALL ALSO SEND A COPIES OF PERMITS OBTAINED FROM DUBLIN AND COLUMBUS TO THE WASHINGTON AND/OR PERRY TOWNSHIP FIRE DEPARTMENT. PERMITS SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. 2.BEFORE THE FINAL ESTIMATE IS PAID, THE CONTRACTOR SHALL SUBMIT A LETTER FROM THE CITY OF COLUMBUS DIVISION OF WATER TO THE CITY ENGINEER STATING THAT THE CONTRACTOR HAS RETURNED THE SIAMESE VALVE TO THE CITY OF COLUMBUS AND HAS PAID ALL COSTS ARISING FROM THE USE OF THE FIRE HYDRANTS. JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690.TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES ELEC. RISER OUTLET TOP=828.93' INV. 12" SPP= 8 2 7 . 3 8 ' (ACCORDING T O G R O U N D S CREW: PIPE O U T L E T S @ P T . 1 6 9 5 ) TOP=836.17' INV. 36" RCP N / S = 8 1 9 . 4 2 ' (77-003-CIP) EX BLDG WV WV 24" STM 12" STM 1 8 " STM 0+00 1+00 2+003 + 0 0 3 + 3 7 CONNECT PROP SANITARY TO EX MANHOLE 6" SAN @2.08% MIN (TYP ALL SERVICES) 6" SAN @2.08% MIN (TYP ALL SERVICES) LI U C O U R T 20' SAN EASE M E N T14+0015+001 6 + 0 0 16 + 1 8 1EX 36" SAN(77-003-CIP)8" SAN 12" STM 12" STM 12" STM2 3 8" SAN8 " S A N 20' SAN EASEMENT6" SAN @2.08% MIN, CONNECT TO EXISTING SANITARY SERVICE 2772 LOT 6 PAD=842.00 LOT 5 PAD=837.00 REAR=827.00 LOT 4 FFE=832 CONTRACTOR TO ABANDON EX SANITARY SERVICE 7192 A T & T WV TOP=840.90' INV. 36" NE/S=819.90' 8" SAN 2+03 0+00 1+00 2+008 7 6" SAN @2.08% MIN (TYP ALL SERVICES) 6" SAN @2.08% MIN (TYP ALL SERVICES)58'28'LIU COURT 11+00 12+00 1 3 + 0 0EX 36" SAN(77-003-CIP)LOT 2 PAD=852.00 REAR=842.00 LOT 3 PAD=847.00 REAR=837.00EX 36" SAN (77-003-CIP) 8" WATER MAIN 20' SAN EASEMENT 6 2789 6" SAN @2.08% MIN (TYP ALL SERVICES)12" STM1 2 " S TMDUBLIN ROAD20'9 0+0 0 0+7 2 LOT 1 PAD=852.50 LOT 7 40,531 S F 0.93 A C PAD=8 5 2 . 5 0 6" SAN @2.08% MIN (TYP ALL SERVICES) SCALE: H:1"=30', V:1"=10' SANITARY SEWER PROFILE SAN 6-8 800 810 820 830 840 850 860 870 800 810 820 830 840 850 860 870 SCALE: H:1"=30', V:1"=10' SANITARY SEWER PROFILE SAN 7-9 800 810 820 830 840 850 860 870 800 810 820 830 840 850 860 870 EXISTING GRADE 840.53841.00840.86840.76841.59842.71843.89844.70845.60-0+300+001+002+002+20 8 T.C. 852.25COC AA-S102DUBLIN SA-01 (48")N: 770823.37E: 1796144.86STA: 2+038" INV (E): 837.007 T.C. 848.19COC AA-S102DUBLIN SA-01 (48")N: 770861.69E: 1796280.95STA: 0+628" INV (W): 836.378" INV (N): 836.278" INV (E): 836.37141' ~ 8" SAN @ 0.45% EX 36" SAN 8" INSIDE DROP (PER COC AA-S110)STA: 0+158" INV (S): 836.068" INV (E): 835.96STA:0+008" INV (W):835.8936" INV (NE):819.9036" INV (S):819.906 T.C. 850.52COC AA-S102DUBLIN SA-01 (48")N: 770908.16E: 1796283.412789 TC 850.03ODOT MH-3N: 770911.23E: 1796298.10EXISTING GRADE 840.42839.67838.88-0+15 0+00 0+85STA: 0+008" INV (W): 836.378" INV (N): 836.278" INV (E): 836.37STA: 0+728" INV (W): 836.699 T.C. 846.06COC AA-S102DUBLIN SA-01 (48")N: 770850.96E: 1796352.257 T.C. 848.19COC AA-S102DUBLIN SA-01 (48")N: 770861.69E: 1796280.9572' ~ 8" SAN @ 0.45% 47' ~ 8" SAN @ 0.45% 15' ~ 8" SAN @ 0.47% EX 36" SAN* WATER SERVICE 4' MIN COVER & 18" MIN CLEARANCE FROM SAN * SCALE: H:1"=30', V:1"=10' SANITARY SEWER PROFILE SAN 1-3 800 810 820 830 840 850 860 800 810 820 830 840 850 860 PROPOSED GRADE PROPOSED GRADE EXISTING GRADE EXISTING GRADE 1 T.C. 834.26COC AA-S102DUBLIN SA-01 (48")N: 770495.74E: 1796588.55STA: 2+008" INV (W): 823.098" INV (N): 823.19836.37836.02835.44835.20834.29832.31830.87829.10827.22825.55826.29826.95827.91829.78832.96833.33833.26834.24834.94834.75834.69833.03833.38-0+15 0+00 1+00 2+00 3+00 3+70STA:0+008" INV (E):822.2036" INV (S):819.4236" INV (N):819.422772 TC 836.37EX MANHOLEN: 770444.06E: 1796395.80200' ~ 8" SAN @ 0.45%STA: 2+918" INV (S): 823.608" INV (NW): 823.702 T.C. 834.11COC AA-S102DUBLIN SA-01 (48")N: 770584.36E: 1796612.19STA: 3+378" INV (SE): 823.913 T.C. 834.10COC AA-S102DUBLIN SA-01 (48")N: 770613.65E: 1796576.8846' ~ 8" SAN @ 0.45% 92' ~ 8" SAN @ 0.45% 24" STM * WATER SERVICE 4' MIN COVER & 18" MIN CLEARANCE FROM SAN # JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:56 PM EDITED BY: MLILIE DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES SITE LEGEND PROPERTY LINE RIGHT-OF-WAY CURB AND GUTTER SIGN UTILITY LEGEND SANITARY GRAVITY SANITARY SERVICE WATER STORM SEWER CATCH BASIN HEADWALL SANITARY MANHOLE FIRE HYDRANT WATER VALVEWV VERT 1"=10' HORZ 1"=30' 0 0 10 30 20 60 NOTE: CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ELEVATIONS AND INVERTS PRIOR TO START OF CONSTRUCTION. LONG SERVICES ARE TO HAVE AT LEAST 2' OF RISER ON HOUSE SIDE OF STREET IN ACCORDANCE WITH CITY OF DUBLIN STANDARD CONSTRUCTION DRAWING SA-03. BACKWATER VALVES SHALL BE INSTALLED ON SANITARY SERVICES WITH LESS THAN 2' RISER. TAPS INTO EXISTING SEWER SYSTEMS ARE TO BE CORE DRILLED AND INSPECTED BY THE CITY OF DUBLIN. END OF SANITARY STUBS SHALL BE MARKED WITH 4"X4" POST. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A MINIMUM 2.5' CLEARANCE BETWEEN THE 6" SANITARY SEWER SERVICES AND ALL UTILITY CROSSINGS WHILE MAINTAINING A MINIMUM 2.08% GRADE FOR THE SANITARY SERVICES. CONSTRUCT THE TYPICAL ANTI-INFILTRATION & INFLOW BARRIER FOR ALL CROSSINGS OF SANITARY SEWERS AND WATER MAINS AND STORM SEWERS; SEE DETAIL SHOWN ON SHEET 4 PROPOSED NON-SANITARY SITE IMPROVEMENTS ARE SHOWN FOR REFERENCE ONLY. PLEASE REFER TO THE 7192 DUBLIN RD PRIVATE ON-SITE AND PUBLIC ROAD WIDENING PLANS. PROFILE NOTES: *COMPACTED BACKFILL, ITEM 911 **COMPACTED GRANULAR BACKFILL, ITEM 912 #SEE ANTI INFILTRATION AND INFLOW BARRIER DETAIL, SHEET 4 1 3/4 STM PLAN & PROFILE SANITARY SEWER STRUCTURE TABLE STR. NO 1 2 3 6 7 8 9 2772 2789 STRUCTURE TYPE COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 EX MANHOLE ODOT MH-3 TOP OF CASTING 834.26 834.11 834.10 850.52 848.19 852.25 846.06 836.37 850.03 NORTHING 770495.74 770584.36 770613.65 770908.16 770861.69 770823.37 770850.96 770444.06 770911.23 EASTING 1796588.55 1796612.19 1796576.88 1796283.41 1796280.95 1796144.86 1796352.25 1796395.80 1796298.10 AS-BUILT NORTHING AS-BUILT EASTING SANITARY PIPE DATA TABLE START STRUCTURE 2789 9 8 7 6 3 2 1 END STRUCTURE 7 7 6 2789 2 1 2772 LENGTH 3 72 141 47 15 46 92 200 BEARING S11° 48' 43.64"E N81° 26' 27.13"W N74° 16' 27.44"E N03° 01' 50.25"E N78° 11' 16.36"E S50° 18' 58.07"E S14° 56' 00.96"W S74° 59' 27.37"W JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:56 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 4/4 ANTI-INFILTRATION AND INFLOW BARRIER NOT TO SCALE 66 105 24 48 4421 MATERIAL 1' BEDDING 1' MIN. BELL HOLESUBGRADE Wn/2 D Wn/2 1' 27 52 1' WD 12 15 18 32 36 40 8 * 6 10 30 * n 30 30 FLEXIBLE SEWER PIPE * INCHES WD 80 72 64 48 42 36 52 48 n 56 * 27 24 * 30 12 32 21 18 15 44 40 36 10 8 6 30 27 24 D * W * n 7142 48 54 60 78 87 96 36 30 33 64 57 61 13690 96 102 108 143 151 160 84 78 72 130 123 116 D * W * n D * W * n COMPACTED CLAY PER ITEM 203, STARTING AT 1' ABOVE SANITARY SEWER. 1' THICK BETWEEN STORM AND SANITARY SEWER LINES STORM SEWER BEDDING 4" MIN. SEE STD DWG AA-S151 FOR BEDDING MATERIAL REQUIREMENTS (RIGID SEWER) 4" BEDDING MATERIAL FOR BEDDING MATERIAL REQUIREMENTS SEE STD DWG AA-S149 (FLEXIBLE SEWER) TYPE "A" - FOR CLEARANCES 28" AND GREATER MATERIAL 1' BEDDING BELL HOLESUBGRADE Wn/2 D Wn/2 BENTOFIX THERMAL LOCK GEOSYNTHETIC CLAY LINER (GCL) OR APPROVED EQUAL STORM SEWER BEDDING 4" MIN. SEE STD DWG AA-S151 FOR BEDDING MATERIAL REQUIREMENTS (RIGID SEWER) 4" BEDDING MATERIAL FOR BEDDING MATERIAL REQUIREMENTS SEE STD DWG AA-S149 (FLEXIBLE SEWER) TYPE "B" - FOR CLEARANCES LESS THAN 28" FLEXIBLE SEWER PIPE RIGID SEWER PIPE FLEXIBLE SEWER PIPE RIGID SEWER PIPE RIGID SEWER PIPE * INCHES PROP. STORM & WATER MAIN PROP. STM & WATER MAIN NOTES: 1.THIS DETAIL IS REQUIRED AT ALL SANITARY SEWER AND WATER MAIN CROSSINGS. IF IT IS DISTURBED DURING THE CONSTRUCTION OF THE STORM SEWER OR WATER MAIN IT MUST BE RESTORED TO THE REQUIREMENTS OF THE DETAIL. THIS DETAIL IS NOT BEING USED TO MITIGATE CROSSINGS WHERE THERE IS LESS THAT 18" OF VERTICAL DISTANCE FROM OUTSIDE TO OUTSIDE OF PIPES. A SANITARY DETAILSESTIMATE OF QUANTITIES THESE QUANTITIES HAVE BEEN PROVIDED ONLY AS AN ESTIMATE TO THE SCOPE OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO EVALUATE THE COMPLETE PROJECT AS DETAILED IN THE NOTES, PLANS, AND SPECIFICATIONS AND PROCEDURES NECESSARY FOR THE COMPLETION OF THE PLAN IMPROVEMENTS AND SUBMIT HIS TOTAL PROJECT COST ACCORDINGLY. ITEM QUANTITY UNIT DESCRIPTION SANITARY 604 7 EACH PRECAST CONCRETE MANHOLE TYPE "C" (AA-S102) W/ CITY OF DUBLIN LID (ST-02) 901 613 LF 8" PVC SANITARY SEWER PIPE, OR APPROVED EQUAL 914 12 LF 6" PVC DIA. PIPE RISER 915 7 EACH 8" X 6" WYE FITTING 918 289 LF 6" DIAMETER PIPE, SANITARY HOUSE SERVICE CONNECTION CALCULATED BY: DA DATE: 03/15/2022 CHECKED BY: MJL 07/16/2025 5200 Emerald Parkway Dublin, Ohio 43017 Community Planning and Development Sustainable | Connected | Resilient 614.410.4600 dublinohiousa.gov RECORD OF ACTION Planning and Zoning Commission Thursday, October 23, 2025 | 6:30 p.m. The Planning and Zoning Commission took the following action at this meeting: 1. Liu Court 24-128PP Preliminary Plat Proposal: Request for review and recommendation of approval of a Preliminary Plat for a seven-lot residential subdivision. The 12.79-acre site is zoned R-1, Restricted Suburban Residential District. Location: 7192 Dublin Road Planning Contact: Tammy Noble, Senior Planner Contact Information: 614.410.4649, tnoble@dublin.oh.us Case Information: www.dublinohiousa.gov/pzc/24-128 MOTION: Mr. Way moved, Ms. Harter seconded recommendation to City Council of approval of the Preliminary Plat. VOTE: 4-3 RESULT: The Preliminary Plat was approved. RECORDED VOTES: Rebecca Call Yes Kim Way Yes Kathy Harter Yes Jamey Chinnock No Gary Alexander No Jason Deschler No Dan Garvin Yes STAFF CERTIFICATION Tammy Noble Senior Planner 5200 Emerald Parkway Dublin, Ohio 43017 Community Planning and Development Sustainable | Connected | Resilient 614.410.4600 dublinohiousa.gov RECORD OF ACTION Planning and Zoning Commission Thursday, October 23, 2025 | 6:30 p.m. The Planning and Zoning Commission took the following action at this meeting: 2. Liu Court 25-026FP Final Plat Proposal: Request for review and recommendation of approval of a Final Plat for a seven-lot residential subdivision. The 12.79 acre site is zoned R-1, Restricted Suburban Residential District. Location: 7192 Dublin Road Planning Contact: Tammy Noble, Senior Planner Contact Information: 614.410.4649, tnoble@dublin.oh.us Case Information: www.dublinohiousa.gov/pzc/25-026 MOTION: Mr. Way moved, Ms. Harter seconded recommendation to City Council of approval of the Final Plat with the following conditions: 1) The applicant adds evergreen trees within the landscape easement, subject to staff review and approval, as part of the Final Plat at City Council. 2) The applicant continues to work with Engineering on the final location and design of the Shared Use Path along Dublin Road, including the easement width necessary for the path maintenance and/or construction, prior to approval of the Final Plat at City Council. 3) The location of the driveway on Lot 1 is restricted to the most eastern location allowable based on setbacks, subject to staff approval. 4) The location of the driveway on Lot 7 is restricted to line up with the driveway on Lot 1 or located further to the east, subject to staff approval. 5) The applicant continues to work with the Engineering Division to resolve all comments provided on the plans and make any adjustments to the plat with the submission of the Final Plat at City Council. VOTE: 4-3 RESULT: The Final Plat was approved. 5200 Emerald Parkway Dublin, Ohio 43017 Community Planning and Development Sustainable | Connected | Resilient 614.410.4600 dublinohiousa.gov RECORDED VOTES: Rebecca Call Yes Kim Way Yes Kathy Harter Yes Jamey Chinnock No Gary Alexander No Jason Deschler No Dan Garvin Yes STAFF CERTIFICATION Tammy Noble Senior Planner Planning and Zoning Commission Meeting Minutes – October 23, 2025 Page 6 of 11 At 8:17 p.m., with no objection from the Commission, Ms. Call called for a 7-minute recess with all members returning to the dais at 8:22 p.m. Ms. Call noted that as the following two cases pertain to the same project and property, they will be considered together this evening. Separate actions will be taken for each case. Case #24-128PP and #25-026FP Liu Court – Preliminary Plat and Final Plat Request for review and recommendation of approval of a Preliminary Plat and a Final Plat for a seven-lot residential subdivision. The 12.79-acre site is zoned R-1, Restricted Suburban Residential District and is located at 7192 Dublin Road. Applicant Presentation Ben Schilling, American Structurepoint, 2550 Corporate Exchange Dive, Columbus, presented on behalf of the property owner, thanking the commission and staff for their feedback since April. The team had worked closely with staff to address all conditions from the preliminary plat approval. He stated the proposed layout remained consistent with the property's zoning and subdivision regulations. Staff Presentation Ms. Noble presented the staff report for both applications. This 12-acre site zoned R-1 (Restricted Suburban Residential) is located on the east side of Dublin Road south of Browning Court. The proposal maintains the existing residence while subdividing to create seven single-family lots ranging from approximately 1 to 3 acres, consistent with Envision Dublin's low-density residential designation. Since the April meeting where commissioners discussed site design, building orientation, and natural features, the applicant addressed Preliminary Plat conditions and agreed to construct the shared-use path along Dublin Road rather than pay a fee-in-lieu. All lots meet the 40,000 square foot minimum and 60-foot frontage requirement. Commission Questions Mr. Alexander asked how building setbacks were determined. Ms. Noble stated that they are based on building locations. Mr. Deschler asked about the shared-use path, learning it would only extend along the property frontage with no immediate connection north to Browning Court. Josh Reinicke from Engineering explained no crosswalk was proposed at Liu Court for safety reasons, and the City path extension to connect northward was not immediately planned. He indicated the City remained open to fee- in-lieu discussions. Mr. Deschler also asked whether demolishing the existing large residence had been considered to create a more uniform subdivision. Mr. Liu indicated this was not economically feasible and noted future homes would have similar character with stone and traditional materials enforced through HOA requirements. Mr. Garvin confirmed the owner's flexibility regarding the path construction versus fee-in-lieu and verified their agreement with all proposed conditions. Planning and Zoning Commission Meeting Minutes – October 23, 2025 Page 7 of 11 Ms. Harter asked about tree preservation. Mr. Liu stated that the reason he liked this site is the mature tree so though a waiver would be requested from City Council, they will try to save as many trees as possible. . Ms. Harter asked about mail delivery. Mr. Liu stated that there will be individual mailboxes on the public street. Ms. Harter asked about potential river amenities. Mr. Liu explained the 30-foot elevation drop to the riverbank made dock installation impractical. Public Comment 5 comment were received electronically and shared with the Commission. Neil Matthias 162 Waterford Drive, expressed support for the project, stating concern that Dublin not be viewed as too difficult for developers to work with. He noted that financial risk falls on developers if they make poor decisions about lot sizes or home placement. He also raised concerns about school redistricting impacts on pedestrian-focused planning along Dublin Road and Route 161. Commission Discussion During deliberation, commissioners were divided. Mr. Alexander expressed serious concerns about the lack of planning coherence, noting the houses would not align with each other or the street, creating a chaotic environment unlike developments such as Cortina or River Forest that demonstrate cohesive design. Mr. Deschler agreed with Mr. Alexander's assessment, stating that after seeing the home unchanged for 30-40 years, this proposal was not the right approach. Mr. Garvin felt it was too dense but acknowledged it met the criteria, inclining him toward support. Mr. Way supported the application, noting that given site constraints including the existing house and sanitary sewer easement, the layout actually worked with two gateway sites and reasonable flow. Ms. Harter supported the proposal, appreciating the collaborative work between applicant and City to reach consensus. She noted it met the low-density requirements even if it felt heavy. Mr. Chinnock opposed the proposal, citing Envision Dublin principles about focusing growth in areas best equipped for change. He felt this created hardship in an already stressed area, adversely affecting the roadway and pedestrian safety. The development did not represent thoughtful design for this iconic property. Ms. Call took a different perspective, noting Dublin has few areas where someone can build a single-family home on an acre of property. She viewed this as seven individual property owners building homes on lots meeting zoning requirements, comparing it to similar large-lot areas like Post Road. In straight zoning for residential properties, the Commission has less authority to dictate design compared to commercial or planned developments. Case #24-128PP Planning and Zoning Commission Meeting Minutes – October 23, 2025 Page 8 of 11 Liu Court – Preliminary Plat Request for review and recommendation of approval of a Preliminary Plat for a seven- lot residential subdivision. The 12.79-acre site is zoned R-1, Restricted Suburban Residential District, and is located at 7192 Dublin Road. Mr. Way moved, Ms. Harter seconded recommendation to City Council of approval of the Preliminary Plat. Vote: Mr. Garvin, yes; Mr. Chinnock, no; Ms. Call, yes; Mr. Way, yes; Mr. Deschler, no; Ms. Harter, yes; Mr. Alexander, no. [Motion carried 4-3] Case #25-026FP Liu Court – Final Plat Request for review and recommendation of approval of a Final Plat for a seven-lot residential subdivision. The 12.79 acre site is zoned R-1, Restricted Suburban Residential District and is located at 7192 Dublin Road. Mr. Way moved, Ms. Harter seconded recommendation to City Council of approval of the Final Plat with the following conditions: 1. The applicant adds evergreen trees within the landscape easement, subject to staff review and approval, as part of the Final Plat at City Council. 2. The applicant continues to work with Engineering on the final location and design of the Shared Use Path along Dublin Road, including the easement width necessary for the path maintenance and/or construction, prior to approval of the Final Plat at City Council. 3. The location of the driveway on Lot 1 is trestricted to the most eastern location allowable based on setbacks, subject to staff approval. 4. The location of the driveway on Lot 7 is restricted to line up with the driveway on Lot 1 or located further to the east, subject to staff approval. 5. The applicant continues to work with the Engineering Division to resolve all comments provided on the plans and make any adjustments to the plat with the submission of the Final Plat at City Council. Vote: Mr. Way, yes; Ms. Harter, yes; Mr. Deschler, no; Mr. Chinnock, no; Mr. Alexander, no; Mr. Garvin, yes; Ms. Call, yes. [Motion carried 4-3] Ms. Call noted that as the following two cases pertain to the same project and property, they will be considered together this evening. Separate actions will be taken for each case. Case #25-079FDP and #25-081FP Bright Road Reserve – Final Development Plan and Final Plat Request for review and approval of a Final Development Plan and a request for review and recommendation of approval of a Final Plat for the development of a residential neighborhood consisting of 20 single-family lots. The 14.2-acre site is zoned PUD, Planned Unit Development District – Bright Road Reserve, and is located north of the intersection of Grandee Cliffs Drive and Bright Road. 5200 Emerald Parkway Dublin, Ohio 43017 Community Planning and Development Sustainable | Connected | Resilient 614.410.4600 dublinohiousa.gov PLANNING REPORT Planning and Zoning Commission Thursday, October 23, 2025 Liu Court 24-128PP,25-026FP www.dublinohiousa.gov/PZC/24-128 www.dublinohiousa.gove/PZC/25-026 Case Summary Address 7192 Dublin Road, Dublin, Ohio 43017 Proposal Preliminary Plat (PP) and Final Plat (FP) for a 12.79-acre site to establish 7 single- family lots and a reserve. Request Review and recommendation of aproval to City Council for a Preliminary Plat and Final Plat under the provisions of the Subdivision Regulations. Zoning R-1: Restricted Suburban Residential District. Planning Recommendation Recommendation of Approval to City Council for a Preliminary Plat and Final Plat with Conditions. Next Steps Upon review and recommendation of approval of the Preliminary Plat and Final Plat from the Planning and Zoning Commission (PZC), the application will be eligible for review by City Council for acceptance. Applicant Matthew Lilie, American Structurepoint, Inc. Case Manager Tammy Noble, Senior Planner (614) 410-4649 tnoble@dublin.oh.us City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 2 of 9 Site Location Map 1 Existing access Existing single-family home, detached buildings, and tennis court 2 1 2 Floodplain 3 3 City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 3 of 9 1. Request and Process The applicant is requesting review and recommendation of approval of a Preliminary Plat (PP) and Final Plat (FP) to City Council to subdivide 12.79-acres into seven single-family lots and a reserve. Process 1. Standard District Preliminary Plat (PZC Recommendation) 2. Standard District Preliminary Plat (CC Acceptance) 3. Standard District Final Plat (PZC Recommendation) 4. Standard District Final Plat (CC Acceptance) These are preliminary and final plat applications in a R-1, Restricted Suburban Residential district. The review of the preliminary and final plats is governed exclusively by Section 152.019 in the subdivision code, and the R-1 district provides minimum lot and yard dimensions at Section 153.020(C) of the Zoning Code incorporated by reference in Section 152.019. Unlike preliminary and final plat applications accompanying Planned Development District (PUD) or Bridge Street District applications that the Commission frequently hears, the plat application in this case only considers whether the applicable code minimums have been depicted on the proposed plat. There is no discretion for the Commission to consider additional factors including building form, architecture, or density (so long as the lot size minimums are met). If the plat meets the minimum conditions and is approved, any building upon the lots created will be subject to stormwater, engineering, and building staff review. The individual structures will also be required to meet the Residential Appearance Standards listed in Section 153.190 of the Zoning Code. These are reviewed administratively at the building permit stage. As noted below, approval of each of the preliminary and final plat is a two step process including review and recommendation by the Planning and Zoning Commission (PZC) and final determination by City Council (CC). 2. Background Site Summary The +/-12.79-acre site is zoned R-1, Restricted Suburban Residential District, and is located on the east side of Dublin Road, approximately 490 feet north of the intersection with Killilea Drive. The site is bordered by single-family residences to the north (Galway Estates Subdivision), south (unplatted lot), and west (unplatted lots and Coventry Woods Subdivision), and the Scioto River to the east. All of the immediate surrounding single-family lots are developed under the R- 1 zoning classification, which requires a 40,000-square-foot lot minimum. Mature tree lines define the northern, eastern, and southern property boundaries. The site is currently developed with a single-family residence, several detached structures, and a tennis court, and is accessed from Dublin Road. A shared use path runs along the west side of Dublin Road. History April 2025 PZC reviewed and provided feedback regarding the Preliminary Plat for Liu Trail (now Liu Court) on April 17, 2025. There was significant discussion by the Commission, especially regarding the size of the existing and proposed houses, building orientation, density, and grading. The need for a left turn lane along Dublin Road and the proposed City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 4 of 9 Fee-in-Lieu options for a required Shared Use Path were also discussed. There was uncertainty about PZC’s authority when reviewing plats in a standard zoning district. The application was then tabled at the applicant’s request to allow the applicant to respond to the Commission’s comments. The Planning Report associated with the April 17 meeting included several recommended conditions of approval. The applicant has since addressed those conditions in the following manner: 1) That the applicant addresses all plat notations regarding setbacks and lot size, with the submission of the Final Plat; All notations have been addressed. 2) That the dimensions indicated on the Site Plan and Preliminary Plat for the Liu Trail (now Liu Court) right-of-way tangents and Front Building Setback for Lot 5 be verified for accuracy, with the submission of the Final Plat; This has been reviewed and verified as accurate. 3) That a Curve Data Table be included on the Final Plat; The Curve Data Table has been provided. 4) The applicant adds evergreen trees within the landscape easement, subject to staff review and approval, as part of the Final Plat application; The applicant has indicated that they will provide additional landscaping in the easement along Dublin Road. This will be a condition of approval and required prior to submitting the Final Plat to City Council. 5) The applicant will continue to work with the Engineering Division to finalize the proposed street name prior to the approval of the Final Plat; Street modified from Liu Trail to Liu Court based on comments by Engineering. 6) The location of the driveway on Lot 1 is restricted to the most eastern location allowable based on setbacks, subject to staff review and approval; This will be a condition of approval and verified at the building permits process. 7) The location of the driveway on Lot 7 is restricted to line up with the driveway on Lot 1 or be located further to the east, away from Dublin Road, subject to staff review and approval; This will be a condition of approval and verified at the building permits process. 8) A continuous 1-foot separation from the proposed ROW to the edge of the sidewalk be provided while maintaining a 6-foot sidewalk and 8-foot tree lawn, with the submission of the Final Plat; The applicants have provided a 6-foot sidewalk, 8-foot tree lawn and a minimum separation of one foot. 9) The applicant continues to work with Engineering on the final location and design of the SUP along Dublin Road, including the easement width necessary for the path; maintenance and/or construction, prior to approval of the Final Plat at City Council; The applicant is working with Engineering and this will continue to be a condition of approval. 10) The applicant shall provide a revised Traffic Memo before the submission of the Final Plat; The applicant has submitted a revised Traffic Memo which has been reviewed by staff. 11) A left turn lane shall be constructed on Dublin Road to provide access to the subdivision; The plat shows a left-turn lane along Dublin Road as required by Engineering. City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 5 of 9 12) The applicant should show and label the driveway locations for all lots demonstrating that the slope of the driveways will not exceed the maximum allowable slope of 8 percent. The location of the driveways should be restricted as necessary, reviewed and approved by staff, with the submission of the Final Plat; and Engineering is satisfied with the information provided and has agreed to review driveway locations at the building permit stage for each lot. 13) The applicant continues to work with the Engineering Division to resolve all comments provided on the plans and make any adjustments to the plat with the submission of the Final Plat. Engineering has reviewed the resubmission and is accepting of all the required adjustments. 3. City Plans and Policies Envision Dublin Community Plan Future Land Use The Envision Dublin Community Plan designates the Future Land Use (FLU) for this site and its surroundings on the east side of Dublin Road as Residential Low Density. This designation envisions large-lot residential development that is responsive to environmentally sensitive areas and integrates existing natural features. The goal is to create a transition from a rural setting to suburban single-family residential neighborhoods. The FLU recommends single- family homes on at least 0.50 acre lots at a density of 0.5 to 2 du/acre. The proposed density for the project is 0.56 du/acre, which meets the recommendation. Thoroughfare Plan The Envision Dublin Thoroughfare Plan classifies roadways based on traffic demand and outlines future character improvements. The Dublin Road Corridor is designated as a Commuter Boulevard with an 80-foot right-of-way, serving as a traditional minor arterial that also accommodates commuter bike routes. It is assigned a River Corridor Character, which is intended to reflect the natural processes on the land over time, featuring significant topographical variation, dense tree cover, and proximity to the Scioto River and its tributaries. New development along Dublin Road is expected to have modest setbacks ranging from 60 to 100 feet. In this case, right-of-way dedication is required for the proposed improvements, including the construction of a Shared Use Path (SUP). The applicant has designed and will construct the necessary infrastructure and provide easements to be recorded on the associated plat. 4. Project Project Summary This is a request to subdivide 12.79 acres into seven single-family lots with 0.5 acres of open space within a private reserve and the construction of a new public street (Liu Court) to provide access to the development. City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 6 of 9 The existing single-family residence will be retained, while two detached buildings, the tennis court, and the existing private drive will be removed. The applicant intends to develop the proposal under the current R-1: Restricted Suburban Residential District. The proposal is required to meet the development standards outlined in the Code, which include a minimum lot size of 40,000 square feet and a minimum lot width of 60 feet at the right-of-way line and 150 feet and front building line, which are met. The proposed lots will have a minimum building line setback of 40 feet from Dublin Road, based on the 80-foot ROW, and a varied building line setback from Liu Court. The development standards are summarized in the table below: Lot Identification Lot Size (Minimum 40,000 square feet/0.918 acres) Lot Width at Front Building Line (Minimum 150 feet). Front Building Line Setback Lot 1 0.921 Acres 152.41 +/- feet 36 Lot 2 1.55 Acres 150.49 +/- feet 92 Lot 3 1.575 Acres 150.78 +/- feet 65 Lot 4 3.001 Acres 251.95 +/- feet 41 Lot 5 1.337 Acres 150.86 +/- feet 31 Lot 6 1.302 Acres 251.24 +/- feet 36 Lot 7 0.931 Acres 250 feet +/- feet 31 Transportation & Mobility To access the subdivision, a new left turn lane on Dublin Road and the construction of a new public street with associated infrastructure improvements are required. The new public street, Liu Court, is designated as a future Shared Street and will include a 58-foot ROW with a 24-foot paved street, 6-foot sidewalks, and 8-foot tree lawns with street trees. A left turn lane is required based on the Traffic Memo and shall be constructed on Dublin Road to provide access to the subdivision. To promote mobility objectives, an 11-foot Shared Use Path (SUP) along the east side of Dublin Road is also required and accommodated in the plat. The applicant should continue to work with Engineering on the final location and design of the SUP along Dublin Road, including the easement width necessary for the path maintenance and/or construction which is a condition of approval. Utilities & Stormwater Water and sanitary sewer utilities are available on site. The existing water line is located on the west side of Dublin Road, and the sanitary sewer runs north/south through the middle of the site. The existing ditch along the north property line connects to an existing 24-inch culvert under Dublin Road and outlets to the Scioto River. This will be relocated 30 feet north and will be placed into an 83-foot storm easement. Stormwater from the development will outlet to the southern property line of lot 5. The subdivision will connect to the public sanitary sewer system and file a sanitary PTI sewer extension through the Ohio Environmental Protection Agency. City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 7 of 9 Water quality control is provided through a proposed underground detention system beneath the Liu Court cul-de-sac. Per the City of Dublin Stormwater Design Manual, stormwater quantity control is not required. Open Space/Reserve Residential subdivisions are required to provide open space based on the number of units proposed. Based on the proposed seven dwelling units, a total of 0.466 acres of open space is required. The proposal includes 0.598 acres of open space, which exceeds the minimum requirement. The proposed open space reserve will be privately owned and maintained by the HOA and is intended to provide shared visual and physical access to the Scioto River. The applicant has provided plans for the open space, which include a gravel path, retaining walls, benches, and landscaping. This space is designed for, and intended use of, the residents of Liu Court. Landscaping For a standard residential subdivision, street trees are required to be planted within the 8-foot tree lawn of the ROW, spaced 45 feet on center, which is met. The applicant is proposing two types of large street trees: Swamp White Oak along Dublin Road and Urban Elms along Liu Court. Additional deciduous trees - Scarlet Oak, Green Mountain Sugar Maple, and Swamp White Oak - will be planted within the landscape buffer along Dublin Road. All other landscaping, including front yard trees, will be finalized during building permitting as part of the final residential site design. Tree Removal/Tree Waiver The tree preservation requirements within the Zoning Code apply to all healthy trees with a minimum diameter of six inches at breast height. Replacements for removals are required on an inch-for-inch basis at a minimum tree installation size of 2.5 inches caliper. A $150 per-inch fee- in-lieu may be paid if full replacement would result in overcrowding. There are 169 healthy trees on site. The applicant is proposing to remove 65 (1,375 inches) of protected trees which require replacement. The applicant is requesting a tree waiver to be determined by City Council with the development of this project. The tree waiver policy was approved by City Council on January 9, 2018 and evaluates trees not only by health, but by species, size and structure. Projects that demonstrate preservation of at least 50% of landmark trees (24 inches or greater) and 50% of priority 1 trees (18-24 inches) on site are eligible to request a waiver. All Landscape Code requirements have been met. However, staff recommends the addition of evergreen trees within the landscape easement along Dublin Road to create a more immediate and effective landscape buffer. The proposed deciduous trees within the buffer are 2 to 2.5 inches in caliper at planting and will require several years to reach maturity. A condition of approval has been included to reflect this recommendation and must be met prior to City Council. Architecture The site is zoned R-1, Restricted Suburban Residential District and is required to meet the Residential Appearance standards in Section 153.190. The section requires minimum architectural features that for residential homes. Some examples of the requirements are masonry chimneys, building materials finishes, exposed foundation cladding (must include brick, City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 8 of 9 stone, or split face block, or patterned concrete). The section also requires four-sided architecture, and includes requirements for garage doors based on type of garage, minimum roof pitches, shutters or trim requirements on all windows. All building materials must meet industry standards and have 30 year life span. All building permits will be reviewed against these standards. 5. Plan Review Criteria Review 1. Plat Information, Zoning Code, and Construction Requirements. Criterion Met with Conditions: The proposal is consistent with the Subdivision regulations. The application may require technical adjustments prior to submission to City Council. 2. Lots, Street, Sidewalk, and Bike Path Standards. Criterion Met: The proposal is consistent with the lot, street, sidewalk, and bike path standards of the Subdivision regulations. 3. Utilities. Criterion Met: Proposed and existing utility easements are shown on the plat. 4. Open Space Requirements. Criterion Met: The proposed privately owned and maintained reserve provides ample amenities for future residents of the subdivision and meets the open space requirements. Final Plat Criteria Review 1. Plat information and construction requirements Criterion Met with Conditions: The proposal is generally consistent with the Subdivision regulations. The application may require technical adjustments prior to submission to City Council. 2. Lots, Street, Sidewalk, and bike path standards Criterion Met: The proposal is consistent with the lot, street, sidewalk, and bike path standards of the Subdivision regulations. 3. Utilities Criterion Met: Proposed and existing utilities are shown on the final plat. 4. Open space requirements Criterion met: The proposed privately owned and maintained reserve provides ample amenities for future residents of the subdivision and meets the open space requirements. Preliminary Plat City of Dublin Planning and Zoning Commission 24-128PP/25-026FP | Liu Court Thursday, October 23, 2025 Page 9 of 9 Recommendation Planning Recommendation: Recommendation to City Council of approval of a Preliminary Plat. Planning Recommendation: Recommendation to City Council of approval of a Final Plat with the following conditions: 1). The applicant adds evergreen trees within the landscape easement, subject to staff review and approval, as part of the Final Plat at City Council. 2) The applicant continues to work with Engineering on the final location and design of the Shared Use Path along Dublin Road, including the easement width necessary for the path maintenance and/or construction, prior to approval of the Final Plat at City Council. 3) The location of the driveway on Lot 1 is restricted to the most eastern location allowable based on setbacks, subject to staff approval. 4) The location of the driveway on Lot 7 is restricted to line up with the driveway on Lot 1 or located further to the east, subject to staff approval. 5) The applicant continues to work with the Engineering Division to resolve all comments provided on the plans and make any adjustments to the plat with the submission of the Final Plat at City Council. 2550 Corporate Exchange Drive, Suite 300 Columbus, OH 43231 TEL 614.901.2235 FAX 614.901.2236 www.structurepoint.com April 02, 2025 Project Narrative The redevelopment of 7192 Dublin Rd will consist of redeveloping an existing 12.79-acre single family lot into a 7-lot single family subdivision and 1 open space reserve with shared amenities, associated walks, pavement, and utilities. The proposed redevelopment maintains a consistent look and feel as the surrounding subdivisions in the area. The proposed redevelopment aligns with the Dublin Community plan and follows all applicable standards/resolutions in place. Shared amenities will be provided for the residents of the development as well as public improvements such as widening Dublin Rd to provide a left turn lane at the subdivision entrance and extension of public sidewalk along Dublin Rd. The shared amenities will be owned and maintained by the HOA and will include a proposed gravel path to provide access to a seating area and the waterfront. The subdivision will connect to the public sewer system and file for a sanitary PTI sewer extension through the OEPA. Water quality treatment will be provided by an underground detention system located beneath the cul-de-sac. An existing ditch along the northern property line that connects an existing 24” culvert under Dublin Rd to the Scioto River will be relocated 30 feet north and will be placed in an 83-foot storm easement. Stormwater will ultimately outlet to the southern property line of lot 5 which is predominantly wooded and flow to the Scioto River. No stormwater detention is required per City of Dublin Stormwater Design Manual section 53.070(D). ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AECP900TBM1 CP947 CP9950 10 1 8 1 7 DUBLIN ROADPID: 273-001924-00 ZONING: R-1 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 ZONING: R-1 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001925-00 ZONING: R-1 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001926-00 ZONING: R-1 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 ZONING: PLR CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 ZONING: R-1 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-001793-00 ZONING: R-1 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001787-00 ZONING: R-1 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.78 ACRES LIU CO U R T SCIOTO RIVERRESERVE A 2 13 12 11 14 15 84 9 6 7 2772 2788 6 2789 2 3 4 Area: 130,733 SF (3.00 AC) 6 Area: 56,744 SF (1.30 AC) 7 Area: 40,531 SF (0.93 AC) 5 Area: 58,218 SF (1.34 AC) 9 1 Area: 40,116 SF (0.92 AC) 2 Area: 67,760 SF (1.56 AC) 3 Area: 68,609 SF (1.58 AC) 5 3 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:31 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 TS&GN.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES APPROVED: CITY OF DUBLIN: SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSE AND GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. REGISTERED ENGINEER E-86125 DATE DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE STANDARD CONSTRUCTION DRAWINGS THE STANDARD CONSTRUCTION DRAWINGS LISTED ON THESE PLANS SHALL BE CONSIDERED A PART THEREOF. UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 MD-02 MD-03 MD-05 PD-02 PD-03 PD-04 PD-06 RD-01 RD-02 RD-03 RD-05 RD-08 RD-10 RD-15 SA-04 ST-01 ST-03 ST-04 ST-05 ST-06 WA-01 CITY OF DUBLIN (2020 EDITION)ODOT BP-3.1 CITY OF COLUMBUS: APPROVAL ON THE PART OF THE CITY OF COLUMBUS IS GIVEN PURSUANT TO THE PROVISIONS OF THE WATER SERVICE AGREEMENT BETWEEN THE CITY OF DUBLIN AND THE CITY OF COLUMBUS, OHIO, ON APRIL 13, 1993 AND ALL SUBSEQUENT AMENDMENTS THEREOF. INDEX MAP SHEET INDEX 1 - TITLE SHEET 2 - GENERAL NOTES 3 - TYPICAL SECTIONS & DETAILS 4 - EXISTING CONDITIONS & DEMOLITION PLAN 5 - SITE PLAN 6 - UTILITY PLAN 7 - PLAN & PROFILE 8 - STORM PROFILE 9 - GRADING PLAN 10 - CUL-DE-SAC DETAIL 11 - DRIVEWAY DETAIL 12 - EROSION CONTROL PLAN 13 - EROSION CONTROL NOTES 14 - EROSION CONTROL DETAILS 15 - EROSION CONTROL DETAILS 16 - UNDERGROUND DETENTION DETAILS 17 - UNDERGROUND DETENTION DETAILS 18 - UNDERGROUND DETENTION DETAILS 19 - TREE PRESERVATION 20 - TREE PRESERVATION SCHEDULE 21 - LANDSCAPE PLAN 22 - LANDSCAPE DETAILS 23 - LANDSCAPE DETAILS 24 - LANDSCAPE SPECS 25 - LANDSCAPE SPECS ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM Ohio Utilities Protection Service Call 811before you dig PUBLIC STREET, STORM, AND WATER IMPROVEMENTS FOR LIU COURT CITY OF DUBLIN, FRANKLIN COUNTY, OHIO TITLE SHEET1/25 SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVERBASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 DATE DIRECTOR, DEPARTMENT OF PUBLIC UTILITIES CITY OF COLUMBUS, OHIO DATE ADMINISTRATOR, DIVISION OF WATER CITY OF COLUMBUS, OHIO SITE DATA ZONING: PROPERTY OWNER:GEORGE CRIMSON LLC PARCEL ID:273-001786-00 SITE ACREAGE:12.820 (REC) 12.793 (MEASURED) SITE ZONING R-1, RESTRICTED SUBURBAN RESIDENTIAL DISTRICT FEMA FLOODPLAIN:39049C0151K (6/17/2008) ZONE X SITE LAYOUT DATA: TOTAL LOTS:7 LOTS GROSS DENSITY (NET DENSITY):0.55 LOTS/ACRE MINIMUM DRIVE AISLE WIDTH:24' MINIMUM LOT WIDTH:150' AT THE FRONT LINE OF THE DWELLING MINIMUM FRONT YARD SETBACK:30' MINIMUM REAR YARD SETBACK:50' TOTAL SIDE YARD SETBACK:25', 8' MINIMUM ON ONE SIDE REAR YARD MINIMUM:20% OF THE LOT DEPTH BUILDING DATA: BUILDING HEIGHT:35' MAXIMUM HEIGHT LANDSCAPE DATA: EXISTING IMPERVIOUS AREA:1.04 AC PROPOSED IMPERVIOUS AREA:2.01 AC GREENSPACE:10.10 AC (79%) HORZ 1"=60'0 100 200 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 PROFE SSIONA L E N G INEERR EGIS T E R E DSTATE OF O H IOE-86125 MATTHEW LILIE J. 07/17/2025 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:31 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 TS&GN.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES GENERAL NOTES2/25 GENERAL NOTES 1.CITY OF COLUMBUS AND OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS, CURRENT EDITIONS, AND ANY SUPPLEMENTS THERETO (HEREAFTER REFERRED TO AS STANDARD SPECIFICATIONS), SHALL GOVERN ALL CONSTRUCTION ITEMS UNLESS OTHERWISE NOTED. IF A CONFLICT BETWEEN SPECIFICATIONS IS FOUND, THE MORE STRICT SPECIFICATION WILL APPLY AS DECIDED BY THE CITY ENGINEER. ITEM NUMBERS LISTED REFER TO CITY OF COLUMBUS ITEM NUMBERS UNLESS OTHERWISE NOTED. 2.THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION THAT ARE NOT SPECIFIED HEREIN. THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR SAFETY ON THE WORK SITE, OR FOR FAILURE BY THE CONTRACTOR TO PERFORM WORK ACCORDING TO CONTRACT DOCUMENTS. 3.THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS INCLUDING BUT NOT LIMITED TO OHIO EPA PERMITS TO INSTALL (PTI) AND NOTICES OF INTENT (NOI), BUILDING PERMITS, ETC. 4.THE CONTRACTOR SHALL NOTIFY THE CITY OF DUBLIN DIVISION OF ENGINEERING IN WRITING AT LEAST 3 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 5.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL SAFETY REQUIREMENTS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970. THE CONTRACTOR SHALL EXERCISE PRECAUTION ALWAYS FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT SHALL ALSO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, INCLUDING THE REQUIREMENTS FOR CONFINED SPACES PER 29 CFR 1910.146. 6.FOLLOWING COMPLETION OF CONSTRUCTION OF THE SITE IMPROVEMENTS AND BEFORE REQUESTING OCCUPANCY, A PROOF SURVEY SHALL BE PROVIDED TO THE DIVISION OF ENGINEERING THAT DOCUMENTS "AS_BUILT" ELEVATIONS, DIMENSIONS, SLOPES AND ALIGNMENTS OF ALL ELEMENTS OF THIS PROJECT. THE PROOF SURVEY SHALL BE PREPARED, SIGNED AND SUBMITTED BY THE PROFESSIONAL ENGINEER WHO SEALED THE CONSTRUCTIONS DRAWINGS. 7.THE CONTRACTOR SHALL RESTRICT CONSTRUCTION ACTIVITY TO PUBLIC RIGHT_OF_WAY AND AREAS DEFINED AS PERMANENT AND/OR TEMPORARY CONSTRUCTION EASEMENTS, UNLESS OTHERWISE AUTHORIZED BY THE CITY ENGINEER. 8.THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN OHIO PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. 9.NON_RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT THE WRITTEN PERMISSION OF THE CITY ENGINEER. 10.THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE GRADES AND CROSS_SECTIONS THAT EXISTED BEFORE CONSTRUCTION. 11.TRACKING OR SPILLING MUD, DIRT OR DEBRIS UPON STREETS, RESIDENTIAL OR COMMERCIAL DRIVES, SIDEWALKS OR BIKE PATHS IS PROHIBITED ACCORDING TO SECTION 97.38 OF THE DUBLIN CODE OF ORDINANCES. ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE CITY. IF THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS, OR SPILLAGE, THE CITY RESERVES THE RIGHT TO REMOVE THESE MATERIALS AND CLEAN AFFECTED AREAS, THE COST OF WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 12.DISPOSAL OF EXCESS EXCAVATION WITHIN SPECIAL FLOOD HAZARD AREAS (100-YEAR FLOODPLAIN) IS NOT PERMITTED. 13.ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES WITHIN RIGHT-OF-WAY DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 14.ALL FIELD TILE BROKEN OR ENCOUNTERED DURING EXCAVATION SHALL BE REPLACED OR REPAIRED AND CONNECTED TO THE PUBLIC STORM SEWER SYSTEM AS DIRECTED BY THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURE. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE CITY OF COLUMBUS. PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION. 16.BACKFILL WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES (HOUSES, GARAGES, ETC.) OR PUBLIC INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, BIKE PATHS, ETC.) SHALL BE COMPACTED GRANULAR BACKFILL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR FLOWABLE CDF, TYPE II ACCORDING TO ITEM 613. ITEM 911 OF THE STANDARD SPECIFICATIONS SHALL BE USED ELSEWHERE. 17.THE CONTRACTOR SHALL SUBMIT A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND A LIST OF PROPOSED PRECAST CONCRETE PRODUCT MANUFACTURERS TO THE CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION BEFORE COMMENCING CONSTRUCTION. SEND THE INFORMATION TO THE FOLLOWING ADDRESS: CONSTRUCTION INSPECTION DIVISION CITY OF COLUMBUS 1800 EAST 17TH AVENUE COLUMBUS, OHIO 43219 SEND A COPY OF THE TRANSMITTAL LETTER TO THE FOLLOWING ADDRESS: DIVISION OF ENGINEERING CITY OF DUBLIN 6555 SHIER RINGS ROAD DUBLIN, OHIO 43016 18.ALL TRENCHES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES OUTSIDE THESE AREAS SHALL BE BACKFILLED OR SHALL BE PROTECTED BY APPROVED TEMPORARY FENCING OR BARRICADES DURING NONWORKING HOURS. CLEAN UP SHALL FOLLOW CLOSELY BEHIND THE TRENCHING OPERATION. 19.ALL TREES WITHIN THE CONSTRUCTION AREA NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY FENCING PLACED A MINIMUM 15 FEET FROM THE TREE TRUNK. TREES 6 - INCHES OR GREATER AT DBH (DIAMETER BREAST HEIGHT) MUST BE PROTECTED WITH FENCING PLACED AT THE CRITICAL ROOT ZONE OR 15 FEET, WHICHEVER IS GREATER. TREES NOT INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS FOR REMOVAL MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE DIVISION OF ENGINEERING. 20.CONDUIT MUST BE DIRECTIONALLY BORED ACROSS STREETS INSTEAD OF OPEN CUT, UNLESS SPECIFICALLY APPROVED BY THE CITY ENGINEER. USE OF PNEUMATIC AIR RAM DEVICES IS NOT PERMITTED. PERMITS TO CONSTRUCT IN THE RIGHT-OF-WAY OF EXISTING STREETS MUST BE OBTAINED FROM THE CITY OF DUBLIN DIVISION OF ENGINEERING BEFORE COMMENCING CONSTRUCTION. SHOULD OPEN CUTTING OF EXISTING PAVEMENT BE PERMITTED, CONTROLLED DENSITY BACKFILL (TYPE II) SHALL BE USED IN PLACE OF COMPACTED GRANULAR BACKFILL, ACCORDING TO ITEM 613 OF THE STANDARD SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES WITHIN THE RIGHT-OF-WAY AND PUBLIC EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE CITY. 22.PAVEMENTS SHALL BE CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR AS REQUIRED BY THE CITY ENGINEER. PAVEMENT REPLACEMENT SHALL BE CONDUCTED ACCORDING TO CITY OF COLUMBUS STANDARD DRAWING 1441 DR. A AND APPLICABLE CITY OF DUBLIN STANDARD DRAWINGS. THE REPLACEMENT OF DRIVEWAYS, HANDICAPPED RAMPS, SIDEWALKS, BIKE PATHS, PARKING LOT PAVEMENT, ETC. SHALL BE PROVIDED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS AND CITY OF DUBLIN STANDARD CONSTRUCTION DRAWINGS. 23.TREE TRIMMING WITHIN THE CONSTRUCTION ZONE IS TO BE COMPLETED BY A CERTIFIED ARBORIST. AT THE COMPLETION OF THE PROJECT, THE ARBORIST IS TO RETURN AND TRIM ANY BROKEN BRANCHES AS NEEDED. 24.ANY MODIFICATION TO THE WORK SHOWN ON DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CITY ENGINEER, CITY OF DUBLIN. 25.ALL INLETS SHALL BE CHANNELIZED. 26.PARK AREAS SHALL BE FINE_GRADED AND SEEDED WITH THE FOLLOWING MIXTURE: IMPROVED KENTUCKY BLUEGRASS: 40% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) IMPROVED PERENNIAL RYE: 60% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) GERMINATION RATE: 85% APPLICATION RATE: 7 LBS PER 1000 SQ FT OR AS DIRECTED BY THE DIVISION OF PARKS AND RECREATION, CITY OF DUBLIN, OHIO. 27.TRAFFIC CONTROL AND OTHER REGULATORY SIGNS SHALL BE TYPE S WITH A SQUARE POST ANCHOR BASE INSTALLATION AND MEET ALL REQUIREMENTS OF ODOT TC-41.20 AND APPLICABLE CITY OF DUBLIN SPECIFICATIONS. 28. STREET SIGNS SHALL MEET ALL CITY OF DUBLIN SPECIFICATIONS WITH LETTERING COLORED IN WHITE DISPLAYED OVER A BROWN BACKGROUND. SIGN TUBING SHALL BE BROWN IN COLOR AND CONFORM WITH THE TYPE S, SQUARE POST ANCHOR BASE INSTALLATION REQUIREMENTS OF ODOT TC-41.20. UTILITIES 1.THE FOLLOWING UTILITIES ARE KNOWN TO BE LOCATED WITHIN THE LIMITS OF THIS PROJECT: AEP OHIO - ELECTRIC BREEZELINE - TELECOM COLUMBIA GAS OF OH-COLUMBUS - GAS DUBLIN SEWER - SANITARY SEWER DUBLIN WATER - WATER MAIN DUBLIN DIVISION OF ENGINEERING - STORMWATER AT&T - TELECOM CHARTER COMM - TELECOM 2.THE CONTRACTOR SHALL GIVE NOTICE OF INTENT TO CONSTRUCT TO OHIO UTILITIES PROTECTION SERVICE (TELEPHONE NUMBER 800_362_2764), PRODUCER'S UNDERGROUND PROTECTION SERVICE (TELEPHONE NUMBER 614_587_0486), AND TO OWNERS OF UNDERGROUND UTILITIES THAT ARE NOT MEMBERS OF A REGISTERED UNDERGROUND PROTECTION SERVICE. NOTICE SHALL BE GIVEN AT LEAST 2 WORKING DAYS BEFORE START OF CONSTRUCTION. 3.THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE OWNER OF THE UNDERGROUND UTILITY. THE CITY OF DUBLIN AND THE CITY ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. 4.LOCATION, SUPPORT, PROTECTION AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5.WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE CITY ENGINEER. 6.PUBLIC STREET LIGHTING MAY BE IN THE VICINITY OF THIS PROJECT. CONTACT THE CITY OF DUBLIN, DIVISION OF ENGINEERING AT 410-4637, TWO DAYS PRIOR TO BEGINNING WORK. TRAFFIC CONTROL 1.TRAFFIC CONTROL SHALL BE FURNISHED, ERECTED, MAINTAINED, AND REMOVED BY THE CONTRACTOR ACCORDING TO OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (OMUTCD), CURRENT EDITION. 2.ALL TRAFFIC LANES OF PUBLIC ROADWAYS SHALL BE FULLY OPEN TO TRAFFIC FROM 7:00 AM TO 9:00 AM AND FROM 4:00 PM TO 6:00 PM UNLESS AUTHORIZED DIFFERENTLY BY THE CITY ENGINEER. AT ALL OTHER HOURS THE CONTRACTOR SHALL MAINTAIN MINIMUM ONE_LANE TWO_WAY TRAFFIC. UNIFORMED, OFF-DUTY POLICE OFFICERS SHALL REPLACE FLAGMEN DESIGNATED BY THE OMUTCD, AND SHALL BE PRESENT WHENEVER ONE_LANE, TWO_WAY TRAFFIC CONTROL IS IN EFFECT. POLICE CRUISERS MAY BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 3.IF THE CITY ENGINEER DETERMINES THAT THE CONTRACTOR IS NOT PROVIDING PROPER PROVISIONS FOR TRAFFIC CONTROL, THE CITY ENGINEER SHALL ASSIGN UNIFORMED, OFF_DUTY POLICE OFFICERS TO THE PROJECT AT NO COST TO THE CITY. 4.STEADY_BURNING, TYPE "C" LIGHTS SHALL BE REQUIRED ON ALL BARRICADES, DRUMS, AND SIMILAR TRAFFIC CONTROL DEVICES IN USE AT NIGHT. 5.ACCESS FROM PUBLIC ROADWAYS TO ALL ADJOINING PROPERTIES FOR EXISTING RESIDENTS OR BUSINESSES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT FOR MAIL, PUBLIC WATER AND SANITARY SEWER SERVICE, AND EMERGENCY VEHICLES. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN DETAILING THE PROPOSED MAINTENANCE OF TRAFFIC PROCEDURES. THE TRAFFIC CONTROL PLAN MUST INCORPORATE ANY TRAFFIC CONTROL DETAILS CONTAINED HEREIN. THE TRAFFIC CONTROL PLAN PROPOSED BY THE CONTRACTOR MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL 1.THE CONTRACTOR OR DEVELOPER IS RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) TO BE REVIEWED AND APPROVED BY THE OHIO EPA. THE NOI MUST BE SUBMITTED TO OEPA 45 DAYS PRIOR TO THE START OF CONSTRUCTION AND MAY ENTITLE COVERAGE UNDER THE OHIO EPA GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. A PROJECT LOCATION MAP MUST BE SUBMITTED WITH THE NOI. A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL IF A SEDIMENT AND EROSION CONTROL PLAN HAS NOT ALREADY BEEN INCLUDED WITH THE APPROVED CONSTRUCTION DRAWINGS. THIS PLAN MUST BE MADE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE DESIGN OF EROSION CONTROL SYSTEMS SHALL FOLLOW THE REQUIREMENTS OF OHIO EPA, ITEM 207 OF OHIO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AND THE CITY ENGINEER. AN INDIVIDUAL NPDES STORMWATER DISCHARGE PERMIT MAY BE REQUIRED. THE CONTRACTOR SHALL BE CONSIDERED THE PERMITTEE. 2.THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL AT ALL POINTS WHERE STORM WATER RUNOFF LEAVES THE PROJECT, INCLUDING WATERWAYS, OVERLAND SHEET FLOW, AND STORM SEWERS. 3.ACCEPTED METHODS OF PROVIDING EROSION/SEDIMENT CONTROL INCLUDE BUT ARE NOT LIMITED TO: SEDIMENT BASINS, SILT FILTER FENCE, AGGREGATE CHECK DAMS, AND TEMPORARY GROUND COVER. HAY OR STRAW BALES ARE NOT PERMITTED. 4.THE CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OF THE WORK AREA AT ALL TIMES CONSISTENT WITH EROSION CONTROL PRACTICES. 5.DISTURBED AREAS THAT WILL REMAIN UNWORKED FOR 30 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN SEVEN CALENDAR DAYS OF THE DISTURBANCE. OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT THE CONCLUSION OF CONSTRUCTION BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER. BLASTING (IF PERMITTED) 1.THE CONTRACTOR MUST OBTAIN A BLASTING PERMIT FROM WASHINGTON TOWNSHIP FIRE DEPARTMENT PRIOR TO BLASTING FOR ROCK EXCAVATION. THE CONTRACTOR SHALL SUBMIT BLASTING REPORTS UPON COMPLETION OF BLASTING TO THE CITY ENGINEER, THE OWNER, AND THE OWNER'S ENGINEER. TOP OF ROCK ELEVATIONS SHALL BE SHOWN ON "AS_BUILT" CONSTRUCTION DRAWINGS. WATER LINE 1.ALL WATER LINE MATERIALS SHALL BE PROVIDED AND INSTALLED ACCORDING TO CURRENT SPECIFICATIONS OF THE CITY OF COLUMBUS DIVISION OF WATER. 2.ALL PUBLIC WATER PIPE WITH A DIAMETER 3 INCHES TO 8 INCHES SHALL BE DUCTILE IRON, CLASS 53. PUBLIC WATER PIPE 12 INCHES IN DIAMETER OR LARGER SHALL BE DUCTILE IRON, CLASS 54. PUBLIC WATER PIPE 20 INCHES IN DIAMETER OR LARGER MAY BE PRESTRESSED CONCRETE PIPE. PRIVATE WATER PIPE SHALL MEET THE APPROVAL OF THE CITY OF COLUMBUS DIVISION OF WATER PRIOR TO APPROVAL OF THE CONSTRUCTION DRAWINGS. 3.ONLY FIRE HYDRANTS CONFORMING TO CITY OF COLUMBUS STANDARDS WILL BE APPROVED FOR USE. 4.PUBLIC WATER LINES SHALL BE DISINFECTED BY THE CITY OF COLUMBUS DIVISION OF WATER. REQUESTS FOR WATER LINE CHLORINATION SHALL BE MADE THROUGH THE CITY OF DUBLIN DIVISION OF ENGINEERING. THE COST FOR CHLORINATION SHALL BE PAID FOR BY THE CONTRACTOR. 5.ALL WATER LINES SHALL BE DISINFECTED ACCORDING TO ITEM 801.13 OF THE STANDARD SPECIFICATIONS. SPECIAL ATTENTION IS DIRECTED TO APPLICABLE SECTIONS OF AMERICAN WATER WORKS ASSOCIATION SPECIFICATION C_651, PARTICULARLY FOR FLUSHING (SECTION 5) AND FOR CHLORINATING VALVES AND FIRE HYDRANTS (SECTION 7). PRESSURE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 801.12 OF THE CITY OF COLUMBUS CONSTRUCTION AND MATERIAL SPECIFICATIONS. WHEN WATER LINES ARE READY FOR DISINFECTION, THE CITY OF DUBLIN SHALL SUBMIT TWO (2) SETS OF "AS-BUILT" PLANS, AND A LETTER STATING THAT THE WATER LINES HAVE BEEN PRESSURE TESTED AND NEED TO BE DISINFECTED, TO THE CITY OF COLUMBUS, DIVISION OF WATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE DISINFECTION OF ALL WATER LINES CONSTRUCTION PER THIS PLAN. PRESSURE TESTING SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 801.12 OF THE CITY OF COLUMBUS CONSTRUCTION AND MATERIAL SPECIFICATIONS. 6.THE CONTRACTOR SHALL PAINT ALL FIRE HYDRANTS ACCORDING TO CITY OF DUBLIN STANDARDS. THE COST OF PAINTING FIRE HYDRANTS SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR FIRE HYDRANTS. 7.NO WATER TAPS OR SERVICE CONNECTIONS (E.G., TO CURB STOPS OR METER PITS) MAY BE ISSUED UNTIL ADJACENT PUBLIC WATER LINES SERVING THE CONSTRUCTION SITE HAVE BEEN DISINFECTED BY THE CITY OF COLUMBUS DIVISION OF WATER AND HAVE BEEN ACCEPTED BY THE CITY ENGINEER. A TAP PERMIT FOR EACH WATER SERVICE MUST BE OBTAINED FROM THE CITY OF DUBLIN AND THE CITY OF COLUMBUS DIVISION OF WATER BEFORE MAKING ANY TAPS INTO PUBLIC WATER LINES. 8.THE CONTRACTOR SHALL NOTIFY THE CITY OF COLUMBUS DIVISION OF WATER AT 645_7788 AND THE CITY OF DUBLIN DIVISION OF ENGINEERING AT LEAST 24 HOURS BEFORE TAPPING INTO EXISTING WATER LINES. 9.ALL WATER MAIN STATIONING SHALL BE BASED ON STREET CENTERLINE STATIONING. 10.ALL BENDS, JOINT DEFLECTIONS AND FITTINGS SHALL BE BACKED WITH CONCRETE PER CITY OF COLUMBUS STANDARDS. 11.THE CONTRACTOR SHALL GIVE WRITTEN NOTICE TO ALL AFFECTED PROPERTY OWNERS AT LEAST 1 WORKING DAY BUT NOT MORE THAN 3 WORKING DAYS PRIOR TO ANY TEMPORARY INTERRUPTION OF WATER SERVICE. INTERRUPTION OF WATER SERVICE SHALL BE MINIMIZED AND MUST BE APPROVED BY THE CITY ENGINEER. 12.WATER METERS SHALL BE INSTALLED INSIDE PROPOSED STRUCTURES UNLESS A METER PIT INSTALLATION IS APPROVED BY THE CITY OF COLUMBUS DIVISION OF WATER. METER PITS MUST CONFORM TO STANDARD DRAWINGS L-7103, A&B FOR 5/8" THROUGH 1" METERS OR L-6317, A, B, C&D FOR 1-1/2" OR LARGER METERS. 13.WATER LINES TO BE INSTALLED IN EMBANKMENT AREAS SHALL BE PLACED AFTER THE EMBANKMENT HAS BEEN PLACED AND COMPACTED ACCORDING TO THE STANDARD SPECIFICATIONS. 14.CURB STOP BOXES SHALL BE LOCATED AT LEAST 1 FOOT INSIDE THE RIGHT_OF_WAY AND SET AT FINISHED GRADE. 15.IF THE TOP OF THE OPERATING NUT OF ANY VALVE IS GREATER THAN 36 INCHES BELOW FINISHED GRADE, AN EXTENSION STEM SHALL BE FURNISHED TO BRING THE TOP OF THE OPERATING NUT TO WITHIN 24 INCHES OF FINISHED GRADE ELEVATION. 16.ALL WATER LINES SHALL BE PLACED AT A MINIMUM DEPTH OF 4 FEET MEASURED FROM TOP OF FINISHED GRADE TO TOP OF WATER LINE. WATER LINES SHALL BE SET DEEPER AT ALL POINTS WHERE NECESSARY TO CLEAR EXISTING OR PROPOSED UTILITY LINES OR OTHER UNDERGROUND RESTRICTIONS BY A MINIMUM OF 18 INCHES. 17.TWO ¾ INCH TAPS SHALL BE INSTALLED WITHIN 2 FEET OF THE END OF THE LINE ON ALL DEAD-END WATER LINES. STORM SEWER 1.ALL STORM WATER DETENTION AND RETENTION AREAS AND MAJOR FLOOD ROUTING SWALES SHALL BE CONSTRUCTED TO FINISH GRADE AND HYDRO_SEEDED AND HYDRO_MULCHED ACCORDING TO ITEMS 203 AND 659 OF THE STANDARD SPECIFICATIONS. 2.WHERE PRIVATE STORM SEWERS CONNECT TO PUBLIC STORM SEWERS, THE LAST RUN OF PRIVATE STORM SEWER CONNECTING TO THE PUBLIC STORM SEWER SHALL BE REINFORCED CONCRETE PIPE CONFORMING TO ASTM DESIGNATION C76, WALL B, CLASS IV FOR PIPE DIAMETERS 12 INCHES TO 15 INCHES, CLASS III FOR 18 INCHES TO 24 INCH PIPES, AND 27 INCHES AND LARGER PIPE SHALL BE CLASS II, UNLESS OTHERWISE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. INSPECTION IS REQUIRED BY THE CITY OF DUBLIN'S DIVISION OF ENGINEERING. 3.GRANULAR BACKFILL SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR CONTROLLED DENSITY BACKFILL ACCORDING TO ITEM 613, TYPE II OF THE STANDARD SPECIFICATIONS AS DIRECTED BY THE CITY ENGINEER. 4.ALL STORM SEWERS SHALL BE REINFORCED CONCRETE PIPE CONFORMING TO ASTM DESIGNATION C76, WALL B, CLASS IV FOR PIPE DIAMETERS 12 INCHES TO 15 INCHES, CLASS III FOR 18 INCHES TO 24 INCH PIPES, AND 27 INCHES AND LARGER PIPE SHALL BE CLASS II, UNLESS OTHERWISE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. 5.HEADWALLS SHALL BE REQUIRED AT ALL STORM SEWER INLETS OR OUTLETS TO AND FROM STORMWATER MANAGEMENT FACILITIES. NATURAL STONE AND/OR BRICK APPROVED BY THE CITY ENGINEER SHALL BE PROVIDED ON ALL VISIBLE HEADWALLS SURFACES. 6.STORM INLETS OR CATCH BASINS SHALL BE CHANNELIZED AND HAVE BICYCLE SAFE GRATES. MANHOLE LIDS SHALL INCLUDE CITY OF DUBLIN LOGO AND ALL CURB INLET AND CATCH BASIN GRATES SHALL INDLUCE ENGRAVED LETTERING: “DUMP NO WASTE; DRAINS TO RIVER.” 6.STORM SEWER OUTLETS GREATER THAN 18 INCHES IN DIAMETER ACCESSIBLE FROM STORMWATER MANAGEMENT FACILITIES OR WATERCOURSES SHALL BE PROVIDED WITH SAFETY GRATES, AS APPROVED BY THE CITY ENGINEER. 7.HP STORM AND HP SANITITE OR APPROVED EQUAL ARE APPROVED ALTERNATIVES TO REINFORCED CONCRETE PIPE IN PAVED AND NON PAVED AREAS AS APPROVED BY THE CITY ENGINEER. THIS INCLUDES APPLICATIONS INSIDE THE RIGHT-OF-WAY. 8.HP STORM AND HP SANITITE OR APPROVED EQUAL PIPE JOINTS SHALL BE WATERTIGHT ACCORDING TO REQUIREMENTS OF ASTM D3212. PIPES SHALL BE JOINED WITH A GASKETED INTEGRAL BELL & SPIGOT JOINT MEETING THE REQUIREMENTS OF ASTM F2881 (HP STORM) AND ASTM F2764 (HP SANITITE). GASKETS SHALL BE INSTALLED BY PIPE MANUFACTURER AND COVERED WITH REMOVABLE, PROTECTIVE WRAP TO ENSURE THE GASKET IS FREE FROM DEBRIS. A JOINT LUBRICANT AVAILABLE FROM THE MANUFACTURER SHALL BE USED ON THE GASKET AND BELL DURING JOINT ASSEMBLY. 9.ALL BEDDING MATERIAL SHALL BE IN ACCORDANCE WITH CITY OF COLUMBUS STANDARD CONSTRUCTION DRAWING AA-S149. 10.BACKFILL MATERIAL SHALL BE PLACED IN ACCORDANCE WITH ITEM 911 OR ITEM 912 OF THE CITY OF COLUMBUS CONSTRUCTION MATERIAL SPECIFICATIONS (CMS). 11.BACKFILL MATERIAL IN AREAS LOCATED OUTSIDE THE PUBLIC RIGHT-OF-WAY SHALL BE PLACED IN ACCORDANCE WITH ITEM 901 OF THE CITY OF COLUMBUS (CMS). ALL HP STORM AND HP SANITITE PIPE (FOR STORM SEWER) SHALL BE MANDREL TESTED IN ACCORDANCE WITH CITY OF COLUMBUS ITEM 901.21, WITH THE EXCEPTION THAT THE WAITING PERIOD PRIOR TO TESTING SHALL BE 30 DAYS. MAIL DELIVERY 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT US MAIL DELIVERY WITHIN THE PROJECT LIMITS IS NOT DISRUPTED BY CONSTRUCTION OPERATIONS. THIS RESPONSIBILITY IS LIMITED TO RELOCATION OF MAILBOXES TO A TEMPORARY LOCATION THAT WILL ALLOW THE COMPLETION OF THE WORK AND SHALL ALSO INCLUDE THE RESTORATION OF MAILBOXES TO THEIR ORIGINAL LOCATION OR APPROVED NEW LOCATION. ANY RELOCATION OF MAILBOX SERVICES MUST BE FIRST COORDINATED WITH THE US POSTAL SERVICE AND THE HOMEOWNER. 2.BEFORE RELOCATING ANY MAILBOXES, THE CONTRACTOR SHALL CONTACT THE U.S. POSTAL SERVICE AND RELOCATE MAILBOXES ACCORDING TO THE REQUIREMENTS OF THE POSTAL SERVICE. USE OF FIRE HYDRANTS 1.THE CONTRACTOR SHALL MAKE PROPER ARRANGEMENTS WITH THE DUBLIN SERVICE DEPARTMENT AND THE COLUMBUS DIVISION OF WATER FOR THE USE OF FIRE HYDRANTS WHEN USED FOR WORK PERFORMED UNDER THIS CONTRACT AND PROVIDE THE CITY OF DUBLIN A COPY OF THE HYDRANT USAGE PERMIT OBTAINED FROM THE CITY OF COLUMBUS. THE CONTRACTOR SHALL ALSO SEND A COPIES OF PERMITS OBTAINED FROM DUBLIN AND COLUMBUS TO THE WASHINGTON AND/OR PERRY TOWNSHIP FIRE DEPARTMENT. PERMITS SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. 2.BEFORE THE FINAL ESTIMATE IS PAID, THE CONTRACTOR SHALL SUBMIT A LETTER FROM THE CITY OF COLUMBUS DIVISION OF WATER TO THE CITY ENGINEER STATING THAT THE CONTRACTOR HAS RETURNED THE SIAMESE VALVE TO THE CITY OF COLUMBUS AND HAS PAID ALL COSTS ARISING FROM THE USE OF THE FIRE HYDRANTS. WATER COORDINATE TABLE DESCRIPTION 8"-11.25° BEND 8"-11.25° BEND 8"-11.25° BEND 8"x6" TEE 8"x6" TEE 8"-11.25° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 8"-22.5° BEND 6"-22.5° BEND 6"-22.5° BEND 8"x6" TEE 8" PLUG & THRUST BLOCK 24"x8" TAPPING SLEEVE & VALVE STATION 10+38.36 10+62.02 11+75.21 11+89.66 14+16.98 14+75.32 15+15.59 15+51.75 15+70.41 15+89.84 16+12.81 16+35.24 16+48.41 16+64.81 16+67.06 16+67.95 94+57.29 OFFSET 14.30' L 19.33' L 19.32' L 19.34' L 19.31' L 18.77' L 17.54' L 20.86' L 26.54' L 42.71' L 49.85' L 47.79' L 40.87' L 21.17' L 13.93' L 11.07' L 19.57' L CL ELEVATION 848.49 848.28 844.42 843.77 834.59 833.02 832.12 831.32 830.86 830.22 829.60 829.60 829.60 829.60 829.60 829.60 848.96 AS-BUILT NORTHING AS-BUILT EASTING AS-BUILT CL ELEVATION WATER COORDINATE TABLE DESCRIPTION FIRE HYDRANT 6" GATE VALVE FIRE HYDRANT FIRE HYDRANT 6" GATE VALVE 8" GATE VALVE 8" GATE VALVE STATION 11+89.60 14+16.98 14+16.98 16+63.85 16+65.03 16+67.68 94+57.29 OFFSET 16.00' L 17.21' L 16.00' L 13.03' L 13.36' L 11.94' L 16.17' L CL ELEVATION 843.81 834.74 834.78 829.68 829.78 829.60 848.93 AS-BUILT NORTHING AS-BUILT EASTING AS-BUILT CL ELEVATION JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:31 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 TS&GN.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES℄1.56% 10234571 58' RIGHT-OF-WAY 6'-0'' WALK (RD-05) 28' B/C TO B/C 1'-0''1'-0'' (TYP)8'-0'' TREE LAWN6'-0'' WALK (RD-05) 3.13% 6'' MIN. TYPICAL SECTION LEGEND ITEM 441 - 1 1/4" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.075 GAL/S.Y. ITEM 441 - 1 3/4'' ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.10 GAL/S.Y. ITEM 301 - 3'' ASPHALT CONCRETE BASE ITEM 304 - 6" AGGREGATE BASE ITEM 204 - SUBGRADE COMPACTION ITEM 659 - SEEDING AND MULCHING, CLASS 1 AS PER PLAN (SEE NOTE 32 ON GENERAL NOTE PAGE) ITEM 608 - 4'' CONCRETE SIDEWALK ITEM 304 - 3'' AGGREGATE BASE ITEM 653 - 3" TOPSOIL FURNISHED AND PLACED 1 2 3 4 5 6 7 8 9 10 11 NOTE A TACK COAT (AC) FACE OF CURB (INCIDENTAL TO ITEM 441 ASPHALT CONCRETE.) ITEM 441 ASPHALT SURFACE COURSE IS TO BE MAXIMUM 1/4" ABOVE GUTTER PLATE. NOTE B NOTE A (TYP) NOTE B (TYP) 1/2''/1'1/2''/1' 1.56% 1.56%1.56% PROFILE ELEVATION 2'-0''14''12'' 8'-0'' TREE LAWN 4: 1 4:14:14: 1 11 98 TYPICAL SECTIONS &DETAILS3/25 NO. 57 AGGREGATE ODOT ITEM 605 4" PIPE UNDERDRAIN (720.01) (TYP) CITY OF DUBLIN CONCRETE COMBINATION CURB & GUTTER RD-02 (TYP) 6 TYPICAL SECTION - LIU COURT NOT TO SCALEA 3.13%3.13%3.13% ESTIMATE OF QUANTITIES THESE QUANTITIES HAVE BEEN PROVIDED ONLY AS AN ESTIMATE TO THE SCOPE OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO EVALUATE THE COMPLETE PROJECT AS DETAILED IN THE NOTES, PLANS, AND SPECIFICATIONS AND PROCEDURES NECESSARY FOR THE COMPLETION OF THE PLAN IMPROVEMENTS AND SUBMIT HIS TOTAL PROJECT COST ACCORDINGLY. DEMOLITION ITEM QUANTITY UNIT DESCRIPTION 201 LUMP SUM CLEARING AND GRUBBING 202 55 EA REMOVE TREE 202 2 EA REMOVE TREE STUMP 202 1356 SY DRIVE REMOVED 202 367 LF FENCE REMOVED 202 37 LF WALL REMOVED 202 3 EA BUILDING REMOVED 202 1 EA TENNIS COURT REMOVED SITE 203 CY EXCAVATION 203 CY EMBANKMENT 204 2,074 SY SUBGRADE COMPACTION 207 27 CY STABILIZED CONSTRUCTION ENTRANCE 207 1 EACH DESIGNATED CONCRETE WASHOUT AREA 207 8 EACH INLET PROTECTION 207 497 LF PERIMETER FILTER FABRIC FENCE 301 173 CY 3" ASPHALT CONCRETE BASE 304 346 CY 6" AGGREGATE BASE 407 156 GAL TACK COAT (0.075 GAL/SY) 407 207 GAL TACK COAT (0.10 GAL/SY) 441 72 CY 1.25" ASPHALT CONCRETE SURFACE COURSE 441 101 CY 1.75" ASPHALT CONCRETE INTERMEDIATE COURSE 608 7,751 SF 4" CONCRETE WALK 608 EACH TYPE "A" CURB RAMP 609 1,257 LF COMBINATION CURB AND GUTTER 630 4 EACH STREET SIGN (RD-10) 630 1 EACH STOP SIGN (RD-10) 659 1,129 SY SEEDING AND MULCHING STORM 601 CY ROCK CHANNEL PROTECTION, TYPE C WITH FILTER 604 5 EACH 48" TYPE "C" MANHOLE (AA-S102) W/ CITY OF DUBLIN LID (ST-03) 604 1 EACH 48" TYPE "C" MANHOLE (AA-S102) W/ CITY OF DUBLIN LID (ST-03) (OUTLET STRUCTURE) 604 6 EACH CURB & GUTTER INLET (AA-S125A) W/ GRATE (ST-04) 604 2 EACH CB (AA-S130) 604 1 EACH PRECAST HEADWALL (AA-S168) 901 44 LF 12" RCP STORM PIPE, WITH ITEM 911 BACKFILL 901 339 LF 12" RCP STORM PIPE, WITH ITEM 912 BACKFILL 901 LF 18" RCP STORM PIPE, WITH ITEM 911 BACKFILL 901 81 LF 18" RCP STORM PIPE, WITH ITEM 912 BACKFILL 901 LF 24" RCP STORM PIPE, WITH ITEM 912 BACKFILL 901 51 LF 24" RCP STORM PIPE, WITH ITEM 911 BACKFILL WATER 801 LF 6 INCH WATER PIPE AND FITTINGS 801 700 LF 8 INCH WATER PIPE AND FITTINGS 802 EACH 8" VALVE AND APPURTENANCES 802 4 EACH 6" VALVE AND APPURTENANCES 805 7 EACH 3/4" WATER TAP 809 3 EACH FIRE HYDRANT TYPE A SPEC LUMP SUM SURVEY COORDINATES CALCULATED BY: DATE: CHECKED BY: STA 10+68.60 TO 14+60.99 7192 AT&T BELL SYSTEMS 322A56 TOP=853.62' (3' LID) SW6959 FRONTIER 7192 w/ELEC.&COMM. DROPS w/RISER ICV OUTLET INTERCOM w/ELEC.&COMM. DROP 3 SIDED BARN ICV ICV ICV ICV LOW AREA ICV ICV ELEC. RISER OUTLET VACANT w/ELEC.&COMM. DROPS ICV ICV OUTLET 3" CAST IRON EXPOSED PIPE MOUNTED ON TREE 3" CAST IRON EXPOSED PIPE 3" CAST IRON EXPOSED PIPE TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) TOP=836.17' INV. 36" RCP N/S=819.42' (77-003-CIP) TOP=840.90' INV. 36" NE/S=819.90' (77-003-CIP) 2" 1" 2" 2" PUMP HOUSE 2" SPP TO BLD. 814.96 6 CMP 819.73 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66 6 CMP 829.17 TBOX WOWWAY 7177 DUBLIN RD ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRESinlet windowinlet window12" RCP12" CPP18" R C P 24" RCP cannot open12" RCPINV:851.28 DIRECTION ONLY EXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADINV:840.88 GALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES 825 8308 2 6 8 2 7 828829831831835840840 8 4 0 831832833834836837838 839 825 830835835 835840826827828829831832833 833 833834834 834 836836836 837838839841 8 4 0 8 4 5 83 9 8 4 1 8 4 2 8 4 3 8 4 4 8 4 6 8 4 7 8 4 8 8 4 9 85285382082 58308358 4 0 8458508198218 2 2 82 382 4 8 2 6 8 2 7 8 2 8 8 2 9 831 832 8338348368378378378388398 4 184 2 8438448 4 6847848849 835840 845831832833834836837838839841842843 8448468478488498408458418428438448468 4 7 825830830830 8218228238248268278288298318328338 3 4 800805810815820 79879980180280380480680780880981181281381481681781881 9 8258308358408458 2 18228238248268278288298318328338348 3 6837 8388398418428438448468478482 0 ' S A N I T A R Y E A S E M E N T D. B . 3 7 2 0 , P G . 5 3 6 20' SANITA R Y EASEMENT D.B. 3720, P G . 5 3 6 1 2 3 4 4 5 6 EX UTILITY POLE (TBR) EXISTING PAVEMENT TO BE SAWCUT PER CITY OF COLUMBUS STANDARD DRAWING 1441 & FULL PAVEMENT REPAIR 562.54'116.39'131.62'110.70'82.7 7 ' 190.67'118.79'343.43'800.40'645.82'180.3 ' 79.1 5' JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 11:41 AM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 DXTP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EXISTING CONDITIONS &DEMOLITION PLAN4/25 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION CODED NOTES EXISTING WALL TBR EXISTING FENCE TBR EXISTING TENNIS COURT TBR EXISTING BUILDING TBR EXISTING HOUSE TO REMAIN EXISTING OVERHEAD ELECTRIC POLE & GUY WIRE TBRO, COORDINATE WITH UTILITY PROVIDER TO RECONNECT TO EXISTING HOUSE 1 2 3 4 5 6 DEMOLITION LEGEND TBR TO BE REMOVED TBRO TO BE REMOVED AND RELOCATED BY OTHERS TBRR TO BE REMOVED AND REPLACED ASPHALT PAVEMENT TO BE REMOVED CONCRETE PAVEMENT TO BE REMOVED MILLING LIMITS ITEM TO BE REMOVED PAVEMENT TO BE SAWCUT EXISTING UTILITY TO BE REMOVED TREE TO BE REMOVED ALL SPRINKLER HEADS TO BE REMOVED SEE ROAD WIDENING PLANS FOR DEMOLITION WITHIN THE R/W HORZ 1"=40'0 40 80 NOTES 1.REFER TO TREE PRESERVATION SHEETS 19-20 FOR TREE REMOVAL INFORMATION 2" 1" 2" 2"ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRES EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 24' E/P TO E / P 12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5 ' S IDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' SIDE YARDSETBACK12.5' REAR YARDSETBACKE X 2 0 ' S A N I T A R Y E A S E M E N T EX 20' SAN I T A R Y EASEMENT 36' FRONT YARD SETBACK 40' DUB L I N RD BUIL D I N G SETBAC K50' REAR YARDSETBACK50' REAR YARDSETBACK50' REAR Y A R D SETBACK 50' RE A R Y A R D SETBA C K 50' REAR Y A R D SETBACK 40' DUBL I N RD BUIL D I N G SETBAC K 58' R/W LIU COU R T 50' REAR Y A R D SETBAC K PROP 10 ' R/W DED I C A T I O N 36' FRON T YARD SETBAC K 31' FRONT YARD SETBACK 31' FRONT YARD SETBACK 41' FRONT YARD SETBACK 12.5 ' S IDE YARDSETBACK50' SIDE YARDSETBACK50' SIDE Y A R D SETBACK 1 2 . 5 ' S IDE YARDSETBACKPROP 83' STORM EASEMENT 20' LANDSC A P E EASEME N T PROP 30' S A N I T A R Y EASEMENT P R O P 3 0 ' S A N I T A R Y E A S E M E N T PROP 20' STORM EASEMENT PROP 20' STORM EASEMENTPROP 20'SANITARYEASEMENTPROP 20' STORM EASEMENT PROP GRAVEL PATH, SEE LANDSCAPE PLANS FOR DETAILS N83°56'54"E - 152.47' N83°56'54"E - 389.84'S13°14'25"E - 116.39'N76°33'00 " E - 2 1 5 . 8 8 'N21°46'09"E - 140.77'N75°48'41 " E - 1 3 1 . 6 2 'S20°11'31"E - 110.70'S70 ° 2 3 ' 1 5 " E - 8 2 . 7 7 ' S70 ° 5 8 ' 2 4 " E - 9 5 . 9 3 ' N87°42'49"E - 190.67' N88°09'02"E - 192.68'S01°42'42"W20.60'N64°3 4' 2 0 " E - 3 6 7. 5 1'S01°42'42"W - 98.19'S06°54'37"W - 94.11'N88°12'27"E - 158.34' N50° 4 7' 0 7" E - 1 4 0. 9 0'S06°54'37"W - 106.85'S06°54'37"W - 142.46'N88°12'27"E - 404.04' N88°12'27"E - 167.57' S88°16'20"W - 435.20'N01°47'33"W - 51.68'S88°16'20"W - 355.09' N74°16'2 7 " E - 2 5 8 . 7 8 'S15°33'22"E - 147.11'S15°33'22"E - 150.37'N29°16'27"E33.40'S15°33'22"E - 167.79'S74°16'2 7 " W - 1 0 6 . 5 8 ' L=175.77,R=121.00 N22°29'41"W - 67 .71 'L=101.05,R=17 9 . 0 0 L = 3 8 . 3 4 ,R=60.00L=7 7 . 0 4, R =60.00 L=26.87, R=60.00 L=46.91, R=60.00L=62.64, R=60.00 L=38.98, R=121.00S22°29'41"E - 67 .87 'L=38.29,R=179.00L=10 4.5 9, R = 1 7 9 .0 0 L=95 .97 ,R=179.00 L=21.17, R=179.00 N74°16'2 7 " E - 1 0 6 . 5 8 'N13°25'56"W - 249.38'N08°41'06"W - 83.09'2 AREA: 67,760 SF (1.56 AC) 3 AREA: 68,609 SF (1.58 AC) 4 AREA: 130,733 SF (3.00 AC) 6 AREA: 56,744 SF (1.30 AC) 7 AREA: 40,531 SF (0.93 AC) 5 AREA: 58,218 SF (1.34 AC) R60' R46' B/CR75'B/C20' LANDSC A P E EASEME N T 12.5' SIDE Y A R D SETBACK 12.5' SIDE Y A R D SETBACK 92' FRONT YARD SETBACK 65' FRONT YARD SETBACK PROP 30' STORM EASEMENTPROP 20'SANITARYEASEMENTPROP SANITARY EASEMENT (VARIES)PROP 20'SANITARYEASEMENT RESERVE A AREA: 26,048 SF (0.60 AC)R162'R138'R77'R77' R162' R44' R44'PROP 20'SANITARYEASEMENT10+00 11+00 12+00 13 + 0 0 14+0015+0016 + 0 0 16 + 1 8BP: 10+00.00PC: 11+75.21PT: 13 + 9 3 . 1 1 PC: 14 + 6 0 . 9 9 PT: 15+63.05EP: 16+17.65L=124.12,R=60.002' SHARE D USE PAT H EASEME N T 2' SHAR E D USE PAT H EASEME N T N6 0 ° 4 3 ' 3 3 " W 32 . 9 6 ' 1 AREA: 40,116 SF (0.92 AC) PROP 20' STORM EASEMENT180.3 ' 79.1 5' STOP S I G N HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:15 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 SP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES SITE PLAN5/25 SITE LEGEND PROPERTY LINE EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY CURB AND GUTTER SIGN HATCH LEGEND CONCRETE SIDEWALK PER CITY OF DUBLIN STANDARD CONSTRUCTION DRAWING RD-05 TO BE CONSTRUCTED BY DEVELOPER AT THE TIME OF STREET CONSTRUCTION PROPOSED SWALE TOP=853.62' (3' LID) w/RISER TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) TOP=836.17' INV. 36" RCP N/S=819.42' (77-003-CIP) TOP=840.90' INV. 36" NE/S=819.90' (77-003-CIP) 2" 1" 2" 2" PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRESinlet windowinlet window12" RCP12" CPP18" R C P 24" RCP cannot openEXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)WV WV WV WV 4 2 10 124" STM 1 8 " S TM 12" STM 8" SAN 8 7 PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN 10+00 11+00 12+00 13 + 0 0 14+0015+0016 + 0 0 16 + 1 8 101 10012" STMEX 12 " S T M E X 2 0 ' S A N I T A R Y E A S E M E N T EX 20' SAN I T A R Y EASEMENTDUBLIN ROADLIU COU R T PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE 1 PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE 16 + 1 8 16 + 7 6 9+75 10+00 8" SAN PROPOSED 20' SANITARY SEWER EASEMENT 12" STM 12 " S T M 6 7 5 8 9 11 12" STM 12" STM 12 13 12" STM15 14 PROP 30' S A N I T A R Y EASEMENT PROP 3/4" WAT SERVICE PROP 3/4" WAT SERVICE P R O P 3 0 ' S A N I T A R Y E A S E M E N T 12" STM15" STM PROP 83' STORM EASEMENT PROP 20' STORM EASEMENT PROP 20' STORM EASEMENT PROP 30' STORM EASEMENTPROP 20'SANITARYEASEMENT8" WM 8" W M 8" WM FIRE HYDRANT STA:11+89.60 CL ELEV:843.81 PROP 30' STORM EASEMENT PROP 20'STORM EASEMENT 2788 2772 PROP 6" SAN SERVICE @ 2.08% MIN 2 3 6 2789 8" SAN8" SAN 8" SAN8" SAN 2 AREA: 67,760 SF (1.56 AC) 3 AREA: 68,609 SF (1.58 AC) 4 AREA: 130,733 SF (3.00 AC) 6 AREA: 56,744 SF (1.30 AC) 7 AREA: 40,531 SF (0.93 AC) 5 AREA: 58,218 SF (1.34 AC)20' PROP SANITARY EASEMENT (WIDTH VARIES)PROP 20'SANITARYEASEMENT8" SAN 9 1 AREA: 40,116 SF (0.92 AC) FIRE HYDRANT STA:14+16.98 CL ELEV:834.78 PROP 20' STORM EASEMENT FIRE HYDRANT STA:16+63.85 CL ELEV:829.68 AS PER SANITARY PLANS AS PER SANITARY PLANS AS PER SANITARY PLANS PAD=852.00 PAD=852.00 REAR=842.00 PAD=847.00 REAR=837.00 PAD=837.00 REAR=827.00 PAD=842.00 PAD=852.00 10312" STM 102 104 36" S T M 105 12" STM106 HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 UP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UTILITY PLAN6/25 UTILITY LEGEND GAS SANITARY GRAVITY SANITARY SERVICE WATER DOMESTIC WATER SERVICE FIRE WATER SERVICE ELECTRIC TELECOMMUNICATION FIBER-OPTIC STORM SEWER CATCH BASIN SANITARY MANHOLE FIRE HYDRANT WATER VALVE FIRE DEPARTMENT CONNECTION WATER MAIN FIRE HYDRANT LIGHT POLE (BY OTHERS) STM WV FDC WM 7192 A T & T TOP = 8 5 3. 6 2' ( 3' LI D) SW6 9 5 9 INTER C O M ELEC. RI S E R OUTL E T TOP = 8 2 8. 9 3'INV. 1 2" S P P = 8 2 7. 3 8'(ACC O R DI N G T O G R O U N D S CRE W: PI P E O U T L E T S @ P T. 1 6 9 5) TOP = 8 3 6. 1 7'INV. 3 6" R C P N/ S = 8 1 9. 4 2'(77-0 0 3- CI P) TOP = 8 4 0. 9 0'INV. 3 6" N E/ S = 8 1 9. 9 0'(77-0 0 3- CI P) PID: 2 7 3- 0 0 1 7 8 7- 0 0 BOU L D E R S A T S CI O T O S H O R E S L L C 7118 D U B LI N R D R E A R 2.96 A C R E Scannot openEX D RI V E LOT 1 LUTH E R MI T C H E L L' S S CI O T O S H O R E S P.B. 1 8, P. G. 3 7 CP90 0 TBM 1 WV WV WV WV 10+0011+0012+ 0 0 13+00 1 4 + 0 0 15+ 0 0 16+00 16+18 4 5 10 2 1 24" S T M 18" S T M8" SAN16+18 16+76 9+7510+00ON-SITE PROJECT BEGIN 10+68.6, 0.0' D U B L I N RO A D LIU COURT 24'F/F12.5' SIDE Y A R D SET B A C K 12.5 ' S IDE YARDSETBACK12.5 ' S IDE YARDSETBACK1 2 . 5 ' S I D E Y A R D S E T B A C K 1 2 . 5 ' R E A R Y A R D S E T B A C K EX 20' S A NIT A R Y EAS E M E NT 36' FRONT YARD SETBACK 92' FRONT YARD SETBACK 65' FRONT YARD SETBACK 31' FRONT YARD SETBACK 36' FRONT YARD SETBACK 31' FRONT YARD SETBACK 40' YARD SIDE SETBACK PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN PROP 6" SAN SERVICE @ 2.08% MIN 58'R/WP A V EM E N T R E P L A C EM E N T L IM I T S ,MOT A S P E R CO C S T D DWG 1 5 1 0 8 7 16'8' PRO P 30' S A NIT A R Y EAS E M E NT 1312 14 15 11 9 8 6 7 12" STM 12" STM 12 " S T M 12" STM15" STM 12" STM 12" STM12" ST M 8" SAN E X 2 0 ' S A N I T A R Y E A S EM E N T PROP 10' R/W DE DICATI ON20'LANDSCAPE EASEMENT PROP 20' STORM EASEMENT PROP 20' STORM EASEMENT PROP 30' STORM EASEMENT LOT 2 67,760 SF (1.56 AC) LOT 3 68,609 SF (1.58 AC) LOT 4 130,733 SF (3.00 AC) RESERVE A Area:26,051 SF (0.60 AC) PROP 6" SAN SERVICE @ 2.08% MIN 8" WM8" WM 8"WM 8" WM 6 2 3 8" SAN 8" SAN8" SAN 8" SAN 9 8" SAN LOT 7 40,531 SF 0.93 AC LOT 6 56,744 SF 1.30 AC LOT 5 58,218 SF 1.34 AC LOT 1 40,116 SF 0.92 AC P RO P 2 0 ' S A N I T A R Y E A S EM E N T PRO P SANI T A R Y EASE M E N T (VARI E S) 3 PROP 20' STORM EASEMENT PAD=852.00 P AD = 8 5 2 . 0 0RE AR = 8 4 2 . 0 0 PAD=847.00 REAR=837.00 PAD=837.00 REAR=827.00 PAD=842.00 PAD=852.00 SCALE: H:1"=30', V:1"=8' LIU COURT 820 830 840 850 860 870 820 830 840 850 860 870 -2.00% -1.56%-1.56% -4.00%GRADE BREAK STA = 10+00.00ELEV = 853.93GRADE BREAK STA = 10+10.67ELEV = 853.77 HIGH POINT EL =853.02 HIGH POINT STA = 10+58.21 PVI STA = 10+83.21 PVI EL = 852.63 K = 20.49 50.0' VC BVCS: 10+58.21BVCE: 853.02EVCS: 11+08.21EVCE: 851.63 LOW POINT EL =837.67 LOW POINT STA = 14+76.13 PVI STA = 14+38.63 PVI EL = 838.42 K = 37.50 75.0' VC BVCS: 14+01.13BVCE: 839.92EVCS: 14+76.13EVCE: 837.67853.93851.85849.37847.69845.90844.48842.85841.65841.02840.09839.49839.24838.61838.21838.02837.46836.54836.65836.88836.26835.54834.26833.01831.55829.68853.93853.54853.15852.69851.95850.96849.96848.96847.96846.96845.96844.96843.96842.96841.96840.96839.96839.04838.28837.69837.19836.69836.19835.69835.199+75 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+25 EX GRADE EX GRADE 828.71828.52827.22825.70834.84834.72834.33834.8316+18 17+00853.84853.939+75 10+00 ON-SITE PROJECT (TYPICAL SECTION) BEGIN STA=10+68.60 ELEV = 852.83 24"x8" TAPPING SLEEVE & VALVE STA:9+84.06 CL ELEV:848.96 HORIZONTAL 8"-11.25° BEND STA:10+38.36 CL ELEV:848.49 HORIZONTAL 8"-11.25° BEND STA:10+62.02 CL ELEV:848.28 HORIZONTAL 8"-11.25° BEND STA:11+75.21 CL ELEV:844.42 8"x6" TEE STA:11+89.66 CL ELEV:843.77 HORIZONTAL 8"-11.25° BEND STA:14+75.32 CL ELEV:833.02 HORIZONTAL 8"-22.5° BEND STA:15+15.59 CL ELEV:832.12 HORIZONTAL 8"-22.5° BEND STA:15+51.75 CL ELEV:831.32 HORIZONTAL 8"-22.5° BEND STA:15+70.41 CL ELEV:830.86 12" STM 12" STM 8" WM @ 0.87% 8" WM @ 3. 4 6 % 8" WM @ 3 . 6 2 % 8" WM @ 3. 6 2 % 8" WM @ 2.55% 8" WM @ 2.55% HORIZONTAL 8"-22.5° BEND STA:15+89.84 CL ELEV:830.22 HORIZONTAL 8"-22.5° BEND STA:16+12.81 CL ELEV:829.60 HORIZONTAL 8"-22.5° BEND STA:16+35.24 CL ELEV:829.60 HORIZONTAL 6"-22.5° BEND STA:16+48.41 CL ELEV:829.60 HORIZONTAL 6"-22.5° BEND STA:16+64.81 CL ELEV:829.60 8"x6" TEE STA:16+67.06 CL ELEV:829.60 8" GATE VALVE STA:16+67.68 CL ELEV:829.60 8" PLUG & THRUST BLOCK STA:16+67.95 CL ELEV:829.604.5' MIN.COVER4.5' MIN.COVER4.5' MIN.COVER** 8"x6" TEE STA:14+16.98 CL ELEV:834.59 PROFILE GRADE VERT 1"=5' HORZ 1"=30' 0 0 5 30 10 60 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:17 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES PLAN & PROFILE7/25 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK CURB ROAD CENTERLINE STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION UTILITY LEGEND SANITARY MAIN SANITARY SERVICE WATER STORM SEWER MAINSTM CATCH BASIN HEADWALL STORM MANHOLE SANITARY MANHOLE XX XX XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM NOTES: 1.PROFILE VERTICAL DATUM NAVD '88. 2.THE WATER MAIN ALIGNMENT IS PROJECTED ONTO THE CENTERLINE ALIGNMENT OF THE ROAD. THE UTILITY CROSSINGS SHOWN DO NOT REPRESENT THE CROSSINGS AT THE WATER MAIN, RATHER THE CROSSING AT THE CENTERLINE (#). 3.SEE WATER COORDINATE TABLE ON SHEET 3. # # 7192 AT&T BELL SYSTEMS 322A56 TOP=853.62' (3' LID) SW6959 FRONTIER 7192 w/ELEC.&COMM. DROPS w/RISER OUTLET INTERCOM w/ELEC.&COMM. DROP ELEC. RISER OUTLET OUTLET MOUNTED ON TREE TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) TOP=836.17' INV. 36" RCP N/S=819.42' (77-003-CIP) TOP=840.90' INV. 36" NE/S=819.90' (77-003-CIP) 2" 1" 2" 2" PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66 TBOX WOWWAY 7177 DUBLIN RD ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRESinlet windowinlet window12" RCP12" CPP18" R C P 24" RCP cannot openEXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)WV WV WV WV PAD=852.50 PAD=852.00 PAD=847.00 PAD=837.00 PAD=842.00 PAD=852.50 825 8308 2 6 8 2 7 828829831831835840840 8 4 0 831832833834836837838 839 825 830835835 835840826827828829831832833 833 833834834 834 836836836 837838839841 8 4 0 8 4 5 83 9 8 4 1 8 4 2 8 4 3 8 4 4 8 4 6 8 4 7 8 4 8 8 4 9 852853820825 8308358 4 0 8458508198 2 182282 3824 826827 828 829 831 832 8338348368378378378388398 4 184 2 8438448 4 6847848849 835840 845831832833834836837838839841842843 8448468478488498408458418428438448468 4 7 8358408458508348368378388398418428438448468478488498518 5 2 825821822823824826827828 835 835836 836837838 825 830 83 5 82282282282282282282282282 2 823824826827828829 831832833 834835836 825830 835 826827828829 831 832 833 834 836 REAR PAD=842.00 825830830830 8218228238248268278288298318328338 3 4 800805810815820 79879980180280380480680780880981181281381481681781881 9 8258308358408458 2 18228238248268278288298318328338348 3 6837 8388398418428438448468478488 7 1 8" SAN 840840840 845 850838 839 841 842 843 844 846 847 848 849 84984 9 8518528 5 3 840845839841842843844846850 846847848849 851 852840845850 838839841842843844846847848849851 840845 850 84184284384484 6 84 7 84 8 849 851851852853 84083783883984184184184284284284384483 5 8 3 6837838839 830 83 5 829 831 832 833834 8 3 6 8 3 7 46.50 HP 38.71 TC 39.21 TC 38.24 TC 24" STM 2 10 5 1 850 849 851 852 853 850849851852853845 850 846 847 848 849 85185285385 3 85 0 84 784884985 1 8 5 2853DUBLIN ROADLIU COU R T PROP 20'SANITARYEASEMENT830 828829 831832833 79212 11 14 15 4 8 9 6 7 820825817818819821822823824826827SEE LANDSCAPE PLANS FOR PATH AND WALL DETAILS PROP 30' STORM EASEMENT E X 2 0 ' S A N I T A R Y E A S E M E N T PROP 83' STORM EASEMENT 20' LANDSC A P E EASEME N T P R O P 3 0 ' S A N I T A R Y E A S E M E N T PROP 20' STORM EASEMENT PROP 20' STORM EASEMENTPROP 20'SANITARYEASEMENTEX 20' SANI T A R Y EASEMENT PROP 30' S A N I T A R Y EASEMENT 13 12" STM 12" STM 12" STM 1 8 " S TM 12" STM 15" STM 12" STM12" STM 12" STM 8" SAN 34.28 TC 34.16 TC 34.02 TC 34.18 TC 35.22 TC 34.26 TC 31.98 TC 38.24 TC 42.64 TC 46.11 TC 46.12 TC 52.25 TC 48.19 TC 6 50.52 TC 2 83083 1832833834 3 34.11 TC 34.10 TC REAR PAD=837.00 REAR PAD=827.00 830 830 831 835 831832833834 34.47 TC 37.00 TC 34.18 TC 9 3 36.42 TC 33.86 33.48 33.25 30.84 27.00 24.83 51.08 51.50 HP 50.71 41.00 1.00%2.00%32.73%16.22%8508518521.32%15.35%35.48 37.00 37.00 36.602.00%2.00% 36.60 31.26 0.83% 20.8610.37% 41.10 HP 40.45 40.73 1.89%1.00%840 837838839841 36.60 2.10% 35.94 42.08 45.59 48.816.35%8 3 5 83283383483 6 837838840845 837838839841842843 844 84 6 835840845832PAD=847.0052.50 49.67 7.85%52.00 48.433.83%4 7 . 0 0 4 5 . 1 5 2.66% 37.00 34.85 4.56% 42.00 38.01 4.08%51.08 4.57%51.64 51.77 49.46 34.25 HP 34.51 29.51 831 832 833 SEE DRIVE DETAIL SHEET 11 SEE CUL-DE-SAC DETAIL SHEET 10 SWALE, SEE DETAIL A PROP 30' STORM EASEMENT HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:25 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 GP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES GRADING PLAN9/25 GRADING LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR FFE=835.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION MATCH EXISTING ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION SLOPE ARROW FLOW ARROW FLOOD ROUTE SWALE 835 834 835 834 10.00 100.00 TC 10.00 HP 10.00 ME 10.50 10.00 X.XX% GRADING NOTE ADD 800 TO ALL SPOT ELEVATIONS TO OBTAIN NAVD88 ELEVATIONS. 4 :1 MA X MINIMUM DEPTH = 2' 100 YR DEPTH = 1.22' TYPICAL SWALE SECTION NOT TO SCALE 6'8'8' 4:1 M A X A 2' SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 7-3 820 830 840 850 820 830 840 850 SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 2-1 815 820 830 840 815 820 830 840833.69835.04836.17837.07837.70837.62838.00838.99839.11839.61840.25839.96836.42836.93837.37837.74838.82839.72840.79841.94843.01844.24845.34845.76-0+200+001+002+003+003+20 SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 11-10 820 830 840 850 820 830 840 850 SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 8-4 820 830 840 850 820 830 840 850 5 T.C. 842.64COC TYPE "C" MHAA-S102N: 770749.39E: 1796357.136 T.C. 846.11COC AA-S125AN: 770791.69E: 1796290.787 T.C. 846.12COC AA-S125AN: 770819.04E: 1796296.77STA: 0+8118" INV (SE): 833.9812" INV (NW): 834.4812" INV (E): 834.4815" INV (W): 834.23STA: 1+9312" INV (SE): 838.8712" INV (NW): 838.87STA: 2+7212" INV (SE): 842.2412" INV (N): 842.24STA: 3+0012" INV (S): 842.384 T.C. 838.24COC AA-S125AN: 770650.44E: 1796410.45STA: 0+0018" INV (NW): 833.003 T.C. 836.42COC TYPE "C" MHAA-S102N: 770591.92E: 1796465.81SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 9-4 820 830 840 850 820 830 840 850 837.27836.17838.24837.88-0+250+000+45 28' ~ 12" STM @ 0.50%79' ~ 1 2 " S T M @ 4 . 2 8 % 112' ~ 1 2 " S T M @ 3 . 9 0 % 81' ~ 18" STM @ 1.22 %837.27838.27838.24837.57-0+250+000+45 4 T.C. 838.24COC AA-S125AN: 770650.44E: 1796410.45STA: 0+3015" INV (E): 834.359 T.C. 837.00COC CB AA-S133AN: 770638.95E: 1796382.7130' ~ 15" STM @ 0.40%STA: 0+0018" INV (SE): 833.9812" INV (NW): 834.4812" INV (E): 834.4815" INV (W): 834.234 T.C. 838.24COC AA-S125AN: 770650.44E: 1796410.4528' ~ 12" STM @ 0.50%STA: 0+2812" INV (W): 834.628 T.C. 838.34COC AA-S125AN: 770661.15E: 1796436.32STA: 0+0018" INV (SE): 833.9812" INV (NW): 834.4812" INV (E): 834.4815" INV (W): 834.23830.03830.95833.11835.22835.47834.76-0+150+000+70 STA: 0+0012" INV (SW): 830.4010 T.C. 835.22COC TYPE "C" MHAA-S102N: 770555.11E: 1796500.5756' ~ 12" STM @ 0.70%STA: 0+5612" INV (NE): 830.7911 T.C. 834.47COC CB AA-S133AN: 770506.50E: 1796472.42SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 15-14 820 830 840 850 820 830 840 850 827.13828.15834.30833.91-0+150+000+50 STA: 0+3212" INV (SW): 830.5632' ~ 12" STM @ 0.50%STA: 0+0012" INV (NE): 830.4014 T.C. 834.30COC TYPE "C" MHAA-S102N: 770537.87E: 1796569.4615 T.C. 834.18COC AA-S125AN: 770566.57E: 1796583.17SCALE: H:1"=30', V:1"=5' STORM SEWER PROFILE 13-12 820 830 840 850 820 830 840 850 828.45834.16-0+300+000+30 STA: 0+1712" INV (NW): 830.4913 T.C. 834.18COC AA-S125AN: 770509.41E: 1796552.1117' ~ 12" STM @ 0.50%STA: 0+0012" INV (SE): 830.4012 T.C. 834.16COC AA-S102N: 770520.96E: 1796539.31828.19828.41827.97827.50832.48834.58-0+150+000+90 STA: 0+7024" INV (SE): 828.002 T.C. 834.02COC TYPE "C" MHAA-S102N: 770519.76E: 1796556.1160' ~ 24" STM @ 0.84%STA: 0+1024" INV (NW): 827.50STA: 0+1024" INV (NW): 827.501 COC HW AA-S168N: 770472.11E: 1796591.75********* ***** ** *** 8" SAN PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) PROPOOSED UNDERGROUND DETENTION CHAMBERS (SC-800) STORM SEWER STRUCTURE TABLE STRUCTURE NO 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 STRUCTURE TYPE COC AA-S125A COC TYPE "C" MH AA-S102 COC AA-S125A COC AA-S102 COC CB AA-S133A COC TYPE "C" MH AA-S102 COC CB AA-S133A COC AA-S125A COC AA-S125A COC AA-S125A COC TYPE "C" MH AA-S102 COC AA-S125A COC TYPE "C" MH AA-S102 COC TYPE "C" MH AA-S102 COC HW AA-S168 LID/ GRATE TYPE AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 AA-S111 NORTHING 770566.5691 770537.8708 770509.4102 770520.9617 770506.4970 770555.1150 770638.9511 770661.1492 770819.0427 770791.6892 770749.3899 770650.4365 770591.9197 770519.7601 770472.1136 EASTING 1796583.1735 1796569.4584 1796552.1115 1796539.3101 1796472.4152 1796500.5652 1796382.7100 1796436.3153 1796296.7742 1796290.7781 1796357.1279 1796410.4457 1796465.8073 1796556.1072 1796591.7461 AS-BUILT NORTHING AS-BUILT EASTING VERT 1"=5' HORZ 1"=20' 0 0 5 20 10 40 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:21 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM PRF.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES STORM PROFILE8/25 FACE OF CURB BACK OF CURB INSERTION POINT OF CURB INLET = T.C. (TOP OF CASTING) STORM SEWER PROFILE NOTES: 1.PROFILE VERTICAL DATUM NAVD '88. 2.ALL STORM STRUCTURES ARE ODOT STANDARD STRUCTURES UNLESS OTHERWISE NOTED. 3.MAINTAIN A MINIMUM OF 18" VERTICAL AND 10' HORIZONTAL CLEARANCE FROM WATERLINES. 4.ALL BACKFILL SHALL BE COMPACTED TO THE DENSITY OF THE EXISTING GROUND UNLESS OTHERWISE NOTED: *COMPACTED BACKFILL PER ODOT CMS ITEM 611 **COMPACTED GRANULAR BACKFILL PER ODOT CMS ITEM 611 5.ALL FILLS ARE TO BE PLACED A MINIMUM OF 2.5' ABOVE THE PROPOSED STORM SEWER PER ODOT CMS ITEM 203 PRIOR TO THE START OF STORM SEWER CONSTRUCTION. HATCH BELOW FOR REFERENCE. 6.ALL STORM STRUCTURES WITHIN PAVEMENT LIMITS SHALL HAVE HEAVY DUTY TRAFFIC RATED GRATES. 7.NORTHING AND EASTING OF CURB AND GUTTER INLETS ARE IN REFERENCE TO THE BACK OF CURB UNLESS OTHERWISE NOTED. 8.T.C. (TOP OF CASTING) ELEVATION AND LOCATION FOR ALL CURB AND GUTTER INLETS IS IN REFERENCE TO THE BACK OF CURB ELEVATION. 9.PIPE RUNS DENOTED WITH A (++) ARE TO HAVE SANITARY GRADE PIPE PER ODOT CMS 611 WITH JOINTS PER ODOT CMS 748.01/748.02. GUTTER TOP OF CASTING ELEV.=834.02 (DUBLIN ST-03) 24" STM 12" INV =828.00 1.6"Ø WQ ORIFICE INV=828.00 24" INV =829.17 SIDE VIEW TOP OF WALL ELEV=830.30 100 YEAR PEAK ELEV=832.20 6' 1.6"Ø WQ ORIFICE 828.00 FRONT VIEW 6' 24" INV =828.00 SUMP ELEV. =826.00 STORMRAX FLAT ROOF RECTANGULAR RACK OR EQUIVALENT STORMRAX FLAT ROOF RECTANGULAR RACK OR EQUIVALENT 8" 24" STM OUTLET STRUCTURE DETAIL - MODIFIED COC AA-S102 MH - STRUCTURE (2) NOT TO SCALE TOP OF CASTING (SOLID LID FLUSH WITH TOP OF CATCH BASIN) TOP OF CASTING (SOLID LID FLUSH WITH TOP OF MANHOLE) STEPS 8" WIDE WEIR WALL 24" STM STEPS 24 " S T M TOP VIEW 24" STMB 1.5 6 %1.56%1.56%2 10 N:770553.52 E: 1796539.06 10' ( T Y P)1.56%1.55%34.18 TC 36. 4 3 34 . 8 4 35 . 4 0 34.5234.15 HP34.90 34. 1 5 34.19 1 5+ 0 0 16 + 0 0 16 + 1 8 16 + 1 8 16 + 7 6 1.56 % 37.5 0 37.4 6 37.2 8 1.55 % 37.3 1 37.0 9 36. 0 6 34.87 37.2 8 36. 6 8 36. 7 8 37.6 8 37.9 4 38.0 3 37.6 5 37.9 0 38.0 0 1.56 % 1.56 %2.00%1.56%1.56%2.00%2.18%2.18%1.86%1.84% 1 . 8 5% 37.0 9 36 . 4 9 36 . 7 4 36 . 8 3 36 . 1 1 36 . 3 0 2. 4 3% 3 2 1 3 12 13 14 15 2.39%2.44% 2.37% 1 . 0 0%1.00%1.00% 1.00% 2 . 2 3%34.7834.8734.18 TC 34. 5 2 34. 7 7 34. 8 7 34 . 1 5 34 . 5 3 34 . 7 8 34 . 8 7 2.0 0 % 2.0 0 % 2 . 0 0% 11 34.02 TC 34.30 TC 34.16 TC 34.47 TC 35.22 TC 36.42 TC 34.10 TC 34.11 TC 34.26 TC 36.85 36.61 36.36 35.88 35.64 35.40 35.16 34.92 34.69 34.45 34.08 33.98 33.88 33.83 33.93 34.03 34.07 33.97 33.87 33.84 33.94 34.04 34.35 34.58 34.80 35.03 35.28 35.52 35.77 36.01 36.22 36.41 36.59 36.78 36.96 1 0 ' ( T Y P ) 9. 1 2 ' 10.8 3 '8.24'11.71'7. 3 6 ' 12.5 9 '7.5' 12 . 4 8 ' 4. 0 9 ' 5. 9 1 ' 10' (TYP) 10' (TYP) LI U C O U R T 34.79 34.75 HORZ 1"=10'0 10 20 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 11:48 AM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 INT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES CUL-DE-SACDETAIL10/25 GRADING LEGEND FFE=110.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION SLOPE ARROW SWALE 10.00 100.00 TC 10.00 HP X.XX% GRADING NOTE ADD 800 TO ALL SPOT ELEVATIONS TO OBTAIN NAVD88 ELEVATIONS. TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) 36" OAK 2" 2" 2" 2" 36" BOXELDER MULCH & FLOWERS LANDSCAPING AREA EX DRIVE 14+0038.0 3 38.24 T C 38.24 T C4 8 38.79 38.69 39.01 39.10 38.31 38.21 38.09 38.01 38.44 38.53 40.20 40.30 39.45 39.95 37.69 38.19 4.50% 1.56% 36.16 35.04 32.54 ME 32.22 ME 31.18 ME 30.62 ME 32.72 34.15 35.76 38.25 38.99 3.42%4.79%2.06% 38.34 39.13 38.7338.7038.6138.3825'11' 37.89 38.39 37.97 38.05 38.56 38.65 38.66 39.16 38.25 38.34 2.00% 39.58 37.81 1.56% 1.56% 32.12 8 3 5 831832833 83483 6 8378388 3 5 83 3 8338 3 4 8 3 6 83083083583183283383483683 0 8358 3 1 832833834836837835836837838835831832833834836837835840832832833834836837838839841842843844 835840832 833834836837838839841842 843 844 840838839LIU COURT3'3'3.69% 1.97% 4.42%5.63%6.43%5.58% HORZ 1"=10'0 10 20 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 11:56 AM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 DRIVEWAY DETAIL.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DRIVEWAY DETAIL11/25 GRADING LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR FFE=835.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION MATCH EXISTING ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION SLOPE ARROW FLOW ARROW FLOOD ROUTE SWALE 835 834 835 834 10.00 100.00 TC 10.00 HP 10.00 ME 10.50 10.00 X.XX% DRIVEWAY DETAIL GRADING NOTE ADD 800 TO ALL SPOT ELEVATIONS TO OBTAIN NAVD88 ELEVATIONS. w/RISER ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRES EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900 TBM1 CP947 CP9950 825 830835840 826 827 8 2 8 829831 83 2 833834836837 838839 841 8358 3 3833834 8 3 4836837 830 827828829 831832833834 850 8 5 0 84 8849849 851 851 852 852 853 853 85485485485 4 82082583083584084581982182282382682782882983183283383483 6837838839841842843844846847848 830 830 830 830835835 840840 845845850831 831832 8 3 2 833 833834834 836836837837838838839839 8418418428428438438448448468468478478488488498498518528538 2 0 825 8 3 0835840845 8188198198198 2 1 82 2823824826 8 2 7 8 2 8 8 2 9 8 3 1 8 3 2833834836837838839841842843844846847848849 820825830835840821822823824826827828829831831831832833834836837838839840 84 5 836 837 838 839 84 1 84 2 84 3 84 4 8 4 6 8 4 7 8 4 8 830 835 840 831 832 833 834 836 837 838 839 7657707757807857907958008058108158 20 765770775780785790795800805810815820765770775780785790795800805810815820765770775780785790795800805810 8158208258308358 4 0 845850829831 832 8338348368378378378388398 4 1 8 4 2 8438448 4 6847848849 851WV WV WV WV CWA A 14 B 14 D 14 8 1 7 6 2789 9 2772 2 3 5 10 2 1 9 3 12 14 11 BD BD BD BD BD BD 6 7 4 8 13 15 DB DB 845 850 850 844846847848 848848849849851 851 852 852 8 5 38538538 5 3 841841 842 842843 841842843840 836837838839841 835840836837838839841842840845850 838839841842843844846847848849851852 84 0 845850 8 3 9 84 1 842843844 84684784884985 1 8 5 2 8358408458508348368378388398418428438448468478488498518 5 2 82583083 5 821822823824826827828 829 831 832833 834 8 3 6 8 3 68368378388 3 5 832 83283383483 6 837838840845 841842 843 844 84 6 850 847848 849851852 830 835 840 845 850826827828829 831 832 833 834 836 837 838 839 841 842 843844 846 847 848 849 851852835 84084583 6 8 3 7 8388398418428438448 4 6 830835 831832833834 836 8 3 2 825 830 822823824826827 828829831 83 2 790 79580080581081582079282082581781881982182282382482683 5 831836837 838839835836837838 839836 830 828829 831832833834 CDCDCD8458448468478488 5 0 84 9 851SEDIMENT TRAP 83 1 832 833CD D 14 G 15CDCDCDE 14 E 14 817 820 823 LOT 7 40,531 SF 0.93 AC PAD=852.50 LOT 1 40,116 SF 0.92 AC PAD=852.50 LOT 2 67,760 SF (1.56 AC) PAD=852.00 REAR=842.00 LOT 3 68,609 SF 1.58 AC PAD=847.00 REAR=837.00 LOT 4 130,733 SF 3.00 AC LOT 5 58,218 SF 1.34 AC PAD=837.00 REAR=827.00 LOT 6 56,744 SF 1.30 AC PAD=842.00CD22'22'HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL PLAN12/25 EROSION CONTROL LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE SILT FENCE SWALE CONCRETE WASHOUT AREA CHECK DAM DANDY BAG INLET PROTECTION BEAVER DAM INLET PROTECTION SILT FENCE INLET PROTECTION INSTATURF SHEARFORCE 10 OR APPROVED EQUAL STABILIZED CONSTRUCTION ENTRANCE XXX XXX XXX XXX CWA CD DB BD JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL NOTES13/25 EROSION CONTROL NOTES: 1.ALL EROSION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO ANY SITE GRADING OPERATIONS. ALL APPLICABLE GOVERNING AGENCIES MUST BE NOTIFIED UPON COMPLETION OF THE INSTALLATION OF THE REQUIRED EROSION FACILITIES AND PRIOR TO ANY GRADING OPERATION BEING COMMENCED. IF DAMAGED OR REMOVED DURING CONSTRUCTION, ALL EROSION CONTROL FACILITIES SHALL BE RESTORED AND IN PLACE AT THE END OF EACH WORK DAY. 2.ANY EROSION CONTROL FACILITIES DEEMED NECESSARY BY THE GOVERNING AGENCIES; BEFORE, DURING OR AFTER THE GRADING ACTIVITIES, SHALL BE INSTALLED AT THEIR REQUEST. 3.FLOWS FROM DIVERSION CHANNELS OR PIPES (TEMPORARY OR PERMANENT) SHALL BE ROUTED TO SEDIMENTATION BASINS OR APPROPRIATE ENERGY DISSIPATERS TO PREVENT TRANSPORT OF SEDIMENT TO OUTFLOW TO LATERAL CONVEYORS AND TO PREVENT EROSION AND SEDIMENTATION WHEN RUNOFF FLOWS INTO THESE CONVEYORS. 4.SITE ACCESS ROADS SHALL BE GRADED OR OTHERWISE PROTECTED WITH SILT FENCES, DIVERSION CHANNELS, OR DIKES AND PIPES TO PREVENT SEDIMENT FROM EXITING THE SITE VIA THE ACCESS ROADS. SITE-ACCESS ROADS/DRIVEWAYS SHALL BE SURFACED WITH CRUSHED ROCK WHERE THEY ADJOIN EXISTING PAVED ROADWAYS. 5.SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES OR EQUIPMENT SHALL BE CLEANED DAILY FROM PAVED ROADWAY SURFACES, OR MORE FREQUENTLY IF REQUESTED BY GOVERNING AGENCIES, THROUGHOUT THE DURATION OF CONSTRUCTION. 6.DUST CONTROL MEASURES SHALL BE PERFORMED PERIODICALLY WHEN CONDITIONS REQUIRE AND/OR AS DIRECTED BY THE GOVERNING AGENCIES. 7.ALL EROSION CONTROL MEASURES SHALL BE USED AND MAINTAINED FOR THE DURATION OF SITE CONSTRUCTION. IF CONSTRUCTION OPERATIONS OR NATURAL EVENTS DAMAGE OR INTERFERE WITH THESE EROSION CONTROL MEASURES, THEY SHALL BE RESTORED TO SERVE THEIR INTENDED FUNCTION AT THE END OF EACH DAY OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. 8.ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AS SOON AS POSSIBLE. ANY AREAS WHICH HAVE BEEN FINISHED GRADED SHALL BE SODDED. AREAS THAT HAVE BEEN DISTURBED AND FOR WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY SHALL BE TEMPORARILY SEEDED AND MULCHED AS REQUIRED BY GOVERNING AGENCIES. 9.RUNOFF SHALL BE PREVENTED FROM ENTERING ALL STORM SEWER CATCH BASINS PROVIDING THEY ARE NOT NEEDED DURING CONSTRUCTION. WHERE STORM SEWER CATCH BASINS ARE NECESSARY FOR SITE DRAINAGE DURING CONSTRUCTION, A SILT FENCE OR SEDIMENT PROTECTION DEVICES SHALL BE INSTALLED AND MAINTAINED AROUND ALL CATCH BASINS UNTIL THE TRIBUTARY AREA TO THE CATCH BASIN IS RESTORED. 10.EROSION CONTROL FACILITIES SHALL BE INSTALLED AND MAINTAINED AROUND THE PERIMETER OF ALL LAKES, PONDS, AND WETLANDS, IF ANY WITHIN OR ADJACENT TO THE AREA TO BE GRADED UNTIL THE AREA TRIBUTARY TO THE LAKE, POND, OR WETLAND IS RESTORED. 11.TO MINIMIZE EROSION, ALL 3:1 SLOPES OR GREATER SHALL BE COVERED WITH A TEMPORARY EROSION CONTROL BLANKET OR STAKED SOD. 12.ACCUMULATION OF ALL SEDIMENT OCCURRING IN STORM SEWERS, DITCHES, LAKES, PONDS, WETLANDS SHALL BE REMOVED PRIOR TO, DURING AND AFTER COMPLETION OF GRADING ACTIVITIES, AT NO ADDITIONAL COST TO OWNER. 13.EROSION CONTROL ITEMS AND DEVICES SHALL BE REMOVED ONLY AFTER THE AREA HAS RECEIVED FINAL STABILIZATION. 14.THIS PLAN MUST BE POSTED ON SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON SITE AT ALL TIME. SEDIMENT AND EROSION CONTROL NOTES: MAINTENANCE & INSPECTION PROCEDURES: ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND WITHIN 24 HOURS FOLLOWING ANY STORM EVENT OF 0.5INCHES OR GREATER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE SEDIMENTATION AND EROSION CONTROL FEATURES ON THIS PROJECT. ANY SEDIMENT OR DEBRIS WHICH REDUCES THE EFFICIENCY OF A CONTROL FEATURE SHALL BE REMOVED IMMEDIATELY. SHOULD A STRUCTURE OR FEATURE BECOME DAMAGED, THE CONTRACTOR SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE OWNER AND IT SHALL BE INITIATED WITHIN 24 HOURS OF REPORT. TEMPORARY SEEDING AND PERMANENT SEEDING AND PLANTING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION, AND A WRITTEN LOG MUST BE KEPT. THIS LOG SHALL INDICATE THE DATE OF THE INSPECTION, NAME OF THE INSPECTOR, WEATHER CONDITIONS, OBSERVATIONS, ANY CORRECTIVE ACTIONS TAKEN, AND BE SIGNED IN ACCORDANCE WITH THE CONDITIONS OF THE NPDES PERMIT. ANY CONTROL MEASURE MUST BE REPAIRED/REPLACED WITHIN THREE DAYS OF INSPECTION. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL BE TRAINED IN ALL INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ONSITE IN GOOD WORKING ORDER. A WRITTEN DOCUMENT CONTAINING THE SIGNATURES OF ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED IN THE IMPLEMENTATION OF ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE MAINTAINED AS PROOF ACKNOWLEDGING THAT THEY REVIEWED AND UNDERSTAND THE CONDITIONS AND RESPONSIBILITIES OF THE PLAN. THE DOCUMENT SHALL BE CREATED BY THE CONTRACTOR SIGNED PRIOR TO THE START OF CONSTRUCTION. DISPOSAL OF SOLID/SANITARY/TOXIC WASTE: SOLID, SANITARY, AND TOXIC WASTE MUST BE DISPOSED OF IN A PROPER MANNER IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS IT IS PROHIBITED TO BURN, BURY, OR POUR OUT ONTO THE GROUND OR INTO A STORM SEWER WATER CONVEYANCE ANY SOLVENTS, PAINTS, STAINS, GASOLINE, DIESEL FUEL, USED MOTOR OIL, HYDRAULIC FLUID, ANTIFREEZE, CEMENT CURING COMPOUNDS, AND OTHER SUCH SOLID AND HAZARDOUS WASTES. ANY RINSE WATERS OF SUCH MATERIAL ARE ALSO PROHIBITED FROM BEING PLACED WHERE THEY MAY ENTER DRAINAGEWAYS. WASH OUT OF CEMENT TRUCKS SHOULD OCCUR IN A DIKED, DESIGNATED AREA, AWAY FROM ANY CONVEYANCE CHANNEL. COORDINATE WASH OUT AREA WITH CONSTRUCTION MANAGER. CONTRACTORS RESPONSIBILITIES: THIS PLAN MUST BE POSTED ON-SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON-SITE AT ALL TIMES. DETAILS HAVE BEEN PROVIDED ON THE PLANS IN AN EFFORT TO HELP THE CONTRACTOR PROVIDE EROSION AND SEDIMENTATION CONTROL. THE DETAILS SHOWN ON THE PLAN SHALL BE CONSIDERED A MINIMUM. ADDITIONAL OR ALTERNATE DETAILS MAY BE FOUND IN THE ODNR MANUAL "RAINWATER AND LAND DEVELOPMENT". THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING NECESSARY AND ADEQUATE MEASURES FOR PROPER CONTROL OF EROSION AND SEDIMENT RUNOFF FROM THE SITE ALONG WITH PROPER MAINTENANCE AND INSPECTION IN COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. THE SCHEDULE SHOULD INCLUDE A SEQUENCE OF THE PLACEMENT OF THE SEDIMENTATION AND EROSION CONTROL MEASURES THAT PROVIDES FOR CONTINUAL PROTECTION OF THE SITE THROUGHOUT EARTH MOVING ACTIVITIES. PRIOR TO CONSTRUCTION OPERATIONS IN A PARTICULAR AREA, ALL SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE IN PLACE. FIELD ADJUSTMENTS WITH RESPECT TO LOCATIONS AND DIMENSIONS MAY BE MADE BY THE ENGINEER AND/OR THE OHIO EPA. THE CONTRACTOR SHALL PLACE INLET PROTECTION FOR THE SEDIMENTATION CONTROL IMMEDIATELY AFTER CONSTRUCTION OF THE CATCH BASINS OR INLETS WHICH ARE NOT TRIBUTARY TO A SEDIMENT BASIN OR DAM. IT MAY BECOME NECESSARY TO REMOVE PORTIONS OF SEDIMENTATION CONTROLS DURING CONSTRUCTION TO FACILITATE THE GRADING OPERATIONS IN CERTAIN AREAS. HOWEVER, THE CONTROLS SHALL BE REPLACED UPON GRADING OR DURING ANY INCLEMENT WEATHER. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT OFFSITE TRACKING OF SEDIMENTS BY VEHICLES AND EQUIPMENT IS MINIMIZED. ALL SUCH OFFSITE SEDIMENT SHALL BE CLEANED UP DAILY. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT NO SOLID OR LIQUID WASTE IS DISCHARGED INTO STORM WATER RUNOFF. UNTREATED SEDIMENT-LADEN RUNOFF SHALL NOT FLOW OFFSITE WITHOUT BEING DIRECTED THROUGH A CONTROL PRACTICE. CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE INTO OR ALONG SIDE RIVERS, STREAMS, CREEKS, NATURAL OR MAN-MADE CHANNELS OR SWALES LEADING THERETO. CONCRETE WASH WATER AND SURPLUS CONCRETE SHALL BE CONFINED TO APPROVED AREAS. AFTER SOLIDIFYING THESE WASTED MATERIALS SHALL BE REMOVED FROM THE SITE. POST FLOOD EVENT SITE MAINTENANCE: FOLLOWING A FLOOD EVENT, INSPECT ALL MECHANICAL EQUIPMENT THAT ARE LOCATED ON THE SITE FOR ANY DAMAGES. WALLS AND WALL PENETRATIONS SHALL ALSO BE CHECKED FOR CRACKS AND LEAKS AND REPAIRED AS NECESSARY. ALL DEBRIS THAT MAY HAVE ACCUMULATED ALONG THE SITE SHALL BE GATHERED AND DISPOSED OF ACCORDING TO CITY STANDARDS. CHECK AND ENSURE THAT ALL DRAINAGE STRUCTURES ARE IN STANDARD OPERATION AND REPAIR ANY DAMAGES OR CLOGS THAT MAY HAVE OCCURRED DURING FLOODING. STABILIZATION PROCEDURES CONTRACTOR SHALL BE RESPONSIBLE TO KEEP A RECORD OF DATES WHEN MAJOR GRADING ACTIVITIES OCCUR, WHEN EARTH DISTURBANCE HAS TEMPORARILY OR PERMANENTLY CEASED ON A PORTION OF THE SITE, AND WHEN STABILIZATION MEASURES HAVE BEEN INITIATED. THE LIMITS OF SEEDING AND MULCHING ARE AS SHOWN WITHIN THE PLAN AS INDICATED BY THE LIMITS OF DISTURBANCE. ALL AREAS NOT DESIGNATED TO BE SEEDED SHALL REMAIN UNDER NATURAL GROUND COVER. THOSE AREAS DISTURBED OUTSIDE THE SEEDING LIMITS SHALL BE SEEDED AND MULCHED AT THE CONTRACTOR'S EXPENSE. TEMPORARY STABILIZATION TOPSOIL STOCKPILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY CEASES FOR AT LEAST 14 DAYS WILL BE STABILIZED WITH TEMPORARY SEED AND MULCH NO LATER THAN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY IN THAT AREA. DISTURBED AREAS WITHIN 50 FEET OF A STREAM, FIRST ORDER OR LARGER, SHALL BE STABILIZED WITHIN 2 DAYS OF INACTIVITY. TEMPORARY STABILIZATION MUST BE APPLIED TO ANY AREA OF THE SITE WHICH WILL REMAIN IDLE OVER THE WINTER. THE TEMPORARY SEED SHALL BE RYE (GRASS) APPLIED AT A RATE OF 25 LBS PER 1000 SY. PRIOR TO SEEDING, 900 LBS OF GROUND AGRICULTURAL LIMESTONE AND 200 LBS OF 10-20-20 FERTILIZER SHALL BE APPLIED TO EVERY 1000 SY STABILIZED. IMMEDIATELY AFTER ANY GIVEN AREA IS SEEDED, STRAW OR HAY SHALL BE EVENLY PLACED OVER ALL SEEDED AREAS. TWO TONS PER ACRE FOR STRAW, OR 3 TONS PER ACRE FOR HAY SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF MARCH 15 AND OCTOBER 15. THREE TONS PER ACRE STRAW, OR 4.5 TONS PER ACRE FOR HAY, SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF OCTOBER 15 AND MARCH 15 OF THE SUCCEEDING YEAR. IF DORMANT SEEDING IS BEING USED FOR STABILIZATION, SEED SHALL BE PLANTED AFTER NOVEMBER 20. AREAS TO BE PAVED SHALL BE TEMPORARILY STABILIZED BY APPLYING STONE BASE UNTIL BITUMINOUS PAVEMENT CAN BE APPLIED. IN ADDITION TO TEMPORARY SEEDING, THE CONTRACTOR SHALL PLACE A FILTER FABRIC BARRIER AROUND THE BASE OF ALL SOIL STOCKPILES. PERMANENT STABILIZATION DISTURBED PORTIONS OF THE SITE WHEN CONSTRUCTION HAS COMPLETED, OR PORTIONS THAT WILL REMAIN DORMANT FOR LONGER THAN ONE YEAR, SHALL BE STABILIZED WITH PERMANENT SEED NO LATER THAN 7 DAYS AFTER FINAL GRADE HAS BEEN ESTABLISHED. THE PERMANENT SEED MIX SHALL CONSIST OF 260 LBS/ACRE OF TURF TYPE TALL FESCUE. PRIOR TO SEEDING, APPLY COMMERCIAL FERTILIZER AT THE RATE OF 1 LB ACTUAL NITROGEN PER 1000 SF. FERTILIZER TO HAVE 20-22-14 ANALYSIS. AFTER SEEDING, EACH AREA SHALL BE MULCHED USING TURFIBER (OR EQUIVALENT) AT A RATE OF 2000 LBS PER ACRE WITH 50 LBS OF TURFIBER ADDED PER 100 GALLONS OF MACHINE CAPACITY. KEEP HYDROMULCH FROM NON-TARGET AREAS INCLUDING PAVEMENT, PLANT MATERIALS, CURBING, AND STRUCTURES. IF THESE SURFACES ARE HIT DURING HYDROMULCHING OPERATIONS, WASH THE SURFACE IMMEDIATELY. IF SEASONAL CONDITIONS PROHIBIT THE ESTABLISHMENT OF VEGETATIVE COVER, OTHER METHODS OF STABILIZATION, SUCH AS MULCHING WITH A TACKIFIER OR MATTING, MUST BE EMPLOYED AND MAINTAINED UNTIL A MORE PERMANENT METHOD CAN BE IMPLEMENTED. SITE NARRATIVE EXISTING SITE CONDITIONS:1 RESIDENTIAL BUILDING AND DRIVEWAY; GRASS. PROJECT DESCRIPTION:ACTIVITIES INCLUDE THE CONSTRUCTION OF A SINGLE FAMILY REDEVELOPMENT (7 DWELLING UNITS, 6 NEW HOMES, ASSOCIATED UTILITIES, DRIVES, SIDEWALK AND PAVEMENT IMPROVEMENTS, AND AN UNDERGROUND DETENTION SYSTEM. APPROXIMATELY 6.82 ACRES OF THE SITE WILL BE DISTURBED. RECEIVING STREAM:SCIOTO RIVER. DISTURBED AREA:6.54 ACRES SITE BMPS:FINAL LOCATIONS OF ALL SITE BMPS, INCLUDING DUMPSTERS, VEHICLE FUELING AREAS, CONCRETE TRUCK WASH, MATERIAL STORAGE, AND TOPSOIL STOCKPILES SHALL BE DETERMINED BY CONTRACTOR. IF FINAL LOCATION OF BMPS DIFFER FROM THE LOCATIONS SHOWN, CONTRACTOR SHALL MODIFY SWPPP AND INFORM OHIO EPA OF NEW LOCATIONS OF BMPS. ADJACENT AREAS:EAST: SCIOTO RIVER NORTH: RESIDENTIAL HOMES WEST: DUBLIN ROAD SOUTH: RESIDENTIAL HOMES GRADING REQUIREMENTS:DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE, ROCK CHECK DAMS, AND TEMPORARY SEDIMENT TRAPS AS SHOWN ON THE PLAN. AREAS WILL BE STABILIZED WHEN GRADED TO PREVENT EROSION ON THE SITE. EROSION & SEDIMENT A COMBINATION OF MEASURES WILL BE USED TO PROVIDE EROSION & SEDIMENT CONTROL MEASURES:CONTROL, INCLUDING SILT FENCE AND SEEDING. PROVIDE INLET PROTECTION AT ALL NEW AND EXISTING DRAINAGE STRUCTURES. ANY OFF SITE BORROW OR SPOIL AREAS SHALL BE SUBJECT TO THE REQUIREMENTS SET FORTH BY THE OHIO EPA. ALL EROSION AND SEDIMENT CONTROL MEASURES FOR OFF-SITE AREAS NOT COVERED BY A SEPARATE NOI OR SWPPP SHALL BE COORDINATED WITH THE OHIO EPA. ALL TRENCH OR EXCAVATION GROUNDWATER CONTAINING SEDIMENT MUST BE EFFECTIVELY TREATED PRIOR TO DISCHARGE INTO THE STORM SEWER SYSTEM. USE ALL MEANS NECESSARY TO CONTROL DUST ON THE SITE AND PREVENT TRACKING SOIL OFF SITE. PERMANENT STABILIZATION:THE SITE WILL BE STABILIZED BY THE USE OF SEEDING OR SODDING IN LAWN AREAS. MAINTENANCE:ALL EROSION CONTROL DEVICES ARE TO BE INSPECTED BY THE CONSTRUCTION SUPERINTENDENT WEEKLY AND AFTER SIGNIFICANT RAINFALLS. ANY DAMAGED FACILITIES ARE TO BE REPLACED OR REPAIRED IMMEDIATELY AS MAY BE NECESSARY. GENERAL CONSTRUCTION (UNLESS NOTED OTHERWISE, ALL EROSION AND SEDIMENT CONTROL MEASURES SEQUENCE:FROM THE BEGINNING OF EARTH DISTURBING ACTIVITIES TO FINAL COMPLETION OF THE PROJECT ARE THE RESPONSIBILITY OF THE CONTRACTOR) 1.ESTABLISH CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT CONSTRUCTION AREA. 2.CONSTRUCT TEMPORARY SEDIMENT CONTROLS AND PERIMETER EROSION CONTROL MEASURES, INCLUDING SEDIMENT BASINS, TEMPORARY OUTLET STRUCTURE, CONSTRUCTION ENTRANCE, AND SILT FENCE. MEASURES SHALL BE IMPLEMENTED AS THE FIRST STEP OF GRADING AND WITHIN 7 DAYS OF FIRST GRUBBING. 3.CLEAR AND GRUB 4.STRIP AND STOCKPILE TOPSOIL. SEED STOCKPILES. PROVIDE PERIMETER SILT FENCE AT TOE OF STOCKPILE SLOPE. 5.PERFORM ROUGH GRADING AND EXCAVATION. STABILIZE AREAS AS INDICATED HEREIN. 6.INSTALL STORM SEWERS, OUTLET STRUCTURE, AND INLET FILTERS. 7.COMPLETE ALL PAVEMENT ACTIVITIES. 8.COMPLETE FINE GRADING OF SEEDED AREAS AND STABILIZE DISTURBED AREAS. 9.ONCE FINAL SEED HAS BEEN ESTABLISHED, CONTRACTOR TO REMOVE TEMPORARY EROSION CONTROL MEASURES AND CLEAN ALL SEDIMENT FROM STRUCTURES AND PAVEMENT. SEDIMENT/WATER QUALITY BASIN SHALL BE CLEANED OF ALL ACCUMULATED SEDIMENT AND RESTORED TO THE ORIGINAL DESIGN CONTOURS SHOWN ON THESE PLANS. 10.PRIOR TO FINISHING WORK, ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION ACTIVITY (INCLUDING, BUT NOT LIMITED TO MATERIAL STORAGE AREAS, TRAILER AREAS, FUELING AREAS, TRUCK WASH AREAS, EQUIPMENT PATHS, HAUL ROADS, ETC.) SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS, OR IF IN AREAS OF PROPOSED IMPROVEMENTS, TO THEIR PROPOSED CONDITIONS. ALL STONE, TRASH, AND DEBRIS SHALL BE REMOVED FROM THE SOIL. THE UPPER 12" OF SOIL SHALL BE SCARIFIED, AND AREA SHALL BE GRADED TO SUBGRADE WITH SUITABLE MATERIALS. FURNISH 6" MINIMUM OF TOPSOIL AND SEED ALL AREAS. SCHEDULE:THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE PLACED IN ACCORDANCE WITH THIS SCHEDULE. JURISDICTION:ALL EROSION AND SEDIMENT CONTROL PRACTICES ARE SUBJECT TO FIELD MODIFICATIONS AT THE DISCRETION OF THE CITY OF DUBLIN AND/OR THE OHIO EPA. OEPA NOI:SUBMITTED, PENDING APPROVAL RUNOFF COEFFICIENTS:PRE-DEVELOPED:C = 0.44 POST-DEVELOPED:C = 0.54 PRE-DEVELOPED IMPERVIOUS AREA:0.47 ACRES POST-DEVELOPED IMPERVIOUS AREA:1.72 ACRES TEMPORARY SEEDING SEEDING DATES SPECIES LB/1,000 SF PER ACRE MARCH 1 TO AUGUST 15 OATS 3 4 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB AUGUST 16 TO NOVEMBER 1 RY 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB WHEAT 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB NOVEMBER 1 TO SPRING SEEDING USE MULCH ONLY, SODDING PRACTICES OR DORMANT SEEDING. NOTE: OTHER APPROVED SEED SPECIES MAY BE SUBSTITUTED PLAN DESIGNER AMERICAN STRUCTUREPOINT, INC. 2550 CORPORATE EXCHANGE DR., STE 300 COLUMBUS, OHIO 43231 CONTACT: MATT LILIE PHONE: (614) 901-2235 EMAIL: MLILIE@structurepoint.com OWNER & SITE CONTACT MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM TEMPORARY STABILIZATION AREA REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY DISTURBED AREA WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND NOT AT FINAL GRADE WITHIN 2 DAYS OF THE MOST RECENT DISTURBANCE IF THE AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS ANY DISTURBED AREAS THAT WILL BE DORMANT FOR MORE THAN 14 DAYS BUT LESS THAN ONE YEAR, AND NOT WITHIN 50 FEET OF A SURFACE WATER OF THE STATE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE WITHIN THE AREA. FOR RESIDENTIAL SUBDIVISIONS, DISTURBED AREAS MUST BE STABILIZED AT LEAST SEVEN DAYS PRIOR TO TRANSFER OF PERMIT COVERAGE FOR THE INDIVIDUAL LOT(S). DISTURBED AREAS THAT WILL BE IDLE OVER WINTER PRIOR TO THE ONSET OF WINTER WEATHER PERMANENT STABILIZATION AREA REQUIRING PERMANENT STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY AREAS THAT WILL LIE DORMANT FOR ONE YEAR OR MORE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE AN AREAS WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND AT FINAL GRADE WITHIN TWO DAYS OF REACHING FINAL GRADE OTHER AREAS AT FINAL GRADE WITHIN SEVEN DAYS OF REACHING FINAL GRADE IN THAT AREA 6.83 ACRES JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL DETAILS14/25 8" NOTES: 1.FENCE POST SHALL BE A MINIMUM LENGTH OF 32 INCHES LONG PLUS BURIAL DEPTH, COMPOSED OF NOMINAL DIMENSIONED 2x2 INCH HARDWOOD OF SOUND QUALITY. ALTERNATELY POST MATERIAL SHALL BE STEEL OR SYNTHETIC AND SHALL BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE DURING INSTALLATION, TO SUPPORT APPLIED LOADS, AND SO THE GEOTEXTILE CAN BE ADEQUATELY SECURED TO POST 2.FABRIC SHALL BE A NEEDLE PUNCHED NON-WOVEN GEOTEXTILE FABRIC CONSISTING OF STRONG, ROT RESISTANT, MATERIALS RESISTANT TO DETERIORATION FROM ULTRAVIOLET AND HEAT EXPOSURE. 3.MINIMUM 8" FABRIC BURY REQUIRED. 4.ENDS OF THE SILT FENCES SHALL BE BROUGHT UPSLOPE SO THAT WATER PONDED BY THE SILT FENCE WILL BE PREVENTED FROM FLOWING AROUND THE ENDS. 5.THE HEIGHT OF THE SILT FENCE SHALL BE A MINIMUM OF 16 INCHES ABOVE THE ORIGINAL GROUND SURFACE. 6.SILT FENCE SHALL BE PLACED ON THE FLATTEST AREA AVAILABLE. 7.SEDIMENT DEPOSITS SHALL BE ROUTINELY REMOVED WHEN THE DEPOSIT REACHES APPROXIMATELY HALF THE HEIGHT OF THE SILT FENCE. FENCE POST FLOW 16" MINEXTEND FABRIC TO 8" BELOW SURFACE FILTER FABRIC NON WOVEN GEOTEXTILE FABRIC SPACE POSTS PER MANUFACTURER RECOMMENDATIONS 16" MIN10' MAX SILT FENCE NOT TO SCALE WRAP GEOTEXTILE AROUND STAKES BEFORE DRIVING TRENCH TO BE BACKFILLED AND COMPACTED MINIMUM CRITERIA FOR SILT FENCE FABRIC (ODOT, 2002) MINIMUM TENSILE STRENGTH 120 lbs (535 N)ASTM D 4632 MAXIMUM ELONGATION AT 60 LBS 50%ASTM D 4632 MINIMUM PUNCTURE STRENGTH 50 lbs (220 N)ASTM D 4833 MINIMUM TEAR STRENGTH 40 lbs (180 N)ASTM D 4533 APPARENT OPENING SIZE <_ 0.84 mm ASTM D 4751 MINIMUM PERMITIVITY 1x10-2 sec. -1 ASTM D 4491 UV EXPOSURE STRENGTH RETENTION 70%ASTM D 4355 D BEAVER DAM INLET PROTECTION NOT TO SCALE DANDY BAG WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN MONOFILAMENT THAT MEETS OR EXCEEDS THE FOLLOWING SPEFICICATIONS GRAB TENSILE STRENGTH ASTM D 4632 GRAB TENSILE ELONGATION ASTM D 4632 PUNCTURE STRENGTH ASTM D 4833 MULLEN BURST STRENGTH ASTM D 3786 TRAPEZOID TEAR STRENGTH ASTM D 4533 UV RESISTANCE ASTM D 4355 APPARENT OPENING SIZE ASTM D 4751 FLOW RATE ASTM D 4491 PERMITIVITY ASTM D 4491 INSTALLATION: 1.STAND GRATE ON END. SLIDE THE BEAVER DAM BAG ON WITH DAM ON TOP OF THE GRATE. PULL ALL EXCESS DOWN. 2.LAY UNIT ON ITS SIDE. CAREFULLY TUCK FLAP IN. PRESS VELCRO STRIPS TOGETHER. 3.INSTALL THE UNIT MAKING SURE FRONT EDGE OF GRATE IS INSERTED IN FRAME FIRST, THEN LOWER BACK INTO PLACE. 4.PRESS VELCRO DOTS TOGETHER WHICH ARE LOCATED UNDER LIFTING STRAPS. THIS ENSURES STRAPS REMAIN FLUSH WITH GUTTER. MAINTENANCE: 1.WITH A STIFF BRISTLE BROOM, SWEEP SILT AND OTHER DEBRIS OFF SURFACE AFTER EACH STORM EVENT. MANHOLE CURB FILTER CURB OPENING WITHOUT GRATE OVERFLOW GAP AGGREGATE POUCH C CONCRETE WASHOUT AREA NOT TO SCALE10' MINIMUM10' MINIMUM 3' MIN.NOTE: BASIN SHOULD BE CLEARLY MARKED FOR CONCRETE WASHOUT. ORANGE SILT FENCE OR CONSTRUCTION FENCE PLAN SECTION NOTE: 1.CONCRETE WASHOUT AREA SHALL BE LOCATED A MINIMUM OF 100' FROM STORM SEWER INLETS, STREAMS, WETLANDS OR ANY OTHER SURFACE WATERS. 2.IF CONCRETE WASHOUT AREA IS LOCATED AWAY FROM A PAVED SURFACE, CONSTRUCT A GRAVEL ACCESS ROUTE EQUAL IN COMPOSITION TO A CONSTRUCTION ENTRANCE. 3.CONCRETE WASHOUT AREA SHALL BE SUFFICIENT SIZE TO CONTAIN CONCRETE WASTE GENERATED. LARGE SITES MAY REQUIRE MULTIPLE CONCRETE WASHOUT AREAS. 4.PLASTIC LINING SHALL BE DOUBLE-LINED, CONTINUOUS 10-ML POLYETHYLENE SHEETING FREE OF HOLES, TEARS OR OTHER DEFECTS INSTALLED ON A SMOOTH, LEVEL SURFACE, FREE OF LARGE ROCKS AND DEBRIS. 5.CONCRETE WASHOUT SIGNAGE SHALL BE CLEARLY VISIBLE AND LOCATED WITHIN 30 FEET OF EACH WASHOUT AREA. 6.CONCRETE WASHOUT AREA SHALL BE COVERED DURING INCLEMENT WEATHER TO PREVENT OVERFLOW. 7.PREFABRICATED, PORTABLE AND RE-USABLE CONCRETE WASHOUT CONTAINERS ARE ACCEPTABLE. 8.CONCRETE WASHOUT AREA SHALL BE INSPECTED DAILY TO CHECK FOR DAMAGE AND DETERMINE IF IT NEEDS CLEANED OR REPLACED. ANY DAMAGE TO THE SIDEWALLS OR PLASTIC LINING SHALL BE REPAIRED IMMEDIATELY. REPLACE THE ENTIRE CONCRETE WASHOUT AREA WHEN IT IS 75% FULL. ALL CONCRETE TRUCKS MUST WASHOUT HERE 6" MIN. NO. 2 CRUSHED STONE GRAVEL PAD 10 ML PLASTIC LINING 10 ML PLASTIC LINING B 20'20'10' MIN.14'EXISTING PAVEMENT 5: 1 3'EXISTING PAVEMENT PROFILE PLAN VIEW 6" MIN(STANDARD)18" MIN(HEAVY DUTY)FILTER CLOTH R/W DIVERSION AS NEEDED70' MIN. AS REQUIRED EXISTING GROUND CULVERT (AS NEEDED)18"CONSTRUCTION ENTRANCE NOT TO SCALE GEOTEXTILE SPECIFICATION FOR CONSTRUCTION ENTRANCE MINIMUM TENSILE STRENGTH 200 lbs MINIMUM PUNCTURE STRENGTH 80 psi MINIMUM TEAR STRENGTH 50 lbs MINIMUM BURST STRENGTH 320 psi MINIMUM ELONGATION 20% EQUIVALENT OPENING SIZE EOS<0.6 mm PERMITIVITY 1x10-3 cm/sec CONSTRUCTION SPECIFICATIONS: 1.STONE SIZE—ODOT # 2 (1.5-2.5 INCH) STONE SHALL BE USED, OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH—THE CONSTRUCTION ENTRANCE SHALL BE AS LONG AS REQUIRED TO STABILIZE HIGH TRAFFIC AREAS BUT NOT LESS THAN 70 FT. (EXCEPTION: APPLY 30 FT. MINIMUM TO SINGLE RESIDENCE LOTS). 3.THICKNESS -THE STONE LAYER SHALL BE AT LEAST 6 INCHES THICK FOR LIGHT DUTY ENTRANCES OR AT LEAST 10 INCHES FOR HEAVY DUTY USE. 4.WIDTH -THE ENTRANCE SHALL BE AT LEAST 14 FEET WIDE, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS 5.GEOTEXTILE -A GEOTEXTILE SHALL BE LAID OVER THE ENTIRE AREA PRIOR TO PLACING STONE. IT SHALL BE COMPOSED OF STRONG ROT-PROOF POLYMERIC FIBERS AND MEET THE FOLLOWING SPECIFICATIONS: 6.TIMING—THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED AS SOON AS IS PRACTICABLE BEFORE MAJOR GRADING ACTIVITIES. 7.CULVERT -A PIPE OR CULVERT SHALL BE CONSTRUCTED UNDER THE ENTRANCE IF NEEDED TO PREVENT SURFACE WATER FROM FLOWING ACROSS THE ENTRANCE OR TO PREVENT RUNOFF FROM BEING DIRECTED OUT ONTO PAVED SURFACES. 8.WATER BAR -A WATER BAR SHALL BE CONSTRUCTED AS PART OF THE CONSTRUCTION ENTRANCE IF NEEDED TO PREVENT SURFACE RUNOFF FROM FLOWING THE LENGTH OF THE CONSTRUCTION ENTRANCE AND OUT ONTO PAVED SURFACES. 9.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR PREVENT FLOWING SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND. MUD SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC ROADS, OR ANY SURFACE WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS, SHALL BE REMOVED IMMEDIATELY. REMOVAL SHALL BE ACCOMPLISHED BY SCRAPING OR SWEEPING. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. 10. CONSTRUCTION ENTRANCES SHALL NOT BE RELIED UPON TO REMOVE MUD FROM VEHICLES AND PREVENT OFF-SITE TRACKING. VEHICLES THAT ENTER AND LEAVE THE CONSTRUCTION-SITE SHALL BE RESTRICTED FROM MUDDY AREAS. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 11. REMOVAL—THE ENTRANCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREA IS STABILIZED OR REPLACED WITH A PERMANENT ROADWAY OR ENTRANCE. A INSTALLATION: 1.STAND GRATE ON END. PLACE DANDY BAG OVER GRATE. 2.FLIP GRATE OVER SO THAT OPEN END IS UP. PULL UP SLACK. TUCK FLAP IN. BE SURE END OF GRATE IS COMPLETELY COVERED BY FLAP OR DANDY BAG WILL NOT FIT PROPERLY. 3.HOLDING HANDLES, CAREFULLY PLACE DANDY BAG WITH THE GRATE INSERTED INTO CATCH BASIN FRAME SO THAT RED DOT ON THE TOP OF THE DANDY BAG IS VISIBLE. MAINTENANCE: AFTER EACH STORM EVENT AND SILT HAS DRIED, REMOVE ACCUMULATED DEBRIS FROM THE SURFACE OF DANDY BAG WITH BROOM. NOTE: PROVIDE FOR INLETS LOCATED IN PAVEMENT DANDY BAG INLET PROTECTION NOT TO SCALE DANDY BAG WILL BE MANUFACTURED IN THE U.S.A. FROM A WOVEN MONOFILAMENT THAT MEETS OR EXCEEDS THE FOLLOWING SPEFICICATIONS GRAB TENSILE STRENGTH ASTM D 4632 GRAB TENSILE ELONGATION ASTM D 4632 PUNCTURE STRENGTH ASTM D 4833 MULLEN BURST STRENGTH ASTM D 3786 TRAPEZOID TEAR STRENGTH ASTM D 4533 UV RESISTANCE ASTM D 4355 APPARENT OPENING SIZE ASTM D 4751 FLOW RATE ASTM D 4491 PERMITIVITY ASTM D 4491 STORM SEWER GRATE VELCRO CLOSURE LIFT STRAPS MADE FOR EASY MOVEMENT AND INSPECTION OF UNIT STORM SEWER GRATE DANDY BAG F 12" MIN.6" MIN.4'-0" LOW CENTER SECTION- MUST CAUSE FLOW OVER NOT AROUND, CHECK DAM NOTES: 1.CONSTRUCT CHECK DAM SUCH THAT THE CENTER IS 6" LOWER THAN THE OUTER EDGES. 2.SPACE CHECK DAMS SUCH THAT THE TOE OF THE UPSTREAM DAM IS AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 3.SIDE SLOPES SHALL BE A MINIMUM OF 2:1 4"-8" DIAMETER ROCKAPRON 3' MAX. DITCH SECTION PROFILE FLOW POSITIVE SLO P EPOSITIVE SL O P E FLOW ROCK CHECK DAM NOT TO SCALEE JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:30 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES EROSIONCONTROL DETAILS15/25 ODOT #57 AGGREGATE 1' THICK LENGTH WIDTHWEIRLENGTH4' MIN SEDIMENTSTORAGE ZONEDEWATERINGZONENOTES: 1.FILL USED FOR THE EMBANKMENT SHALL BE EVALUATED TO ASSURE IT IS SUITABLE AND STABLE FOR THE SLOPES OF THE BASIN. IT IS TO BE FREE OF ANY DEBRIS AS A RESULT OF CLEARING AND GRUBBING (E.G. ROOTS, OTHER ORGANICS, ETC) 2.THE MAXIMUM HEIGHT OF THE EMBANKMENT SHALL BE FIVE FEET. ALL CUT AND FILL SLOPES SHALL BE 2:1 (H:V) OR FLATTER. 3.THE OUTLET SHALL BE CONSTRUCTED USING THE MATERIALS SPECIFIED ON THIS DRAWING. GEOTEXTILE SHALL BE KEYED IN AT LEAST 6" ON THE UPSTREAM SIDE OF THE OUTLET. 4.WARNING SIGNS AND SAFETY FENCE SHALL BE PLACED AROUND THE TRAPS AND MAINTAINED OVER THE LIFE OF THE BASIN. 5.AFTER THE BASIN IS NO LONGER NEEDED THE STRUCTURE AND ALL ASSOCIATED SEDIMENT SHALL BE REMOVED. THE BASIN SHALL BE FILLED WITH STABLE EARTH MATERIAL, COMPACTED, GRADED, AND SEEDED TO BLEND IN WITH ADJACENT LAND. OPERATION AND MAINTENANCE: 1.THE CAPACITY AND FUNCTION OF THE SEDIMENT TRAP SHALL BE MAINTAINED BY INSPECTING ON A WEEKLY BASIS AND AFTER EACH STORM EVENT BY PERFORMING THE ACTIVITIES BEFORE. 2.SHORE UP ANY ERODING SLOPES, REMOVE WOODY VEGETATED GROWTH ON THE EMBANKMENT AND SPILLWAY AREAS, AND REMOVE ANY TRASH OR DEBRIS THAT HAVE ACCUMULATED IN THE BASIN. 3.DEWATERING OUTLETS SHALL BE REGULARLY CHECK THAT THEY ARE PERFORMING AS INTENDED. 4.REMOVE SEDIMENT AND RESTORE BASIN BACK TO ITS INTENDED DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO THE TOP OF THE SEDIMENT STORAGE ZONE. THIS ELEVATION SHALL BE MARKED WITH A STAKE NEAR THE CENTER OF THE BASIN 2:1 MAX SLOPE ODOT TYPE D RIP RAP GEOTEXTILE 1.5' MIN HEIGHT 2:1 SLOPES 2:1 SLOPES BASIN SEDIMENT TRAP NOT TO SCALE SPILLWAY WEIR SIZED TO PASS 10 YEAR 24 HOUR STORM. A MAX FLOW DEPTH OF 1', A MINIMUM FREEBOARD OF 0.5', AND MAXIMUM SIDE SLOPES OF 2:1 REQUIRED. DRAINAGE AREA (ACRES)WEIR LENGTH 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 MINIMUM 4' WIDE EMBANKMENT 6" KEY SECTION VIEW PLAN VIEW OUTLET SECTION TEMPORARY SEDIMENT TRAP - DEWATERING VOLUME 1800 CF PER ACRE OF DRAINAGE AREA 1800 CF/AC * 4.31 AC = 7758 CF SEDIMENT STORAGE ELEVATION = 820.00 DEWATERING/SPILLWAY ELEVATION = 823.00 TOP OF BASIN ELEVATION = 824.50 VOLUME PROVIDED = 8,133 CF 3 2 1 3 4 2 1 TEMPORARY SEDIMENT TRAP - SEDIMENT STORAGE VOLUME 1000 CF PER ACRE OF DISTURBED AREA 1000 CF/AC * 3.76 AC = 3760 CF SEDIMENT STORAGE ELEVATION = 820.00 BOTTOM OF BASIN ELEVATION = 817.00 VOLUME PROVIDED = 4,243 CF 3 45' MAXG JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:05 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM ADS SPECS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UNDERGROUNDDETENTION DETAILS16/25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:05 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM ADS SPECS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UNDERGROUNDDETENTION DETAILS17/25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 7/17/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:05 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 STM ADS SPECS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UNDERGROUNDDETENTION DETAILS18/25 w/RISER ICV ICV ICV LOW AREA ICV ICV ICVICV 3" CAST IRON EXPOSED PIPE 3" CAST IRON EXPOSED PIPE 3" CAST IRON EXPOSED PIPE PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AEcannot openGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP9950 EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)TBM1 CP900 CP947 WV WV WV WV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 4445 46 47 4849 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 8283 84 85 86 87 88 89 90 91 92 9394 95 96 97 98 99100 101 102 103 104 105 106 107 108 109 110 111 112 113 114115 116 117 118 119 120 121 122 123 124 125 126 127128 129 130 131 132 133 134135 136137 138 139 140141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158159 160 161 162 163 164 165 166 167168 169 170 171 172 173 174 175 176 177 178179 180 181182 183 184185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200201202 203 204 205 206 207 208 209 210 211 212 213 214 216 215 3 HA 3 HK 3 HK 3 HA 5 HK 3 HA 5 HK 3 HA LANDSCAPE ENLARGEMENT 3/16" = 1'-0"00 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES TREE PRESERVATIONAND REPLACEMENT19/25 KAA PWJ TREE TO BE PRESERVED CIRCLE REPRESENTS THE CRITICAL ROOT ZONE. TREE PROTECTION FENCE TO BE PLACED AT CRITICAL ROOT ZONE. TREE TO BE REMOVED. REFER TO SCHEDULE ON SHEET 12.DUBLIN RD.ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 0 SCALE: feet4080120 1" = 40' NORTH 01.27.25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES TREE PRESERVATIONSCHEDULE & DETAILS20/25 KAA PWJ NTS TREE PROTECTION DETAIL3 CROWN DRIP LINE OR OTHER LIMIT OF TREE PROTECTION AREA. SEE TREE PRESERVATION PLAN FOR FENCE ALIGNMENT. MAINTAIN EXISTING GRADE WITH THE TREE PROTECTION FENCE UNLESS OTHERWISE INDICATED ON THE PLANS. 2" X 6' STEEL POSTS OR APPROVED EQUAL. TREE PROTECTION FENCE: HIGH DENSITY POLYETHYLENE FENCING WITH 3.5" X 1.5" OPENINGS; COLOR- ORANGE. STEEL POSTS INSTALLED AT EDGE OF CANOPY EXISTING MULCH LAYER GENERAL NOTES: 1.ALL TREES NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY TREE PROTECTION FENCING PLACED AT CRITICAL ROOT ZONE, OR 15' FROM THE TRUNK WHICHEVER IS GREATER. 2.OWNER SHALL BE RESPONSIBLE FOE THE CONSTRUCTION, ERECTION, AND MAINTENANCE OF THE PROTECTION FENCING. FENCING MUST REMAIN IN PLACE DURING ALL PHASES OF CONSTRUCTION. 3.ANY CHANGE IN PLACEMENT OF FENCING MUST BE APPROVED BY CITY STAFF. 4.IT IS UNLAWFUL TO FAIL TO ABIDE BY THE TREE PRESERVATION PLAN OR TREE REMOVAL PERMIT. 5.UTILITY LOCATIONS ARE AS IDENTIFIED. ANY FIELD CHANGES THAT AFFECTS THE LOCATION OF THE TREE PROTECTION FENCING WILL BE REFLECTED ON REVISED PLANS AND COORDINATED WITH THE DIVISION OF PLANNING. 6.CRITICAL ROOT ZONE IS THE AREA INSCRIBED BY AN IMAGINARY LINE ON THE GROUND BENEATH A TREE HAVING ITS CENTER POINT AT THE CENTER OF THE TRUNK AND HAVING A RADIUS EQUAL TO ONE FOOT FOR EVERY INCH OF DIAMETER CHEST HEIGHT. 7.A TREE REMOVAL PERMIT MUST BE OBTAINED FROM THE PLANNING DIVISION PRIOR TO THE REMOVAL OF ANY TREES. 8.ROOT PRUNING WILL BE PERFORMED ON ANY ROOT DAMAGED WITHIN THE CRITICAL ROOT ZONE AS PER THE INTERNATIONAL SOCIETY OF ARBORICULTURE ACCEPTED STANDARDS. 9.NO WORK SHALL BEGIN UNTIL PLAN APPROVAL AND FIELD VERIFICATION BY CITY STAFF. 10.STREET TREES AND FRONT YARD TREES ARE TO BE FIELD COORDINATED WITH CITY ARBORIST. KEEP OUT TREE PROTECTION AREA 8.5" X 11" SIGN LAMINATED IN PLASTIC SPACED EVERY 50' ALONG THE FENCE. ZONING NOTES: NTS TREE PLANTING - LEVEL AREA1 1'-0"6"MIN.SPADE EDGE COMPACT EXCAVATED FILL TO CREATE SAUCER 3" MULCH LAYER (SEE GENERAL NOTES) ROOTBALL (LOOSEN BURLAP ON TOP 1/2) NOTES: 1. SEE NOTES FOR DRAINAGE REQUIREMENTS PROIR TO PLANTING 2. DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING 3. IMMEDIATELY SOAK WITH WATER 4. DO NOT BREAK ROOTBALL FINISHED GRADE PLANTING SOIL TYPE 1 ADD EXCAVATED SOIL AS NEEDED TO BRING TREE TO FINISHED GRADE. TAMP LIGHTLY BUT THOROUGHLY PRIOR TO SETTING TREE TO PREVENT SETTLING. SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH & LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE) KEEP MULCH OFF TRUNK OF TREE 1.EXCAVATE ROOTBALL PIT 2.SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3" HIGHER THAN FINISH GRADE. 3.REMOVE ALL TWINE, ROPE, WIRE BASKET, AND BURLAP FROM TOP 1/3 OF ROOTBALL & EXPOSE ROOT FLARE. 4.BACKFILL WITH SOIL MIX & "WATER IN" 5.COMPLETE BACKFILLING, CONSTRUCT SAUCER, SPADE-EDGE & ADD MULCH 6.STAKE & GUY SECURELY (AS REQUIRED) 7.INSTALL WATERING DEVICE (AS REQUIRED) PLANTING PROCEDURE 2-3" NTS TREE PLANTING - ON SLOPE2 Use Requirement Single-Family Front yard trees are required on every single family lot at the quantity and size specified in the following table. The trees to be planted shall be an approved front yard tree as listed in Appendix H (Approved Front Yard Trees for Dublin, Ohio) and have a minimum truck caliper of no less than 2 inches. Trees shall be located in front of or along any front-facing facade of the home, no closer than three feet to a side property line. Corner and through lots shall meet these requirements on all street frontages. Lot Width Front Building Setback Tree Size and Quantity Up to 59.9 feet Less than 20 feet 1 small tree 20 feet or more 1 medium tree 60-90.9 feet Less than 20 feet 1 medium tree plus 1 small tree 20 feet or more 1 large tree plus 1 medium tree 91 feet or more Less than 20 feet 1 large tree plus 2 trees of any size 20 feet or more 2 large tree plus 1 tree of any size 153.133 (D)(2)(b) 153.133 (C) Screening For Service Structures. Service structures shall be screened in all zoning districts. For the purposes of this section, service structures shall include but not be limited to loading docks, storage tanks, dumpsters, electrical transformers, utility vaults which extend above the surface, cooling towers, roof top units and other equipment or elements providing service to a building or a site. Structures may be grouped together; however, screening height shall be based upon the tallest of the structures. Roof top mechanical units must be screened to the full height of the unit SERVICE UNITS ARE NOT SCREENED AS PART OF THIS SUBMISSION BUT NOTED TO BE PROVIDED AS NEEDED. 153.134 STREET TREE AND PUBLIC TREE REQUIREMENTS. The planting of street trees shall be required at the time a parcel is developed or redeveloped, in all zoning districts, and in accordance with the following regulations. (Ord. 66-93, passed 9-20-93) (A) Requirements for trees located on city-owned public property. The following are requirements for the planting, pruning and removal of trees within city-owned property. For the purposes of this section, city-owned property shall include all public ways, streets, alleys, parks or other property owned by the Municipality. (1) Requirements. It shall be required that all subdividers or developers plant trees along public streets of their developments in such a manner, type, quantity and location as approved by the Planning and Zoning Commission and as defined by the following conditions, and that any undeveloped street or existing street with undeveloped frontage shall conform to these requirements at the time of the development. Final tree locations may be adjusted by the city as unusual conditions may warrant. (a) The tree to be planted shall be an approved street tree as listed in Appendix E (Approved Street Trees for Dublin, Ohio). (b) The minimum spacing between this and other trees shall be 40 feet for large trees, 30 feet for medium trees and 20 feet for small trees. See definition below. (c) The maximum spacing between trees shall be 45 feet for large trees, 35 feet for medium trees, and 25 feet for small trees. Spacing may be adjusted for columnar trees, as approved by City Forestry Division. TREE REPLACEMENT NOTES: TREE PROTECTION FENCE TO BE LOCATED WHERE THE LIMIT OF CONSTRUCTION IS ADJACENT TO TREES TO BE PRESERVED. THE TREE PROTECTION FENCE IS TO BE LOCATED TO PROTECT THE CRITICAL ROOT ZONE AS DEFINED AS THE AREA INSCRIBED BY AN IMAGINARY LINE ON THE GROUND BENEATH A TREE HAVING ITS CENTER POINT AT THE CENTER OF THE TRUNK OF THE TREE AND HAVING A RADIUS EQUAL TO ONE FOOT FOR EVERY INCH OF DIAMETER BREAST HEIGHT. PRIORITY 3 TREES REPLACE AT 1 TO 1 BASIS WITH A 2" CAL TREE. (7) TREES REQUIRED (7) 2" CALTREES TO BE TREES PROVIDED PRIORITY 2 TREES REPLACE AT 2 TO 1 BASIS WITH A 2" CAL. TREE. (58) 2" TREES REQUIRED (58) 2" CAL. TREES TO BE PROVIDED PRIORITY 1 TREES REPLACE AT 3 TO 1 BASIS WITH A 2" CAL. TREE (39) 2" CAL. TREES REQUIRED. (39) 2" CAL. TREES TO BE PROVIDED LANDMARK TREES REPLACE INCH FOR INCH WITH 2.5" CAL TREES. 672 / 2.5 = 269 TREES REQUIRED. ( 26) TREES PLANTED ON SITE AND REMAINDER TO BE PAID INTO THE DUBLIN TREE FUND. FRONT YARD TREES ARE SHOWN FOR ZONING PURPOSES ONLY AND ARE TO BE LOCATED WITH THE FINAL RESIDENTIAL SITE DESIGN.ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 1.EXCAVATE ROOTBALL PIT 2.SET TREE SUCH THAT TOP OF ROOTBALL IS 2-3" HIGHER THAN FINISH GRADE. 3.REMOVE ALL TWINE, ROPE, WIRE BASKET, AND BURLAP FROM TOP 1/3 OF ROOTBALL & EXPOSE ROOT FLARE. 4.BACKFILL WITH SOIL MIX & "WATER IN" 5.COMPLETE BACKFILLING, CONSTRUCT SAUCER, SPADE-EDGE & ADD MULCH 6.STAKE & GUY SECURELY (AS REQUIRED) 7.INSTALL WATERING DEVICE (AS REQUIRED) SCARIFY BASE OF PLANT PIT WHEN EXCAVATING PIT. BREAK THROUGH & LOOSEN ALL "HARDPAN" (REMOVE AS NECESSARY TO FACILITATE DRAINAGE) PLANTING SOIL TYPE 1 12"12" 12" MIN. 8" NOTES: 1.DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILLING. 2.IMMEDIATELY SOAK WITH WATER. 3.DO NOT BREAK ROOTBALL. 2-3" SPADE EDGE 3" SHREDDED HARDWOOD MULCH LAYER EARTH SAUCER RING 1-1/2" MULCH LAYER FINISHED GRADE BEFORE PLANTING PLANTING PROCEDURE KEEP MULCH OFF TRUNK OF TREE REMOVE ALL ROPE, BURLAP, AND WIRE BASKET FROM TOP 1/3 OF ROOTBALL EXISTING TREES 7192 Dublin Road - Dublin TREE NUMBER SIZE SPECIES CONDITION STATUS PRIORITY 3 PRIORITY 2 PRIORITY 1 LANDMARK REMARKS PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE 1 18 DOGWOOD GOOD REMOVE 18 2 20 RED CEDAR FAIR REMOVE 20 3 15 RED CEDAR POOR REMOVE 4 30 SPRUCE GOOD REMOVE 30 5 22 CATALPA GOOD REMOVE 22 6 29 MAPLE FAIR REMOVE 29 MULTI-STEM 7 60 MAPLE FAIR REMOVE 60 MULTI-STEM 8 15 MAPLE FAIR REMOVE 15 9 8 MAPLE POOR REMOVE 10 17 HACKBERRY FAIR REMOVE 17 11 21 WALNUT FAIR REMOVE 21 12 10 CHERRY POOR REMOVE 13 22 CATALPA GOOD REMOVE 22 14 16 ELM FAIR REMOVE 16 15 102 HACKBERRY FAIR REMOVE 102 16 15 HACKBERRY FAIR REMOVE 15 17 8 CATALPA FAIR REMOVE 8 18 6 CATALPA FAIR REMOVE 6 19 24 CATALPA FAIR REMOVE 24 20 11 LOCUST FAIR REMOVE 11 21 6 CATALPA FAIR REMOVE 6 22 7 WALNUT FAIR PRESERVE 7 23 14 CATALPA FAIR PRESERVE 14 24 23 OAK FAIR REMOVE 23 25 24 OAK FAIR REMOVE 24 26 44 MAPLE GOOD PRESERVE 44 27 27 HICKORY GOOD PRESERVE 27 28 35 HICKORY GOOD PRESERVE 35 29 20 OAK GOOD PRESERVE 20 30 80 MAPLE FAIR PRESERVE 80 31 17 MULBERRY FAIR PRESERVE 17 32 17 MAPLE FAIR PRESERVE 17 33 15 HACKBERRY POOR PRESERVE 34 15 MAPLE POOR PRESERVE 35 13 SPRUCE FAIR PRESERVE 13 36 19 PINE GOOD PRESERVE 19 37 15 MULBERRY FAIR PRESERVE 15 38 14 PINE FAIR PRESERVE 14 39 34 WALNUT FAIR PRESERVE 34 40 28 MAPLE FAIR PRESERVE 28 41 17 MAPLE FAIR PRESERVE 17 42 14 WALNUT FAIR PRESERVE 14 43 15 MAPLE FAIR PRESERVE 15 44 15 WALNUT FAIR PRESERVE 15 45 11 PINE FAIR PRESERVE 11 46 10 MAPLE FAIR PRESERVE 10 47 14 PINE GOOD PRESERVE 14 48 19 SPRUCE POOR PRESERVE 49 17 MAPLE FAIR PRESERVE 17 50 25 SPRUCE FAIR PRESERVE 25 51 11 MAPLE POOR PRESERVE 52 12 BOXELDER POOR PRESERVE 12 53 12 SPRUCE POOR PRESERVE 54 16 PINE POOR PRESERVE 55 27 HICKORY GOOD PRESERVE 27 56 13 PINE FAIR REMOVE 13 57 6 HACKBERRY FAIR REMOVE 6 58 7 MAPLE FAIR REMOVE 7 59 16 CHERRY FAIR PRESERVE 16 60 13 MAPLE FAIR REMOVE 13 61 7 MAPLE FAIR REMOVE 7 62 9 MAPLE FAIR REMOVE 9 63 6 MAPLE FAIR PRESERVE 6 64 8 PINE POOR REMOVE 65 7 MAPLE FAIR REMOVE 7 66 9 PINE POOR REMOVE 67 34 WALNUT FAIR REMOVE 34 68 20 MAPLE FAIR REMOVE 20 69 46 MAPLE FAIR REMOVE 46 70 36 MAPLE FAIR REMOVE 36 71 21 LOCUST GOOD REMOVE 21 72 19 LOCUST GOOD REMOVE 19 73 21 LOCUST GOOD REMOVE 21 74 22 LOCUST GOOD PRESERVE 22 75 7 WALNUT GOOD PRESERVE 7 76 26 MAPLE FAIR REMOVE 26 77 16 MAPLE GOOD REMOVE 16 78 27 MAPLE GOOD PRESERVE 27 79 46 CHERRY FAIR PRESERVE 46 MULTI-STEM 80 8 CHERRY POOR REMOVE 81 14 PINE FAIR REMOVE 14 82 11 WALNUT FAIR REMOVE 11 83 11 PINE POOR REMOVE 84 19 MAPLE GOOD PRESERVE 19 85 27 WALNUT FAIR PRESERVE 27 86 10 HACKBERRY FAIR REMOVE 10 87 9 HACKBERRY FAIR REMOVE 9 88 17 HACKBERRY POOR PRESERVE 89 6 MAPLE FAIR PRESERVE 6 90 13 MAPLE FAIR PRESERVE 13 91 8 MAPLE FAIR PRESERVE 8 92 7 MAPLE FAIR PRESERVE 7 93 11 MAPLE GOOD PRESERVE 11 94 42 HACKBERRY POOR PRESERVE 95 18 HACKBERRY POOR PRESERVE 96 16 MAPLE FAIR REMOVE 16 97 19 HACKBERRY FAIR REMOVE 19 98 12 MAPLE FAIR REMOVE 12 99 10 MAPLE POOR REMOVE 100 47 HACKBERRY POOR REMOVE 101 21 WALNUT FAIR REMOVE 21 102 10 MAPLE FAIR REMOVE 10 103 10 HACKBERRY POOR REMOVE 104 10 HACKBERRY FAIR REMOVE 10 105 8 MAPLE POOR REMOVE 106 19 MAPLE FAIR REMOVE 19 107 11 MAPLE FAIR REMOVE 11 108 11 HACKBERRY FAIR PRESERVE 11 109 15 MAPLE FAIR PRESERVE 15 110 16 MAPLE FAIR PRESERVE 16 111 16 WALNUT FAIR PRESERVE 16 112 41 HACKBERRY FAIR PRESERVE 41 MULTI-STEM 113 26 MAPLE FAIR PRESERVE 26 114 24 HACKBERRY FAIR PRESERVE 24 115 8 MAPLE FAIR REMOVE 8 116 14 MAPLE FAIR PRESERVE 14 117 21 MAPLE POOR REMOVE 118 13 MAPLE FAIR PRESERVE 13 119 8 MAPLE POOR PRESERVE 8 120 12 MAPLE FAIR PRESERVE 12 121 16 MAPLE FAIR PRESERVE 16 122 7 HACKBERRY FAIR PRESERVE 7 123 8 HACKBERRY FAIR PRESERVE 8 124 11 MAPLE FAIR REMOVE 11 125 21 HACKBERRY FAIR PRESERVE 21 126 20 HACKBERRY FAIR PRESERVE 20 127 24 HACKBERRY FAIR PRESERVE 24 128 22 HACKBERRY FAIR PRESERVE 22 129 46 HICKORY POOR REMOVE 130 39 SPRUCE GOOD REMOVE 39 131 27 SPRUCE FAIR REMOVE 27 132 30 SPRUCE FAIR REMOVE 30 133 15 PINE FAIR REMOVE 15 134 17 PINE FAIR REMOVE 17 135 10 PINE FAIR REMOVE 10 136 14 PINE FAIR REMOVE 14 137 15 PINE DEAD REMOVE 138 39 ELM POOR REMOVE 139 26 PEAR FAIR REMOVE 26 140 90 MAPLE FAIR REMOVE 90 MULTI-STEM 141 14 CATALPA FAIR PRESERVE 14 142 14 WALNUT FAIR PRESERVE 14 143 8 MULBERRY POOR PRESERVE 144 9 WALNUT POOR PRESERVE 145 9 CATALPA POOR PRESERVE 146 11 WALNUT FAIR PRESERVE 11 147 12 WALNUT FAIR PRESERVE 12 148 11 HACKBERRY FAIR PRESERVE 11 149 21 CATALPA FAIR PRESERVE 21 150 8 HACKBERRY FAIR PRESERVE 8 151 8 HACKBERRY FAIR PRESERVE 8 152 49 COTTONWOOD FAIR REMOVE 49 153 14 COTTONWOOD FAIR REMOVE 14 154 39 ELM POOR REMOVE 155 46 ELM POOR REMOVE 156 8 WALNUT FAIR PRESERVE 8 157 11 WALNUT FAIR PRESERVE 11 158 11 WALNUT FAIR PRESERVE 11 TREE NUMBER SIZE SPECIES CONDITION STATUS PRIORITY 3 PRIORITY 2 PRIORITY 1 LANDMARK REMARKS PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE PRESERVE REMOVE 159 11 CHERRY POOR PRESERVE 160 25 MAPLE POOR REMOVE 161 19 MAPLE FAIR PRESERVE 19 162 23 MAPLE FAIR PRESERVE 23 163 23 MAPLE GOOD REMOVE 23 164 30 HICKORY GOOD PRESERVE 30 165 31 MAPLE GOOD PRESERVE 31 166 11 PINE FAIR REMOVE 11 167 24 PINE FAIR PRESERVE 24 168 39 MAPLE FAIR PRESERVE 39 169 21 PINE GOOD REMOVE 21 170 15 MAPLE FAIR PRESERVE 15 171 15 MAPLE FAIR PRESERVE 15 172 8 HACKBERRY FAIR PRESERVE 8 173 22 MAPLE FAIR PRESERVE 22 174 6 MAPLE GOOD PRESERVE 6 175 13 MAPLE GOOD PRESERVE 13 176 17 HACKBERRY FAIR PRESERVE 17 177 12 MAPLE FAIR PRESERVE 12 178 9 MAPLE FAIR PRESERVE 9 179 8 MAPLE FAIR PRESERVE 8 180 22 CHERRY FAIR PRESERVE 22 181 7 HACKBERRY FAIR PRESERVE 7 182 12 MAPLE FAIR PRESERVE 12 183 14 WALNUT FAIR PRESERVE 14 184 10 MAPLE FAIR PRESERVE 10 185 11 MAPLE FAIR PRESERVE 11 186 19 MAPLE FAIR PRESERVE 19 187 16 LOCUST GOOD PRESERVE 16 188 9 HACKBERRY GOOD PRESERVE 9 189 8 MAPLE GOOD PRESERVE 8 190 22 WALNUT FAIR PRESERVE 22 191 18 WALNUT FAIR PRESERVE 18 192 11 HACKBERRY FAIR PRESERVE 11 193 10 MAPLE GOOD PRESERVE 10 194 19 MAPLE FAIR PRESERVE 19 195 18 SPRUCE FAIR PRESERVE 18 196 21 SPRUCE FAIR PRESERVE 21 197 21 SPRUCE FAIR PRESERVE 21 198 15 HACKBERRY FAIR PRESERVE 15 199 11 WALNUT FAIR PRESERVE 11 200 18 WALNUT GOOD PRESERVE 18 201 14 HACKBERRY FAIR PRESERVE 14 202 9 MAPLE GOOD PRESERVE 9 203 18 WALNUT GOOD PRESERVE 18 204 6 REDBUD GOOD PRESERVE 6 205 14 PEAR FAIR PRESERVE 14 206 20 PEAR GOOD PRESERVE 20 207 22 PEAR FAIR PRESERVE 22 208 32 ELM POOR PRESERVE 209 18 COTTONWOOD FAIR REMOVE 18 210 26 HACKBERRY GOOD PRESERVE 26 211 52 OAK GOOD PRESERVE 52 212 24 SYCAMORE GOOD PRESERVE 24 213 32 OAK GOOD PRESERVE 32 214 27 OAK GOOD PRESERVE 27 215 23 OAK GOOD PRESERVE 23 216 18 OAK GOOD PRESERVE 18 TOTALS 4111 442 266 773 672 7 TREE 29 TREES 13 TREES 672 INCHES w/RISER PUMP HOUSE 2" SPP TO BLD. 814.96 6" VERT. SPP POSSIBLE ICV W/NO LID & 8' TANK 12' SPP 768.66ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AEcannot openGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)EX 36" SAN (77-003-CIP)EX 36" SAN (77-003-CIP)EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)EX 16" FORCE MAIN (19-025-CIP)EX 16" FORCE MAIN (19-025-CIP)TBM1 CP900 CP947 WV WV WV WV 22 23 26 27 28 29 30 3132 35 36 38 40 41 42 43 4445 47 51 53 54 55 59 63 74 75 78 79 84 85 88 89 90 91 92 9394 95108 109 110 111 112 113 114 116 118 119 120 121 122 123 125 126 127128 141 142 143 144 145 146 147 148 149 150 151 156 157 158159 161 162 164 165 167168 169 170 171 172 173 174 175 176 177 178179 180 181182 183 184185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200201202 203 204 205 206 207 208 210 211 212 213 214 216 215 7 QB 29 UX 2 ASG 2 QC 2 NSW 2 ASG 2 NSW 2 QC 2 ASG 3 QC 3 QB 3 ASG 3 QC JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPE PLAN21/25 KAA PWJDUBLIN RD.CODE QTY BOTANICAL NAME COMMON NAME COND.SIZE SPACING SHADE TREES ASG 9 Acer saccharum `Green Mountain` TM Green Mountain Sugar Maple B&B 2" Cal.As shown NSW 4 Nyssa sylvatica `Wildfire`Wildfire Tupelo B&B 2" Cal.As Shown QB 15 Quercus bicolor STREET TREES ARE TO BE FIELD ADJUSTED AS NEEDED BY CITY ARBORIST. Swamp White Oak B&B 2.5" Cal. QC 10 Quercus coccinea Scarlet Oak B&B 2" Cal. UX 29 Ulmus x 'Urban'Urban Elm B&B 2.5" Cal. PLANT SCHEDULE ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 0 SCALE: feet4080120 1" = 40' NORTH 5 QB SEE ENLARGMENT 1 PAGE 19 04.2.25 SEE ENLARGMENT 1 PAGE 12 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPE DETAILS22/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 DRAIN DETAILS MOSAIC-WALLS OVER 4' TALL SCALE: NONE VERSA-LOK DRAIN 1" = 20' OUTLET AT 40' CENTERS OUTLET AT 40' CENTERS PERFORATED DRAIN PIPE PERFORATED DRAIN PIPE MOSAIC PANEL MOSAIC PANELOUTLET DRAIN PIPE THRU 4" HIGH UNITS OUTLET DRAIN PIPE THRU 6" HIGH UNITS 4" CUT IN ACCENT UNITS 6"X6" GRATE 6" CUT IN STANDARD UNIT 1 P-24-DUB-07 MOSAIC PANEL HEIGHT VERSA-LOK UNREINFORCED SECTION 1" = 20' 12" THICK MIN. DRAINAGE AGGREGATE 4" DIA. (MIN.) DRAIN PIPE OUTLET @ END OF WALL OR @ 40' CENTER MAX. SLOPE TO DRAIN (1/8"/FT.) IMPERVIOUS FILL GRANULAR LEVELING PAD 6" MIN. IMPERVIOUS FILL 12" DEEP CAP UNIT ADHERES TO TOP UNIT W/VERSA-LOK CONCRETE ADHESIVE VERSA-LOK MOSAIC CONCRETE UNITS FACING UNITS VERSA-LOK STANDARD UNIT (BASE COURSE) UNDISTURBED SOIL 2 P-24-DUB-08 SLOPE PAVEMENT AWAY FROM WALL VERSA-LOK PAVEMENT AT BASE 1/16" = 1'-0" VERSA-LOK STANDARD UNIT (BASE COURSE)GRANULAR LEVELING PAD MIN.6" THICK PAVEMENT EXPANSION JOINT DRAIN PIPE 3 P-24-DUB-09 VERSA-LOK MOSAIC PINNING DETAIL 1 1/2" = 1'-0" SNAP OFF REMAINDER OF PIN ABOVE UNIT PINHOLE VERA-TUFF SNAP OFF PIN, 2 PER UNIT VERA-TUFF SNAP OFF PIN, 2 PER UNIT RECEIVING SLOT NOTE IN SOME REGIONS, ALL UNITS OF THE MOSAIC RETAINING WALL SYSTEM (COBBLE, ACCENT AND STANDARD) HAVE 1/4" SETBACK OPTION, ALLOWING A NEW VERTICAL SETBACK MOSAIC WALL. CONTACT THE LOCAL VERSA-LOK MANUFACTURER NEAREST TO YOU FOR INFORMATION. 4 P-24-DUB-04 VERSA-LOK CAPPING DETAIL 1/2" = 1'-0" B-CAP A-CAP FOR STRAIGHT WALLS, ALTERNATE A-CAP AND B-CAP SPLIT STANDARD UNIT SPLIT CAP SPLIT CAP 5 P-24-DUB-03 VERSA-LOK CURVED WALL CAP 1/2" = 1'-0" NOTES FOLLOW GEOGRID MANUFACTURER'S INSTRUCTIONS AND REINFORCEMENT PLACEMENT AT CURVES AND CORNERS MINIMUM RADIUS 8' AT TOP OF WALL RECOMMENDED MINIMUM RADIUS 6' BOTTOM OF WALL 6 P-24-DUB-05 VERSA-LOK MOSAIC UNITS 1/8" = 1'-0" PINNING SLOTS FOR FREESTANDING WALLS SPLITTING GROOVE FOR FREESTANDING WALLS SPLITTING GROOVE FOR HALF UNIT PINHOLES FOR VERTICAL WALLS PIN HOLES AND SLOTS FOR 3 4" SETBACK WALL CONSTRUCTION STRAIGHT SPLIT FACE TYPICAL PAVER UNIT PAVER UNIT ALTERNATE A PAVER UNIT ALTERNATE B 7 P-24-DUB-06 BASE STEPPING DETAIL MOSAIC-10" STEP NOTE: ·LIMIT CHANGES IN BASE ELEVATION TO 10" PER STEP TO AVOID DIFFERENTIAL SETTLEMENT ·STEP AS NEEDED TO MINIMIZE BURIED UNITS AND MAINTAIN MINIMUM REQUIRED EMBEDMENT ·FOR EASE OF INSTALLATION, USE VERSA-LOK STANDARD UNITS FOR THE BASE COURSEVERSA-LOK BASE STEPPING 1/16" = 1'-0" 6" LEVELING PAD VERSA-LOK STANDARD UNITS FINISH GRADE 8 P-24-DUB-10 3 HA 3 HK 3 HK 3 HA 5 HK 3 HA JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPE DETAILS23/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 NATURAL CLEFT SLAB LIMESTONE STAIR 3/8" = 1'-0" ODOT 304 STONE FINISHED TREAD IS 13 1 4" WITH 1 1 2" RESTING ON PREVIOUS TREAD LIMESTONE BLOCK GEO-TEXTILE 3 1 2" (89 MM) DECOMPOSED AGGREGATE 3 P-24-DUB-14 SUBGRADE 3 1 2" (89 MM) DECOMPOSED AGGREGATE LANDSCAPE BED SOIL ODOT 304 TOP OF EDGING TO BE MAX. OF 1 4" (6.4 MM) ABOVE SURFACE MATERIAL 12" (305 MM) ALUMINUM STAKES TO LOCK INTO PERFORMED LOOPS ON THE EDGING PERMALOC PERMASTRIP ALUMINUM EDGING 3 16" X 3 1 2" (4.8 MM X 89 MM) WEED BARRIER FABRIC DECOMPOSED GRANITE MEETS GRASS FRINGE 3/4" = 1'-0" 2 P-24-DUB-11 LANDSCAPE ENLARGEMENT 1 3 HA 3 HK 3 HK 3 HA 5 HK 3 HA LANDSCAPE ENLARGEMENT 3/16" = 1'-0" SEGMENTED RETAINING WALL GRAVEL SEATING AREA GRAVEL PATH 4 P-24-DUB-15 CODE QTY BOTANICAL NAME COMMON NAME COND.SIZE DECIDUOUS SHRUBS HA 9 Hydrangea macrophylla 'All Summer Beauty'All Summer Beauty Hydrangea CONT 3 Gal. PERENNIALS HK 11 Hosta x 'Krossa Regal'Krossa Regal Hosta CONT 1 GAL PLANT SCHEDULE REPLACEMENT TREE 5 RETAINING_WALL 6 DECOMPOSED_AGGREGATE_PATH 0 SCALE: feet102030 1" = 10' NORTH JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPESPECIFICATIONS24/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC STREET, STORM, AND WATER IMPROVEMENTSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 10/1/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 10/1/25 - 10:52 AM EDITED BY: PJONES DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\ONSITE CDS\2024.00690 LP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES LANDSCAPESPECIFICATIONS25/25 KAA PWJ ENEPA C SD SIG ER T TIHCRADEREALETATSO TCOIHO F 01.27.25 ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AECP9950 TBM1 CP900 CP947DUBLIN ROADPID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.82 ACRES LIU CO U R T SCIOTO RIVER2 Area: 67,760 SF (1.56 AC) 3 Area: 68,609 SF (1.58 AC) 4 Area: 130,733 SF (3.00 AC) 6 Area: 56,744 SF (1.30 AC) 7 Area: 40,531 SF (0.93 AC) 5 Area: 58,218 SF (1.34 AC) RESERVE A Area: 26,048 SF (0.60 AC) 1 Area: 40,116 SF (0.92 AC) JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPRELIMINARY PLATFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 9/29/2025 DA MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 9/29/25 - 2:00 PM EDITED BY: DANUGERAH DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\PRELIMINARY PLAT\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 INDEX MAP SHEET INDEX 1 - TITLE SHEET 2 - PRELIMINARY PLAT ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM Ohio Utilities Protection Service Call 811before you dig ARCHITECT BASS STUDIO ARCHITECTS 36 KING AVENUE COLUMBUS, OHIO 43201 CONTACT: TIMOTHY A. BASS, AIA, LEED AP PHONE: (614) 294-4893 EMAIL: WWW.BASSSTUDIOARCHITECTS.COM PRELIMINARY PLAT FOR LIU COURT CITY OF DUBLIN, FRANKLIN COUNTY, OHIO TITLE SHEET1/2 BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVEROWNER MAINTENANCE DESCRIPTION RESERVE A HOA HOA PRIVATE OPEN SPACE WITH PROPOSED GRAVEL PATH TO PROVIDE ACCESS TO SEATING AREA AND WATERFRONT. SANITARY EASEMENT CITY OF DUBLIN CITY OF DUBLIN EASEMENT FOR SANITARY SEWER. STORM EASEMENT CITY OF DUBLIN CITY OF DUBLIN EASEMENT FOR STORM SEWER AND SWALE. LANDSCAPE EASEMENT HOA HOA EASEMENT FOR LANDSCAPE BUFFER BETWEEN DUBLIN RD AND LOTS 1, 6, AND 7. SITE DATA ZONING: PROPERTY OWNER:GEORGE CRIMSON LLC PARCEL ID:273-001786-00 SITE ACREAGE:12.820 (REC) 12.793 (MEASURED) SITE ZONING R-1, RESTRICTED SUBURBAN RESIDENTIAL DISTRICT FEMA FLOODPLAIN:39049C0151K (6/17/2008) ZONE X SITE LAYOUT DATA: TOTAL LOTS:7 LOTS GROSS DENSITY (NET DENSITY):0.55 LOTS/ACRE MINIMUM DRIVE AISLE WIDTH:24' MINIMUM LOT WIDTH:150' AT THE FRONT LINE OF THE DWELLING MINIMUM FRONT YARD SETBACK:30' MINIMUM REAR YARD SETBACK:50' TOTAL SIDE YARD SETBACK:25', 8' MINIMUM ON ONE SIDE REAR YARD MINIMUM:20% OF THE LOT DEPTH BUILDING DATA: BUILDING HEIGHT:35' MAXIMUM HEIGHT LANDSCAPE DATA: EXISTING IMPERVIOUS AREA:1.04 AC PROPOSED IMPERVIOUS AREA:2.01 AC GREENSPACE:10.10 AC (79%) HORZ 1"=100'0 100 200 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 THIS SURVEY IS BASED ON AN ACTUAL SURVEY PERFORMED OF THE PREMISES IN AUGUST, 2024 AND IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF. AMERICAN STRUCTUREPOINT,INC. ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AESCIOTO RIVERPID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M I.N. 202106160106000 1.672 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR I.N. 201201130006073 3.279 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKH A R T 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.820 ACRES EX POOL EX DRIVE EX DRIVE EX BLDGDUBLIN ROADGALWAY ESTATES SUBDIVISION P.B. 89, P.G. 55 LOT 1 LOT 9 LOT 8 LOT 7 LOT 42 LOT 6 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, P.G. 37 RESERVE "D" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 KILLILEA, SECTION 2 P.B. 93, P.G. 91DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD(VARIABLE R/W WIDTH - PUBLIC)RESERVE "E" CONVENTRY WOODS, SECTION 2 P.B. 73, P.G. 17 EX 24" WATERMAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP9950 TBM1 CP900 CP947 24' F/F P R O P 3 0 ' S A N I T A R Y E A S E M E N T PROP 30' S A N I T A R Y EASEMENT 36' FRON T YARD SETBACK 92' FRONT YARD SETBACK 65' FRONT YARD SETBACK 31' FRONT YARD SETBACK 36' FRONT YARD SETBACK 31' FRON T YARD SETBACK 10+00 11+00 12+00 13 + 0 0 14+0015+0016 + 0 0 16 + 1 8 58' R/W LIU COU R T PROP 10 ' R/W DED I C A T I O N 40' DUB L I N R D BUILDIN G LINE SE T B A C K 40' DUBL I N R D BUILDIN G LINE SE T B A C K 58'20'N74°16'2 7 " E - 1 3 0 . 2 2 ' L=130.74,R=90.00 S22°29'41"E - 64 .04 ' L=22.61, R=215.00 L=140.46,R=91.00N01°47'33"W 22.64' 20' LANDSC A P E EASEME N T PROP 10 ' R/W DED I C A T I O N PROP 20'SANITARYEASEMENT41' FRONT YARD SETBACK 20' LANDSC A P E EASEME N T PROP 83' STORM EASEMENT EX 20' SAN I T A R Y EASEMENT PROP 20' STORM EASEMENT E X 2 0 ' S A N I T A R Y E A S E M E N T D. B . 3 7 2 0 , P G . 5 3 6 PROP 20' STORM EASEMENT PROP 30' STORM EASEMENT PROP 30' STORM EASEMENT PROP 20' STORM EASEMENT 2 AREA: 67,760 SF (1.56 AC) 3 AREA: 68,609 SF (1.58 AC) 4 AREA: 130,733 SF (3.00 AC) 6 AREA: 56,744 SF (1.30 AC) 7 AREA: 40,531 SF (0.93 AC) 5 AREA: 58,218 SF (1.34 AC) RESERVE A AREA: 26,048 SF (0.60 AC) N83°56'54"E - 152.47' N83°56'54"E - 389.84'S13°14'25"E - 116.39'N75°48'41 " E - 1 3 1 . 6 2 'S20°11'31"E - 110.70'S70 ° 2 3 ' 1 5 " E - 8 2 . 7 7 ' S70 ° 5 8 ' 2 4 " E - 9 5 . 9 3 ' N87°42'49"E - 190.67' N88°09'02"E - 192.68'S01°42'42"W20.60'S01°42'42"W - 98.19'S06°54'37"W - 94.11'S06°54'37"W - 106.85'N88°12'27"E - 158.34' N50° 4 7' 0 7" E - 1 4 0. 9 0' N88°12'27"E - 167.57' N88°12'27"E - 404.04'S06°54'37"W - 142.46'S88°16'20"W - 435.20'N01°47'33"W - 51.68'S88°16'20"W - 355.09'S15°33'22"E - 147.11'S15°33'22"E - 150.37'S15°33'22"E - 167.79'N74°16'2 7 " E - 2 5 8 . 7 8 ' N64°3 4' 2 0 " E - 3 6 7. 5 1' N76°33'00 " E - 2 1 5 . 8 8 'N21°46'09"E - 140.77'N13°25'56"W - 249.38'S6 0 ° 4 3 ' 3 3 " E 32 . 9 6 'S29°16'27"W33.40'N74°16'2 7 " E - 1 0 6 . 5 8 ' L=175.77,R=121.00 L=101.05,R=1 7 9 . 0 0 L = 3 8 . 3 4 ,R=60.00L=7 7 .0 4, R =60.00 L =1 24.12,R=60.00L=26.87, R=60.00 L =4 6 .91,R=60.00 L = 6 2.64, R=60.00L=38.98,R=121. 0 0S22°29'41"E - 67 .87 'L=38.29,R=179.00L=10 4.5 9, R = 1 7 9 .0 0 L=9 5 .97 ,R=179.00L=2 1 .1 7 ,R =1 7 9 .0 0 N74°16'2 7 " E - 1 0 6 . 5 8 'S08°41'06"E - 83.09'2' SHAR E D USE PAT H EASEME N T 2' SHAR E D USE PAT H EASEME N T 1 AREA: 40,116 SF (0.92 AC) S01°47'33"E 26.12' L =1 5 2 .5 0 ,R =271.0 0 L = 1 5 3 .2 1, R = 2 4 4 . 0 0 S22°29'41"E - 67 .87 'PROP 20'SANITARYEASEMENTPROP 20'SANITARYEASEMENTPROP SANITARY EASEMENT (VARIES) 11' SHAR E D USE PAT H 11' SHAR E D USE PAT H PROPOSED DRIVE PROP 20'SANITARYEASEMENT L=121.38,R=2 1 5 . 0 0 L=15.34, R=24.00 L=86.36,R= 9 6 .0 0 S74°16'2 8 " W - 1 2 9 . 8 5 ' PROP 30' STORM EASEMENT 161.27 ' 37.14' 24.61' 79.1 5'76.09'65.67'30.55'PROP 20' STORM EASEMENT L = 2 1 7 .9 0 ,R= 1 5 0 . 0 0L=102 . 0 6 ,R=15 0 .0 0N22°29'41"W - 67 .87 ' N6 1 ° 2 8 ' 4 4 " W 54 . 6 0 ' S74°16'2 7 " W 171.58'N22°29'41"W67.87 ' HORZ 1"=40'0 40 80 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPRELIMINARY PLATFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 9/29/2025 DA MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 9/29/25 - 1:54 PM EDITED BY: DANUGERAH DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\PRELIMINARY PLAT\2024.00690 PRELIM PLAT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES PRELIMINARYPLAT2/2 SITE LEGEND PROPERTY LINE EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY CURB AND GUTTER SIGN PROJECT LIMITS LIU COURTPID: 273-001793-00 ZONING: R-1 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001792-00 ZONING: R-1 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 ZONING: PLR CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001926-00 ZONING: R-1 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT PID: 273-001787-00 ZONING: R-1 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES DUBLIN ROAD CP900 TBM1CP947 CP9950 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00 108+89 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 1/24TITLE SHEETINDEX MAP SHEET INDEX 1 - TITLE SHEET 2 - GENERAL NOTES 3 - TYPICAL SECTIONS 4 - DEMOLITION PLAN 5 - MAINTENANCE OF TRAFFIC PLAN PHASE 1 6 - MAINTENANCE OF TRAFFIC PLAN PHASE 2 7 - MAINTENANCE OF TRAFFIC PLAN PHASE 3 8 - SCHEMATIC PLAN 9-10 - PLAN & PROFILE 11 - MULTI-USE PATH PROFILE 12-19 - DUBLIN RD CROSS SECTIONS 20 - SIGNAGE AND STRIPING PLAN 21 - SIGHT DISTANCE PLAN 22 - EROSION CONTROL PLAN 23 - EROSION CONTROL NOTES 24 - INTERSECTION & DRIVEWAY DETAILS Ohio Utilities Protection Service Call 811before you dig PUBLIC ROADWAY WIDENING PLANS FOR DUBLIN ROAD CITY OF DUBLIN, FRANKLIN COUNTY, OHIO APPROVED: CITY OF DUBLIN: SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSE AND GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. REGISTERED ENGINEER E-86125 DATE DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE STANDARD CONSTRUCTION DRAWINGS THE STANDARD CONSTRUCTION DRAWINGS LISTED ON THESE PLANS SHALL BE CONSIDERED A PART THEREOF. MD-02 MD-03 MD-05 PD-02 PD-03 PD-04 PD-06 RD-01 RD-02 RD-03 RD-05 RD-09 RD-10 SA-04 ST-01 ST-03 ST-04 ST-05 ST-06 WA-01 CITY OF DUBLIN (2020 EDITION)ODOT BP-3.1 DESIGN CRITERIA DESIGN SPEED POSTED SPEED DUBLIN ROAD 50 MPH 45 MPH SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVERHORZ 1"=60'0 60 120 UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM ARCHITECT BASS STUDIO ARCHITECTS 36 KING AVENUE COLUMBUS, OHIO 43201 CONTACT: TIMOTHY A. BASS, AIA, LEED AP PHONE: (614) 294-4893 EMAIL: WWW.BASSSTUDIOARCHITECTS.COM PROFE SSIONA L E N G INEERR E GIS T E R E DSTATE OF O H IOE-86125 MATTHEW LILIE J. 07/17/2025 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 2/24GENERAL NOTESGENERAL NOTES 1.CITY OF COLUMBUS AND OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS, CURRENT EDITIONS, AND ANY SUPPLEMENTS THERETO (HEREAFTER REFERRED TO AS STANDARD SPECIFICATIONS), SHALL GOVERN ALL CONSTRUCTION ITEMS UNLESS OTHERWISE NOTED. IF A CONFLICT BETWEEN SPECIFICATIONS IS FOUND, THE MORE STRICT SPECIFICATION WILL APPLY AS DECIDED BY THE CITY ENGINEER. ITEM NUMBERS LISTED REFER TO CITY OF COLUMBUS ITEM NUMBERS UNLESS OTHERWISE NOTED. 2.THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION THAT ARE NOT SPECIFIED HEREIN. THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR SAFETY ON THE WORK SITE, OR FOR FAILURE BY THE CONTRACTOR TO PERFORM WORK ACCORDING TO CONTRACT DOCUMENTS. 3.THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS INCLUDING BUT NOT LIMITED TO OHIO EPA PERMITS TO INSTALL (PTI) AND NOTICES OF INTENT (NOI), BUILDING PERMITS, ETC. 4.THE CONTRACTOR SHALL NOTIFY THE CITY OF DUBLIN DIVISION OF ENGINEERING IN WRITING AT LEAST 3 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 5.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL SAFETY REQUIREMENTS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970. THE CONTRACTOR SHALL EXERCISE PRECAUTION ALWAYS FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT SHALL ALSO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, INCLUDING THE REQUIREMENTS FOR CONFINED SPACES PER 29 CFR 1910.146. 6.FOLLOWING COMPLETION OF CONSTRUCTION OF THE SITE IMPROVEMENTS AND BEFORE REQUESTING OCCUPANCY, A PROOF SURVEY SHALL BE PROVIDED TO THE DIVISION OF ENGINEERING THAT DOCUMENTS "AS_BUILT" ELEVATIONS, DIMENSIONS, SLOPES AND ALIGNMENTS OF ALL ELEMENTS OF THIS PROJECT. THE PROOF SURVEY SHALL BE PREPARED, SIGNED AND SUBMITTED BY THE PROFESSIONAL ENGINEER WHO SEALED THE CONSTRUCTIONS DRAWINGS. 7.THE CONTRACTOR SHALL RESTRICT CONSTRUCTION ACTIVITY TO PUBLIC RIGHT_OF_WAY AND AREAS DEFINED AS PERMANENT AND/OR TEMPORARY CONSTRUCTION EASEMENTS, UNLESS OTHERWISE AUTHORIZED BY THE CITY ENGINEER. 8.THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN OHIO PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. 9.NON_RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT THE WRITTEN PERMISSION OF THE CITY ENGINEER. 10.THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE GRADES AND CROSS_SECTIONS THAT EXISTED BEFORE CONSTRUCTION. 11.TRACKING OR SPILLING MUD, DIRT OR DEBRIS UPON STREETS, RESIDENTIAL OR COMMERCIAL DRIVES, SIDEWALKS OR BIKE PATHS IS PROHIBITED ACCORDING TO SECTION 97.38 OF THE DUBLIN CODE OF ORDINANCES. ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE CITY. IF THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS, OR SPILLAGE, THE CITY RESERVES THE RIGHT TO REMOVE THESE MATERIALS AND CLEAN AFFECTED AREAS, THE COST OF WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 12.DISPOSAL OF EXCESS EXCAVATION WITHIN SPECIAL FLOOD HAZARD AREAS (100-YEAR FLOODPLAIN) IS NOT PERMITTED. 13.ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES WITHIN RIGHT-OF-WAY DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 14.ALL FIELD TILE BROKEN OR ENCOUNTERED DURING EXCAVATION SHALL BE REPLACED OR REPAIRED AND CONNECTED TO THE PUBLIC STORM SEWER SYSTEM AS DIRECTED BY THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURE. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE CITY OF COLUMBUS. PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION. 16.BACKFILL WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES (HOUSES, GARAGES, ETC.) OR PUBLIC INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, BIKE PATHS, ETC.) SHALL BE COMPACTED GRANULAR BACKFILL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR FLOWABLE CDF, TYPE II ACCORDING TO ITEM 613. ITEM 911 OF THE STANDARD SPECIFICATIONS SHALL BE USED ELSEWHERE. 17.THE CONTRACTOR SHALL SUBMIT A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND A LIST OF PROPOSED PRECAST CONCRETE PRODUCT MANUFACTURERS TO THE CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION BEFORE COMMENCING CONSTRUCTION. SEND THE INFORMATION TO THE FOLLOWING ADDRESS: CONSTRUCTION INSPECTION DIVISION CITY OF COLUMBUS 1800 EAST 17TH AVENUE COLUMBUS, OHIO 43219 SEND A COPY OF THE TRANSMITTAL LETTER TO THE FOLLOWING ADDRESS: DIVISION OF ENGINEERING CITY OF DUBLIN 6555 SHIER RINGS ROAD DUBLIN, OHIO 43016 18.ALL TRENCHES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES OUTSIDE THESE AREAS SHALL BE BACKFILLED OR SHALL BE PROTECTED BY APPROVED TEMPORARY FENCING OR BARRICADES DURING NONWORKING HOURS. CLEAN UP SHALL FOLLOW CLOSELY BEHIND THE TRENCHING OPERATION. 19.ALL TREES WITHIN THE CONSTRUCTION AREA NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY FENCING PLACED A MINIMUM 15 FEET FROM THE TREE TRUNK. TREES 6 - INCHES OR GREATER AT DBH (DIAMETER BREAST HEIGHT) MUST BE PROTECTED WITH FENCING PLACED AT THE CRITICAL ROOT ZONE OR 15 FEET, WHICHEVER IS GREATER. TREES NOT INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS FOR REMOVAL MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE DIVISION OF ENGINEERING. 20.CONDUIT MUST BE DIRECTIONALLY BORED ACROSS STREETS INSTEAD OF OPEN CUT, UNLESS SPECIFICALLY APPROVED BY THE CITY ENGINEER. USE OF PNEUMATIC AIR RAM DEVICES IS NOT PERMITTED. PERMITS TO CONSTRUCT IN THE RIGHT-OF-WAY OF EXISTING STREETS MUST BE OBTAINED FROM THE CITY OF DUBLIN DIVISION OF ENGINEERING BEFORE COMMENCING CONSTRUCTION. SHOULD OPEN CUTTING OF EXISTING PAVEMENT BE PERMITTED, CONTROLLED DENSITY BACKFILL (TYPE II) SHALL BE USED IN PLACE OF COMPACTED GRANULAR BACKFILL, ACCORDING TO ITEM 613 OF THE STANDARD SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES WITHIN THE RIGHT-OF-WAY AND PUBLIC EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE CITY. 22.PAVEMENTS SHALL BE CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR AS REQUIRED BY THE CITY ENGINEER. PAVEMENT REPLACEMENT SHALL BE CONDUCTED ACCORDING TO CITY OF COLUMBUS STANDARD DRAWING 1441 DR. A AND APPLICABLE CITY OF DUBLIN STANDARD DRAWINGS. THE REPLACEMENT OF DRIVEWAYS, HANDICAPPED RAMPS, SIDEWALKS, BIKE PATHS, PARKING LOT PAVEMENT, ETC. SHALL BE PROVIDED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS AND CITY OF DUBLIN STANDARD CONSTRUCTION DRAWINGS. 23.TREE TRIMMING WITHIN THE CONSTRUCTION ZONE IS TO BE COMPLETED BY A CERTIFIED ARBORIST. AT THE COMPLETION OF THE PROJECT, THE ARBORIST IS TO RETURN AND TRIM ANY BROKEN BRANCHES AS NEEDED. 24.ANY MODIFICATION TO THE WORK SHOWN ON DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CITY ENGINEER, CITY OF DUBLIN. 25.ALL INLETS SHALL BE CHANNELIZED. 26.PARK AREAS SHALL BE FINE_GRADED AND SEEDED WITH THE FOLLOWING MIXTURE: IMPROVED KENTUCKY BLUEGRASS: 40% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) IMPROVED PERENNIAL RYE: 60% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) GERMINATION RATE: 85% APPLICATION RATE: 7 LBS PER 1000 SQ FT OR AS DIRECTED BY THE DIVISION OF PARKS AND RECREATION, CITY OF DUBLIN, OHIO. 27.TRAFFIC CONTROL AND OTHER REGULATORY SIGNS SHALL BE TYPE S WITH A SQUARE POST ANCHOR BASE INSTALLATION AND MEET ALL REQUIREMENTS OF ODOT TC-41.20 AND APPLICABLE CITY OF DUBLIN SPECIFICATIONS. 28. STREET SIGNS SHALL MEET ALL CITY OF DUBLIN SPECIFICATIONS WITH LETTERING COLORED IN WHITE DISPLAYED OVER A BROWN BACKGROUND. SIGN TUBING SHALL BE BROWN IN COLOR AND CONFORM WITH THE TYPE S, SQUARE POST ANCHOR BASE INSTALLATION REQUIREMENTS OF ODOT TC-41.20. UTILITIES 1.THE FOLLOWING UTILITIES ARE KNOWN TO BE LOCATED WITHIN THE LIMITS OF THIS PROJECT: AEP OHIO - ELECTRIC BREEZELINE - TELECOM COLUMBIA GAS OF OH-COLUMBUS - GAS DUBLIN SEWER - SANITARY SEWER DUBLIN WATER - WATER MAIN DUBLIN DIVISION OF ENGINEERING - STORMWATER AT&T - TELECOM CHARTER COMM - TELECOM 2.THE CONTRACTOR SHALL GIVE NOTICE OF INTENT TO CONSTRUCT TO OHIO UTILITIES PROTECTION SERVICE (TELEPHONE NUMBER 800_362_2764), PRODUCER'S UNDERGROUND PROTECTION SERVICE (TELEPHONE NUMBER 614_587_0486), AND TO OWNERS OF UNDERGROUND UTILITIES THAT ARE NOT MEMBERS OF A REGISTERED UNDERGROUND PROTECTION SERVICE. NOTICE SHALL BE GIVEN AT LEAST 2 WORKING DAYS BEFORE START OF CONSTRUCTION. 3.THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE OWNER OF THE UNDERGROUND UTILITY. THE CITY OF DUBLIN AND THE CITY ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. 4.LOCATION, SUPPORT, PROTECTION AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5.WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE CITY ENGINEER. 6.PUBLIC STREET LIGHTING MAY BE IN THE VICINITY OF THIS PROJECT. CONTACT THE CITY OF DUBLIN, DIVISION OF ENGINEERING AT 410-4637, TWO DAYS PRIOR TO BEGINNING WORK. TRAFFIC CONTROL 1.TRAFFIC CONTROL SHALL BE FURNISHED, ERECTED, MAINTAINED, AND REMOVED BY THE CONTRACTOR ACCORDING TO OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (OMUTCD), CURRENT EDITION. 2.ALL TRAFFIC LANES OF PUBLIC ROADWAYS SHALL BE FULLY OPEN TO TRAFFIC FROM 7:00 AM TO 9:00 AM AND FROM 4:00 PM TO 6:00 PM UNLESS AUTHORIZED DIFFERENTLY BY THE CITY ENGINEER. AT ALL OTHER HOURS THE CONTRACTOR SHALL MAINTAIN MINIMUM ONE_LANE TWO_WAY TRAFFIC. UNIFORMED, OFF-DUTY POLICE OFFICERS SHALL REPLACE FLAGMEN DESIGNATED BY THE OMUTCD, AND SHALL BE PRESENT WHENEVER ONE_LANE, TWO_WAY TRAFFIC CONTROL IS IN EFFECT. POLICE CRUISERS MAY BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 3.IF THE CITY ENGINEER DETERMINES THAT THE CONTRACTOR IS NOT PROVIDING PROPER PROVISIONS FOR TRAFFIC CONTROL, THE CITY ENGINEER SHALL ASSIGN UNIFORMED, OFF_DUTY POLICE OFFICERS TO THE PROJECT AT NO COST TO THE CITY. 4.STEADY_BURNING, TYPE "C" LIGHTS SHALL BE REQUIRED ON ALL BARRICADES, DRUMS, AND SIMILAR TRAFFIC CONTROL DEVICES IN USE AT NIGHT. 5.ACCESS FROM PUBLIC ROADWAYS TO ALL ADJOINING PROPERTIES FOR EXISTING RESIDENTS OR BUSINESSES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT FOR MAIL, PUBLIC WATER AND SANITARY SEWER SERVICE, AND EMERGENCY VEHICLES. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN DETAILING THE PROPOSED MAINTENANCE OF TRAFFIC PROCEDURES. THE TRAFFIC CONTROL PLAN MUST INCORPORATE ANY TRAFFIC CONTROL DETAILS CONTAINED HEREIN. THE TRAFFIC CONTROL PLAN PROPOSED BY THE CONTRACTOR MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL 1.THE CONTRACTOR OR DEVELOPER IS RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) TO BE REVIEWED AND APPROVED BY THE OHIO EPA. THE NOI MUST BE SUBMITTED TO OEPA 45 DAYS PRIOR TO THE START OF CONSTRUCTION AND MAY ENTITLE COVERAGE UNDER THE OHIO EPA GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. A PROJECT LOCATION MAP MUST BE SUBMITTED WITH THE NOI. A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL IF A SEDIMENT AND EROSION CONTROL PLAN HAS NOT ALREADY BEEN INCLUDED WITH THE APPROVED CONSTRUCTION DRAWINGS. THIS PLAN MUST BE MADE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE DESIGN OF EROSION CONTROL SYSTEMS SHALL FOLLOW THE REQUIREMENTS OF OHIO EPA, ITEM 207 OF OHIO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AND THE CITY ENGINEER. AN INDIVIDUAL NPDES STORMWATER DISCHARGE PERMIT MAY BE REQUIRED. THE CONTRACTOR SHALL BE CONSIDERED THE PERMITTEE. 2.THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL AT ALL POINTS WHERE STORM WATER RUNOFF LEAVES THE PROJECT, INCLUDING WATERWAYS, OVERLAND SHEET FLOW, AND STORM SEWERS. 3.ACCEPTED METHODS OF PROVIDING EROSION/SEDIMENT CONTROL INCLUDE BUT ARE NOT LIMITED TO: SEDIMENT BASINS, SILT FILTER FENCE, AGGREGATE CHECK DAMS, AND TEMPORARY GROUND COVER. HAY OR STRAW BALES ARE NOT PERMITTED. 4.THE CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OF THE WORK AREA AT ALL TIMES CONSISTENT WITH EROSION CONTROL PRACTICES. 5.DISTURBED AREAS THAT WILL REMAIN UNWORKED FOR 30 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN SEVEN CALENDAR DAYS OF THE DISTURBANCE. OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT THE CONCLUSION OF CONSTRUCTION BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER. BLASTING (IF PERMITTED) 1.THE CONTRACTOR MUST OBTAIN A BLASTING PERMIT FROM WASHINGTON TOWNSHIP FIRE DEPARTMENT PRIOR TO BLASTING FOR ROCK EXCAVATION. THE CONTRACTOR SHALL SUBMIT BLASTING REPORTS UPON COMPLETION OF BLASTING TO THE CITY ENGINEER, THE OWNER, AND THE OWNER'S ENGINEER. TOP OF ROCK ELEVATIONS SHALL BE SHOWN ON "AS_BUILT" CONSTRUCTION DRAWINGS. SANITARY SEWERS 1.CONNECTIONS TO THE SANITARY SEWER WILL BE PERMITTED UPON RECEIVING AN OEPA PERMIT TO INSTALL (PTI), AND UPON RECEIVING A SATISFACTORY LETTER FROM THE DESIGN ENGINEER STATING THAT THE PROJECT HAS BEEN CONSTRUCTED AS PER THE PLANS, AND ALL OF THE CONDITIONS OF THE PTI HAVE BEEN MET. THE DEVELOPER IS RESPONSIBLE FOR OBTAINING ALL REQUIRED OHIO EPA APPROVALS AND PAYING REVIEW FEES. 2.SANITARY SEWAGE COLLECTION SYSTEMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE RULES, REGULATIONS, STANDARDS AND SPECIFICATIONS OF THE CITY OF DUBLIN, OHIO EPA, OHIO DEPARTMENT OF HEALTH AND THE CURRENT EDITION OF THE GREAT LAKES-UPPER MISSISSIPPI RIVER BOARD (TEN STATES) - RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES. 3.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPE WITH DIAMETERS 8 INCHES TO 10 INCHES SHALL BE PVC SEWER PIPE ASTM D3034, SDR 35. PIPE FOR 6 INCH DIAMETER HOUSE SERVICE LINES SHALL BE PVC PIPE ASTM D3034, SDR 35. PVC PIPE SHALL NOT BE USED AT DEPTHS GREATER THAN 28 FEET. PIPE MATERIALS AND RELATED STRUCTURES SHALL BE SHOP TESTED IN ACCORDANCE WITH CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION QUALITY CONTROL REQUIREMENTS. 4.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPES WITH DIAMETERS 12 INCHES TO 30 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2736. SANITARY SEWER PIPES WITH DIAMETERS 30 INCHES TO 60 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2764. 5.ALL IN_LINE WYE AND TEE CONNECTIONS IN CONCRETE SEWERS, 18-INCH DIAMETER AND LARGER, SHALL BE EITHER KOR_N_TEE OR KOR_N_SEAL CONNECTIONS CONFORMING TO THE MANUFACTURER'S RECOMMENDATIONS. 6.GRANULAR BACKFILL SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR CONTROLLED DENSITY BACKFILL ACCORDING TO ITEM 613, TYPE II OF THE STANDARD SPECIFICATIONS AS DIRECTED BY THE CITY ENGINEER. 7.ALL MANHOLE LIDS SHALL BE PROVIDED WITH CONTINUOUS SELF_SEALING GASKETS. THE APPROVED CONSTRUCTION DRAWINGS SHALL SHOW WHERE BOLT_DOWN LIDS ARE REQUIRED. SANITARY SEWER MANHOLES SHALL BE PRECAST CONCRETE OR AS APPROVED BY THE CITY ENGINEER AND CONFORM TO THE CITY OF DUBLIN SANITARY MANHOLE STANDARD DRAWING. MANHOLE LIDS SHALL INCLUDE CITY OF DUBLIN LOGO. 8.ALL PVC SEWER PIPES SHALL BE DEFLECTION TESTED NO LESS THAN 60 DAYS AFTER COMPLETION OF BACKFILLING OPERATIONS. ALL OTHER REQUIREMENTS SHALL BE ACCORDING TO ITEM 901.21 OF THE STANDARD SPECIFICATIONS. 9.TEMPORARY BULKHEADS SHALL BE PLACED IN PIPES AT LOCATIONS SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AND SHALL REMAIN IN PLACE UNTIL THE PERMIT TO INSTALL (PTI) HAS BEEN ISSUED BY THE OEPA AND THE SEWERS HAVE BEEN APPROVED FOR USE BY THE CITY ENGINEER. THE COST FOR FURNISHING, INSTALLING, MAINTAINING, AND REMOVING BULKHEADS SHALL BE INCLUDED IN THE CONTRACT UNIT BID PRICE FOR THE VARIOUS SANITARY SEWER ITEMS. 10.ALL SANITARY SEWERS INCLUDING SANITARY SEWER SERVICE LINES SHALL BE SUBJECTED TO AND PASS INFILTRATION OR EXFILTRATION TESTS ACCORDING TO ITEM 901 OF THE STANDARD SPECIFICATIONS AND MUST BE APPROVED FOR USE BY THE CITY ENGINEER BEFORE ANY SERVICE CONNECTIONS ARE TAPPED INTO SEWERS. 11.FOR SANITARY SEWER INFILTRATION, LEAKAGE THROUGH JOINTS SHALL NOT EXCEED 100 GALLONS PER INCH OF TRIBUTARY SEWER DIAMETER PER 24 HOURS PER MILE OF LENGTH OR THE COMPUTED EQUIVALENT. ALL SANITARY SEWERS SHALL BE TESTED. 12.AT THE DETERMINATION OF THE CITY ENGINEER, THE CONTRACTOR MAY BE REQUIRED TO PERFORM A TV INSPECTION OF THE SANITARY SEWER SYSTEM PRIOR TO FINAL ACCEPTANCE BY THE CITY. THIS WORK SHALL BE COMPLETED BY THE CONTRACTOR AT HIS EXPENSE. 13.VISIBLE LEAKS OR OTHER DEFECTS OBSERVED OR DISCOVERED DURING TV INSPECTION SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER. 14.ROOF DRAINS, FOUNDATION DRAINS, FIELD TILE OR OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER SYSTEM ARE STRICTLY PROHIBITED ACCORDING TO SECTION 51.23 OF THE DUBLIN CODE OF ORDINANCES. 15.ALL WATER LINES SHALL BE LOCATED AT LEAST 10 FEET HORIZONTALLY AND 18 INCHES VERTICALLY, FROM SANITARY SEWERS AND STORM SEWERS, TO THE GREATEST EXTENT PRACTICABLE. WHERE SANITARY SEWERS CROSS WATER MAINS OR OTHER SEWERS OR OTHER UTILITIES, TRENCH BACKFILL SHALL BE PLACED BETWEEN THE PIPES CROSSING AND SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS. IN THE EVENT THAT A WATER LINE MUST CROSS WITHIN 18 INCHES OF A SANITARY SEWER, THE SANITARY SEWER SHALL BE CONCRETE ENCASED OR CONSIST OF DUCTILE IRON PIPE MATERIAL. 16.SERVICE RISERS SHALL BE INSTALLED WHERE THE DEPTH FROM WYES TO PROPOSED GROUND ELEVATION EXCEEDS 10 FEET. TOPS OF RISERS SHALL BE NO LESS THAN 9 FEET BELOW PROPOSED GROUND ELEVATION IF BASEMENT SERVICE IS INTENDED. 17.WHERE SERVICE RISERS ARE NOT INSTALLED, A MINIMUM 5_FOOT LENGTH OF SANITARY SEWER SERVICE PIPE OF THE SAME SIZE AS THE WYE OPENING SHALL BE INSTALLED. 18.THE CONTRACTOR SHALL FURNISH AND PLACE, AS DIRECTED, APPROVED WYE POLES MADE OF 2 INCHES X 2 INCHES LUMBER AT ALL WYE LOCATIONS, ENDS OF EXTENDED SERVICES, OR AT THE END OF EACH RISER WHERE RISERS ARE REQUIRED. WYE POLES SHALL BE VISIBLE BEFORE ACCEPTANCE BY THE CITY. THE COST OF THESE POLES SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR THE VARIOUS SEWER ITEMS. 19.EXISTING SANITARY SEWER FLOWS SHALL BE MAINTAINED AT ALL TIMES. COSTS FOR PUMPING AND BYPASSING SHALL BE INCLUDED IN THE CONTRACTOR'S UNIT PRICE BID FOR THE RELATED ITEMS. 20.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, EQUIPMENT, AND LABOR TO MAKE CONNECTIONS TO EXISTING MANHOLES. THE SEWER PIPE TO MANHOLE CONNECTIONS FOR ALL SANITARY SEWERS SHALL BE FLEXIBLE AND WATERTIGHT. ALL HOLES SHALL BE NEATLY CORED. THE SEWER PIPE BARREL AT THE SPRINGLINE SHALL NOT EXTEND MORE THAN 1 INCH BEYOND THE INSIDE FACE OF THE MANHOLE. TO MAINTAIN FLEXIBILITY IN THE CONNECTION, A 1_INCH SPACE SHALL BE LEFT BETWEEN THE END OF THE PIPE INSIDE THE MANHOLE AND THE CONCRETE CHANNEL; THIS SPACE SHALL BE FILLED WITH A WATERPROOF FLEXIBLE JOINT FILLER. ANY METAL THAT IS USED SHALL BE TYPE 300 SERIES STAINLESS STEEL. THE CONNECTION MAY BE ANY OF THE FOLLOWING TYPES: A.RUBBER SLEEVE WITH STAINLESS STEEL BANDING. 1)KOR_N_SEAL AS MANUFACTURED BY NATIONAL POLLUTION CONTROL SYSTEMS, INC. 2)LOCK JOINT FLEXIBLE MANHOLE SLEEVE AS MANUFACTURED BY INTERPACE CORPORATION. 3)OR EQUAL AS APPROVED BY THE CITY ENGINEER. B.RUBBER GASKET COMPRESSION. 1)PRESS WEDGE II AS MANUFACTURED BY PRESS_SEAL GASKET CORPORATION. 2)DURA SEAL III AS MANUFACTURED BY DURA TECH, INC. 3)LINK_SEAL AS MANUFACTURED BY THUNDERLINE CORPORATION. 4)OR EQUAL AS APPROVED BY THE CITY ENGINEER. THE COST FOR THIS WORK ALONG WITH A NEW CHANNELIZED BASE FOR THE MANHOLE SHALL BE INCLUDED IN THE UNIT BID PRICE FOR THE RELATED ITEMS OF WORK. WATER LINE 1-17 DELETED STORM SEWER 1-11 DELETED MAIL DELIVERY 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT US MAIL DELIVERY WITHIN THE PROJECT LIMITS IS NOT DISRUPTED BY CONSTRUCTION OPERATIONS. THIS RESPONSIBILITY IS LIMITED TO RELOCATION OF MAILBOXES TO A TEMPORARY LOCATION THAT WILL ALLOW THE COMPLETION OF THE WORK AND SHALL ALSO INCLUDE THE RESTORATION OF MAILBOXES TO THEIR ORIGINAL LOCATION OR APPROVED NEW LOCATION. ANY RELOCATION OF MAILBOX SERVICES MUST BE FIRST COORDINATED WITH THE US POSTAL SERVICE AND THE HOMEOWNER. 2.BEFORE RELOCATING ANY MAILBOXES, THE CONTRACTOR SHALL CONTACT THE U.S. POSTAL SERVICE AND RELOCATE MAILBOXES ACCORDING TO THE REQUIREMENTS OF THE POSTAL SERVICE. USE OF FIRE HYDRANTS 1.THE CONTRACTOR SHALL MAKE PROPER ARRANGEMENTS WITH THE DUBLIN SERVICE DEPARTMENT AND THE COLUMBUS DIVISION OF WATER FOR THE USE OF FIRE HYDRANTS WHEN USED FOR WORK PERFORMED UNDER THIS CONTRACT AND PROVIDE THE CITY OF DUBLIN A COPY OF THE HYDRANT USAGE PERMIT OBTAINED FROM THE CITY OF COLUMBUS. THE CONTRACTOR SHALL ALSO SEND A COPIES OF PERMITS OBTAINED FROM DUBLIN AND COLUMBUS TO THE WASHINGTON AND/OR PERRY TOWNSHIP FIRE DEPARTMENT. PERMITS SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. 2.BEFORE THE FINAL ESTIMATE IS PAID, THE CONTRACTOR SHALL SUBMIT A LETTER FROM THE CITY OF COLUMBUS DIVISION OF WATER TO THE CITY ENGINEER STATING THAT THE CONTRACTOR HAS RETURNED THE SIAMESE VALVE TO THE CITY OF COLUMBUS AND HAS PAID ALL COSTS ARISING FROM THE USE OF THE FIRE HYDRANTS. JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 3/24TYPICAL SECTIONS℄ DUBLIN ROAD6 40' 1.56% EX. GRADE 1.56% PROFILE ELEVATION EDGE OF PAVEMENT TO CONSTRUCTION CL VARIES 2'-0'' PAVED SHOULDER E X G R A D E 4:14: 1 798 10' R/W DEDICATION 11' SHARED USE PATH TYPICAL SECTION LEGEND ITEM 442 - 1 1/4" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.075 GAL/S.Y. ITEM 441 - 1 3/4'' ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG. 64-22 ITEM 407 - NON-TRACKING TACK COAT @ 0.10 GAL/S.Y. ITEM 301 - 6" BITUMINOUS AGGREGATE BASE ITEM 304 - 6" AGGREGATE BASE ITEM 204 - SUBGRADE COMPACTION ITEM 659 - SEEDING AND MULCHING, AS PER PLAN (SEE NOTE 32 ON GENERAL NOTE PAGE) ITEM 441 - 2 1/2" ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), MEDIUM TRAFFIC, PG. 64-22 ITEM 653 - 3" TOPSOIL FURNISHED AND PLACED ITEM 254 - PAVEMENT PLANING, 1 1/4" TYP ITEM 442 - THICKNESS VARIES, ASPHALT CONCRETE INTERMEDIATE COURSE (WEDGE COURSE), 12.5MM, TYPE A (449), SEE VARIABLE THICKNESS TABLE BELOW ITEM 254 - PAVEMENT PLANING, 2 1/2" TYP ITEM 441 - 1 1/4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448), PG. 64-22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2 3 4 5 7 1 6℄ CONSTRUCTION11 12 10 30' CONSTRUCTION CL TO DUBLIN ROAD CL VARIES EDGE OF TRAVELED WAY2'-0'' GRASS SHOULDER 4:1 MAX4:1 MA X 8.33% 10 3'-0'' MILLED STRIP FROM SAWCUT LINE 1 CONSTRUCTION CL TO SAWCUT LINE VARIES SAWCUT LINE TO EDGE OF PAVEMENT VARIES VARIES FROM 2.45'-4.74' VARIES FROM 2.45'-4.74' 1 14 13111EXISTING EDGE OFPAVEMENTSTATION DATA NAME BEGIN STA END STA DUBLIN ROAD 100+38.29 104+05.0 DUBLIN ROAD 105+13.2 107+95.49 TYPICAL SECTION - DUBLIN ROAD NOT TO SCALEA EX G R A D E 1' SHARED USE PATH EASEMENT ESTIMATE OF QUANTITIES THESE QUANTITIES HAVE BEEN PROVIDED ONLY AS AN ESTIMATE TO THE SCOPE OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO EVALUATE THE COMPLETE PROJECT AS DETAILED IN THE NOTES, PLANS, AND SPECIFICATIONS AND PROCEDURES NECESSARY FOR THE COMPLETION OF THE PLAN IMPROVEMENTS AND SUBMIT HIS TOTAL PROJECT COST ACCORDINGLY. ROADWAY ITEM QUANTITY UNIT DESCRIPTION 201 LUMP SUM CLEARING AND GRUBBING 202 580 SF ASPHALT REMOVAL 202 1140 SF CONCRETE REMOVAL 202 345 LF GUARDRAIL REMOVAL 202 12 EA REMOVE TREE 202 1 EA 12" CULVERT REMOVAL 203 CY EXCAVATION 203 CY EMBANKMENT 203 17,662 SF 1.25" MILL AND OVERLAY 203 2,272 SF 2.5" MILL AND OVERLAY 204 998 SY SUBGRADE COMPACTION 207 27 CY STABILIZED CONSTRUCTION ENTRANCE 301 166 CY 6" BITUMINOUS AGGREGATE BASE 304 166 CY 6' AGGREGATE BASE 407 75 GAL TACK COAT (0.075 GAL/SY) 407 100 GAL TACK COAT (0.10 GAL/SY) 448*35 CY 1 1/4" ASPHALT CONCRETE SURFACE COURSE, TYPE I, MEDIUM TRAFFIC, PG64-22 448*35 CY 1 1/4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE II, MEDIUM TRAFFIC, PG64-22 448*48 CY 1 3/4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE II, MEDIUM TRAFFIC, PG64-22 659 589 SY SEEDING & MULCHING SPEC 1 LUMP PROOF SURVEY, A.P.P. STORM 604 2 EA PRECAST HEADWALL (AA-S168) 901 59 LF 12" STORM PIPE, WITH ITEM 912 BACKFILL EROSION CONTROL 207 SY TEMPORARY SEEDING AND MULCHING SPEC 6 EA NO. 2 STONE CHECK DAM SPEC 1 EA CONCRETE WASHOUT AREA SPEC x EA INLET PROTECTION MAINTENANCE OF TRAFFIC* 614 1 LUMP MAINTAINING TRAFFIC CALCULATED BY: MTR DATE: 06/21/2022 CHECKED BY: JRP 06/21/2022 1'-0" 8 7192 AT&TBELL SYSTEMS322A56TOP=853.62' (3' LID)SW6959FRONTIER 7192w/ELEC.&COMM. DROPSw/RISERICVOUTLETINTERCOMw/ELEC.&COMM. DROPTBOXWOWWAY 7177 DUBLIN RDcannot open INV:840.88EX 24" WATER MAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900TBM1CP947CP9950EX 16" FORCE MAIN (19-025-CIP) EX 16" FORCE MAIN (19-025-CIP) EX LIGHT POLE EX FIRE HYRDANT EX LIGHT POLE EX FIRE HYRDANT EX LIGHT POLE EX TELECOM & OVERHEAD ELECTRIC EX FENCE EX WATER VALVE EX WATER MAIN EX DOP OHE EX WATER VALVE EX GAS VALVE EX GAS MAIN EX ELECTRIC BOX EX LIGHT POLE EX GAS MARKER EX DRIVE EX HYDRANTEX WATER METER EX WATER VALVE PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES EX GAS MAIN EX GAS VALVE EX LIGHT POLE EX STM EX DRIVE EX PWR & TELE POLE EX GUY WIRE (TYP) EX GUY WIRE (TYP) EX UTIL MISC EX LIGHT POLE 1 2 33 4 4 5 6 5 6 24" BOXELDER 24" BOXELDER 2" 2" 2" 2" 24"24" 6"42" DUBLIN LANDMARK TREE 4440 4"4"4"4"4"4"4"4" MULCH-9 BUSHES & FLOWERS MULCH-11 BUSHES & FLOWERS GUARD SHACK MULTI-USE PATH INTERSECTION AHEAD MULTI-USE PATH MULTI-USE PATH MULTI-USE PATH 369691 conc 369692 322a56 7192 sw-6959 columbia energy group 7177 conc conc WHITE LAYERED STONE WALL ASPH ASPH WHITE 16" 16" 14" 8" 8" WOODEN ASPH ASPH ASPH ASPH ASPH ASPH ASPH DOUBLE YELLOW ASPH ASPH LAYERED STONE W A L L LAYERED STONE WALL LAYERED STONE WALL TBM#1 2" 1" 1 PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES DUBLIN RD PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.78 ACRES 12" RCP 12" RCP EXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 18" RCP12" RC P 24" RCPINV:840.88 12" CPP DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC)DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX GUARDRAIL EX MAILBOX 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00PI: 97+54.31PROJECT LIMITS 7 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:57 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 EC&DP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 4/24DEMOLITION PLANHORZ 1"=30'0 30 60 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION DEMOLITION LEGEND TBR TO BE REMOVED TBRO TO BE REMOVED BY OTHERS TBRR TO BE REMOVED AND REPLACED ASPHALT PAVEMENT TO BE REMOVED CONCRETE PAVEMENT TO BE REMOVED MILLING LIMITS ITEM TO BE REMOVED PAVEMENT TO BE SAWCUT TREE TO BE REMOVED SPRINKLER HEAD TO BE REMOVED CODED NOTES EXISTING 12" CULVERT TBR EXISTING INTERSECTION SIGN TO BE RELOCATED EXISTING GUARDRAIL (345' TBR) EXISTING PAVEMENT TO BE SAWCUT (2'-2.5' FROM EOP) EXISTING PAVEMENT TO BE MILLED 1.25" EXISTING PAVEMENT WITHIN 3' OF SAWCUT LINE TO BE MILLED 2.5" EXISTING POLE TO BE RELOCATED, COORDINATE WITH UTILITY PROVIDER 1 2 3 4 5 6 7 NOTES: CONTRACTOR TO PROTECT ALL UTILITY POLES DURING CONSTRUCTION. 135' TAPER 350'W20-1-48W1-H16(L)-3640' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 40' 20'W20-1-4813'12'W1-H16(R)-36R4-7B-18W1-H16(R)R6-2R DUBLIN ROAD 88+00 89+00 90+00 91+00 92+00 93+00 88+29.5, 20.0' L 89+02.0, 2.5' L 90+22.0, 1.2' L 91+02.0, 2.2' L 93+02.0, 3.2' L 88+87.3, 22.5' R88+31.1, 23.8' R PROJECT LIMITS INV:840.88W20-1-4820' SPACING CENTER OF DRUM TO CENTER OF DRUM 40' SPACING CENTER OF DRUM TO CENTER OF DRUM 350' PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES 40' 20'W20-1-48DUBLIN ROAD 12'12'R4-7B-18W1-H16(R)-36R6-2R 94+00 95+00 96+00 97+00 98+00 99+00PI: 97+54.3195+02.0, 6.4' L 97+79.5, 4.0' L 97+99.2, 4.1' L 98+73.5, 13.5' R 98+72.5, 24.9' L W2-2 & W16-8aP94+62.1, 8.8' R CONTRACTOR TO PROVIDE TEMPORARY INTERSECTION SIGN DURING CONSTRUCTION PROJECT LIMITS JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 MOT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 5/24MAINTENANCE OFTRAFFIC PLAN PHASE 1MATCHLINE SEE ABOVE (STA: 93+83.00)MATCHLINE SEE BELOW (STA: 93+83.00)HORZ 1"=20'0 20 40 NOTES: CONTRACTOR TO MAINTAIN ACCESS TO ALL DRIVES DURING CONSTRUCTION NO PEDESTRIAN TRAVEL IS PERMITTED WITHIN WORK ZONE AREAS RAISED PAVEMENT MARKER REFLECTORS TO BE REMOVED DURING PHASE 1 PER COC ITEM 621. LEGEND WORK ZONE DRUM SIGN PHASE 1: MOT DURING INSTALLATION OF TURN LANE. W20-1-4840' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 40' 20'W20-1-4813'13.5'DUBLIN ROAD 88+00 89+00 90+00 91+00 92+00 93+00 89+21.8, 20.5' L PROJECT LIMITS 100' TAPER W20-4-48W20-7-48350'350'350' BEGIN CONSTRUCTION STA: 100+38.29NOT TO SCALE EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) 20' SPACING CENTER OF DRUM TO CENTER OF DRUM 40' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES 40'DUBLIN ROAD 14'12'94+00 95+00 96+00 97+00 98+00 99+00 PROJECT LIMITS END CONSTRUCTION STA: 107+95.49 20'W20-1-48W20-4-48W20-7-48350'350'100' TAPER W20-1-4898+79.7, 13.5' R 350' NOT TO SCALE JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 MOT P2.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 6/24MAINTENANCE OFTRAFFIC PLAN PHASE 2HORZ 1"=20'0 20 40MATCHLINE SEE ABOVE (STA: 93+83.00)MATCHLINE SEE BELOW (STA: 93+83.00)NOTES: CONTRACTOR TO MAINTAIN ACCESS TO ALL DRIVES DURING CONSTRUCTION NO PEDESTRIAN TRAVEL IS PERMITTED WITHIN WORK ZONE AREAS RAISED PAVEMENT MARKER REFLECTORS TO BE REMOVED DURING PHASE 1 PER COC ITEM 621. LEGEND WORK ZONE DRUM SIGN TRAFFIC FLOW PHASE 2: MILL AND OVERLAY EAST PORTION OF DUBLIN RD. W20-1-4840' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 40'W20-1-4813'13.5'DUBLIN ROAD 88+00 89+00 90+00 91+00 92+00 93+00 89+21.8, 20.5' L PROJECT LIMITS W20-4-48W20-7-48350'350'350' BEGIN CONSTRUCTION STA: 100+38.29NOT TO SCALE 20' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) 40' SPACING CENTER OF DRUM TO CENTER OF DRUM PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES 40'DUBLIN ROAD 14'12'94+00 95+00 96+00 97+00 98+00 99+00 PROJECT LIMITS END CONSTRUCTION STA: 107+95.49 W20-1-48W20-4-48W20-7-48350'350'100' TAPER W20-1-4898+79.7, 13.5' R 350' NOT TO SCALE 20' SPACING CENTER OF DRUM TO CENTER OF DRUM 20' JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:18 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 MOT P2.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 7/24MAINTENANCE OFTRAFFIC PLAN PHASE 3HORZ 1"=20'0 20 40MATCHLINE SEE ABOVE (STA: 93+83.00)MATCHLINE SEE BELOW (STA: 93+83.00)NOTES: CONTRACTOR TO MAINTAIN ACCESS TO ALL DRIVES DURING CONSTRUCTION NO PEDESTRIAN TRAVEL IS PERMITTED WITHIN WORK ZONE AREAS RAISED PAVEMENT MARKER REFLECTORS TO BE REMOVED DURING PHASE 1 PER COC ITEM 621. LEGEND WORK ZONE DRUM SIGN TRAFFIC FLOW PHASE 3: MILL AND OVERLAY WEST PORTION OF DUBLIN RD. w/RISERDUBLIN ROAD EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD PROP STRIPING EX LIGHT POLE PROP E/P EX FIRE HYRDANT EX LIGHT POLE EX LIGHT POLE EX TELECOM & OVERHEAD ELECTRIC EX WALK EX FENCE EX WATER VALVE EX WATER MAIN EX DOP OHE EX WATER VALVE 12'11'EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) EX GAS MAIN EX ELECTRIC BOX EX LIGHT POLE EX GAS MARKER EX DRIVE PROP STRIPING 10+0011+00101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA: 100+38.29 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES EX GAS MAIN EX GAS VALVE EX LIGHT POLE EX STM EX DRIVE EX GUY WIRE (TYP) EX UTIL MISC 101100 12" STM 11'11'11'PROP E/P PROP E/P 11' MULTI-USE PATH LIU COURT27.22'10'30'12'6 Area: 56,805 SF (1.30 AC)TOP=853.62' (3' LID)w/ELEC.&COMM. DROPcannot open EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD EX FIRE HYRDANT 12'11'EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) PROP STRIPING 10+0011+00105+00 106+00 107+00 108+00 END CONSTRUCTION STA: 107+95.49EX 24" STM EX HYDRANT EX 18" S T M EX 18" STMEX WATER METER EX WATER VALVE PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES EX PWR & TELE POLE EX GUY WIRE (TYP) EX LIGHT POLE11'PROP E/P PROP E/PPROP E/P LIU COURT27.22'30'1 Area: 40,065 SF (0.92 AC) 11' MULTI-USE PATH 106 105 10412" STM 102 103 36" STM12" STM JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:59 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 SP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 8/24SCHEMATIC PLANHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE BELOWMATCHLINE: SEE ABOVESITE LEGEND PROPERTY LINE RIGHT-OF-WAY STRAIGHT CURB CURB AND GUTTER SIGN PAVEMENT MARKINGS w/RISERDUBLIN ROAD EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD EX LIGHT POLE PROP EOP EX FIRE HYRDANT EX LIGHT POLE EX LIGHT POLE EX TELECOM & OVERHEAD ELECTRIC EX WALK EX FENCE EX WATER VALVE EX WATER MAIN EX DOP OHE EX WATER VALVE EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) EX GAS MAIN EX ELECTRIC BOX EX LIGHT POLE EX GAS MARKER EX DRIVE 10+0011+00101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA: 100+38.29 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES EX GAS MAIN EX GAS VALVE EX LIGHT POLE EX STM EX DRIVE EX GUY WIRE (TYP) EX UTIL MISC 101100 12" STM PROP E/P 11' MULTI-USE PATH LIU COURT10'30'EOP 100+38.3, 15.2' R EOP 100+48.4, 16.0' R EOP 100+54.6, 16.2' R EOP 101+08.8, 17.5' R EOP 103+63.0, 25.2' R EOP 104+16.8, 25.3' R HEADWALL 100+47.0, 24.7' R HEADWALL 101+06.0, 26.0' R SAWCUT 104+82.8, 10.5' R EOP 105+00.7, 24.8' R PROP DRIVEWAY ADJUST TO GRADE11'12'11'6 Area: 56,805 SF (1.30) PROJECT LIMITS 6+00 7+00 8+00 9+00 10+00 REMOVE AND RELOCATE COORDINATE WITH UTILITY PROVIDER 103+41.1, 27.5' R SCALE: H:1"=20', V:1"=5' DUBLIN ROAD CROWN 830 840 850 860 EXISTING GRADE EXISTING GRADE 843.40843.91845.34846.89848.34849.47850.53851.60852.49852.92853.33853.65853.96854.10854.23854.11853.98853.96853.94853.92853.91100+15 101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA=100+38.29 ELEV = 844.65 100 COC AA-S168N: 770367.05E: 1796188.8759' ~ 12" STM @ 3 . 3 5 % 101 COC AA-S168N: 770424.19E: 1796174.07STA: 101+0612" INV (S): 845.75STA: 100+4712" INV (N): 843.77PROFILE CL EAST DITCH PROFILE CL EAST DITCH 847.36848.37849.39850.40851.41851.79852.17852.55852.71852.88853.04853.21JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:58 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 9/24PLAN & PROFILEHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE SHEET 10SITE LEGEND STRAIGHT CURB CURB AND GUTTER SIGN PROPOSED MILL & OVERLAY (1.25" DEPTH) PROPOSED MILL & OVERLAY (2.5" DEPTH) PROPOSED NEW ASPHALT PAVEMENT PAVEMENT MARKINGS MATCHLINE: SEE SHEET 10EX GAS UTILITY LEGEND SANITARY MAIN WATER STORM SEWER MAINSTM HEADWALL SANITARY MANHOLE XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM TOP=853.62' (3' LID)w/ELEC.&COMM. DROPcannot open EX 24" WATER MAIN (90-009-CIP) EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD EX FIRE HYRDANT EX GAS VALVE EX SANITARY MH (CANNOT BE OPENED) PROP STRIPING 10+0011+00105+00 106+00 107+00 108+00 END CONSTRUCTION STA: 107+95.49 EX 24" STM EX HYDRANT EX 18" S T M EX 18" STMEX WATER METER EX WATER VALVE PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES EX PWR & TELE POLE EX GUY WIRE (TYP) EX LIGHT POLE PROP E/P PROP E/PPROP E/P LIU COURT10'30'SAWCUT 104+82.8, 10.5' R EOP 105+00.7, 24.8' R EOP 106+29.3, 23.3' R EOP 107+51.8, 18.8' R EOP 107+95.8, 16.2' R ADJUST TO GRADE 12'11'11'1 Area: 40,065 SF (0.92) 11' MULTI-USE PATH PROJECT LIMITS 10+00 11+00 12+00 12 + 8 5 12" STM 36" STM12" STM 102 103 104 105 106 HEADWALL 107+00.4, 58.7' R HEADWALL 107+36.5, 61.2' R CONTRACTOR TO RESET GUY WIRES SCALE: H:1"=20', V:1"=5' DUBLIN ROAD CROWN 830 840 850 860 EXISTING GRADE EXISTING GRADE 853.96853.94853.92853.91853.89853.87853.38852.85851.68850.46849.62848.78848.62848.47848.71848.98849.95850.95852.58853.55852.74852.24851.75851.26850.13848.95847.77847.70847.95847.75847.07105+00 106+00 107+00 108+00 108+89 END CONSTRUCTION STA=107+95.49 ELEV = 848.93 PROFILE CL EAST DITCH EX 24" STM JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:58 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 10/24PLAN & PROFILEHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE SHEET 9SITE LEGEND STRAIGHT CURB CURB AND GUTTER SIGN PROPOSED MILL & OVERLAY (1.5" DEPTH) PROPOSED MILL & OVERLAY (2.5" DEPTH) PROPOSED NEW ASPHALT PAVEMENT PAVEMENT MARKINGS UTILITY LEGEND SANITARY MAIN WATER STORM SEWER MAINSTM HEADWALL SANITARY MANHOLE XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM MATCHLINE: SEE SHEET 9 WVinlet window inlet window 12" RC P12" CPP 18" RCP24" RCPEXIST DRAINAGE INLETTR:847.08INV(N):844.79INV(S):844.89DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX 24" WATER MAIN (90-009-CIP)CP9950EX 16" FORCE MAIN (19-025-CIP) 600'18'0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+02 DUBLIN ROAD BROWNING CTLIU COURTSCALE: H:1"=30', V:1"=10' DUBLIN RD - NORTH SIGHT DISTANCE 840 850 860 870 840 850 860 870 EXISTING GRADE EXISTING GRADEPROPOSED GRADE 850.44850.26850.40850.73850.98850.29850.05849.50847.96846.58846.77848.00848.00848.01849.18850.16851.27853.04854.54856.01856.91857.97858.66859.37859.93853.21853.60853.70853.27852.82851.70850.90850.20849.50848.85848.40848.29848.34848.48-0+25 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+253.5'3.5'SIGHT DISTANCE LINE DRIVER'S EYE OBJECT WVw/RISERDUBLIN ROAD DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX 24" WATER MAIN (90-009-CIP)CP900TBM1CP947EX 16" FORCE MAIN (19-025-CIP)18'600' 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+01 DUBLIN ROAD LIU COURTSCALE: H:1"=30', V:1"=10' DUBLIN RD SOUTH SIGHT DISTANCE 830 840 850 860 870 830 840 850 860 870 PROPOSED GRADE PROPOSED GRADE EXISTING GRADE EXISTING GRADE EXISTING GRADE 850.44850.10850.94851.75854.00853.85853.24852.68852.36852.28852.33852.01850.69850.00848.63847.36845.59843.97842.74841.06840.30840.04840.03839.87838.70853.21853.29853.68853.55853.39853.22853.06852.81852.47851.95851.04849.88848.95848.27847.53847.50846.07-0+250+001+002+003+004+005+006+006+25 3.5'3.5'DRIVER'S EYE SIGHT DISTANCE LINE OBJECT JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/15/25 - 2:28 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 SIGHT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 21/24SIGHT DISTANCEPLANVERT 1"=10' HORZ 1"=30' 0 0 10 30 20 60 SCALE: H:1"=20', V:1"=5' MULTI-USE PATH 830 840 850 860 870 EXISTING GRADE EXISTING GRADE 851.37850.91850.46850.19850.02850.38850.65851.39850.09848.67847.39846.16844.91844.54843.00844.72853.58853.15853.37853.51853.65853.25852.85852.45851.75850.58849.40848.61848.40848.40848.40848.389+00 10+00 11+00 12+00 13+00 -1.60% -4.73% +0.00%+0.00%+0.00%GRADE BREAK STA = 10+00.00ELEV = 853.65GRADE BREAK STA = 12+26.24ELEV = 848.40GRADE BREAK STA = 12+46.00ELEV = 848.40GRADE BREAK STA = 12+84.90ELEV = 848.40 HIGH POINT EL =852.40 HIGH POINT STA = 10+78.23 PVI STA = 10+90.73 PVI EL = 852.20 K = 7.98 25.0' VC BVCS: 10+78.23BVCE: 852.40EVCS: 11+03.23EVCE: 851.61 LOW POINT EL =848.40 LOW POINT STA = 11+95.97 PVI STA = 11+70.97 PVI EL = 848.40 K = 10.56 50.0' VC BVCS: 11+45.97BVCE: 849.58EVCS: 11+95.97EVCE: 848.40PI: 10+00.00ELEV = 853.65PC: 11+62.92ELEV = 848.92PT: 11+70.97ELEV = 848.70PC: 12+16.42ELEV = 848.40PT: 12+26.24ELEV = 848.40PC: 12+37.73ELEV = 848.40PT: 12+64.27ELEV = 848.40-1.60% -4.73% +0.00%+0.00%+0.00%GRADE BREAK STA = 10+00.00ELEV = 853.65GRADE BREAK STA = 12+26.24ELEV = 848.40GRADE BREAK STA = 12+46.00ELEV = 848.40GRADE BREAK STA = 12+84.90ELEV = 848.40 HIGH POINT EL =852.40 HIGH POINT STA = 10+78.23 PVI STA = 10+90.73 PVI EL = 852.20 K = 7.98 25.0' VC BVCS: 10+78.23BVCE: 852.40EVCS: 11+03.23EVCE: 851.61 LOW POINT EL =848.40 LOW POINT STA = 11+95.97 PVI STA = 11+70.97 PVI EL = 848.40 K = 10.56 50.0' VC BVCS: 11+45.97BVCE: 849.58EVCS: 11+95.97EVCE: 848.40PI: 10+00.00ELEV = 853.65PC: 11+62.92ELEV = 848.92PT: 11+70.97ELEV = 848.70PC: 12+16.42ELEV = 848.40PT: 12+26.24ELEV = 848.40PC: 12+37.73ELEV = 848.40PT: 12+64.27ELEV = 848.40GRADE BREAK STA = 8+95.51ELEV = 853.58GRADE BREAK STA = 8+95.51ELEV = 853.58SCALE: H:1"=20', V:1"=5' MULTI-USE PATH 830 840 850 860 870 EXISTING GRADE EXISTING GRADE 849.74850.64851.29851.81852.04852.22852.09852.86853.23852.76852.03851.37850.91850.46850.19848.67849.61850.55851.50852.16852.47852.79853.03853.17853.32853.46853.58853.15853.37853.515+75 6+00 7+00 8+00 9+00 +3.77% +1.26% +0.58%GRADE BREAK STA = 6+00.37ELEV = 847.74GRADE BREAK STA = 7+88.86ELEV = 852.96GRADE BREAK STA = 8+95.51ELEV = 853.58 HIGH POINT EL =852.33 HIGH POINT STA = 7+38.92 PVI STA = 7+13.92 PVI EL = 852.02 K = 19.90 50.0' VC BVCS: 6+88.92BVCE: 851.08EVCS: 7+38.92EVCE: 852.33+3.77% +1.26% +0.58%GRADE BREAK STA = 6+00.37ELEV = 847.74GRADE BREAK STA = 7+88.86ELEV = 852.96GRADE BREAK STA = 8+95.51ELEV = 853.58 HIGH POINT EL =852.33 HIGH POINT STA = 7+38.92 PVI STA = 7+13.92 PVI EL = 852.02 K = 19.90 50.0' VC BVCS: 6+88.92BVCE: 851.08EVCS: 7+38.92EVCE: 852.33JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:58 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 11/24MULTI-USE PATHPROFILEHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION SITE LEGEND STRAIGHT CURB CURB AND GUTTER SIGN PROPOSED MILL & OVERLAY (1.5" DEPTH) PROPOSED MILL & OVERLAY (2.5" DEPTH) PROPOSED NEW ASPHALT PAVEMENT PAVEMENT MARKINGS UTILITY LEGEND SANITARY MAIN WATER STORM SEWER MAINSTM HEADWALL SANITARY MANHOLE XX XX FIRE HYDRANT WATER VALVE WATER MAIN WATER TEE WATER BEND WATER REDUCER WV WM MATCHLINE: SEE SHEET 9 100+50.00 830 835 840 845 850 855 830 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 101+00.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT OFF:0.00' ELEV:845.34OFF:12.48' R ELEV:845.14OFF:12.48' R ELEV:845.14OFF:16.09' R ELEV:845.08OFF:-16.61' L ELEV:844.98-1.56%-1.56%-2.14%OFF:0.00' ELEV:848.34OFF:11.96' R ELEV:848.16OFF:11.96' R ELEV:848.16OFF:17.26' R ELEV:848.08OFF:-15.02' L ELEV:847.96-1.56%-1.56%-2.57% 12" STM EX GAS EX 24" WM EX 16" SAN 12" STM EX GAS EX 24" WM EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS12/24 101+50.00 835 840 845 850 855 860 835 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:30.20' R ELEV:849.18OFF:41.20' R ELEV:849.35OFF:30.20' R ELEV:849.18OFF:29.20' R ELEV:849.15OFF:41.20' R ELEV:849.35OFF:42.20' R ELEV:849.32OFF:42.20' R ELEV:849.32OFF:42.81' R ELEV:849.523.15%-3.11%3:1 102+00.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:30.58' R ELEV:851.07OFF:41.58' R ELEV:851.24OFF:30.58' R ELEV:851.07OFF:29.58' R ELEV:851.04OFF:41.58' R ELEV:851.24OFF:42.58' R ELEV:851.21OFF:42.58' R ELEV:851.21OFF:44.59' R ELEV:850.543.16%-3.10%3:1 850.53 852.49 OFF:0.00' ELEV:850.53OFF:-14.60' L ELEV:850.31OFF:11.46' R ELEV:850.35OFF:11.46' R ELEV:850.35OFF:18.43' R ELEV:850.25OFF:20.43' R ELEV:850.08OFF:25.09' R ELEV:848.37OFF:26.09' R ELEV:848.37OFF:29.20' R ELEV:849.15-1.54%-1.56%-1.56%-8.33% 3:1 4:1OFF:0.00' ELEV:852.49OFF:-14.13' L ELEV:852.17OFF:11.07' R ELEV:852.32OFF:11.07' R ELEV:852.32OFF:19.72' R ELEV:852.19OFF:21.72' R ELEV:852.02OFF:26.00' R ELEV:850.39OFF:27.00' R ELEV:850.39OFF:29.58' R ELEV:851.04-2.29%-1.56%-1.56%-8.33% 3:1 4:1 EX GAS EX GAS EX 16" SAN EX 16" SAN EX 24" WM EX 24" WM VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS13/24 102+50.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:31.43' R ELEV:852.33OFF:42.44' R ELEV:852.51OFF:31.43' R ELEV:852.33OFF:30.43' R ELEV:852.30OFF:42.44' R ELEV:852.51OFF:43.44' R ELEV:852.48OFF:43.44' R ELEV:852.48OFF:45.58' R ELEV:851.763.15%3.15%-3.11%3:1 103+00.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:32.17' R ELEV:852.96OFF:43.17' R ELEV:853.13OFF:32.17' R ELEV:852.96OFF:31.17' R ELEV:852.93OFF:43.17' R ELEV:853.13OFF:44.17' R ELEV:853.103.15%-3.12% 853.33 853.96 OFF:0.00' ELEV:853.33OFF:-12.88' L ELEV:853.17OFF:11.14' R ELEV:853.15OFF:11.14' R ELEV:853.15OFF:21.49' R ELEV:852.99OFF:23.49' R ELEV:852.83OFF:27.38' R ELEV:851.79OFF:28.38' R ELEV:851.79OFF:30.43' R ELEV:852.30-1.21%-1.56%-1.56%-8.33% 4:1 4:1OFF:0.00' ELEV:853.96OFF:-12.18' L ELEV:854.01OFF:11.11' R ELEV:853.79OFF:11.11' R ELEV:853.79OFF:23.13' R ELEV:853.60OFF:25.13' R ELEV:853.43OFF:28.65' R ELEV:852.55OFF:29.65' R ELEV:852.55OFF:31.17' R ELEV:852.930.38%-1.56%-1.56%-8.33% 4:1 4:1 EX GAS EX 24" WM EX GAS EX 16" SAN EX 16" SANEX 24" WM VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS14/24 103+50.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:32.88' R ELEV:853.25OFF:43.88' R ELEV:853.42OFF:32.88' R ELEV:853.25OFF:31.88' R ELEV:853.22OFF:43.88' R ELEV:853.42OFF:44.88' R ELEV:853.393.14%-3.12% 104+00.00 840 845 850 855 860 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:33.63' R ELEV:853.54OFF:44.63' R ELEV:853.71OFF:33.63' R ELEV:853.54OFF:32.63' R ELEV:853.51OFF:44.63' R ELEV:853.71OFF:45.63' R ELEV:853.683.14%-3.12% 854.23 853.98 OFF:0.00' ELEV:854.23OFF:-11.72' L ELEV:854.17OFF:11.05' R ELEV:854.05OFF:11.05' R ELEV:854.05OFF:24.75' R ELEV:853.84OFF:26.75' R ELEV:853.67OFF:29.51' R ELEV:852.88OFF:30.51' R ELEV:852.88OFF:31.88' R ELEV:853.22-0.49%-1.56%-1.56%-8.33% 3:1 4:1OFF:0.00' ELEV:853.98OFF:-13.04' L ELEV:853.76OFF:11.03' R ELEV:853.81OFF:11.03' R ELEV:853.81OFF:25.31' R ELEV:853.59OFF:27.31' R ELEV:853.42OFF:30.41' R ELEV:853.21OFF:31.41' R ELEV:853.21OFF:32.63' R ELEV:853.51-1.67%-1.56%-1.56%-8.33%14:1 4:1 EX GAS EX 24" WM EX GAS EX 24" WM EX 16" SAN EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS15/24 104+50.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 105+00.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 853.94 853.91 OFF:0.00' ELEV:853.94OFF:10.73' R ELEV:853.77OFF:-14.14' L ELEV:853.76-1.56%-1.27%OFF:0.00' ELEV:853.91OFF:10.79' R ELEV:853.74OFF:-15.14' L ELEV:853.83-1.56%-0.49% EX GAS EX 24" WM EX 16" SAN EX 24" WM EX GAS EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS16/24 105+50.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT 106+00.00 840 845 850 855 860 865 840 845 850 855 860 865 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:34.78' R ELEV:853.03OFF:45.78' R ELEV:853.20OFF:34.78' R ELEV:853.03OFF:33.78' R ELEV:853.00OFF:45.78' R ELEV:853.20OFF:46.78' R ELEV:853.173.12%-3.14%OFF:0.00' ELEV:853.87OFF:-15.75' L ELEV:853.46OFF:11.38' R ELEV:853.69OFF:11.38' R ELEV:853.69OFF:24.23' R ELEV:853.49OFF:26.23' R ELEV:853.33OFF:30.02' R ELEV:852.24OFF:31.02' R ELEV:852.24OFF:33.78' R ELEV:853.00-2.63%-1.56%-1.56%-8.33% 3:1 4:1 OFF:34.93' R ELEV:852.17OFF:45.93' R ELEV:852.34OFF:34.93' R ELEV:852.17OFF:33.93' R ELEV:852.13OFF:45.93' R ELEV:852.34OFF:46.93' R ELEV:852.303.12%-3.14%OFF:0.00' ELEV:852.85OFF:-15.45' L ELEV:852.45OFF:11.88' R ELEV:852.67OFF:11.88' R ELEV:852.67OFF:23.52' R ELEV:852.49OFF:25.52' R ELEV:852.32OFF:29.75' R ELEV:851.26OFF:30.75' R ELEV:851.26OFF:33.93' R ELEV:852.13-2.60%-1.56%-1.56%-8.33% 4:1 4:1 EX GAS EX 24" WM EX GAS EX 24" WM EX 16" SAN EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS17/24 106+50.00 835 840 845 850 855 860 835 840 845 850 855 860 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT 107+00.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W PROP R/W SAWCUT OFF:35.44' R ELEV:849.93OFF:46.44' R ELEV:850.09OFF:35.44' R ELEV:849.93OFF:34.44' R ELEV:849.90OFF:46.44' R ELEV:850.09OFF:47.44' R ELEV:850.063.08%-3.18%OFF:0.00' ELEV:850.46OFF:-15.21' L ELEV:850.20OFF:12.74' R ELEV:850.27OFF:12.74' R ELEV:850.27OFF:22.70' R ELEV:850.11OFF:24.70' R ELEV:849.94OFF:29.49' R ELEV:848.94OFF:30.49' R ELEV:848.94OFF:34.44' R ELEV:849.90-1.73%-1.56%-1.56%-8.33% 5:1 4:1OFF:32.02' R ELEV:848.43OFF:43.16' R ELEV:848.61OFF:32.02' R ELEV:848.43OFF:31.00' R ELEV:848.40OFF:43.16' R ELEV:848.61OFF:44.17' R ELEV:848.583.22%-2.96%OFF:0.00' ELEV:848.78OFF:-15.53' L ELEV:848.46OFF:13.14' R ELEV:848.58OFF:13.14' R ELEV:848.58OFF:20.80' R ELEV:848.46OFF:22.80' R ELEV:848.29OFF:26.77' R ELEV:847.70OFF:27.77' R ELEV:847.70OFF:31.00' R ELEV:848.40-2.06%-1.56%-1.56%-8.33% 7:1 5:1 EX GAS EX 24" WM EX GAS EX 24" WM EX 16" SAN EX 16" SAN VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS18/24 108+00.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX ℄ CONSTEX R/W 107+50.00 835 840 845 850 855 835 840 845 850 855 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 EX R/W EX ℄ CONSTEX R/W SAWCUT 848.98 OFF:26.86' R ELEV:848.40OFF:37.86' R ELEV:848.57OFF:26.86' R ELEV:848.40OFF:25.86' R ELEV:848.37OFF:37.86' R ELEV:848.57OFF:38.86' R ELEV:848.543.13%-3.13%OFF:0.00' ELEV:848.47OFF:-16.22' L ELEV:848.07OFF:13.54' R ELEV:848.26OFF:13.54' R ELEV:848.26OFF:18.90' R ELEV:848.18OFF:20.90' R ELEV:848.01OFF:22.65' R ELEV:847.75OFF:23.65' R ELEV:847.75OFF:25.86' R ELEV:848.37-2.46%-1.56%-1.56%-8.33%7:1 4:1 EX GAS EX 24" WM EX 16" SAN 36" STM EX GAS EX 16" SAN EX 24" WM VERT 1"=5' HORZ 1"=5' 0 0 5 5 10 10 JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 2:55 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 CROSS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES DUBLIN RD CROSSSECTIONS19/24 DUBLIN ROAD EX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD PROP STRIPING PROP E/P EX WALK 12'11'PROP STRIPING 10+0011+00101+00 102+00 103+00 104+00 105+00 BEGIN CONSTRUCTION STA: 100+38.29 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES 11'11'11'PROP E/P PROP E/P 11' MULTI-USE PATH LIU COURT27.22'10'30'12'6 Area: 56,805 SF (1.30 AC)W2-2RW16-2aPPROJECT LIMITS R1-1 104+78.9, 52.4' R 101+09.2, 20.5' R WE WE WE WE WE WE YT YT CL CL LA1 375.33' PROP DIAGONAL STRIPING PER ODOT TC-71.10 BEGIN CHANNELIZING LINES,SOLID WHITEEND CENTER LINES,DOUBLE SOLID YELLOW,℄BEGIN CENTER LINES,DOUBLE SOLID YELLOW,℄BEGIN CHANNELIZING LINES,SOLID WHITE, LTSTA 100+38.3, 0.00 TSTA 104+13.6, 6.29 RTSTA 104+70.5, 0.09 RTEX 16" FORCE MAIN (19-025-CIP) DUBLIN ROAD 12'11'PROP STRIPING 10+0011+00105+00 106+00 107+00 108+00 108+89 END CONSTRUCTION STA: 107+95.49 PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES 11'PROP E/P LIU COURT27.22'30'11' MULTI-USE PATH EXISTING SIGN TOBE RELOCATED HEREW2-1W16-H8PW16-H8PW2-2LW16-H8PR3-H8baR1-1 106+95.9, 20.3' L 104+78.9, 52.4' R 108+87.4, 24.8' L 106+65.5, 25.9' R WE WE WE WE YT YTCH CL CL LA1 LA1 BEGIN CENTER LINES,DOUBLE SOLID YELLOW,℄END CHANNELIZING LINES,SOLID WHITEEND CENTER LINES,DOUBLE SOLID YELLOW,℄END EDGE LINESWHITE, LTEND CHANNELIZING LINES,SOLID WHITE, LTPROP DIAGONAL STRIPING PER ODOT TC-71.10 150'50'125'BEGIN CHANNELIZING LINES,SOLID WHITESTA 104+70.5, 0.09 RTSTA 105+95.5, 1.42 LTSTA 105+95.6, 10.58 RTSTA 107+95.5, 0.00 T→→→JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 4:06 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 SIGNAGE.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 20/24SIGNAGE ANDSTRIPING PLANHORZ 1"=20'0 20 40 EXISTING LEGEND PROPERTY LINE RIGHT-OF-WAY PAVEMENT/ SIDEWALK PAVEMENT STRIPING CURB ROAD CENTERLINE TREE DRIP LINE FENCE STREAM STORM SEWER SANITARY SEWER WATER LINE GAS LINE FIBER OPTIC LINE ELECTRIC OVERHEAD ELECTRIC TELECOMMUNICATION CABLE TELEVISION MATCHLINE: SEE BELOWMATCHLINE: SEE ABOVESITE LEGEND PROPERTY LINE RIGHT-OF-WAY STRAIGHT CURB CURB AND GUTTER SIGN CONCRETE BOLLARD HEAVY DUTY ASPHALT PAVEMENT STANDARD DUTY ASPHALT PAVEMENT HEAVY DUTY CONCRETE CONCRETE WALK GRAVEL PATH PAVEMENT MARKINGS STRIPING LEGEND ITEM 644 CENTER LINE, DOUBLE YELLOW 4" ITEM 644 TRANSVERSE/ DIAGONAL LINE, YELLOW 24" ITEM 644 CHANNELIZING LINE, WHITE 8" ITEM 644 EDGE LINE, WHITE 4" ITEM 644 LANE ARROW, 72" CL YT CH WE LA1 WVTOP=853.62' (3' LID)w/RISERHEGENDERFER JUSTIN L & ABIGAIL MWAGNER KATHRYN LTROLSON ZACHARY MICHAEL & RACHEL LUCKHARTinlet window inlet window 12" RC P12" CPP 18" RCP24" RCPcannot open EXIST DRAINAGE INLETTR:847.08INV(N):844.79INV(S):844.89DUBLIN ROADLOT 42RESERVE "D"DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) EX 24" WATER MAIN (90-009-CIP)EX 24" WATER MAIN (90-009-CIP)CP900TBM1CP947CP9950EX 16" FORCE MAIN (19-025-CIP) EX 16" FORCE MAIN (19-025-CIP) 101100 12" STM CDCWA8458508508468478488498498518518528528 5 3 8538 4 5 85084 6 847 848848849851852853850847 847 848 848 8488488498518528 5 3 848 848 849 853CDCDCDCDCD8458508508448468478488498498518518528528538 5 3 8548548458 5 0 8508558558558 5 5855855 8468478488 4 8 84884 9 8 4 9 8 5 1 851 85 2 8528538 5 3 853 8538 5 4 85485485 4 856856857857858858840845850850 850 839841 842 843 844846847 848 849 851 852 853 845 850 850846847848849851 851 8518518 5 2 852 8 5 2 85284 5 85 0 84 3 84 4 84 6 8 4 7 848 8 4 9 85 1 852852 A 22 B 22 C 22C 22 12" STM36" STM12" STM 48'21' ODOT TYPE C 1.5' DEEP RCP, WIDTH & DEPTH PER PLAN10'5' 27' JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:00 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 22/24EROSION CONTROLPLANHORZ 1"=30'0 30 60 CONCRETE WASHOUT AREA NOT TO SCALE10' MINIMUM10' MINIMUM 3' MIN.NOTE: BASIN SHOULD BE CLEARLY MARKED FOR CONCRETE WASHOUT. ORANGE SILT FENCE OR CONSTRUCTION FENCE PLAN SECTION NOTE: 1.CONCRETE WASHOUT AREA SHALL BE LOCATED A MINIMUM OF 100' FROM STORM SEWER INLETS, STREAMS, WETLANDS OR ANY OTHER SURFACE WATERS. 2.IF CONCRETE WASHOUT AREA IS LOCATED AWAY FROM A PAVED SURFACE, CONSTRUCT A GRAVEL ACCESS ROUTE EQUAL IN COMPOSITION TO A CONSTRUCTION ENTRANCE. 3.CONCRETE WASHOUT AREA SHALL BE SUFFICIENT SIZE TO CONTAIN CONCRETE WASTE GENERATED. LARGE SITES MAY REQUIRE MULTIPLE CONCRETE WASHOUT AREAS. 4.PLASTIC LINING SHALL BE DOUBLE-LINED, CONTINUOUS 10-ML POLYETHYLENE SHEETING FREE OF HOLES, TEARS OR OTHER DEFECTS INSTALLED ON A SMOOTH, LEVEL SURFACE, FREE OF LARGE ROCKS AND DEBRIS. 5.CONCRETE WASHOUT SIGNAGE SHALL BE CLEARLY VISIBLE AND LOCATED WITHIN 30 FEET OF EACH WASHOUT AREA. 6.CONCRETE WASHOUT AREA SHALL BE COVERED DURING INCLEMENT WEATHER TO PREVENT OVERFLOW. 7.PREFABRICATED, PORTABLE AND RE-USABLE CONCRETE WASHOUT CONTAINERS ARE ACCEPTABLE. 8.CONCRETE WASHOUT AREA SHALL BE INSPECTED DAILY TO CHECK FOR DAMAGE AND DETERMINE IF IT NEEDS CLEANED OR REPLACED. ANY DAMAGE TO THE SIDEWALLS OR PLASTIC LINING SHALL BE REPAIRED IMMEDIATELY. REPLACE THE ENTIRE CONCRETE WASHOUT AREA WHEN IT IS 75% FULL. ALL CONCRETE TRUCKS MUST WASHOUT HERE 6" MIN. NO. 2 CRUSHED STONE GRAVEL PAD 10 ML PLASTIC LINING 10 ML PLASTIC LINING B20'20'10' MIN.14'EXISTING PAVEMENT 5: 1 3'EXISTING PAVEMENT PROFILE PLAN VIEW 6" MIN(STANDARD)18" MIN(HEAVY DUTY)FILTER CLOTH R/W DIVERSION AS NEEDED70' MIN. AS REQUIRED EXISTING GROUND CULVERT (AS NEEDED)18"CONSTRUCTION ENTRANCE NOT TO SCALE GEOTEXTILE SPECIFICATION FOR CONSTRUCTION ENTRANCE MINIMUM TENSILE STRENGTH 200 lbs MINIMUM PUNCTURE STRENGTH 80 psi MINIMUM TEAR STRENGTH 50 lbs MINIMUM BURST STRENGTH 320 psi MINIMUM ELONGATION 20% EQUIVALENT OPENING SIZE EOS<0.6 mm PERMITIVITY 1x10-3 cm/sec CONSTRUCTION SPECIFICATIONS: 1.STONE SIZE—ODOT # 2 (1.5-2.5 INCH) STONE SHALL BE USED, OR RECYCLED CONCRETE EQUIVALENT. 2.LENGTH—THE CONSTRUCTION ENTRANCE SHALL BE AS LONG AS REQUIRED TO STABILIZE HIGH TRAFFIC AREAS BUT NOT LESS THAN 70 FT. (EXCEPTION: APPLY 30 FT. MINIMUM TO SINGLE RESIDENCE LOTS). 3.THICKNESS -THE STONE LAYER SHALL BE AT LEAST 6 INCHES THICK FOR LIGHT DUTY ENTRANCES OR AT LEAST 10 INCHES FOR HEAVY DUTY USE. 4.WIDTH -THE ENTRANCE SHALL BE AT LEAST 14 FEET WIDE, BUT NOT LESS THAN THE FULL WIDTH AT POINTS WHERE INGRESS OR EGRESS OCCURS 5.GEOTEXTILE -A GEOTEXTILE SHALL BE LAID OVER THE ENTIRE AREA PRIOR TO PLACING STONE. IT SHALL BE COMPOSED OF STRONG ROT-PROOF POLYMERIC FIBERS AND MEET THE FOLLOWING SPECIFICATIONS: 6.TIMING—THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED AS SOON AS IS PRACTICABLE BEFORE MAJOR GRADING ACTIVITIES. 7.CULVERT -A PIPE OR CULVERT SHALL BE CONSTRUCTED UNDER THE ENTRANCE IF NEEDED TO PREVENT SURFACE WATER FROM FLOWING ACROSS THE ENTRANCE OR TO PREVENT RUNOFF FROM BEING DIRECTED OUT ONTO PAVED SURFACES. 8.WATER BAR -A WATER BAR SHALL BE CONSTRUCTED AS PART OF THE CONSTRUCTION ENTRANCE IF NEEDED TO PREVENT SURFACE RUNOFF FROM FLOWING THE LENGTH OF THE CONSTRUCTION ENTRANCE AND OUT ONTO PAVED SURFACES. 9.MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR PREVENT FLOWING SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND. MUD SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC ROADS, OR ANY SURFACE WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS, SHALL BE REMOVED IMMEDIATELY. REMOVAL SHALL BE ACCOMPLISHED BY SCRAPING OR SWEEPING. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. 10. CONSTRUCTION ENTRANCES SHALL NOT BE RELIED UPON TO REMOVE MUD FROM VEHICLES AND PREVENT OFF-SITE TRACKING. VEHICLES THAT ENTER AND LEAVE THE CONSTRUCTION-SITE SHALL BE RESTRICTED FROM MUDDY AREAS. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHTS-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE ON AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 11. REMOVAL—THE ENTRANCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED AREA IS STABILIZED OR REPLACED WITH A PERMANENT ROADWAY OR ENTRANCE. A 12" MIN.6" MIN.4'-0" LOW CENTER SECTION- MUST CAUSE FLOW OVER NOT AROUND, CHECK DAM NOTES: 1.CONSTRUCT CHECK DAM SUCH THAT THE CENTER IS 6" LOWER THAN THE OUTER EDGES. 2.SPACE CHECK DAMS SUCH THAT THE TOE OF THE UPSTREAM DAM IS AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 3.SIDE SLOPES SHALL BE A MINIMUM OF 2:1 4"-8" DIAMETER ROCKAPRON 3' MAX. DITCH SECTION PROFILE FLOW POSITIVE SLO P EPOSITIVE SL O P E FLOW ROCK CHECK DAM NOT TO SCALEC EROSION CONTROL LEGEND PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE SILT FENCE SWALE CONCRETE WASHOUT AREA CHECK DAM EROSION CONTROL MATTING ODOT TYPE B STABILIZED CONSTRUCTION ENTRANCE XXX XXX XXX XXX CWA CD JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 3:00 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 ECP.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 23/24EROSION CONTROLNOTESEROSION CONTROL NOTES: 1.ALL EROSION CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO ANY SITE GRADING OPERATIONS. ALL APPLICABLE GOVERNING AGENCIES MUST BE NOTIFIED UPON COMPLETION OF THE INSTALLATION OF THE REQUIRED EROSION FACILITIES AND PRIOR TO ANY GRADING OPERATION BEING COMMENCED. IF DAMAGED OR REMOVED DURING CONSTRUCTION, ALL EROSION CONTROL FACILITIES SHALL BE RESTORED AND IN PLACE AT THE END OF EACH WORK DAY. 2.ANY EROSION CONTROL FACILITIES DEEMED NECESSARY BY THE GOVERNING AGENCIES; BEFORE, DURING OR AFTER THE GRADING ACTIVITIES, SHALL BE INSTALLED AT THEIR REQUEST. 3.FLOWS FROM DIVERSION CHANNELS OR PIPES (TEMPORARY OR PERMANENT) SHALL BE ROUTED TO SEDIMENTATION BASINS OR APPROPRIATE ENERGY DISSIPATERS TO PREVENT TRANSPORT OF SEDIMENT TO OUTFLOW TO LATERAL CONVEYORS AND TO PREVENT EROSION AND SEDIMENTATION WHEN RUNOFF FLOWS INTO THESE CONVEYORS. 4.SITE ACCESS ROADS SHALL BE GRADED OR OTHERWISE PROTECTED WITH SILT FENCES, DIVERSION CHANNELS, OR DIKES AND PIPES TO PREVENT SEDIMENT FROM EXITING THE SITE VIA THE ACCESS ROADS. SITE-ACCESS ROADS/DRIVEWAYS SHALL BE SURFACED WITH CRUSHED ROCK WHERE THEY ADJOIN EXISTING PAVED ROADWAYS. 5.SOILS TRACKED FROM THE SITE BY MOTOR VEHICLES OR EQUIPMENT SHALL BE CLEANED DAILY FROM PAVED ROADWAY SURFACES, OR MORE FREQUENTLY IF REQUESTED BY GOVERNING AGENCIES, THROUGHOUT THE DURATION OF CONSTRUCTION. 6.DUST CONTROL MEASURES SHALL BE PERFORMED PERIODICALLY WHEN CONDITIONS REQUIRE AND/OR AS DIRECTED BY THE GOVERNING AGENCIES. 7.ALL EROSION CONTROL MEASURES SHALL BE USED AND MAINTAINED FOR THE DURATION OF SITE CONSTRUCTION. IF CONSTRUCTION OPERATIONS OR NATURAL EVENTS DAMAGE OR INTERFERE WITH THESE EROSION CONTROL MEASURES, THEY SHALL BE RESTORED TO SERVE THEIR INTENDED FUNCTION AT THE END OF EACH DAY OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS. 8.ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AS SOON AS POSSIBLE. ANY AREAS WHICH HAVE BEEN FINISHED GRADED SHALL BE SODDED. AREAS THAT HAVE BEEN DISTURBED AND FOR WHICH GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY SHALL BE TEMPORARILY SEEDED AND MULCHED AS REQUIRED BY GOVERNING AGENCIES. 9.RUNOFF SHALL BE PREVENTED FROM ENTERING ALL STORM SEWER CATCH BASINS PROVIDING THEY ARE NOT NEEDED DURING CONSTRUCTION. WHERE STORM SEWER CATCH BASINS ARE NECESSARY FOR SITE DRAINAGE DURING CONSTRUCTION, A SILT FENCE OR SEDIMENT PROTECTION DEVICES SHALL BE INSTALLED AND MAINTAINED AROUND ALL CATCH BASINS UNTIL THE TRIBUTARY AREA TO THE CATCH BASIN IS RESTORED. 10.EROSION CONTROL FACILITIES SHALL BE INSTALLED AND MAINTAINED AROUND THE PERIMETER OF ALL LAKES, PONDS, AND WETLANDS, IF ANY WITHIN OR ADJACENT TO THE AREA TO BE GRADED UNTIL THE AREA TRIBUTARY TO THE LAKE, POND, OR WETLAND IS RESTORED. 11.TO MINIMIZE EROSION, ALL 3:1 SLOPES OR GREATER SHALL BE COVERED WITH A TEMPORARY EROSION CONTROL BLANKET OR STAKED SOD. 12.ACCUMULATION OF ALL SEDIMENT OCCURRING IN STORM SEWERS, DITCHES, LAKES, PONDS, WETLANDS SHALL BE REMOVED PRIOR TO, DURING AND AFTER COMPLETION OF GRADING ACTIVITIES, AT NO ADDITIONAL COST TO OWNER. 13.EROSION CONTROL ITEMS AND DEVICES SHALL BE REMOVED ONLY AFTER THE AREA HAS RECEIVED FINAL STABILIZATION. 14.THIS PLAN MUST BE POSTED ON SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON SITE AT ALL TIME. SEDIMENT AND EROSION CONTROL NOTES: MAINTENANCE & INSPECTION PROCEDURES: ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND WITHIN 24 HOURS FOLLOWING ANY STORM EVENT OF 0.5INCHES OR GREATER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE SEDIMENTATION AND EROSION CONTROL FEATURES ON THIS PROJECT. ANY SEDIMENT OR DEBRIS WHICH REDUCES THE EFFICIENCY OF A CONTROL FEATURE SHALL BE REMOVED IMMEDIATELY. SHOULD A STRUCTURE OR FEATURE BECOME DAMAGED, THE CONTRACTOR SHALL REPAIR OR REPLACE AT NO ADDITIONAL COST TO THE OWNER AND IT SHALL BE INITIATED WITHIN 24 HOURS OF REPORT. TEMPORARY SEEDING AND PERMANENT SEEDING AND PLANTING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION, AND A WRITTEN LOG MUST BE KEPT. THIS LOG SHALL INDICATE THE DATE OF THE INSPECTION, NAME OF THE INSPECTOR, WEATHER CONDITIONS, OBSERVATIONS, ANY CORRECTIVE ACTIONS TAKEN, AND BE SIGNED IN ACCORDANCE WITH THE CONDITIONS OF THE NPDES PERMIT. ANY CONTROL MEASURE MUST BE REPAIRED/REPLACED WITHIN THREE DAYS OF INSPECTION. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL BE TRAINED IN ALL INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED ONSITE IN GOOD WORKING ORDER. A WRITTEN DOCUMENT CONTAINING THE SIGNATURES OF ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED IN THE IMPLEMENTATION OF ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE MAINTAINED AS PROOF ACKNOWLEDGING THAT THEY REVIEWED AND UNDERSTAND THE CONDITIONS AND RESPONSIBILITIES OF THE PLAN. THE DOCUMENT SHALL BE CREATED BY THE CONTRACTOR SIGNED PRIOR TO THE START OF CONSTRUCTION. DISPOSAL OF SOLID/SANITARY/TOXIC WASTE: SOLID, SANITARY, AND TOXIC WASTE MUST BE DISPOSED OF IN A PROPER MANNER IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS IT IS PROHIBITED TO BURN, BURY, OR POUR OUT ONTO THE GROUND OR INTO A STORM SEWER WATER CONVEYANCE ANY SOLVENTS, PAINTS, STAINS, GASOLINE, DIESEL FUEL, USED MOTOR OIL, HYDRAULIC FLUID, ANTIFREEZE, CEMENT CURING COMPOUNDS, AND OTHER SUCH SOLID AND HAZARDOUS WASTES. ANY RINSE WATERS OF SUCH MATERIAL ARE ALSO PROHIBITED FROM BEING PLACED WHERE THEY MAY ENTER DRAINAGEWAYS. WASH OUT OF CEMENT TRUCKS SHOULD OCCUR IN A DIKED, DESIGNATED AREA, AWAY FROM ANY CONVEYANCE CHANNEL. COORDINATE WASH OUT AREA WITH CONSTRUCTION MANAGER. CONTRACTORS RESPONSIBILITIES: THIS PLAN MUST BE POSTED ON-SITE. A COPY OF THE SWPPP PLAN AND THE APPROVED EPA STORMWATER PERMIT (WITH THE SITE-SPECIFIC NOI NUMBER) SHALL BE KEPT ON-SITE AT ALL TIMES. DETAILS HAVE BEEN PROVIDED ON THE PLANS IN AN EFFORT TO HELP THE CONTRACTOR PROVIDE EROSION AND SEDIMENTATION CONTROL. THE DETAILS SHOWN ON THE PLAN SHALL BE CONSIDERED A MINIMUM. ADDITIONAL OR ALTERNATE DETAILS MAY BE FOUND IN THE ODNR MANUAL "RAINWATER AND LAND DEVELOPMENT". THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING NECESSARY AND ADEQUATE MEASURES FOR PROPER CONTROL OF EROSION AND SEDIMENT RUNOFF FROM THE SITE ALONG WITH PROPER MAINTENANCE AND INSPECTION IN COMPLIANCE WITH THE NPDES GENERAL PERMIT FOR STORM DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. THE SCHEDULE SHOULD INCLUDE A SEQUENCE OF THE PLACEMENT OF THE SEDIMENTATION AND EROSION CONTROL MEASURES THAT PROVIDES FOR CONTINUAL PROTECTION OF THE SITE THROUGHOUT EARTH MOVING ACTIVITIES. PRIOR TO CONSTRUCTION OPERATIONS IN A PARTICULAR AREA, ALL SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE IN PLACE. FIELD ADJUSTMENTS WITH RESPECT TO LOCATIONS AND DIMENSIONS MAY BE MADE BY THE ENGINEER AND/OR THE OHIO EPA. THE CONTRACTOR SHALL PLACE INLET PROTECTION FOR THE SEDIMENTATION CONTROL IMMEDIATELY AFTER CONSTRUCTION OF THE CATCH BASINS OR INLETS WHICH ARE NOT TRIBUTARY TO A SEDIMENT BASIN OR DAM. IT MAY BECOME NECESSARY TO REMOVE PORTIONS OF SEDIMENTATION CONTROLS DURING CONSTRUCTION TO FACILITATE THE GRADING OPERATIONS IN CERTAIN AREAS. HOWEVER, THE CONTROLS SHALL BE REPLACED UPON GRADING OR DURING ANY INCLEMENT WEATHER. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT OFFSITE TRACKING OF SEDIMENTS BY VEHICLES AND EQUIPMENT IS MINIMIZED. ALL SUCH OFFSITE SEDIMENT SHALL BE CLEANED UP DAILY. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT NO SOLID OR LIQUID WASTE IS DISCHARGED INTO STORM WATER RUNOFF. UNTREATED SEDIMENT-LADEN RUNOFF SHALL NOT FLOW OFFSITE WITHOUT BEING DIRECTED THROUGH A CONTROL PRACTICE. CONCRETE TRUCKS WILL NOT BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE INTO OR ALONG SIDE RIVERS, STREAMS, CREEKS, NATURAL OR MAN-MADE CHANNELS OR SWALES LEADING THERETO. CONCRETE WASH WATER AND SURPLUS CONCRETE SHALL BE CONFINED TO APPROVED AREAS. AFTER SOLIDIFYING THESE WASTED MATERIALS SHALL BE REMOVED FROM THE SITE. POST FLOOD EVENT SITE MAINTENANCE: FOLLOWING A FLOOD EVENT, INSPECT ALL MECHANICAL EQUIPMENT THAT ARE LOCATED ON THE SITE FOR ANY DAMAGES. WALLS AND WALL PENETRATIONS SHALL ALSO BE CHECKED FOR CRACKS AND LEAKS AND REPAIRED AS NECESSARY. ALL DEBRIS THAT MAY HAVE ACCUMULATED ALONG THE SITE SHALL BE GATHERED AND DISPOSED OF ACCORDING TO CITY STANDARDS. CHECK AND ENSURE THAT ALL DRAINAGE STRUCTURES ARE IN STANDARD OPERATION AND REPAIR ANY DAMAGES OR CLOGS THAT MAY HAVE OCCURRED DURING FLOODING. STABILIZATION PROCEDURES CONTRACTOR SHALL BE RESPONSIBLE TO KEEP A RECORD OF DATES WHEN MAJOR GRADING ACTIVITIES OCCUR, WHEN EARTH DISTURBANCE HAS TEMPORARILY OR PERMANENTLY CEASED ON A PORTION OF THE SITE, AND WHEN STABILIZATION MEASURES HAVE BEEN INITIATED. THE LIMITS OF SEEDING AND MULCHING ARE AS SHOWN WITHIN THE PLAN AS INDICATED BY THE LIMITS OF DISTURBANCE. ALL AREAS NOT DESIGNATED TO BE SEEDED SHALL REMAIN UNDER NATURAL GROUND COVER. THOSE AREAS DISTURBED OUTSIDE THE SEEDING LIMITS SHALL BE SEEDED AND MULCHED AT THE CONTRACTOR'S EXPENSE. TEMPORARY STABILIZATION TOPSOIL STOCKPILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY CEASES FOR AT LEAST 14 DAYS WILL BE STABILIZED WITH TEMPORARY SEED AND MULCH NO LATER THAN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY IN THAT AREA. DISTURBED AREAS WITHIN 50 FEET OF A STREAM, FIRST ORDER OR LARGER, SHALL BE STABILIZED WITHIN 2 DAYS OF INACTIVITY. TEMPORARY STABILIZATION MUST BE APPLIED TO ANY AREA OF THE SITE WHICH WILL REMAIN IDLE OVER THE WINTER. THE TEMPORARY SEED SHALL BE RYE (GRASS) APPLIED AT A RATE OF 25 LBS PER 1000 SY. PRIOR TO SEEDING, 900 LBS OF GROUND AGRICULTURAL LIMESTONE AND 200 LBS OF 10-20-20 FERTILIZER SHALL BE APPLIED TO EVERY 1000 SY STABILIZED. IMMEDIATELY AFTER ANY GIVEN AREA IS SEEDED, STRAW OR HAY SHALL BE EVENLY PLACED OVER ALL SEEDED AREAS. TWO TONS PER ACRE FOR STRAW, OR 3 TONS PER ACRE FOR HAY SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF MARCH 15 AND OCTOBER 15. THREE TONS PER ACRE STRAW, OR 4.5 TONS PER ACRE FOR HAY, SHALL BE PLACED WHEN SEEDING IS PREFORMED BETWEEN THE DATES OF OCTOBER 15 AND MARCH 15 OF THE SUCCEEDING YEAR. IF DORMANT SEEDING IS BEING USED FOR STABILIZATION, SEED SHALL BE PLANTED AFTER NOVEMBER 20. AREAS TO BE PAVED SHALL BE TEMPORARILY STABILIZED BY APPLYING STONE BASE UNTIL BITUMINOUS PAVEMENT CAN BE APPLIED. IN ADDITION TO TEMPORARY SEEDING, THE CONTRACTOR SHALL PLACE A FILTER FABRIC BARRIER AROUND THE BASE OF ALL SOIL STOCKPILES. PERMANENT STABILIZATION DISTURBED PORTIONS OF THE SITE WHEN CONSTRUCTION HAS COMPLETED, OR PORTIONS THAT WILL REMAIN DORMANT FOR LONGER THAN ONE YEAR, SHALL BE STABILIZED WITH PERMANENT SEED NO LATER THAN 7 DAYS AFTER FINAL GRADE HAS BEEN ESTABLISHED. THE PERMANENT SEED MIX SHALL CONSIST OF 260 LBS/ACRE OF TURF TYPE TALL FESCUE. PRIOR TO SEEDING, APPLY COMMERCIAL FERTILIZER AT THE RATE OF 1 LB ACTUAL NITROGEN PER 1000 SF. FERTILIZER TO HAVE 20-22-14 ANALYSIS. AFTER SEEDING, EACH AREA SHALL BE MULCHED USING TURFIBER (OR EQUIVALENT) AT A RATE OF 2000 LBS PER ACRE WITH 50 LBS OF TURFIBER ADDED PER 100 GALLONS OF MACHINE CAPACITY. KEEP HYDROMULCH FROM NON-TARGET AREAS INCLUDING PAVEMENT, PLANT MATERIALS, CURBING, AND STRUCTURES. IF THESE SURFACES ARE HIT DURING HYDROMULCHING OPERATIONS, WASH THE SURFACE IMMEDIATELY. IF SEASONAL CONDITIONS PROHIBIT THE ESTABLISHMENT OF VEGETATIVE COVER, OTHER METHODS OF STABILIZATION, SUCH AS MULCHING WITH A TACKIFIER OR MATTING, MUST BE EMPLOYED AND MAINTAINED UNTIL A MORE PERMANENT METHOD CAN BE IMPLEMENTED. SITE NARRATIVE EXISTING SITE CONDITIONS:PUBLIC ROAD, 2 DRIVE ENTRANCES; GRASS. PROJECT DESCRIPTION:ACTIVITIES INCLUDE THE WIDENING OF DUBLIN ROAD, ADDING A TURN LANE, AND INTERSECTION TO THE PROPOSED CUL-DE-SAC. CONSTRUCTION OF A SINGLE FAMILY REDEVELOPMENT (7 DWELLING UNITS, 6 NEW HOMES, ASSOCIATED UTILITIES, DRIVES, SIDEWALK AND PAVEMENT IMPROVEMENTS, AND AN UNDERGROUND DETENTION SYSTEM. APPROXIMATELY 1.12 ACRES OF THE SITE WILL BE DISTURBED. RECEIVING STREAM:SCIOTO RIVER. DISTURBED AREA:1.12 ACRES SITE BMPS:FINAL LOCATIONS OF ALL SITE BMPS, INCLUDING DUMPSTERS, VEHICLE FUELING AREAS, CONCRETE TRUCK WASH, MATERIAL STORAGE, AND TOPSOIL STOCKPILES SHALL BE DETERMINED BY CONTRACTOR. IF FINAL LOCATION OF BMPS DIFFER FROM THE LOCATIONS SHOWN, CONTRACTOR SHALL MODIFY SWPPP AND INFORM OHIO EPA OF NEW LOCATIONS OF BMPS. ADJACENT AREAS:EAST: SCIOTO RIVER NORTH: RESIDENTIAL HOMES WEST: RESIDENTIAL HOMES SOUTH: RESIDENTIAL HOMES GRADING REQUIREMENTS:DISTURBED AREAS WILL BE PROTECTED BY SILT FENCE, AND ROCK CHECK DAMS. AREAS WILL BE STABILIZED WHEN GRADED TO PREVENT EROSION ON THE SITE. EROSION & SEDIMENT A COMBINATION OF MEASURES WILL BE USED TO PROVIDE EROSION & SEDIMENT CONTROL MEASURES:CONTROL, INCLUDING SILT FENCE AND SEEDING. PROVIDE INLET PROTECTION AT ALL NEW AND EXISTING DRAINAGE STRUCTURES. ANY OFF SITE BORROW OR SPOIL AREAS SHALL BE SUBJECT TO THE REQUIREMENTS SET FORTH BY THE OHIO EPA. ALL EROSION AND SEDIMENT CONTROL MEASURES FOR OFF-SITE AREAS NOT COVERED BY A SEPARATE NOI OR SWPPP SHALL BE COORDINATED WITH THE OHIO EPA. ALL TRENCH OR EXCAVATION GROUNDWATER CONTAINING SEDIMENT MUST BE EFFECTIVELY TREATED PRIOR TO DISCHARGE INTO THE STORM SEWER SYSTEM. USE ALL MEANS NECESSARY TO CONTROL DUST ON THE SITE AND PREVENT TRACKING SOIL OFF SITE. PERMANENT STABILIZATION:THE SITE WILL BE STABILIZED BY THE USE OF SEEDING OR SODDING IN LAWN AREAS. MAINTENANCE:ALL EROSION CONTROL DEVICES ARE TO BE INSPECTED BY THE CONSTRUCTION SUPERINTENDENT WEEKLY AND AFTER SIGNIFICANT RAINFALLS. ANY DAMAGED FACILITIES ARE TO BE REPLACED OR REPAIRED IMMEDIATELY AS MAY BE NECESSARY. GENERAL CONSTRUCTION (UNLESS NOTED OTHERWISE, ALL EROSION AND SEDIMENT CONTROL MEASURES SEQUENCE:FROM THE BEGINNING OF EARTH DISTURBING ACTIVITIES TO FINAL COMPLETION OF THE PROJECT ARE THE RESPONSIBILITY OF THE CONTRACTOR) 1.ESTABLISH CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT CONSTRUCTION AREA. 2.CONSTRUCT TEMPORARY SEDIMENT CONTROLS AND PERIMETER EROSION CONTROL MEASURES, INCLUDING SEDIMENT BASINS, TEMPORARY OUTLET STRUCTURE, CONSTRUCTION ENTRANCE, AND SILT FENCE. MEASURES SHALL BE IMPLEMENTED AS THE FIRST STEP OF GRADING AND WITHIN 7 DAYS OF FIRST GRUBBING. 3.CLEAR AND GRUB 4.STRIP AND STOCKPILE TOPSOIL. SEED STOCKPILES. PROVIDE PERIMETER SILT FENCE AT TOE OF STOCKPILE SLOPE. 5.PERFORM ROUGH GRADING AND EXCAVATION. STABILIZE AREAS AS INDICATED HEREIN. 6.INSTALL STORM SEWERS, OUTLET STRUCTURE, AND INLET FILTERS. 7.COMPLETE ALL PAVEMENT ACTIVITIES. 8.COMPLETE FINE GRADING OF SEEDED AREAS AND STABILIZE DISTURBED AREAS. 9.ONCE FINAL SEED HAS BEEN ESTABLISHED, CONTRACTOR TO REMOVE TEMPORARY EROSION CONTROL MEASURES AND CLEAN ALL SEDIMENT FROM STRUCTURES AND PAVEMENT. SEDIMENT/WATER QUALITY BASIN SHALL BE CLEANED OF ALL ACCUMULATED SEDIMENT AND RESTORED TO THE ORIGINAL DESIGN CONTOURS SHOWN ON THESE PLANS. 10.PRIOR TO FINISHING WORK, ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION ACTIVITY (INCLUDING, BUT NOT LIMITED TO MATERIAL STORAGE AREAS, TRAILER AREAS, FUELING AREAS, TRUCK WASH AREAS, EQUIPMENT PATHS, HAUL ROADS, ETC.) SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS, OR IF IN AREAS OF PROPOSED IMPROVEMENTS, TO THEIR PROPOSED CONDITIONS. ALL STONE, TRASH, AND DEBRIS SHALL BE REMOVED FROM THE SOIL. THE UPPER 12" OF SOIL SHALL BE SCARIFIED, AND AREA SHALL BE GRADED TO SUBGRADE WITH SUITABLE MATERIALS. FURNISH 6" MINIMUM OF TOPSOIL AND SEED ALL AREAS. SCHEDULE:THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF OPERATIONS TO THE OWNER. SEDIMENTATION AND EROSION CONTROL FEATURES SHALL BE PLACED IN ACCORDANCE WITH THIS SCHEDULE. JURISDICTION:ALL EROSION AND SEDIMENT CONTROL PRACTICES ARE SUBJECT TO FIELD MODIFICATIONS AT THE DISCRETION OF THE CITY OF DUBLIN AND/OR THE OHIO EPA. OEPA NOI:SUBMITTED, PENDING APPROVAL RUNOFF COEFFICIENTS:PRE-DEVELOPED:C = 0.43 POST-DEVELOPED:C = 0.56 PRE-DEVELOPED IMPERVIOUS AREA:0.07 ACRES POST-DEVELOPED IMPERVIOUS AREA:0.32 ACRES TEMPORARY SEEDING SEEDING DATES SPECIES LB/1,000 SF PER ACRE MARCH 1 TO AUGUST 15 OATS 3 4 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB AUGUST 16 TO NOVEMBER 1 RY 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYEGRASS 1 40 LB WHEAT 3 2 BUSHEL TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB PERENNIAL RYEGRASS 1 40 LB TALL FESCUE 1 40 LB ANNUAL RYGRASS 1 40 LB NOVEMBER 1 TO SPRING SEEDING USE MULCH ONLY, SODDING PRACTICES OR DORMANT SEEDING. NOTE: OTHER APPROVED SEED SPECIES MAY BE SUBSTITUTED PLAN DESIGNER AMERICAN STRUCTUREPOINT, INC. 2550 CORPORATE EXCHANGE DR., STE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: bschilling@structurepoint.com OWNER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM SITE CONTACT NAME TITLE PHONE: (XXX) XXX-XXXX EMAIL: EMAIL ADDRESS TEMPORARY STABILIZATION AREA REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY DISTURBED AREA WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND NOT AT FINAL GRADE WITHIN 2 DAYS OF THE MOST RECENT DISTURBANCE IF THE AREA WILL REMAIN IDLE FOR MORE THAN 14 DAYS ANY DISTURBED AREAS THAT WILL BE DORMANT FOR MORE THAN 14 DAYS BUT LESS THAN ONE YEAR, AND NOT WITHIN 50 FEET OF A SURFACE WATER OF THE STATE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE WITHIN THE AREA. FOR RESIDENTIAL SUBDIVISIONS, DISTURBED AREAS MUST BE STABILIZED AT LEAST SEVEN DAYS PRIOR TO TRANSFER OF PERMIT COVERAGE FOR THE INDIVIDUAL LOT(S). DISTURBED AREAS THAT WILL BE IDLE OVER WINTER PRIOR TO THE ONSET OF WINTER WEATHER PERMANENT STABILIZATION AREA REQUIRING PERMANENT STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS ANY AREAS THAT WILL LIE DORMANT FOR ONE YEAR OR MORE WITHIN SEVEN DAYS OF THE MOST RECENT DISTURBANCE AN AREAS WITHIN 50 FEET OF A SURFACE WATER OF THE STATE AND AT FINAL GRADE WITHIN TWO DAYS OF REACHING FINAL GRADE OTHER AREAS AT FINAL GRADE WITHIN SEVEN DAYS OF REACHING FINAL GRADE IN THAT AREA cannot open53.2753.37 53.27 53.37 53.51 53.54 53.75 53.63 53.58 53.51 53.58 53.14 53.03 53.02 53.17 53.31 53.46 53.57 52.88 53.52 53.43 53.30 53.16 53.03 52.89 53.62 53.75 53.54 53.45 53.05 53.16 7.36' 10' ( T Y P ) 6.68'10' (T Y P ) Δ=089.18, CH=42.1 L=46.69, R=30.0 Δ=090.49, CH=42.6 L=47.38, R=30.0 53.91 53.8530'40'30'40'52.6552.65 14'13'N:770730.25 E: 1796114.98 N:770811.32 E: 1796091.01 1.56%1.55%1.57%1.56%53.71 53.77 1.56%1.56%0.33%0.27%53.740.06%0.07% 53.881.56%53.41 52.83 1.56%1.64%DUBLIN RD 53.42 53.421.79%1.88%94+0095+00 1.5 6 % 7.6 9 % 7.66 % 1.56 %1.56%1.44%1.56% 1.56% 52.91 52.91 52.89 53.39 53.02 53.02 53.03 53.53 52.90 53.40 52.92 52.92 53.04 53.04 53.06 53.56 53.46 LIU COURT1"16"16"DUBLIN ROAD (VARIABLE R/W WIDTH - PUBLIC) 91+00 0+000+3648.42 48.45 47.91 47.96 ME 45.36 45.39 47.12 47.18 ME47.51 ME 46.98 48.51 48.70 47.25 45.64 45.4347.05 1.71%1.69%1.67%1.67%1.69%1.71%3.61%5.49%6.17% 3.69%2.80% 101 12" STM 100 N:770425.49 E: 1796176.53 N:770375.60 E: 1796192.81 48.18 46.26 Δ=070.55, CH=16.2 L=17.24, R=14.0 Δ=084.23, CH=18.8 L=20.58, R=14.0 PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES SCALE: H:1"=10', V:1"=5' STORM SEWER PROFILE 100-101 830 840 850 860 830 840 850 860 844.43846.81847.77843.77846.92847.98-0+250+000+75 STA: 0+5912" INV (S): 845.75101 COC AA-S168N: 770424.19E: 1796174.0759' ~ 12" STM @ 3.35%STA: 0+0012" INV (N): 843.77100 COC AA-S168N: 770367.05E: 1796188.87EX GRADE EX GRADE PROP GRADE PROP GRADE +3.61% SCALE: H:1"=10', V:1"=5' 7118 DUBLIN RD DRIVEWAY PROFILE 830 840 850 860 830 840 850 860 847.24847.25847.25847.29-0+25 0+00 0+50 EX GRADE ℄ DUBLIN RD CENTERLINE STA=0+01.30 ELEV = 847.23 PROP EDGE OF PAVEMENT STA=0+16.12 ELEV = 846.92 R/W STA=0+31.30 ELEV = 847.51 -1.69% JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONPUBLIC ROADWAY WIDENING PLANSFORDUBLIN ROADCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 4:02 PM EDITED BY: DANUGERAH DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\DUBLIN ROAD WIDENING CDS\2024.00690 INT.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 24/24INTERSECTION &DRIVEWAY DETAILSGRADING LEGEND FFE=110.00 FINISHED FLOOR ELEVATION SPOT ELEVATION TOP OF CASTING ELEVATION HIGH POINT ELEVATION MATCH EXISTING ELEVATION TOP OF CURB ELEVATION BOTTOM OF CURB ELEVATION SLOPE ARROW 10.00 100.00 TC 10.00 HP 10.00 ME 10.50 10.00 X.XX% HORZ 1"=10'0 10 20 ZONE AE100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAY500-YR FLOODPLAIN100-YR FLOODPLAINFLOODWAY100-YR FLOODPLAIN500-YR FLOODPLAINFLOODWAYZONE AEZONE AECP900TBM1 CP947 CP9950 PROJECT LIMITS 2.37 AC TRIB TO MH 8 1.41 AC TRIB TO MH 2 TOP=828.93' INV. 12" SPP=827.38' (ACCORDING TO GROUNDS CREW: PIPE OUTLETS @ PT. 1695) EXIST DRAINAGE INLET TR:847.08 INV(N):844.79 INV(S):844.89 EXIST DRAINAGE INLET TR:846.88 INV(S):843.43 INV(W):842.83 INV(E):842.78 INV:843.75 18" R C P 12" RCP12" CPPTOP=853.62' (3' LID) 24" RCP INV:840.88 EX SAN MH 2789 TOP=840.90' INV. 36" NE/S=819.90' EX SAN MH 2772 TOP=836.17' INV. 36" RCP N/S=819.42' 3.84 AC TRIB TO MH 38 1 7 TOTAL TRIBUTARY AREA: 12.36 AC LIU COURTEX SAN (77-003-CIP)EX SAN (77-003-CIP)OPEN SPACE A PID: 273-005561-00 CITY OF DUBLIN 7215 DUBLIN RD 0.90 ACRES PID: 273-001792-00 WAGNER KATHRYN LTR 7199 DUBLIN RD 3.28 ACRES PID: 273-001793-00 HEGENDERFER JUSTIN L & ABIGAIL M 7177 DUBLIN RD 1.67 ACRES PID: 273-001787-00 BOULDERS AT SCIOTO SHORES LLC 7118 DUBLIN RD REAR 2.96 ACRES PID: 273-001926-00 OLSON ZACHARY MICHAEL & RACHEL LUCKHART 19 BROWNING CT 1.01 ACRES PID: 273-001925-00 EAGLES NAETHAN 49 BROWNING CT 1.01 ACRES PID: 273-001924-00 CANDELA RICHARD & SANDRA R 75 BROWNING CT 1.23 ACRES PID: 273-001923-00 SALISBURY LEE & KATE 91 BROWNING CT 1.95 ACRES PID: 273-001786-00 GEORGE CRIMSON LLC 7192 DUBLIN RD 12.78 ACRES SCIOTO RIVEREX SAN MH 2788 6 2 3 9 1.61 AC TRIB TO MH 6 1.64 AC TRIB TO MH 9 1.50 AC TRIB TO EX MH 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 INDEX AND TRIBUTARY AREA MAP SHEET INDEX 1 - TITLE SHEET 2 - GENERAL NOTES 3 - PLAN & PROFILE 4 - SANITARY DETAILS Ohio Utilities Protection Service Call 811before you dig SANITARY SEWER PLANS FOR LIU COURT CITY OF DUBLIN, FRANKLIN COUNTY, OHIO TITLE SHEET1/4 STANDARD CONSTRUCTION DRAWINGS THE STANDARD CONSTRUCTION DRAWINGS LISTED ON THESE PLANS SHALL BE CONSIDERED A PART THEREOF. CITY OF DUBLIN (2020 EDITION) CITY OF COLUMBUS SA-01 SA-02 SA-03 SA-04 AA-S102 AA-S106 AA-S107 AA-S110 AA-S117 AA-S119 AA-S149 AA-S150 AA-S161 AA-S162 APPROVED: CITY OF DUBLIN: SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSE AND GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. REGISTERED ENGINEER E-86125 DATE DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE CITY OF COLUMBUS: APPROVAL ON THE PART OF THE CITY OF COLUMBUS IS GIVEN PURSUANT TO THE PROVISIONS OF THE SEWER (AND/OR WATER) SERVICE AGREEMENT BETWEEN THE CITY OF DUBLIN, OHIO, DATED APRIL 13, 1993. DATE DIRECTOR, DEPARTMENT OF PUBLIC UTILITIES CITY OF COLUMBUS, OHIO DATE ADMINISTRATOR, DIVISION OF SEWERAGE & DRAINAGE CITY OF COLUMBUS, OHIO SITE VICINITY MAP NTS SITE VICINITY MAP NTSDUBLIN RD270 RIVERSIDE DREMERAL D PK WY GALWAY ESTATES COVENTRY WOODS KILLILEA WASHINGTON TOWNSHIP WASHINGTON TOWNSHIP SCIOTO SHORES SCIOTO RIVERJOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690.TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES HORZ 1"=100'0 100 200 UTILITY CONTACTS AMERITECH 408 CRITES ROAD CIRCLEVILLE, OH 43113 PHONE: (740) 477-3658 AMERICAN ELECTRIC POWER 850 TECH CENTER DRIVE GAHANA, OH 43230 PHONE: (614) 883-6831 CITY OF DUBLIN DIVISION OF ENGINEERING 5800 SHIER-RINGS ROAD DUBLIN, OH 43016 PHONE: (614) 410-4600 CITY OF COLUMBUS DIVISION OF WATER 910 DUBLIN ROAD COLUMBUS, OH 43215 PHONE: (614) 645-7788 COLUMBIA GAS OF OHIO 200 S CIVIC CENTER DR COLUMBUS, OH 43215 PHONE: (614) 460-6000 TIME WARNER CABLE 1980 ALUM CREEK DR COLUMBUS, OH 43207 PHONE: (614) 918-8439 ENGINEER AMERICAN STRUCTUREPOINT 2550 CORPORATE EXCHANGE DRIVE, SUITE 300 COLUMBUS, OHIO 43231 CONTACT: BENJAMIN SCHILLING PHONE: (614) 901-2235 EMAIL: BSCHILLING@STRUCTUREPOINT.COM OWNER/ DEVELOPER MR. JASON LIU 10279 WELLINGTON BLVD. POWELL, OHIO 43065 CONTACT: JASON LIU PHONE: (614) 313-1268 EMAIL: JASONLIU1218@YAHOO.COM ARCHITECT BASS STUDIO ARCHITECTS 36 KING AVENUE COLUMBUS, OHIO 43201 CONTACT: TIMOTHY A. BASS, AIA, LEED AP PHONE: (614) 294-4893 EMAIL: WWW.BASSSTUDIOARCHITECTS.COM BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION VERTICAL CONTROL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988, AS DERIVED FROM GNSS OBSERVATIONS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT) AND GEOID 18, AND AN NGS OPUS SOLUTION FOR CONTROL POINT 900. THE ELEVATIONS FOR ALL OTHER CONTROL POINTS AND BENCHMARKS LISTED HEREON WERE ESTABLISHED UTILIZING A DIFFERENTIAL LEVEL CIRCUIT ORIGINATING FROM CONTROL POINT 900. B.M.DESCRIPTION NORTHING (GROUND)EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 TBM 1 MAG NAIL FOUND IN POWER POLE +/- 72' NORTH OF THE DRIVE FOR 7192 DUBLIN ROAD, +/- 48' WEST OF CP 900, +/- 27' EAST OF THE CENTER LINE OF DUBLIN ROAD N/A N/A 853.64 HORIZONTAL CONTROL COORDINATES ARE BASED ON OHIO STATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. A PROJECT ADJUSTMENT FACTOR OF 1.0000184927 WAS APPLIED ABOUT C.P. 900 TO OBTAIN GROUND COORDINATES. C.P.DESCRIPTION NORTHING (GROUND) EASTING (GROUND)ELEVATION CP 900 5/8" IRON PIN SET W/ "ASI CONTROL POINT" CAP 770657.227 1796156.545 852.24 CP 947 MAG NAIL FOUND 770565.830 1796139.799 851.58 CP 949 MAG NAIL SET 770019.566 1796217.909 842.37 CP 9950 MAG NAIL SET 771031.845 1795937.341 848.03 PROFE SSIONA L E N G INEERR E GIS T E R E DSTATE OF O H IOE-86125 MATTHEW LILIE J. 07/17/2025 GENERAL NOTES2/4 GENERAL NOTES 1.CITY OF COLUMBUS AND OHIO DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MATERIAL SPECIFICATIONS, CURRENT EDITIONS, AND ANY SUPPLEMENTS THERETO (HEREAFTER REFERRED TO AS STANDARD SPECIFICATIONS), SHALL GOVERN ALL CONSTRUCTION ITEMS UNLESS OTHERWISE NOTED. IF A CONFLICT BETWEEN SPECIFICATIONS IS FOUND, THE MORE STRICT SPECIFICATION WILL APPLY AS DECIDED BY THE CITY ENGINEER. ITEM NUMBERS LISTED REFER TO CITY OF COLUMBUS ITEM NUMBERS UNLESS OTHERWISE NOTED. 2.THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION THAT ARE NOT SPECIFIED HEREIN. THE CITY ENGINEER WILL NOT BE RESPONSIBLE FOR SAFETY ON THE WORK SITE, OR FOR FAILURE BY THE CONTRACTOR TO PERFORM WORK ACCORDING TO CONTRACT DOCUMENTS. 3.THE DEVELOPER OR CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS INCLUDING BUT NOT LIMITED TO OHIO EPA PERMITS TO INSTALL (PTI) AND NOTICES OF INTENT (NOI), BUILDING PERMITS, ETC. 4.THE CONTRACTOR SHALL NOTIFY THE CITY OF DUBLIN DIVISION OF ENGINEERING IN WRITING AT LEAST 3 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 5.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE AND LOCAL SAFETY REQUIREMENTS INCLUDING THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970. THE CONTRACTOR SHALL EXERCISE PRECAUTION ALWAYS FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT SHALL ALSO BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, INCLUDING THE REQUIREMENTS FOR CONFINED SPACES PER 29 CFR 1910.146. 6.FOLLOWING COMPLETION OF CONSTRUCTION OF THE SITE IMPROVEMENTS AND BEFORE REQUESTING OCCUPANCY, A PROOF SURVEY SHALL BE PROVIDED TO THE DIVISION OF ENGINEERING THAT DOCUMENTS "AS_BUILT" ELEVATIONS, DIMENSIONS, SLOPES AND ALIGNMENTS OF ALL ELEMENTS OF THIS PROJECT. THE PROOF SURVEY SHALL BE PREPARED, SIGNED AND SUBMITTED BY THE PROFESSIONAL ENGINEER WHO SEALED THE CONSTRUCTIONS DRAWINGS. 7.THE CONTRACTOR SHALL RESTRICT CONSTRUCTION ACTIVITY TO PUBLIC RIGHT_OF_WAY AND AREAS DEFINED AS PERMANENT AND/OR TEMPORARY CONSTRUCTION EASEMENTS, UNLESS OTHERWISE AUTHORIZED BY THE CITY ENGINEER. 8.THE CONTRACTOR SHALL CAREFULLY PRESERVE BENCHMARKS, PROPERTY CORNERS, REFERENCE POINTS, STAKES AND OTHER SURVEY REFERENCE MONUMENTS OR MARKERS. IN CASES OF WILLFUL OR CARELESS DESTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORATIONS. RESETTING OF MARKERS SHALL BE PERFORMED BY AN OHIO PROFESSIONAL SURVEYOR AS APPROVED BY THE CITY ENGINEER. 9.NON_RUBBER TIRED VEHICLES SHALL NOT BE MOVED ON OR ACROSS PUBLIC STREETS OR HIGHWAYS WITHOUT THE WRITTEN PERMISSION OF THE CITY ENGINEER. 10.THE CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER CONDITION THAN EXISTED BEFORE CONSTRUCTION. DRAINAGE DITCHES OR WATERCOURSES THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RESTORED TO THE GRADES AND CROSS_SECTIONS THAT EXISTED BEFORE CONSTRUCTION. 11.TRACKING OR SPILLING MUD, DIRT OR DEBRIS UPON STREETS, RESIDENTIAL OR COMMERCIAL DRIVES, SIDEWALKS OR BIKE PATHS IS PROHIBITED ACCORDING TO SECTION 97.38 OF THE DUBLIN CODE OF ORDINANCES. ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR AT NO COST TO THE CITY. IF THE CONTRACTOR FAILS TO REMOVE SAID MUD, DIRT, DEBRIS, OR SPILLAGE, THE CITY RESERVES THE RIGHT TO REMOVE THESE MATERIALS AND CLEAN AFFECTED AREAS, THE COST OF WHICH SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 12.DISPOSAL OF EXCESS EXCAVATION WITHIN SPECIAL FLOOD HAZARD AREAS (100-YEAR FLOODPLAIN) IS NOT PERMITTED. 13.ALL SIGNS, LANDSCAPING, STRUCTURES OR OTHER APPURTENANCES WITHIN RIGHT-OF-WAY DISTURBED OR DAMAGED DURING CONSTRUCTION SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 14.ALL FIELD TILE BROKEN OR ENCOUNTERED DURING EXCAVATION SHALL BE REPLACED OR REPAIRED AND CONNECTED TO THE PUBLIC STORM SEWER SYSTEM AS DIRECTED BY THE CITY ENGINEER. THE COST OF THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURE. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE CITY OF COLUMBUS. PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION. 16.BACKFILL WITHIN A 1:1 INFLUENCE LINE OF EXISTING STRUCTURES (HOUSES, GARAGES, ETC.) OR PUBLIC INFRASTRUCTURE (PAVEMENT, CURBS, SIDEWALKS, BIKE PATHS, ETC.) SHALL BE COMPACTED GRANULAR BACKFILL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR FLOWABLE CDF, TYPE II ACCORDING TO ITEM 613. ITEM 911 OF THE STANDARD SPECIFICATIONS SHALL BE USED ELSEWHERE. 17.THE CONTRACTOR SHALL SUBMIT A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND A LIST OF PROPOSED PRECAST CONCRETE PRODUCT MANUFACTURERS TO THE CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION BEFORE COMMENCING CONSTRUCTION. SEND THE INFORMATION TO THE FOLLOWING ADDRESS: CONSTRUCTION INSPECTION DIVISION CITY OF COLUMBUS 1800 EAST 17TH AVENUE COLUMBUS, OHIO 43219 SEND A COPY OF THE TRANSMITTAL LETTER TO THE FOLLOWING ADDRESS: DIVISION OF ENGINEERING CITY OF DUBLIN 6555 SHIER RINGS ROAD DUBLIN, OHIO 43016 18.ALL TRENCHES WITHIN PUBLIC RIGHT-OF-WAY SHALL BE BACKFILLED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS OR SECURELY PLATED DURING NONWORKING HOURS. TRENCHES OUTSIDE THESE AREAS SHALL BE BACKFILLED OR SHALL BE PROTECTED BY APPROVED TEMPORARY FENCING OR BARRICADES DURING NONWORKING HOURS. CLEAN UP SHALL FOLLOW CLOSELY BEHIND THE TRENCHING OPERATION. 19.ALL TREES WITHIN THE CONSTRUCTION AREA NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. TREES TO BE PRESERVED SHALL BE PROTECTED WITH HIGH VISIBILITY FENCING PLACED A MINIMUM 15 FEET FROM THE TREE TRUNK. TREES 6 - INCHES OR GREATER AT DBH (DIAMETER BREAST HEIGHT) MUST BE PROTECTED WITH FENCING PLACED AT THE CRITICAL ROOT ZONE OR 15 FEET, WHICHEVER IS GREATER. TREES NOT INDICATED ON THE APPROVED CONSTRUCTION DRAWINGS FOR REMOVAL MAY NOT BE REMOVED WITHOUT PRIOR APPROVAL OF THE DIVISION OF ENGINEERING. 20.CONDUIT MUST BE DIRECTIONALLY BORED ACROSS STREETS INSTEAD OF OPEN CUT, UNLESS SPECIFICALLY APPROVED BY THE CITY ENGINEER. USE OF PNEUMATIC AIR RAM DEVICES IS NOT PERMITTED. PERMITS TO CONSTRUCT IN THE RIGHT-OF-WAY OF EXISTING STREETS MUST BE OBTAINED FROM THE CITY OF DUBLIN DIVISION OF ENGINEERING BEFORE COMMENCING CONSTRUCTION. SHOULD OPEN CUTTING OF EXISTING PAVEMENT BE PERMITTED, CONTROLLED DENSITY BACKFILL (TYPE II) SHALL BE USED IN PLACE OF COMPACTED GRANULAR BACKFILL, ACCORDING TO ITEM 613 OF THE STANDARD SPECIFICATIONS. 21.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDITION OF TRENCHES WITHIN THE RIGHT-OF-WAY AND PUBLIC EASEMENTS FOR A PERIOD OF ONE YEAR FROM THE FINAL ACCEPTANCE OF THE WORK, AND SHALL MAKE ANY NECESSARY REPAIRS AT NO COST TO THE CITY. 22.PAVEMENTS SHALL BE CUT IN NEAT, STRAIGHT LINES THE FULL DEPTH OF THE EXISTING PAVEMENT, OR AS REQUIRED BY THE CITY ENGINEER. PAVEMENT REPLACEMENT SHALL BE CONDUCTED ACCORDING TO CITY OF COLUMBUS STANDARD DRAWING 1441 DR. A AND APPLICABLE CITY OF DUBLIN STANDARD DRAWINGS. THE REPLACEMENT OF DRIVEWAYS, HANDICAPPED RAMPS, SIDEWALKS, BIKE PATHS, PARKING LOT PAVEMENT, ETC. SHALL BE PROVIDED ACCORDING TO THE APPROVED CONSTRUCTION DRAWINGS AND CITY OF DUBLIN STANDARD CONSTRUCTION DRAWINGS. 23.TREE TRIMMING WITHIN THE CONSTRUCTION ZONE IS TO BE COMPLETED BY A CERTIFIED ARBORIST. AT THE COMPLETION OF THE PROJECT, THE ARBORIST IS TO RETURN AND TRIM ANY BROKEN BRANCHES AS NEEDED. 24.ANY MODIFICATION TO THE WORK SHOWN ON DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CITY ENGINEER, CITY OF DUBLIN. 25.ALL INLETS SHALL BE CHANNELIZED. 26.PARK AREAS SHALL BE FINE_GRADED AND SEEDED WITH THE FOLLOWING MIXTURE: IMPROVED KENTUCKY BLUEGRASS: 40% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) IMPROVED PERENNIAL RYE: 60% OF WEIGHT (2 VARIETIES IN EQUAL PARTS) GERMINATION RATE: 85% APPLICATION RATE: 7 LBS PER 1000 SQ FT OR AS DIRECTED BY THE DIVISION OF PARKS AND RECREATION, CITY OF DUBLIN, OHIO. 27.TRAFFIC CONTROL AND OTHER REGULATORY SIGNS SHALL BE TYPE S WITH A SQUARE POST ANCHOR BASE INSTALLATION AND MEET ALL REQUIREMENTS OF ODOT TC-41.20 AND APPLICABLE CITY OF DUBLIN SPECIFICATIONS. 28. STREET SIGNS SHALL MEET ALL CITY OF DUBLIN SPECIFICATIONS WITH LETTERING COLORED IN WHITE DISPLAYED OVER A BROWN BACKGROUND. SIGN TUBING SHALL BE BROWN IN COLOR AND CONFORM WITH THE TYPE S, SQUARE POST ANCHOR BASE INSTALLATION REQUIREMENTS OF ODOT TC-41.20. UTILITIES 1.THE FOLLOWING UTILITIES ARE KNOWN TO BE LOCATED WITHIN THE LIMITS OF THIS PROJECT: AEP OHIO - ELECTRIC BREEZELINE - TELECOM COLUMBIA GAS OF OH-COLUMBUS - GAS DUBLIN SEWER - SANITARY SEWER DUBLIN WATER - WATER MAIN DUBLIN DIVISION OF ENGINEERING - STORMWATER AT&T - TELECOM CHARTER COMM - TELECOM 2.THE CONTRACTOR SHALL GIVE NOTICE OF INTENT TO CONSTRUCT TO OHIO UTILITIES PROTECTION SERVICE (TELEPHONE NUMBER 800_362_2764), PRODUCER'S UNDERGROUND PROTECTION SERVICE (TELEPHONE NUMBER 614_587_0486), AND TO OWNERS OF UNDERGROUND UTILITIES THAT ARE NOT MEMBERS OF A REGISTERED UNDERGROUND PROTECTION SERVICE. NOTICE SHALL BE GIVEN AT LEAST 2 WORKING DAYS BEFORE START OF CONSTRUCTION. 3.THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE OWNER OF THE UNDERGROUND UTILITY. THE CITY OF DUBLIN AND THE CITY ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS. IF DAMAGE IS CAUSED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF THE SAME AND FOR ANY RESULTING CONTINGENT DAMAGE. 4.LOCATION, SUPPORT, PROTECTION AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES, WHETHER SHOWN OR NOT SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5.WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND THE CITY ENGINEER. 6.PUBLIC STREET LIGHTING MAY BE IN THE VICINITY OF THIS PROJECT. CONTACT THE CITY OF DUBLIN, DIVISION OF ENGINEERING AT 410-4637, TWO DAYS PRIOR TO BEGINNING WORK. TRAFFIC CONTROL 1.TRAFFIC CONTROL SHALL BE FURNISHED, ERECTED, MAINTAINED, AND REMOVED BY THE CONTRACTOR ACCORDING TO OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (OMUTCD), CURRENT EDITION. 2.ALL TRAFFIC LANES OF PUBLIC ROADWAYS SHALL BE FULLY OPEN TO TRAFFIC FROM 7:00 AM TO 9:00 AM AND FROM 4:00 PM TO 6:00 PM UNLESS AUTHORIZED DIFFERENTLY BY THE CITY ENGINEER. AT ALL OTHER HOURS THE CONTRACTOR SHALL MAINTAIN MINIMUM ONE_LANE TWO_WAY TRAFFIC. UNIFORMED, OFF-DUTY POLICE OFFICERS SHALL REPLACE FLAGMEN DESIGNATED BY THE OMUTCD, AND SHALL BE PRESENT WHENEVER ONE_LANE, TWO_WAY TRAFFIC CONTROL IS IN EFFECT. POLICE CRUISERS MAY BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 3.IF THE CITY ENGINEER DETERMINES THAT THE CONTRACTOR IS NOT PROVIDING PROPER PROVISIONS FOR TRAFFIC CONTROL, THE CITY ENGINEER SHALL ASSIGN UNIFORMED, OFF_DUTY POLICE OFFICERS TO THE PROJECT AT NO COST TO THE CITY. 4.STEADY_BURNING, TYPE "C" LIGHTS SHALL BE REQUIRED ON ALL BARRICADES, DRUMS, AND SIMILAR TRAFFIC CONTROL DEVICES IN USE AT NIGHT. 5.ACCESS FROM PUBLIC ROADWAYS TO ALL ADJOINING PROPERTIES FOR EXISTING RESIDENTS OR BUSINESSES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT FOR MAIL, PUBLIC WATER AND SANITARY SEWER SERVICE, AND EMERGENCY VEHICLES. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN DETAILING THE PROPOSED MAINTENANCE OF TRAFFIC PROCEDURES. THE TRAFFIC CONTROL PLAN MUST INCORPORATE ANY TRAFFIC CONTROL DETAILS CONTAINED HEREIN. THE TRAFFIC CONTROL PLAN PROPOSED BY THE CONTRACTOR MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. EROSION AND SEDIMENT CONTROL 1.THE CONTRACTOR OR DEVELOPER IS RESPONSIBLE FOR SUBMITTING A NOTICE OF INTENT (NOI) TO BE REVIEWED AND APPROVED BY THE OHIO EPA. THE NOI MUST BE SUBMITTED TO OEPA 45 DAYS PRIOR TO THE START OF CONSTRUCTION AND MAY ENTITLE COVERAGE UNDER THE OHIO EPA GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY. A PROJECT LOCATION MAP MUST BE SUBMITTED WITH THE NOI. A SEDIMENT AND EROSION CONTROL PLAN MUST BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL IF A SEDIMENT AND EROSION CONTROL PLAN HAS NOT ALREADY BEEN INCLUDED WITH THE APPROVED CONSTRUCTION DRAWINGS. THIS PLAN MUST BE MADE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE DESIGN OF EROSION CONTROL SYSTEMS SHALL FOLLOW THE REQUIREMENTS OF OHIO EPA, ITEM 207 OF OHIO DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AND THE CITY ENGINEER. AN INDIVIDUAL NPDES STORMWATER DISCHARGE PERMIT MAY BE REQUIRED. THE CONTRACTOR SHALL BE CONSIDERED THE PERMITTEE. 2.THE CONTRACTOR SHALL PROVIDE SEDIMENT CONTROL AT ALL POINTS WHERE STORM WATER RUNOFF LEAVES THE PROJECT, INCLUDING WATERWAYS, OVERLAND SHEET FLOW, AND STORM SEWERS. 3.ACCEPTED METHODS OF PROVIDING EROSION/SEDIMENT CONTROL INCLUDE BUT ARE NOT LIMITED TO: SEDIMENT BASINS, SILT FILTER FENCE, AGGREGATE CHECK DAMS, AND TEMPORARY GROUND COVER. HAY OR STRAW BALES ARE NOT PERMITTED. 4.THE CONTRACTOR SHALL PROVIDE ADEQUATE DRAINAGE OF THE WORK AREA AT ALL TIMES CONSISTENT WITH EROSION CONTROL PRACTICES. 5.DISTURBED AREAS THAT WILL REMAIN UNWORKED FOR 30 DAYS OR MORE SHALL BE SEEDED OR PROTECTED WITHIN SEVEN CALENDAR DAYS OF THE DISTURBANCE. OTHER SEDIMENT CONTROLS THAT ARE INSTALLED SHALL BE MAINTAINED UNTIL VEGETATIVE GROWTH HAS BEEN ESTABLISHED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY SEDIMENT DEVICES AT THE CONCLUSION OF CONSTRUCTION BUT NOT BEFORE GROWTH OF PERMANENT GROUND COVER. BLASTING (IF PERMITTED) 1.THE CONTRACTOR MUST OBTAIN A BLASTING PERMIT FROM WASHINGTON TOWNSHIP FIRE DEPARTMENT PRIOR TO BLASTING FOR ROCK EXCAVATION. THE CONTRACTOR SHALL SUBMIT BLASTING REPORTS UPON COMPLETION OF BLASTING TO THE CITY ENGINEER, THE OWNER, AND THE OWNER'S ENGINEER. TOP OF ROCK ELEVATIONS SHALL BE SHOWN ON "AS_BUILT" CONSTRUCTION DRAWINGS. SANITARY SEWERS 1.CONNECTIONS TO THE SANITARY SEWER WILL BE PERMITTED UPON RECEIVING AN OEPA PERMIT TO INSTALL (PTI), AND UPON RECEIVING A SATISFACTORY LETTER FROM THE DESIGN ENGINEER STATING THAT THE PROJECT HAS BEEN CONSTRUCTED AS PER THE PLANS, AND ALL OF THE CONDITIONS OF THE PTI HAVE BEEN MET. THE DEVELOPER IS RESPONSIBLE FOR OBTAINING ALL REQUIRED OHIO EPA APPROVALS AND PAYING REVIEW FEES. 2.SANITARY SEWAGE COLLECTION SYSTEMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE RULES, REGULATIONS, STANDARDS AND SPECIFICATIONS OF THE CITY OF DUBLIN, OHIO EPA, OHIO DEPARTMENT OF HEALTH AND THE CURRENT EDITION OF THE GREAT LAKES-UPPER MISSISSIPPI RIVER BOARD (TEN STATES) - RECOMMENDED STANDARDS FOR WASTEWATER FACILITIES. 3.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPE WITH DIAMETERS 8 INCHES TO 10 INCHES SHALL BE PVC SEWER PIPE ASTM D3034, SDR 35. PIPE FOR 6 INCH DIAMETER HOUSE SERVICE LINES SHALL BE PVC PIPE ASTM D3034, SDR 35. PVC PIPE SHALL NOT BE USED AT DEPTHS GREATER THAN 28 FEET. PIPE MATERIALS AND RELATED STRUCTURES SHALL BE SHOP TESTED IN ACCORDANCE WITH CITY OF COLUMBUS CONSTRUCTION INSPECTION DIVISION QUALITY CONTROL REQUIREMENTS. 4.THE MINIMUM REQUIREMENTS FOR SANITARY SEWER PIPES WITH DIAMETERS 12 INCHES TO 30 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2736. SANITARY SEWER PIPES WITH DIAMETERS 30 INCHES TO 60 INCHES SHALL BE PVC SEWER PIPE, ASTM D3034, SDR 35 OR SANITITE HP PIPE, ASTM F2764. 5.ALL IN_LINE WYE AND TEE CONNECTIONS IN CONCRETE SEWERS, 18-INCH DIAMETER AND LARGER, SHALL BE EITHER KOR_N_TEE OR KOR_N_SEAL CONNECTIONS CONFORMING TO THE MANUFACTURER'S RECOMMENDATIONS. 6.GRANULAR BACKFILL SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS OR CONTROLLED DENSITY BACKFILL ACCORDING TO ITEM 613, TYPE II OF THE STANDARD SPECIFICATIONS AS DIRECTED BY THE CITY ENGINEER. 7.ALL MANHOLE LIDS SHALL BE PROVIDED WITH CONTINUOUS SELF_SEALING GASKETS. THE APPROVED CONSTRUCTION DRAWINGS SHALL SHOW WHERE BOLT_DOWN LIDS ARE REQUIRED. SANITARY SEWER MANHOLES SHALL BE PRECAST CONCRETE OR AS APPROVED BY THE CITY ENGINEER AND CONFORM TO THE CITY OF DUBLIN SANITARY MANHOLE STANDARD DRAWING. MANHOLE LIDS SHALL INCLUDE CITY OF DUBLIN LOGO. 8.ALL PVC SEWER PIPES SHALL BE DEFLECTION TESTED NO LESS THAN 60 DAYS AFTER COMPLETION OF BACKFILLING OPERATIONS. ALL OTHER REQUIREMENTS SHALL BE ACCORDING TO ITEM 901.21 OF THE STANDARD SPECIFICATIONS. 9.TEMPORARY BULKHEADS SHALL BE PLACED IN PIPES AT LOCATIONS SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AND SHALL REMAIN IN PLACE UNTIL THE PERMIT TO INSTALL (PTI) HAS BEEN ISSUED BY THE OEPA AND THE SEWERS HAVE BEEN APPROVED FOR USE BY THE CITY ENGINEER. THE COST FOR FURNISHING, INSTALLING, MAINTAINING, AND REMOVING BULKHEADS SHALL BE INCLUDED IN THE CONTRACT UNIT BID PRICE FOR THE VARIOUS SANITARY SEWER ITEMS. 10.ALL SANITARY SEWERS INCLUDING SANITARY SEWER SERVICE LINES SHALL BE SUBJECTED TO AND PASS INFILTRATION OR EXFILTRATION TESTS ACCORDING TO ITEM 901 OF THE STANDARD SPECIFICATIONS AND MUST BE APPROVED FOR USE BY THE CITY ENGINEER BEFORE ANY SERVICE CONNECTIONS ARE TAPPED INTO SEWERS. 11.FOR SANITARY SEWER INFILTRATION, LEAKAGE THROUGH JOINTS SHALL NOT EXCEED 100 GALLONS PER INCH OF TRIBUTARY SEWER DIAMETER PER 24 HOURS PER MILE OF LENGTH OR THE COMPUTED EQUIVALENT. ALL SANITARY SEWERS SHALL BE TESTED. 12.AT THE DETERMINATION OF THE CITY ENGINEER, THE CONTRACTOR MAY BE REQUIRED TO PERFORM A TV INSPECTION OF THE SANITARY SEWER SYSTEM PRIOR TO FINAL ACCEPTANCE BY THE CITY. THIS WORK SHALL BE COMPLETED BY THE CONTRACTOR AT HIS EXPENSE. 13.VISIBLE LEAKS OR OTHER DEFECTS OBSERVED OR DISCOVERED DURING TV INSPECTION SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER. 14.ROOF DRAINS, FOUNDATION DRAINS, FIELD TILE OR OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER SYSTEM ARE STRICTLY PROHIBITED ACCORDING TO SECTION 51.23 OF THE DUBLIN CODE OF ORDINANCES. 15.ALL WATER LINES SHALL BE LOCATED AT LEAST 10 FEET HORIZONTALLY AND 18 INCHES VERTICALLY, FROM SANITARY SEWERS AND STORM SEWERS, TO THE GREATEST EXTENT PRACTICABLE. WHERE SANITARY SEWERS CROSS WATER MAINS OR OTHER SEWERS OR OTHER UTILITIES, TRENCH BACKFILL SHALL BE PLACED BETWEEN THE PIPES CROSSING AND SHALL BE COMPACTED GRANULAR MATERIAL ACCORDING TO ITEM 912 OF THE STANDARD SPECIFICATIONS. IN THE EVENT THAT A WATER LINE MUST CROSS WITHIN 18 INCHES OF A SANITARY SEWER, THE SANITARY SEWER SHALL BE CONCRETE ENCASED OR CONSIST OF DUCTILE IRON PIPE MATERIAL. 16.SERVICE RISERS SHALL BE INSTALLED WHERE THE DEPTH FROM WYES TO PROPOSED GROUND ELEVATION EXCEEDS 10 FEET. TOPS OF RISERS SHALL BE NO LESS THAN 9 FEET BELOW PROPOSED GROUND ELEVATION IF BASEMENT SERVICE IS INTENDED. 17.WHERE SERVICE RISERS ARE NOT INSTALLED, A MINIMUM 5_FOOT LENGTH OF SANITARY SEWER SERVICE PIPE OF THE SAME SIZE AS THE WYE OPENING SHALL BE INSTALLED. 18.THE CONTRACTOR SHALL FURNISH AND PLACE, AS DIRECTED, APPROVED WYE POLES MADE OF 2 INCHES X 2 INCHES LUMBER AT ALL WYE LOCATIONS, ENDS OF EXTENDED SERVICES, OR AT THE END OF EACH RISER WHERE RISERS ARE REQUIRED. WYE POLES SHALL BE VISIBLE BEFORE ACCEPTANCE BY THE CITY. THE COST OF THESE POLES SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE FOR THE VARIOUS SEWER ITEMS. 19.EXISTING SANITARY SEWER FLOWS SHALL BE MAINTAINED AT ALL TIMES. COSTS FOR PUMPING AND BYPASSING SHALL BE INCLUDED IN THE CONTRACTOR'S UNIT PRICE BID FOR THE RELATED ITEMS. 20.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, EQUIPMENT, AND LABOR TO MAKE CONNECTIONS TO EXISTING MANHOLES. THE SEWER PIPE TO MANHOLE CONNECTIONS FOR ALL SANITARY SEWERS SHALL BE FLEXIBLE AND WATERTIGHT. ALL HOLES SHALL BE NEATLY CORED. THE SEWER PIPE BARREL AT THE SPRINGLINE SHALL NOT EXTEND MORE THAN 1 INCH BEYOND THE INSIDE FACE OF THE MANHOLE. TO MAINTAIN FLEXIBILITY IN THE CONNECTION, A 1_INCH SPACE SHALL BE LEFT BETWEEN THE END OF THE PIPE INSIDE THE MANHOLE AND THE CONCRETE CHANNEL; THIS SPACE SHALL BE FILLED WITH A WATERPROOF FLEXIBLE JOINT FILLER. ANY METAL THAT IS USED SHALL BE TYPE 300 SERIES STAINLESS STEEL. THE CONNECTION MAY BE ANY OF THE FOLLOWING TYPES: A.RUBBER SLEEVE WITH STAINLESS STEEL BANDING. 1)KOR_N_SEAL AS MANUFACTURED BY NATIONAL POLLUTION CONTROL SYSTEMS, INC. 2)LOCK JOINT FLEXIBLE MANHOLE SLEEVE AS MANUFACTURED BY INTERPACE CORPORATION. 3)OR EQUAL AS APPROVED BY THE CITY ENGINEER. B.RUBBER GASKET COMPRESSION. 1)PRESS WEDGE II AS MANUFACTURED BY PRESS_SEAL GASKET CORPORATION. 2)DURA SEAL III AS MANUFACTURED BY DURA TECH, INC. 3)LINK_SEAL AS MANUFACTURED BY THUNDERLINE CORPORATION. 4)OR EQUAL AS APPROVED BY THE CITY ENGINEER. THE COST FOR THIS WORK ALONG WITH A NEW CHANNELIZED BASE FOR THE MANHOLE SHALL BE INCLUDED IN THE UNIT BID PRICE FOR THE RELATED ITEMS OF WORK. WATER LINE 1-17 DELETED STORM SEWER 1-11 DELETED MAIL DELIVERY 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT US MAIL DELIVERY WITHIN THE PROJECT LIMITS IS NOT DISRUPTED BY CONSTRUCTION OPERATIONS. THIS RESPONSIBILITY IS LIMITED TO RELOCATION OF MAILBOXES TO A TEMPORARY LOCATION THAT WILL ALLOW THE COMPLETION OF THE WORK AND SHALL ALSO INCLUDE THE RESTORATION OF MAILBOXES TO THEIR ORIGINAL LOCATION OR APPROVED NEW LOCATION. ANY RELOCATION OF MAILBOX SERVICES MUST BE FIRST COORDINATED WITH THE US POSTAL SERVICE AND THE HOMEOWNER. 2.BEFORE RELOCATING ANY MAILBOXES, THE CONTRACTOR SHALL CONTACT THE U.S. POSTAL SERVICE AND RELOCATE MAILBOXES ACCORDING TO THE REQUIREMENTS OF THE POSTAL SERVICE. USE OF FIRE HYDRANTS 1.THE CONTRACTOR SHALL MAKE PROPER ARRANGEMENTS WITH THE DUBLIN SERVICE DEPARTMENT AND THE COLUMBUS DIVISION OF WATER FOR THE USE OF FIRE HYDRANTS WHEN USED FOR WORK PERFORMED UNDER THIS CONTRACT AND PROVIDE THE CITY OF DUBLIN A COPY OF THE HYDRANT USAGE PERMIT OBTAINED FROM THE CITY OF COLUMBUS. THE CONTRACTOR SHALL ALSO SEND A COPIES OF PERMITS OBTAINED FROM DUBLIN AND COLUMBUS TO THE WASHINGTON AND/OR PERRY TOWNSHIP FIRE DEPARTMENT. PERMITS SHALL BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES. 2.BEFORE THE FINAL ESTIMATE IS PAID, THE CONTRACTOR SHALL SUBMIT A LETTER FROM THE CITY OF COLUMBUS DIVISION OF WATER TO THE CITY ENGINEER STATING THAT THE CONTRACTOR HAS RETURNED THE SIAMESE VALVE TO THE CITY OF COLUMBUS AND HAS PAID ALL COSTS ARISING FROM THE USE OF THE FIRE HYDRANTS. JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:43 PM EDITED BY: DANUGERAH DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690.TS.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES ELEC. RISER OUTLET TOP=828.93' INV. 12" SPP= 8 2 7 . 3 8 ' (ACCORDING T O G R O U N D S CREW: PIPE O U T L E T S @ P T . 1 6 9 5 ) TOP=836.17' INV. 36" RCP N / S = 8 1 9 . 4 2 ' (77-003-CIP) EX BLDG WV WV 24" STM 12" STM 1 8 " STM 0+00 1+00 2+003 + 0 0 3 + 3 7 CONNECT PROP SANITARY TO EX MANHOLE 6" SAN @2.08% MIN (TYP ALL SERVICES) 6" SAN @2.08% MIN (TYP ALL SERVICES) LI U C O U R T 20' SAN EASE M E N T14+0015+001 6 + 0 0 16 + 1 8 1EX 36" SAN(77-003-CIP)8" SAN 12" STM 12" STM 12" STM2 3 8" SAN8 " S A N 20' SAN EASEMENT6" SAN @2.08% MIN, CONNECT TO EXISTING SANITARY SERVICE 2772 LOT 6 PAD=842.00 LOT 5 PAD=837.00 REAR=827.00 LOT 4 FFE=832 CONTRACTOR TO ABANDON EX SANITARY SERVICE 7192 A T & T WV TOP=840.90' INV. 36" NE/S=819.90' 8" SAN 2+03 0+00 1+00 2+008 7 6" SAN @2.08% MIN (TYP ALL SERVICES) 6" SAN @2.08% MIN (TYP ALL SERVICES)58'28'LIU COURT 11+00 12+00 1 3 + 0 0EX 36" SAN(77-003-CIP)LOT 2 PAD=852.00 REAR=842.00 LOT 3 PAD=847.00 REAR=837.00EX 36" SAN (77-003-CIP) 8" WATER MAIN 20' SAN EASEMENT 6 2789 6" SAN @2.08% MIN (TYP ALL SERVICES)12" STM1 2 " S TMDUBLIN ROAD20'9 0+0 0 0+7 2 LOT 1 PAD=852.50 LOT 7 40,531 S F 0.93 A C PAD=8 5 2 . 5 0 6" SAN @2.08% MIN (TYP ALL SERVICES) SCALE: H:1"=30', V:1"=10' SANITARY SEWER PROFILE SAN 6-8 800 810 820 830 840 850 860 870 800 810 820 830 840 850 860 870 SCALE: H:1"=30', V:1"=10' SANITARY SEWER PROFILE SAN 7-9 800 810 820 830 840 850 860 870 800 810 820 830 840 850 860 870 EXISTING GRADE 840.53841.00840.86840.76841.59842.71843.89844.70845.60-0+300+001+002+002+20 8 T.C. 852.25COC AA-S102DUBLIN SA-01 (48")N: 770823.37E: 1796144.86STA: 2+038" INV (E): 837.007 T.C. 848.19COC AA-S102DUBLIN SA-01 (48")N: 770861.69E: 1796280.95STA: 0+628" INV (W): 836.378" INV (N): 836.278" INV (E): 836.37141' ~ 8" SAN @ 0.45% EX 36" SAN 8" INSIDE DROP (PER COC AA-S110)STA: 0+158" INV (S): 836.068" INV (E): 835.96STA:0+008" INV (W):835.8936" INV (NE):819.9036" INV (S):819.906 T.C. 850.52COC AA-S102DUBLIN SA-01 (48")N: 770908.16E: 1796283.412789 TC 850.03ODOT MH-3N: 770911.23E: 1796298.10EXISTING GRADE 840.42839.67838.88-0+15 0+00 0+85STA: 0+008" INV (W): 836.378" INV (N): 836.278" INV (E): 836.37STA: 0+728" INV (W): 836.699 T.C. 846.06COC AA-S102DUBLIN SA-01 (48")N: 770850.96E: 1796352.257 T.C. 848.19COC AA-S102DUBLIN SA-01 (48")N: 770861.69E: 1796280.9572' ~ 8" SAN @ 0.45% 47' ~ 8" SAN @ 0.45% 15' ~ 8" SAN @ 0.47% EX 36" SAN* WATER SERVICE 4' MIN COVER & 18" MIN CLEARANCE FROM SAN * SCALE: H:1"=30', V:1"=10' SANITARY SEWER PROFILE SAN 1-3 800 810 820 830 840 850 860 800 810 820 830 840 850 860 PROPOSED GRADE PROPOSED GRADE EXISTING GRADE EXISTING GRADE 1 T.C. 834.26COC AA-S102DUBLIN SA-01 (48")N: 770495.74E: 1796588.55STA: 2+008" INV (W): 823.098" INV (N): 823.19836.37836.02835.44835.20834.29832.31830.87829.10827.22825.55826.29826.95827.91829.78832.96833.33833.26834.24834.94834.75834.69833.03833.38-0+15 0+00 1+00 2+00 3+00 3+70STA:0+008" INV (E):822.2036" INV (S):819.4236" INV (N):819.422772 TC 836.37EX MANHOLEN: 770444.06E: 1796395.80200' ~ 8" SAN @ 0.45%STA: 2+918" INV (S): 823.608" INV (NW): 823.702 T.C. 834.11COC AA-S102DUBLIN SA-01 (48")N: 770584.36E: 1796612.19STA: 3+378" INV (SE): 823.913 T.C. 834.10COC AA-S102DUBLIN SA-01 (48")N: 770613.65E: 1796576.8846' ~ 8" SAN @ 0.45% 92' ~ 8" SAN @ 0.45% 24" STM * WATER SERVICE 4' MIN COVER & 18" MIN CLEARANCE FROM SAN # JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:56 PM EDITED BY: MLILIE DRAWING FILE: O:\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES SITE LEGEND PROPERTY LINE RIGHT-OF-WAY CURB AND GUTTER SIGN UTILITY LEGEND SANITARY GRAVITY SANITARY SERVICE WATER STORM SEWER CATCH BASIN HEADWALL SANITARY MANHOLE FIRE HYDRANT WATER VALVEWV VERT 1"=10' HORZ 1"=30' 0 0 10 30 20 60 NOTE: CONTRACTOR SHALL FIELD VERIFY ALL EXISTING ELEVATIONS AND INVERTS PRIOR TO START OF CONSTRUCTION. LONG SERVICES ARE TO HAVE AT LEAST 2' OF RISER ON HOUSE SIDE OF STREET IN ACCORDANCE WITH CITY OF DUBLIN STANDARD CONSTRUCTION DRAWING SA-03. BACKWATER VALVES SHALL BE INSTALLED ON SANITARY SERVICES WITH LESS THAN 2' RISER. TAPS INTO EXISTING SEWER SYSTEMS ARE TO BE CORE DRILLED AND INSPECTED BY THE CITY OF DUBLIN. END OF SANITARY STUBS SHALL BE MARKED WITH 4"X4" POST. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A MINIMUM 2.5' CLEARANCE BETWEEN THE 6" SANITARY SEWER SERVICES AND ALL UTILITY CROSSINGS WHILE MAINTAINING A MINIMUM 2.08% GRADE FOR THE SANITARY SERVICES. CONSTRUCT THE TYPICAL ANTI-INFILTRATION & INFLOW BARRIER FOR ALL CROSSINGS OF SANITARY SEWERS AND WATER MAINS AND STORM SEWERS; SEE DETAIL SHOWN ON SHEET 4 PROPOSED NON-SANITARY SITE IMPROVEMENTS ARE SHOWN FOR REFERENCE ONLY. PLEASE REFER TO THE 7192 DUBLIN RD PRIVATE ON-SITE AND PUBLIC ROAD WIDENING PLANS. PROFILE NOTES: *COMPACTED BACKFILL, ITEM 911 **COMPACTED GRANULAR BACKFILL, ITEM 912 #SEE ANTI INFILTRATION AND INFLOW BARRIER DETAIL, SHEET 4 1 3/4 STM PLAN & PROFILE SANITARY SEWER STRUCTURE TABLE STR. NO 1 2 3 6 7 8 9 2772 2789 STRUCTURE TYPE COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 COC AA-S102 DUBLIN SA-01 EX MANHOLE ODOT MH-3 TOP OF CASTING 834.26 834.11 834.10 850.52 848.19 852.25 846.06 836.37 850.03 NORTHING 770495.74 770584.36 770613.65 770908.16 770861.69 770823.37 770850.96 770444.06 770911.23 EASTING 1796588.55 1796612.19 1796576.88 1796283.41 1796280.95 1796144.86 1796352.25 1796395.80 1796298.10 AS-BUILT NORTHING AS-BUILT EASTING SANITARY PIPE DATA TABLE START STRUCTURE 2789 9 8 7 6 3 2 1 END STRUCTURE 7 7 6 2789 2 1 2772 LENGTH 3 72 141 47 15 46 92 200 BEARING S11° 48' 43.64"E N81° 26' 27.13"W N74° 16' 27.44"E N03° 01' 50.25"E N78° 11' 16.36"E S50° 18' 58.07"E S14° 56' 00.96"W S74° 59' 27.37"W JOB NUMBER: DRAWN BY: DATE:REVISIONSDATESHEET NO.DESCRIPTIONSANITARY SEWER PLANSFORLIU COURTCITY OF DUBLIN, FRANKLIN COUNTY, OHIOCHECKED BY: 04/02/2025 HSR MJL 2024.00690 PLOT SCALE: 1:1 EDIT DATE: 7/17/25 - 1:56 PM EDITED BY: MLILIE DRAWING FILE: \\COLUFS2\PROJECTS\2024\00690\D. DRAWINGS\CIVIL\CONSTRUCTION DOCUMENTS\SANITARY PLAN\2024.00690 P&P.DWG2550 Corporate Exchange Dr, Ste 300 | Columbus, Ohio 43231TEL 614.901.2235 | FAX 614.901.2236www.structurepoint.comAPPROVAL PENDING NOT FOR CONSTRUCTION IN SUBMITTING BIDS IN RELIANCE ON THESE PLANS THE CONTRACTOR ASSUMES ALL RISKS OF ADDITIONAL COSTS OF REVISIONS DUE TO REQUIREMENTS OF THE OWNER OR GOVERNMENTAL AUTHORITIES AND MATERIAL REVISIONS IN THE COURSE OF COMPLETING THE FINAL DESIGN. 24-005-RES 4/4 ANTI-INFILTRATION AND INFLOW BARRIER NOT TO SCALE 66 105 24 48 4421 MATERIAL 1' BEDDING 1' MIN. BELL HOLESUBGRADE Wn/2 D Wn/2 1' 27 52 1' WD 12 15 18 32 36 40 8 * 6 10 30 * n 30 30 FLEXIBLE SEWER PIPE * INCHES WD 80 72 64 48 42 36 52 48 n 56 * 27 24 * 30 12 32 21 18 15 44 40 36 10 8 6 30 27 24 D * W * n 7142 48 54 60 78 87 96 36 30 33 64 57 61 13690 96 102 108 143 151 160 84 78 72 130 123 116 D * W * n D * W * n COMPACTED CLAY PER ITEM 203, STARTING AT 1' ABOVE SANITARY SEWER. 1' THICK BETWEEN STORM AND SANITARY SEWER LINES STORM SEWER BEDDING 4" MIN. SEE STD DWG AA-S151 FOR BEDDING MATERIAL REQUIREMENTS (RIGID SEWER) 4" BEDDING MATERIAL FOR BEDDING MATERIAL REQUIREMENTS SEE STD DWG AA-S149 (FLEXIBLE SEWER) TYPE "A" - FOR CLEARANCES 28" AND GREATER MATERIAL 1' BEDDING BELL HOLESUBGRADE Wn/2 D Wn/2 BENTOFIX THERMAL LOCK GEOSYNTHETIC CLAY LINER (GCL) OR APPROVED EQUAL STORM SEWER BEDDING 4" MIN. SEE STD DWG AA-S151 FOR BEDDING MATERIAL REQUIREMENTS (RIGID SEWER) 4" BEDDING MATERIAL FOR BEDDING MATERIAL REQUIREMENTS SEE STD DWG AA-S149 (FLEXIBLE SEWER) TYPE "B" - FOR CLEARANCES LESS THAN 28" FLEXIBLE SEWER PIPE RIGID SEWER PIPE FLEXIBLE SEWER PIPE RIGID SEWER PIPE RIGID SEWER PIPE * INCHES PROP. STORM & WATER MAIN PROP. STM & WATER MAIN NOTES: 1.THIS DETAIL IS REQUIRED AT ALL SANITARY SEWER AND WATER MAIN CROSSINGS. IF IT IS DISTURBED DURING THE CONSTRUCTION OF THE STORM SEWER OR WATER MAIN IT MUST BE RESTORED TO THE REQUIREMENTS OF THE DETAIL. THIS DETAIL IS NOT BEING USED TO MITIGATE CROSSINGS WHERE THERE IS LESS THAT 18" OF VERTICAL DISTANCE FROM OUTSIDE TO OUTSIDE OF PIPES. A SANITARY DETAILSESTIMATE OF QUANTITIES THESE QUANTITIES HAVE BEEN PROVIDED ONLY AS AN ESTIMATE TO THE SCOPE OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO EVALUATE THE COMPLETE PROJECT AS DETAILED IN THE NOTES, PLANS, AND SPECIFICATIONS AND PROCEDURES NECESSARY FOR THE COMPLETION OF THE PLAN IMPROVEMENTS AND SUBMIT HIS TOTAL PROJECT COST ACCORDINGLY. ITEM QUANTITY UNIT DESCRIPTION SANITARY 604 7 EACH PRECAST CONCRETE MANHOLE TYPE "C" (AA-S102) W/ CITY OF DUBLIN LID (ST-02) 901 613 LF 8" PVC SANITARY SEWER PIPE, OR APPROVED EQUAL 914 12 LF 6" PVC DIA. PIPE RISER 915 7 EACH 8" X 6" WYE FITTING 918 289 LF 6" DIAMETER PIPE, SANITARY HOUSE SERVICE CONNECTION CALCULATED BY: DA DATE: 03/15/2022 CHECKED BY: MJL 07/16/2025 VICINITY MAP NO SCALE SIT E BROWNING CT BELLAIRE AVE. DUBLIN RD LIU COURT SURVEYOR'S CERTIFICATION WE DO HEREBY CERTIFY THAT WE HAVE SURVEYED THE PREMISES AND PREPARED THE ATTACHED PLAT AND THAT SAID PLAT IS CORRECT AND MEETS MINIMUM STANDARDS FOR BOUNDARY SURVEYS IN THE STATE OF OHIO. THE DIMENSIONS OF THE LOTS AND STREETS ARE SHOWN IN FEET AND DECIMAL PARTS THEREOF. _____________________________________________________________ DALTON L. BISCHOFF DATE REGISTERED PROFESSIONAL SURVEYOR NO. 8874 BEARINGS DESCRIBED HEREON ARE BASED ON SOUTH 88 DEGREES 16 MINUTES 20 SECONDS WEST FOR THE NORTH LINE OF LUTHER MITCHELL'S SCIOTO SHORES, AS DELINEATED ON THE RECORD PLAT THEREOF, OF RECORD IN PLAT BOOK 18, PAGE 37, MEASURED FROM GRID NORTH, REFERENCED TO THE OHIO STATE PLANE COORDINATE SYSTEM (SOUTH ZONE) AND THE NORTH AMERICAN DATUM OF 1983 (2011 ADJUSTMENT), AS ESTABLISHED UTILIZING A GPS SURVEY AND AN NGS OPUS SOLUTION. THE SOURCES OF RECORDED SURVEY DATA REFERENCED IN THE PLAN AND TEXT OF THIS PLAT ARE THE RECORDS OF THE RECORDER'S OFFICE, FRANKLIN COUNTY, OHIO. SOURCE OF DATA PERMANENT MARKERS, WHERE INDICATED HEREON, ARE SOLID REBAR, 1 INCH DIAMETER, 30 INCHES LONG, WITH ALUMINUM CAPS DESIGNATED "ASI FIRM 1648" PERMANENT MARKERS ALL OTHER MONUMENTS INDICATED HEREON ARE SOLID REBAR 5/8 INCH IN DIAMETER, 30 INCHES LONG, WITH CAPS DESIGNATED "ASI FIRM 1648" PLAT MONUMENTS PREPARED BY: STATE OF OHIO, COUNTY OF FRANKLIN, CITY OF DUBLIN, VIRGINIA MILITARY SURVEY NUMBER 2543 ACREAGE SUMMARY DEDICATED R/W LOTS TOTAL 10.623 12.793 1 of 2 RESERVES 0.598 LINETYPE LEGEND Plat Boundary Centerline of Right-of-Way Property Line Existing Easement Right-of-Way (R/W) Line Building Setback Platted Easement *0.449 AC IN PRO (Present Road Occupied) 1.572 IRON PIN FOUND (SEE NOTES ON SHEET 2) 1" IRON PIN SET WITH ALUMINUM CAP DESIGNATED "ASI FIRM 1648" (PERMANENT MARKERS) MONUMENT & EASEMENT TYPE LEGEND 5/8" IRON PIN SET WITH CAP DESIGNATED "ASI FIRM 1648" MAG SPIKE SET MAG NAIL/SPIKE FOUND ACKNOWLEDGMENT STATE OF OHIO ) ) FRANKLIN COUNTY ) The foregoing instrument was acknowledged before me this ____ day of __________________, 2025, by ____________________, ____________________ of George Crimson LLC, on behalf of the company. _________________________________________ Notary Public Approved this _____ day of _______________, 2025 _________________________________________________ Director of Community Planning & Development City of Dublin, Ohio Approved this _____ day of _______________, 2025 _________________________________________________ Director of Engineering City of Dublin, Ohio Approved this _______ day of _________________, 2025, Resolution No. _______________, by a vote of council, wherein all of Dublin Road and Liu Court, dedications hereon are accepted as such by the Council of the City of Dublin, Ohio. In witness whereof, I have hereunto set my hand and affixed _________________________________________________ my seal this _______ day of _______________, 2025 Clerk of Council City of Dublin, Ohio Transferred this _______ day of _____________, 2025 _________________________________________________ Auditor Franklin County, Ohio _________________________________________________ Deputy Auditor Franklin County, Ohio Recorded this _____ day of _________________, 2025 _________________________________________________ Recorder At ______ AM/PM Franklin County, Ohio Fee $__________ Plat Book ___________, Page ________________Instrument Number ___________________________ NOTE "D":Liu Court is in the Zone X (areas determined to be outside of the 0.2% annual chance floodplain) Flood Hazard Zone X (areas determined to be inside the 0.2% annual chance floodplain) Flood Hazard Zone AE (areas determined to be inside the 0.1% annual chance floodplain) and Floodway, as shown on the Federal Emergency Management Agency Flood Insurance Rate Maps, Map Number 39049C0151K (effective date June 17, 2008) and LOMR 15-05-1599P (effective date August 1, 2015). SS: DEED REFERENCE: SITUATED IN THE STATE OF OHIO, COUNTY OF FRANKLIN, CITY OF DUBLIN, BEING LOCATED IN VIRGINIA MILITARY SURVEY NUMBER 2543, BEING A SUBDIVISION CONTAINING 12.793 ACRES (MEASURED), AND BEING ALL OF THE 12.820 ACRE (RECORDED) TRACT CONVEYED BY DEED TO GEORGE CRIMSON, LLC. IN INSTRUMENT 202402210017392, ALL DOCUMENTS REFERENCED HEREON ARE ON RECORD IN THE OFFICE OF THE RECORDER, FRANKLIN COUNTY, OHIO. OWNER'S CONSENT AND DEDICATION: THE UNDERSIGNED, JASON LIU, OWNER OF GEORGE CRIMSON, LLC, BEING ALL THE OWNERS OF THE LANDS HEREIN PLATTED, ADOPT AND CONFIRM THAT THIS PLAT CORRECTLY REPRESENTS OUR "LIU COURT", A SUBDIVISION OF LOTS 1 THROUGH 7, RESERVE A, AND DO HEREBY DEDICATE TO PUBLIC USE, AS SUCH, ALL OF DUBLIN ROAD, AND LIU COURT, AS SHOWN HEREON AND NOT HERETOFORE DEDICATED. IN WITNESS THEREOF, JASON LIU, OWNER OF SAID GEORGE CRIMSON, LLC HAS HEREUNTO SET HIS HAND THIS _______ DAY OF ________________, 2025. SIGNED AND ACKNOWLEDGED GEORGE CRIMSON, LLC IN THE PRESENCE OF: SIGN:______________________________BY: _________________________________ PRINT: ____________________ ____________________ SIGN:______________________________ PRINT: THE UNDERSIGNED FURTHER AGREES THAT ANY USE OR IMPROVEMENTS ON THIS LAND SHALL BE IN CONFORMITY WITH ALL EXISTING VALID ZONING, PLATTING, HEALTH OR OTHER LAWFUL RULES AND REGULATIONS, INCLUDING APPLICABLE OFF-STREET PARKING AND LOADING REQUIREMENTS OF THE CITY OF DUBLIN, OHIO, FOR THE BENEFIT OF ITSELF AND ALL OTHER SUBSEQUENT OWNERS OR ASSIGNS TAKING TITLE FROM, UNDER OR THROUGH THE UNDERSIGNED. EASEMENTS ARE HEREBY RESERVED IN, OVER AND UNDER "LANDSCAPE EASEMENT", "STORM EASEMENT", "SANITARY EASEMENT", AREAS AS DELINEATED ON THIS PLAT. EACH OF THE AFOREMENTIONED DESIGNATED EASEMENTS PERMIT THE CONSTRUCTION, OPERATION, AND MAINTENANCE OF ALL PUBLIC AND QUASI PUBLIC UTILITIES ABOVE, BENEATH, AND ON THE SURFACE OF THE GROUND AND, WHERE NECESSARY, FOR THE CONSTRUCTION, OPERATION, AND MAINTENANCE OF SERVICE CONNECTIONS TO ALL ADJACENT LOTS AND LANDS. RESERVE A IS HEREBY DEDICATED AS PRIVATE OPEN SPACE WITH PROPOSED GRAVEL PATH TO PROVIDE ACCESS TO FUTURE SEATING AREA AND WATERFRONT. NOTE "C":Fencing is not permitted in this neighborhood to preserve the established character of the community. LIU COURT FINAL PLAT Owner and Developer: Mr. Jason Liu 10279 Wellington Blvd. Powell, Ohio 43065 Contact: Jason Liu Phone: (614) 313-1268 Email: jasonliu1218@yahoo.com Architect: Bass Studio Architects 36 King Avenue Columbus, Ohio 43201 Contact: Timothy A. Bass, AIA, LEED AP Phone: (614) 294-4893 Email: www.bassstudioarchitects.com Engineer: American Structurepoint 2550 Corporate Exchange Dr., Suite 300 Columbus, Ohio 43231 Contact: Benjamin Schilling Phone: (614) 901-2235 Email: bschilling@structurepoint.comSCIOTO RIVERCHADDINGTONDRNOTE "B":"Landscape Easements" shown hereon are reserved for the homeowner's association for the purpose of maintaining various landscaping features. NOTE "A":"Reserve A" shown hereon is owned and maintained by the homeowner's association. Curve Table Curve # C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 Length 217.90' 102.06' 260.03' 38.98' 62.64' 274.94' 38.34' 101.05' 175.77' 21.17' 95.97' 104.59' 38.29' 46.91' 26.87' 124.12' 77.04' 38.59' 280.48' 64.05' Radius 150.00' 150.00' 179.00' 121.00' 60.00' 60.00' 60.00' 179.00' 121.00' 179.00' 179.00' 179.00' 179.00' 60.00' 60.00' 60.00' 60.00' 60.00' 61.00' 60.00' Delta 083°13'52" 038°59'03" 083°13'52" 018°27'25" 059°49'05" 262°32'44" 036°36'59" 032°20'46" 083°13'52" 006°46'38" 030°43'03" 033°28'47" 012°15'24" 044°47'36" 025°39'26" 118°31'35" 073°34'06" 036°51'10" 263°27'06" 061°09'59" Chord Length 199.24' 100.10' 237.76' 38.81' 59.83' 90.19' 37.70' 99.72' 160.72' 21.16' 94.82' 103.11' 38.22' 45.72' 26.64' 103.14' 71.86' 37.93' 91.05' 61.05' Chord Bearing N64°06'37"W N41°59'12"W S64°06'37"E S31°43'23"E S70°51'38"E S30°30'11"W N36°31'57"W N38°40'03"W N64°06'37"W S77°39'46"W N83°35'23"W N51°29'28"W N28°37'23"W N78°22'22"W N43°08'51"W N28°56'39"E S55°00'30"E S36°00'48"E N30°41'14"E N70°27'20"WPLPLPLPLPL PLPLPLPLPL PL83' STORM EASEMENT 20' LANDSCAPEEASEMENT83' STORM EASEMENT EX 20' SANITARYEASEMENTD.B. 3720, PG. 536EX 20' SANITARYEASEMENTD.B. 3720, PG. 53630' SANITARYEASEMENTLIU CO U R T 5 8 'LIU COURT 58 ' 20'20' LOT 1 0.921 AC LOT 2 1.556 AC LOT 3 1.575 AC LOT 4 3.001 AC LOT 5 1.337 AC LOT 6 1.302 AC LOT 7 0.931 AC RESERVE A 0.598 AC 20' ST O R M EASE M E N T 20'20' SAN I T A R Y E A S E M E N T20' STORMEASEMENT20' STORMEASEMENTPID: 273-001786-00 GEORGE CRIMSON, LLC IN. 202402210017392 12.820 ACRES (REC) 12.793 ACRES (MEASURED) LOT 6 GALWAY ESTATES SUBDIVISION P.B. 89, PG. 55 LOT 7 LOT 8 LOT 9 LUTHER MITCHELL'S SCIOTO SHORES P.B. 18, PG. 37 LOT 1 SCIOTO RIVERDUBLIN ROAD(VARIABLE WIDTH R/W - PUBLIC)20' LANDSCAPEEASEMENT10' 20' 20' STORM EASEMENT 31' FR O N T SETB A C K 1" iron pipe found 3/4" iron pipe found 2" iron pipe found 1" iron pipe found 1" iron p i p e f o u n d 1" iron pipe found 40' DUB L I N R O A D BUILDIN G L I N E SETBAC K 20' 3 6 ' F RO N T S E T B A C K 31' FRONT YARD SETBACK 41' F R O N T Y A R D SETB A C K30' SANITARYEASEMENTSANITA R Y EASEM E N T SANITARYEASEMENT92' FRONT YARDSETBACKFLOOD HAZARD ZONE XZONE XFLOODWAYFLOOD HAZARD ZONE AEN15°33'22"W - 651.19'N83°56'54"E - 592 . 9 5 'S13°14'25"E - 116.39'N75°48'4 1 " E - 1 3 1 . 6 2 'S20°11'31"E - 110.70 ' S70 ° 2 3 ' 1 5 " E - 8 2 . 7 7 ' N87°42'49"E - 190.67'S01°42'42"W - 118.79'S06°54'37"W - 343.43'S88°16'20"W - 831.48'S08°41'06"E - 83.09'S15°33'22"E - 167.79 ' S6 0 ° 4 3 ' 3 3 " E 32 . 9 6 ' N74°16' 2 7 " E - 1 0 6 . 5 8' C3 S22°29'41"E - 67 .87 'C4C5 C6C7C8N22°29'41"W - 67 .87 ' C9 S74°16' 2 7 " W - 1 0 6 . 5 8 'S29°16'27"W33.40'297.48' S74°16' 2 7 " W - 1 7 0 . 0 4' C1 N22°29'41"W - 67 .87 'C2 N6 1 ° 2 8 ' 4 4 " W 54. 6 0 ' 152.47'S13°25'56"E - 249.38' C10 389.84' S76°33'0 0 " W - 2 1 5 . 8 8 'S21°46'09"W - 140.77'C11 S88°09'02"W - 192.68' N70° 5 8 ' 2 4 " W - 9 5 . 9 3 ' S64°3 4' 2 0 " W - 3 6 7. 5 1' C 1 2 20.60'98.19'94.11'S88°12'27"W - 158.34' S50°47'07" W - 140.90' S88°12'27"W - 167.57' C14C13 106.85'S88°12'27"W - 404.04'C1 5 142.46'435.20' N01°47'33"W 51.68'C16355.09'147.11' N74°18' 3 4 " E - 2 5 8 . 7 9 ' C 1 7150.37' N74°16' 2 7 " E - 1 4 4 . 2 2 ' N03°01'50"E 37.25'N34°17'34"E - 238.35'S34°17'34"W - 238.21'N83°56'54"E - 548 . 9 7 'S11°35'55"E - 394.76'S74°16' 2 7 " W - 8 5 . 5 6'N11°35'55"W - 417.11'S03°30'34"E 9.30' S74°59'2 7 " W - 1 9 6 . 6 6 ' N74°59'2 7 " E - 1 3 6 . 9 0 ' L 1 L 1 3 S14°56'01"W - 102.70'13.57'4 9 . 4 7 ' N39°41'02"E 20.00' S 5 0 ° 1 8 ' 5 8 " E - 6 2 . 2 7 ' N88°16'20"E - 378.36' S76°1 7 ' 5 5 " E - 2 0 3 . 4 9 ' S76°1 7 ' 5 5 " E - 1 8 5 . 9 9 '20.14'25.07'29.25' 39.36'31.18'L4L3 40' 40'29'29'29'29' 29' 29' 29'29'29' 60'R 29' 50.00'L21" ir o n p i p e f o u n d 340.13'311.06' LOT 5 FLOOD HAZARD ZONE XZONE XFLOODWAYFLOOD HAZARD ZONE AEFLOOD HAZARD ZONE XZONE XFLOODWAYFLOOD HAZARD ZONE AEalong the river bank (per deed)along the river bank (per deed)along the river bank (per deed)PL S15°33'22"E - 297.48 '2' SHARED USEPATH EASEMENT31.08' 10.11'2' SHARED USEPATH EASEMENT65' FRONT YARDSETBACK36' FRONT YARDSETBACK40' DUBLIN R O A D BUILDING LI N E SETBACK L5L6L7 L8 L9L10L11 L12Line Table Line # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 Length 30.49 29.15 20.00 42.71 25.20 20.00 25.02 34.94 20.00 42.28 46.13 20.00 42.30 36.99 Direction S36° 47' 45"E N30° 04' 16"E S59° 55' 44"E S30° 04' 16"W S67° 30' 19"W N22° 29' 41"W N67° 30' 19"E S81° 26' 27"E N08° 33' 33"E N81° 26' 27"W N11° 35' 55"W N15° 43' 33"W S36° 47' 45"E N88° 16' 20"E 20.22' 30.42'C18C19C20 L14 36' 31' 1' WALK EASEMENT 1' WALK EASEMENT1'1' LIU COURT FINAL PLAT Owner and Developer: Mr. Jason Liu 10279 Wellington Blvd. Powell, Ohio 43065 Contact: Jason Liu Phone: (614) 313-1268 Email: jasonliu1218@yahoo.com PREPARED BY: 2 of 2 IRON PIN FOUND (SEE NOTES) 1" IRON PIN SET WITH ALUMINUM CAP DESIGNATED "ASI FIRM 1648" (PERMANENT MARKERS) MONUMENT & EASEMENT TYPE LEGEND 5/8" IRON PIN SET WITH CAP DESIGNATED "ASI FIRM 1648" MAG SPIKE SET MAG NAIL/SPIKE FOUND 0'40'80' SCALE: 1"=40' Architect: Bass Studio Architects 36 King Avenue Columbus, Ohio 43201 Contact: Timothy A. Bass, AIA, LEED AP Phone: (614) 294-4893 Email: www.bassstudioarchitects.com Engineer: American Structurepoint 2550 Corporate Exchange Dr., Suite 300 Columbus, Ohio 43231 Contact: Benjamin Schilling Phone: (614) 901-2235 Email: bschilling@structurepoint.com LINETYPE LEGEND Plat Boundary Centerline of Right-of-Way Property Line Existing Easement Right-of-Way (R/W) Line Building Setback Platted Easement ACREAGE SUMMARY DEDICATED R/W LOTS TOTAL 10.623 12.793 RESERVES 0.598 *0.449 AC IN PRO (Present Road Occupied) 1.572 NOTE "B" NOTE "A"NOTE "B" 5200 Emerald Parkway Dublin, Ohio 43017 Community Planning and Development Sustainable | Connected | Resilient 614.410.4600 dublinohiousa.gov RECORD OF ACTION Planning and Zoning Commission Thursday, April 17, 2025 | 6:30 p.m. 4. Liu Trail 24-128PP Preliminary Plat Proposal: Request for review and recommendation of approval for a Preliminary Plat for 7 single-family lots and a reserve. The 12.78-acre site is zoned R-1, Restricted Suburban Residential District. Location: 7192 Dublin Road Planning Contact: Taylor Mullinax, AICP, Planner I Contact Information: 614.410.4632, tmullinax@dublin.oh.us Case Information: www.dublinohiousa.gov/pzc/24-128 MOTION: Mr. Deschler moved, Mr. Alexander seconded to table the application per the applicant’s request to address the cited Code sections. VOTE: 6-0 RESULT: The Preliminary Plat was tabled. RECORDED VOTES: Rebecca Call Yes Kim Way Absent Kathy Harter Yes Jamey Chinnock Yes Gary Alexander Yes Jason Deschler Yes Dan Garvin Yes STAFF CERTIFICATION (Signing for Taylor) Taylor Mullinax, AICP Planner I Docusign Envelope ID: 0C6A57D9-EB01-41B3-9E20-140AEAFE7544 Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 19 of 30 The Commission needs to make sure there is proper structure in the site plan to allow that future development. The City can be patient as it waits on the right development. There are areas of the City that have been green for many years that are now developing, i.e., the hospital next to Sawmill Road. In regard to the theme, in her opinion, the last thing we need in this area is more Bridge Park type of block housing. This is a suburban area; it is primarily residential, trying to transition gradually between single-family homes inside Dublin to the multi-family homes outside our City limits. We need to be sensitive to that, but we are not the City of Columbus and do not want to be. We want to look like Dublin; it doesn’t matter if we are in 43016 or 43017. She inquired if the applicant needed any additional clarification in the Commission’s feedback. Mr. Turnock stated that they needed no additional clarification. • Case #24-128PP - Liu Trail – Preliminary Plat Request for review and recommendation of approval of a Preliminary Plat for 7 single-family lots and a reserve. The 12.78-acre site is zoned R-1, Restricted Suburban Residential District, and is located at 7192 Dublin Road. Applicant Presentation Ben Schilling, 122 South Otterbein Avenue, Westerville, stated that the developer is Mr. Jason Liu, who has been a Dublin resident since 2003, and is the owner and founder of J Liu Restaurant with both Dublin and Worthington locations. Mr. Liu has been involved with a number of City events. He has been a sponsor of the Dublin Irish Festival since 2004 and has hosted the lunch following the St. Patrick’s Day parade since 2005. He is with American Structurepoint, as is Matt Lily and Landscape Architect Kyle Adams, who are present this evening. Mr. Schilling stated that 7192 Dublin Road is located just north of I-270 and Emerald Parkway, and south of Brand Road on the east side. Currently, there is a single-family home on the site and many mature trees adjacent to the Scioto River. This site is over 12 acres. To the west of the site is Coventry Woods. In the proposed development, the smallest lot is .92 acres and the average lot is 1.51; the largest lot, the existing residence, is 3.0 acres. He described the site plan. Liu Trail is a public cul de sac road. There are 7 proposed lots. 79% of the site is greenspace. Their plan proposes no impact to the floodplain along the Scioto River, even with the stormwater outlet. There is a City-required left turn only lane onto Dublin Road. They are also proposing a 10-foot right-of-way dedication along the east side of Dublin Road. Along with the 40-foot setback along Dublin Road, that totals 50 feet from the east right-of-way line of Dublin Road. They are also proposing a 20-foot landscape easement along Dublin Road. There is 58-foot right-of-way for Liu Trail, 24 feet of which is paved, 6-foot sidewalks and 8-foot tree lawn. The stormwater outlet is along the south side of Lot 5. The existing residence would not be occupied during construction. Their proposal is aligned with the Envision Dublin Community Plan. The Dublin Road corridor has a FLU in this area of residential, low density. They are proposing .56 du/acre, consistent with that land use. Dublin Road is also designated as a river character area and commuter boulevard. Multiuse paths along both sides of Dublin Road are indicated. There is currently a multiuse path on the west side of Dublin Road. They are proposing a fee in lieu for the future multiuse path on the east side. The reason primarily is because the extension of that path along the east side of Dublin Road probably is several years in the future. It makes the most sense aesthetically to defer that installation in this location to later when the whole network would be built. A path installed now Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 20 of 30 would deteriorate over time and look much older than future portions of the path. They conducted a tree survey. Any tree over 6 inches in diameter was evaluated for need for preservation. Of the 216 trees surveyed, 31 were identified to be in poor condition; 17 of those are identified as preserved. 185 trees were in fair or good condition, and 125 will be preserved. They are looking at the tree canopy area and the critical root zone. The intent is to preserve any mature trees that should be kept. There are heavily wooded areas along the Scioto River and denser vegetation on the north, south and northeast corner of the site. They will try to protect those trees. Street trees are proposed along Liu Trail and in the landscape buffer along the east side of Dublin Road. They are proposing a private reserve area (Reserve A), maintained by the HOA, along the Scioto River, essentially a riverside park for the residents. They are envisioning a gravel path with stone steps, due to the steep topography, and a landscaped area with a retaining wall and benches. Staff Presentation Ms. Mullinax stated that a preliminary plat is required for the subdivision of land including right-of- way dedication and the recording of easements. Approval is a two-step process where the Commission makes a recommendation to City Council and City Council provides approval of the plat. Subsequently, the final plat would follow the same process, before any building permits are submitted. Ms. Mullinax reviewed the existing site conditions. A private residence currently exists on the site along Dublin Road. The site is zoned R1, Restricted Suburban Residential, which is a standard zoning district. The R1 development standards and the Subdivision Regulations apply to this application. The proposed minimum lot sizes are met, although minor administrative errors need corrected. To access the subdivision, a new left turn lane on Dublin Road and a new public street are required. An 11-foot shared use path is required along the east side of Dublin Road. The applicant is requesting a fee in lieu of constructing the path. Engineering will determine if this option is acceptable, otherwise, the applicant is required to construct the path. Depending on which option occurs, an associated easement will be required for the width of that path. Additional minor adjustments regarding the proposed street name, location of driveways and measurements still need to be addressed. Water and sanitary sewer utilities are available on site. Water quality control is provided through a proposed underground detention system that is beneath the cul de sac. Stormwater quantity control is not required. The applicant is proposing to design lots around the sanitary sewer. Staff has concerns regarding Lot #2’s limited developable area, once those easements are shown on the plat. The applicant will need to show driveway locations to demonstrate that their slopes do not exceed the maximum allowable slope, and house locations on Lots #2 and #6 will need to be relocated to be out of the sanitary sewer easement. These issues are reflected in the Conditions of Approval. Required open space is being provided between Lots #4 and #5 and street trees along Liu Trail and Dublin Road. The applicant has provided a tree survey and tree preservation plan. The tree replacements are required to be provided within the landscape easement along Dublin Road. Staff recommends evergreen trees be used to create a more immediate and effective landscape buffer. The applicant is requesting a tree waiver, which will be reviewed and approved by City Council. All the preliminary plat criteria are met or met with conditions, therefore, staff recommends the Commission recommend approval of the Preliminary Plat to City Council with 13 conditions. Commission Questions Mr. Garvin inquired what necessitates the left turn lane – the number of units or the side street? Ms. Mullinax responded that it is required because it allows traffic to slow, navigate and turn left safely; it is a safety precaution. Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 21 of 30 Mr. Garvin inquired if there were a second home on the road that would also require a left turn lane. Heidi Rose, Engineer, indicated that whenever a private development application is submitted with a proposed access point, for safety purposes, Transportation & Mobility requires a left turn lane, regardless of the circumstances. Mr. Garvin inquired if the fee in lieu request considers the future or current cost of the multiuse trail. Ms. Rose responded that those details have not been determined at this point. Typically, it would consider a future date and the prevailing wage rate. Essentially, whatever it would cost the City to construct the path would be the fee, which would be established via an agreement with the applicant. Mr. Garvin inquired if the stone gatehouse would remain. Mr. Schilling responded that it would be removed. Initially, they attempted to keep it because it is a nice feature, but were not permitted to do so. Mr. Garvin inquired the square footage of the current residence. Mr. Schilling responded that it is 13,500 SF. Mr. Garvin inquired the anticipated square footage of the Lot #2 home. Mr. Schilling responded that it is not yet defined, but a 3,000 SF home would fit on the building pad. Mr. Garvin inquired if the existing home would remain significantly larger than the proposed homes. Mr. Schilling responded affirmatively. Mr. Garvin inquired which direction the homes on Lots #1 and #7 would front along Dublin Road. Mr. Schilling responded that there was discussion about their fronting Liu Trail, but it remains a discussion point. Mr. Garvin stated that per the staff report, 28% of the existing trees on the site would be removed. Would all of those be replaced? Does the evergreen buffer count toward that replacement? Ms. Mullinax stated that the 14 trees within the landscape buffer would count as tree replacements, and a condition of approval requires additional replacement trees. The applicant is pursuing a tree waiver. If they were to replace all the inches that are proposed for removal, it would cause tree overcrowding on site. However, they cannot replace them on the single-family lots, as the future homeowners potentially could remove the trees, inconsistent with the tree replacement requirements. The tree waiver would proceed to City Council for consideration. Mr. Deschler inquired clarification of the PZC’s scope of evaluation with this case. Is the Commission approving only the lot lines, or the house and driveway locations? He does not see the latter provided in the materials. He was trying to look for the associated Code sections. Mr. Boggs responded that this application is simply for the Preliminary Plat review. This is a straight zoned property, and the Code does not establish specific criteria for the Preliminary Plat. Ms. Call added that the Commission is providing a recommendation to City Council, which is the deciding body for platting of property. Mr. Boggs stated that the Commission is looking at the layout of the streets and lots, not the more finely grained zoning details that are governed by the Code. Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 22 of 30 Mr. Deschler requested clarification that the Commission is looking only at the street and the lot lines. He does not want to provide a recommendation to City Council, if he believes he does not have all the information necessary to make that determination. Mr. Boggs responded that the question for the Commission is if the plan’s arrangement of streets and lots is consistent with the Subdivision Regulations. Mr. Deschler asked if the plan indicates lot lines or proposed locations of the buildings. Mr. Boggs responded it indicates only the lot lines. Ms. Call stated that we understand that something will go on the lots. If that something can’t be constructed according to Code, then that factor needs to be considered for the platting of property. Mr. Boggs concurred. If the proposal was for a 40-foot lot and the zoning requirement was for a 60-foot frontage, that would be an element to consider with the Preliminary Plat review. This is unlike a Preliminary Development Plan review of a planned district, where the Commission would look at setbacks and neighborhood design guidelines to ensure the building pad configuration is adequate to accommodate outdoor hardscape, etc. That level of fine-grained review does not occur with a straight zoning district, such as this. Mr. Deschler stated that if he has questions about the proposed location, he cannot see a proposed driveway that might indicate that. Ms. Call stated that it is warranted to ask questions about driveways, because it does affect the build envelope. Mr. Deschler stated that they are not shown on the proposed plan. Mr. Boggs stated that this is the Preliminary Plat. The Final Plat will have more fine-grained details that would be dictated by the Preliminary Plat. Ms. Call stated that at the Preliminary Plat review, the Commission could state that with the Final Plat review, it will be essential to have the driveway orientation and any other details that the Commission will need for that review. Mr. Alexander stated that if there is information in this packet that leads a Commissioner not to support the way in which the site is divided, it can be pointed out. He assumes at this stage we can evaluate everything provided in the meeting materials and indicate that based on that information, we can or cannot support this. Ms. Call stated that the response could be made a condition(s) for Final Plat approval. Mr. Boggs noted that Code Section 152.021 requires that for disapproval of a Preliminary Plat, the Commission must specifically cite the Code section or rule that leads to that result. Mr. Alexander stated that these questions impact whether he can support the way in which the property is subdivided. He inquired if the barn on the property that is intended to be razed has any historical significance. Ms. Mullinax stated that she does not believe so. The intent is that the detached structures and tennis courts will be demolished. The single-family house will remain. Mr. Alexander inquired the reason for the large amount of gravel currently on the site. Jason Liu, 10279 Worthington Boulevard, Powell, stated that the reason he stockpiled gravel reserves on the site is for another land development project he has south of Bloomfield. Available gravel for that project is limited. He was hoping the project would start this time of the year. A truck entering a wet area would tear up the ground, so he took advantage of the winter season and frozen ground to stockpile the gravel and have it ready for construction. Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 23 of 30 Ms. Rauch stated that City Code Enforcement has received some complaints about the gravel stockpiles, and they are working through that Code violation process at this point. The gravel is not permitted on the site, as there is not an active building permit, which would permit the storage of building materials on the site. Mr. Alexander inquired how the applicant established the proposed number of homes on the site. Mr. Liu stated that if he could have done a Bridge Park development, a 5-story condensed development; that would have been better for him. However, they are attempting to meet the criteria of the zoning on this land. Originally, they were interested in having a private, gated community, similar to Deer Run two miles north. City staff indicated that would not be permitted. They are attempting to maintain the private setting and keep most of the trees on the site. Mr. Alexander inquired how the proposed plan responds to the existing house and size of the current parcel. Mr. Liu stated that for this particular location, a 2,000 SF home would not make sense. He is interested in having a high-end, minimum of 5,000-6,000 SF house. Mr. Alexander stated that there is significant manipulation of the contours of this property. Why is there the need to create walk-out basements in these housing units? They are raising the grade 10 feet in most of the houses. He has looked at the grading plan, the existing grades, and the existing build pad grades. On Lot #2, there is 10 feet difference between the grade currently at the front of the house. At the back of the house, the grades drop dramatically. In Lot #3, there is a 9-foot difference and the difference from the road below and to the right is 14 feet. That is just the building pad; the first floor will be elevated another 1.5 feet. On Lot #5, they are proposing to raise the grade 13 feet from what it is currently, and that is to the platform, not the first floor. When you look at the way the grades change on the site, and the difference from the build pad to the rear elevation, it is clear the desire is to create walkouts or have full exposure. However, what they are doing to the site is highly questionable. Why do they need to do that to the natural contours of the earth just to create walk-out basements? Mr. Turnock stated that it is due in part to the public road extension; the transition downward is too quick. Mr. Alexander stated that there is a 9-foot drop on that driveway to the house. That is what is created by the new grading plan. From the top of the new driveway to the existing roundabout is 9 feet. If you were not creating walk-out basements, you would not need to bring in all of this fill onto the property. Mr. Turnock stated that the creation of the walk-outs is in response to the fact that there is such severe topography; not the other way around. Mr. Alexander responded that is not the case. Comparing the current topographic survey and the distance between the contours on the front of the lot compared to the rear of the lot, the spacing between the contours is radically different. That suggests that the slope is more gradual in the front than it is in the back. Mr. Turnock stated that it is due to the public road extension. With the existing grade, they can’t extend from the existing road at same that slope. That public road extension is dictating the need for so much fill on the site. Because there is so much fill, the houses have to be much higher. They have proposed walk-out basements to break up that elevation. Mr. Alexander stated that he understands his reasoning. However, what is the reason they are proposing seven houses on the site? If they had fewer houses, they would need less fill and they Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 24 of 30 could work more with the existing topography of the site. Mr. Alexander stated that the footprint of the proposed build pad is approximately 3,000 SF; the footprint of the existing house is 13,000 SF. It doesn’t appear that the character of that house has much impact on the proposed development. Mr. Turnock responded that his estimate of 3,000 SF was to give an idea of the size house that could comfortably fit on the build pads. They could be much bigger, and that is the desire. Mr. Alexander inquired how they determined the siting of house #6. Mr. Turnock stated that to the right is a sanitary easement; they placed the site up against that. In addition, staff requested that they increase the buffer between Dublin Road and the proposed pad as much as possible. Finally, there are some mature trees in that corner that they are attempting to preserve. Mr. Alexander inquired if the proposed plan is subject to the Neighborhood Design Guidelines. Ms. Rauch responded that it has to meet the Residential Appearance Standards; it does not need to meet the Neighborhood Design Guidelines. Mr. Alexander inquired if those standards address how homes address the streets, i.e. the setbacks from the street aligning the home frontages. Ms. Rauch responded that she believes in the Subdivision Regulations there are requirements about staggering the setbacks. She would check into that. Mr. Deschler stated that he has reviewed the Code section Mr. Boggs identified earlier. He indicated that if the Commission were to disapprove the Preliminary Plat, they would need to identify the criteria that the proposed plat does not meet. Mr. Boggs responded affirmatively. For example, one of the criteria is that if it is a subdivision with more than eight lots, no more than six lots in a row may have the same lot width. If the lots did not meet that requirement, Section 152.019 (B)(8), that could be cited as the reason for disapproval. Ms. Harter inquired how large the private park near the river would be. Could it accommodate a group? Mr. Turnock responded that it would be 15-20 feet in diameter, sufficient for a family gathering. Ms. Harter inquired if the park is closer to the house or the treeline. Mr. Turnock responded that it is right up against the trees. Ms. Harter inquired if the intent is that someone will be residing in the existing house. Are any other uses of the home foreseen? Mr. Turnock stated that it would remain a private home. It is on its own parcel. Ms. Harter referred to the tree replacement waiver. She inquired if the tree replacement requirements could be met by the individual homebuilders with the associated landscaping. Ms. Mullinax responded that the tree replacement requirements cannot be met by trees planted on single-family lots, because of the potential for a homeowner to remove the trees. A homeowner cannot be prevented from removing a tree on their lot. Ms. Harter inquired if there is potential for replacing the trees in some way, so that a tree replacement waiver is not needed. Ms. Mullinax responded that the applicant would need to replace the trees by placing them in the landscape buffer along Dublin Road; however, it would not be possible for them to replace 1,210 Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 25 of 30 inches of tree caliper within that landscape buffer. A waiver is needed to reduce the amount of the requirement. Ms. Harter inquired how often the City receives similar tree replacement waivers. Ms. Rauch responded that it is rare, and there is criteria that Council considers, such as whether the applicant is demonstrating that they are trying to build on their site and preserve as many trees as possible. In the last year or two, the City has had one other request. The tree waiver replacement is strictly Council’s purview, so the Commission does not evaluate the associated criteria. Mr. Chinnock stated that this home site is an iconic site and an integral part of that area of Dublin Road. The site has significant impact on the character of Dublin Road. How does this plan enhance that area and help the character of Dublin Road by developing the site in this manner? Mr. Turnock stated that he believes the proposed development is consistent with the rest of the lots within the area. It stands out, as it is now. The addition of the turn lane will add a safety feature to that area of Dublin Road. Mr. Liu stated that there is a beautiful modern home located south of this site and a very traditional, larger house on the site, so they will be sensitive to the character of the neighboring homes when the build the house. The intent is to use stone, brick and wood building materials. He is confident Dublin will be proud of the result. Ms. Call inquired if the meeting materials delineate the dimensions of the existing home. Mr. Turnock responded that the dimensions are not shown on the plans. Mr. Deschler stated that he believes the left turn lane here is not a good idea, as he does not see the safety aspects of it. There are numerous large subdivisions along Dublin Road where there are no turn lanes, such as Donegal Cliffs and Woods of Dublin, so why is it required here? Ms. Rose responded that she would attempt to represent Transportation and Mobility, as no one from that department was able to attend this evening. She believes that after a fatal accident occurred at Glick Road, the City has pursued left turn lanes for safety purposes. Mr. Deschler stated that widening that area and slowing traffic there might make the area less safe. He stated that he believes this proposal is premature. Mr. Deschler stated that he does not believe the Commission has sufficient information to be able to make a recommendation for City Council. The addition of numerous conditions is placing City Council in a position in which they should not be placed. The Commission should ensure the issues are settled at this stage before passing it on to Council. If he needs to state, line by line, everything he believes is not satisfactorily met by the plat, he would attempt to do that. However, based on Mr. Alexander’s questions and some of the homes being positioned without driveways and dimensions identified, he believes the Commission would not be exercising due diligence in recommending a preliminary plat with missing information. Mr. Alexander inquired if staff dictated to the applicant where the entry point and curbcut to the development should be. Ms. Mullinax responded affirmatively. Mr. Alexander inquired if staff advised the applicant to move it from the current location. Ms. Mullinax responded that staff had advised the applicant that the existing private drive could not remain a private drive; it would need to be replaced with a public street. She does not believe staff provided a specific location for that curbcut. She invited Engineering to respond. Mr. Rose confirmed Ms. Mullinax’s response. Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 26 of 30 Public Comments Rochelle Wagner, 7199 Dublin Road, Dublin stated that her property is diagonal to the target site. Mr. Liu has shared his plan with the neighbors. She would much rather have big houses than 10 smaller homes. She does not believe the neighbors have any objection to the proposed plan. It is a beautiful property. She is hopeful that as many of the trees be preserved as possible, perhaps some could be placed near the river. She believes the proposed building materials indicate beautiful homes will be built. Douglas Sladoge, 7118 Dublin Road, Dublin stated that his property is adjacent to the south. Mr. Liu has kept the neighbors informed of his plan. There are a couple of things on which he disagrees with him, however. As Mr. Alexander pointed out, the elevation of the houses, particularly that on Lot #5, the one that would be next to his property, suggests it will be a 3-story house. With regard to the trees, there is a telephone easement on the east side of Dublin Road and an electrical easement on the west side of Dublin Road. Those prohibit extension of a walking path beyond this site. He believes a left-turn lane into Mr. Liu’s property is needed, even if there are only seven homes on the site. During AM and PM peak hours, the traffic becomes quite difficult. He also is concerned about the 24-inch stormsewer that runs between the south side of Mr. Liu’s property and the north edge of his property. That will create a significant problem running downhill. Mr. Liu has committed to working with him on that element. That area sits approximately 60 feet above the river. Finally, there are two cul de sacs in front of the house, the one in front of the existing house and the additional cul de sac that would be constructed. That will result in two parking lots in front of four houses. He believes Liu Trail should be shortened and moved up; that would result in a better watershed at that point. In summary, he believes there are some of the items that should be considered for the Final Plat. Naethan Eagles, 49 Browning Ct., Dublin stated that his property is located north and adjacent to Lot #2. The meeting documents discuss moving the existing northern stormwater drainage up 30 feet toward the northern property line, which is his property. That entire area floods during heavy rains, particularly the area of Lot #2. There were no additional public comments. Ms. Call requested staff to respond to the north stormsewer drainage issue referenced in the last public comment. Josh Reinicke, Engineer, stated that the applicant has indicated a desire to move the existing stormwater sewer on the north side of the property further north, because it would enable them to have larger building pads on Lots #1, #2 and #3. That is typically permitted with appropriate considerations given to impacts to adjacent properties, as well as impacts to the property being developed. Ms. Call inquired what evaluation process is followed to ensure that moving the stormwater sewer would not negatively impact adjacent property owners. At what stage in the process does that occur? Mr. Reinicke stated that would be addressed as the plat moves forward. Staff will continue to look at the grading plan. The applicant will provide engineering calculations that show what the current volume and impact of stormwater is with the proposed stormwater drainage and impact. Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 27 of 30 Mr. Garvin inquired where the liability lies if there is a mistake in those calculations, and one of the adjacent properties began to regularly flood as a result of this change. What would the recourse be? Mr. Boggs responded that the liability would not lie with the City. Commission Discussion Ms. Call stated that the Commission is asked to recommend approval of the Preliminary Plat with 13 conditions as proposed by staff. Commission members have expressed some concerns. She asked the applicant if they would like the Commission’s deliberations to move forward, or if they would like to table the application for refinement and future consideration. The applicant indicated they wished to move forward. Mr. Garvin stated that Mr. Deschler’s points about missing details on the lots is accurate. It is difficult for him to look at Lot #2 and envision exactly how that lot fits. While it may meet the criteria for lot lines, there are concerns about moving the stormwater drainage and the amount of land fill needed to raise the height of the building sites. The neighbor to the south has mentioned that he will effectively have a 3-story home next to him. There are rules regarding the size of the homes. It is difficult to approve the parcels if we don’t know exactly how they will be used. He acknowledged that may be intended to be a future, Final Plat discussion. He would be inclined to recommend approval with the conditions as stated, but he would intend to take a much deeper look at the details in the next phase. He would expect the Commission to be very thorough at that point, which is where we look at the impact on the neighbors. Mr. Deschler stated that if it is the City’s determination that the left turn lane is warranted, then he has no objection. He understands there are obligations either determined by ordinance or the current City policy. He has no objection to the development of the property. However, currently, he does not have enough information to be able to make a recommendation to City Council. Without delineating the specific Code requirements not met, he would point out that the applicant has not provided the location and approximate dimension of all existing buildings. In addition, there are lots where there is lack of clarity. For those reasons, he would not vote to recommend approval of the Preliminary Plat. Mr. Alexander stated that we have identified language in the Code that would support those Commissioners who are unable to support approval of the Preliminary Plat. He is not supportive of the plat, as proposed. He does not agree with the application of planning standards for this site with an existing home on the site that is nowhere close to those homes across the street, which do meet the planning standards that we want to apply. If this house did not exist on the site, the conversation would be very different, although he would still have issues with the topography. When we compare the building footprint and frontage of the existing home and the footprints and frontage of the potential homes, the scenario is that of creating a manor house and serf homes. The estates in Muirfield have addressed the issue correctly, where large houses, such as this, are set apart by themselves. In Muirfield, the larger estates are on one side of the fairway; the smaller homes are on the other side. The estates have a separate entry; the parcels are bigger and all the homes there are similar. He believes the applicant is creating a very awkward condition here by having one huge house and much smaller homes. It would be better for the site to add one or two other larger homes more consistent with the existing home. The applicant has also created a Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 28 of 30 problem with the proposed grading. They have indicated a need to build up the site to where the new road will be. The applicant chose to move the road and place the entry point at the proposed location. However, if they had left the entry point at its current location, they would not have the same issue. The proposed grading is insensitive, and the property owners to the north may really pay a price for what is proposed. There is Code language that clarifies his reasons for not being supportive of a recommendation of approval. Ms. Harter stated that this proposal does not provide what the Commission needs to be supportive of recommending its approval. There are 13 conditions and a tree waiver needed with this proposal. Very few developments are approved if not meeting the tree replacement requirements. She would not be supportive of a recommendation for Council approval. Mr. Chinnock stated that we need to take a look at what is happening further south on Riverside Drive, where they are taking large home sites like this and re-developing the sites. It has had a very negative impact on that environment. He does not believe this type of development is necessary here. If you are familiar with this area, you understand what is going on. These sites have so much character. This is a very nice piece of property. There are adjacent parcels for which we do not want to set a precedent to continue in the entire area. That area could not handle it. We can discuss road improvements, but what is proposed is too much for that area. When we look at what is right for the space, this isn’t right, in his opinion. He would not be supportive of a recommendation of approval. Ms. Call stated that she would echo most of her fellow commissioners’ points. Ms. Harter has pointed out the tree waiver request. While that is not in the Commission’s purview, we do look at sites in totality, and that sets the tone. When an application must have 13 conditions to make the proposal fit, it feels like forcing square pegs in round holes. According to the realtor’s listing, the existing house on the site is 13,556 SF. The applicant has indicated that 3,000 SF homes could fit on the proposed building envelopes. City Code 152.018C(2) requires that the dimensions of the existing buildings must be identified for a Preliminary Plat. The Commission is not opposed to subdividing. We could look at this Preliminary Plat proposal again, but we will be sensitive to details. We will want to see the vision for how this property is treated to a more precise degree than what we can see right now. It is very hard to recommend approval of the plat for a property that has major existing trees, significant sewer easements in different alignments, some that must be moved; significant impact to street lanes; waiver requests for multiuse paths. She walks Dublin Road and it is not very pleasant when you have to cross the street a couple of times to access the walking path. While we would wish the City were financially able to install the complete trail system, we achieve that goal by doing sections of it over time. She also is not supportive of recommending approval of the Preliminary Plat at this time. Mr. Chinnock stated that for the record, he is not supportive of the subdivision of this property. She asked the applicant if he would like the Commission to vote or would like to table the application. Mr. Boggs pointed out that if there is a vote, the Commission will need to provide Code citations. Ms. Call stated that the Commission would cite accordingly. Planning and Zoning Commission Meeting Minutes – April 17, 2025 Page 29 of 30 Mr. Deschler suggested that clarification be provided to the applicant about the differences, if any, in tabling and disapproval, including if there is a waiting period to re-apply and if a new application would engender new fees. Ms. Rauch stated that if the Preliminary Plat application is not approved, the applicant would need to re-submit a new Preliminary Plat application. It would be starting over, so there would be new fees, but there is no wait period to re-submit. If the applicant should choose to table the application, however, there would be no fee to bring back a revised Preliminary Plat. It would continue to be an active application with no timeframe for submission of revisions. Mr. Boggs read aloud the following Code requirement: “The disapproval of a Preliminary Plat by the Planning and Zoning Commission: If the PZC disapproves such preliminary plat, it shall enter in its minutes the reason for such disapproval, including citation of a reference to the rule or regulation violated by such plat. The subdivider may thereafter make such changes as necessary to conform the plat to the rules and regulations and re-submit the same as revised to the Commission for approval or disapproval, which revised plat shall processed within the times and in the manner provided in this section.” That does not reflect a maximum time for the applicant but a minimum time for the Commission to prepare to have it on its agenda. Ms. Call repeated the difference between tabling the current application versus receiving a vote for disapproval and needing to re-submit a new application. Mr. Liu stated he acquired this property 2.5 years ago. Since then, he has worked with City engineering to meet the requirements, such as the need to change the name, which in turn was reversed, and a traffic study. He has worked with Engineering on every detail of the plat. If the Commission is opposed, he asks that they explain their reasons for denial. Originally, he attempted to develop the site with the original entrance, as there would be less disturbance to the site, including stormwater runoff and less impact on the trees on the site. However, City staff directed otherwise. He wants to be treated similarly to Deer Run, but he feels that he is being discriminated against. He has spent so much time and resources on this project. He asks that the Commission consider his record. All the property he touches ends up looking better. Some examples are J.Liu Dublin, Fox in the Snow and J.Liu Worthington. He extends effort to ensure the buildings are beautiful. If he builds something, he wants to leave a positive mark on the community. His interest in naming Liu Trail was to leave his mark on the Dublin community. Since he came to Dublin, he has always been supportive and a good Dublin citizen. He expects to be treated fairly, as well. He asks the Commission to reconsider and approve the project so it can move forward. Mr. Turnock inquired if it is only through a vote that they can learn the citation for disapproval. If we table the application, could we also hear that reason? Ms. Call stated that the Commission would cite Code for the reason for disapproval. She would highly encourage the applicant to provide more detail for the next phase. It is one thing to say the site can be platted; it is another thing to actually be able to build on the site. Even though this is the Preliminary Plat phase, the Commission is concerned about the build phase. Mr. Turnock stated that they have done more than create a Preliminary Plat with this project. They have completed 80% construction documents, working extensively with the Engineering Department. They have held grading and stormwater discussions with Engineering staff. The level of coordination has been extensive, one that he would expect more in the final engineering stage. In regard to the resident’s question about the stormwater swale on the north side of the property, as a professional engineer, he can say that they would be improving that situation. The existing Planning and Zoning Commission Meeting Minutes — April 17, 2025 Page 30 of 30 swale is shallow; they would improve the situation by deepening it and accommodating the level of drainage needed. This is just one example of the amount of engineering that has been invested to date. Mr. Liu indicated that he would like to table the application with provision of the citations related to disapproval, so they can be addressed. Mr. Boggs responded that would have been his recommendation, as well. Ms. Call provided the following Code citations: Section 152.018C(2) — requires providing of approximate dimensions of all existing buildings on the site. Section 152.019C(3) — asks for the sidelines of all lots to be right angles to straight streets or radial to curb street lines. With the proposed plat, those are difficult to envision. Section 152.09C(6) — requires varied setbacks. With the vagueness of building locations, we cannot see enough detail to see if this plat will work for a future building. Potentially, Section 152.019C(5) — define corner lots, due to access for maintenance. If driveways are narrow, they cannot accommodate certain types of vehicles. Mr. Alexander added: Section 152.018C(7) — regards the contours and the slopes. Make sure the revised plan conforms to that Code section. Section 152.019C(5) — lot width. Be sure that Lot #2 meets that requirement. Mr. Deschler moved, Mr. Alexander seconded to table the application per the applicant's request with the provision of the Code sections as cited. Vote: Ms. Harter, yes; Mr. Chinnock, yes; Ms. Call, yes; Mr. Alexander, yes; Mr. Garvin, yes; Mr. Deschler, yes. [Motion carried 6-0.] COMMUNICATIONS There were no communications. ADJOURNMENT The meeting was adjourned at 10:40 p.m. \ _erair, br LL Zoning Commission Quiitty K Buab Assistant Clerk of Council Melanie Krook krookma@gmail.com 4825 Macallan Ct. W Dublin, Ohio 43017 United States (734) 476-6670 24-128PP,25-026FP Public Comment * To Whom It May Concern, We respectfully submit our strong opposition to the proposed Liu Court development and urge the Zoning Commission and City Council to consider the following concerns. While we support thoughtful and context-sensitive development in Dublin, this proposal appears to prioritize developer profit over community character, environmental preservation, and public safety. 1. Landscape Preservation The discrepancy in tree counts between the April 17, 2025 Planning and Zoning Commission meeting (216 trees surveyed, 125 to be preserved) and the current application (169 trees, 65 to be removed) raises serious questions. Mature trees are a defining feature of the Dublin corridor and essential to maintaining the River Corridor Character, which emphasizes “dense tree cover.” A tree waiver should not be granted, and the current plan undermines the aesthetic and environmental integrity of the area. Additionally, the property’s natural topography and elevation changes contribute significantly to its character and ecological value. Any development should be designed to preserve the existing terrain and integrate homes in a way that respects these natural features while meeting all zoning and safety requirements. Excessive grading or the importation of fill dirt to accommodate larger or elevated home designs would disrupt the landscape and diminish the visual and environmental appeal of the corridor. 2. Lot Size Inequity The proposed lot sizes vary dramatically—from 0.921 to 3.001 acres—creating an imbalanced neighborhood layout. Additionally, the retention of the existing 13,500 sq ft home on Lot 3 (as discussed in the April 17 meeting) would starkly contrast with the scale of homes on smaller lots, disrupting visual harmony. To preserve neighborhood equity and character, we recommend reducing the number of lots to no more than five, ideally three to four. 3. Traffic and Safety The proposed development would exacerbate traffic on Dublin Road, particularly near Emerald Parkway—a major intersection with limited visibility due to elevation changes. Furthermore, with ongoing redistricting discussions, there is a strong likelihood that Map 3 will redefine school boundaries, resulting in a substantial increase in traffic along Dublin Road—especially between Emerald Parkway and Brand Road—as northern neighborhoods begin commuting to Scioto High School. This shift would introduce a higher volume of teen drivers and school buses to an already busy corridor, amplifying existing safety concerns. These risks are especially pronounced given the property's close proximity to the Emerald Parkway intersection, which already experiences significant traffic flow and visibility challenges. Additionally, the entrance to 7192 Dublin Road sits on a slight incline, further compromising visibility for vehicles approaching from both the north and south. This combination of increased traffic, limited sightlines, and proximity to a major intersection presents a serious safety hazard that must be carefully considered. If development proceeds, both left and right turn lanes should be incorporated into the property design, which would necessitate a revised layout. 4. Inappropriate Comparison to Deer Run The comparison that had been previously made to the Deer Run neighborhood is misleading. Deer Run (Subarea B) spans 15.6 acres with only five lots and includes substantial no-disturb zones. Liu Court, at 12.79 acres with seven proposed homes, lacks similar preservation measures. Moreover, Deer Run is not adjacent to a major intersection, unlike Liu Court. Given current market conditions and the slow development of Deer Run (application submitted in 2016 and appears to not be fully developed), there is concern Liu Court may result in vacant lots or homes, detracting from the corridor’s appeal. 5. Lot Configuration Challenges The proposed lot configurations appear forced and impractical. For example, Lot 2’s buildable area is severely constrained by storm and sanitary easements and setback requirements, pushing development into close proximity with Lot 1. Lots 1 and 7 also become disproportionately small when accounting for easements, further indicating the site is unsuitable for a dense subdivision. 6. Shared Use Path Concerns The proposed 2’ shared use path easement is insufficient. Dublin’s standards, based on ODOT’s Multimodal Design Guide, require a minimum width of 11 feet to ensure safe use by families and children. The current proposal does not meet these standards and fails to account for the area’s topography, tree density, and proximity to the Scioto River. 7. Driveway Placement Driveways for Lots 1 and 7 are shown, but others are not. The proximity of driveways, particularly between Lots 1 and 2, could create congestion and safety issues. A comprehensive driveway plan should be provided to assess feasibility and impact. 8. Future Land Use Compliance The Envision Dublin Community Plan designates this area as Residential Low Density, with expectations of 1–2 story, single-family homes integrated into the natural setting. The proposed density of 0.56 du/acre may technically meet the minimum threshold, but it does so marginally and fails to reflect the spirit and intent of the Envision Dublin Community Plan. New development along Dublin Road is expected to have modest setbacks ranging from 60 to 100 feet--while this proposal fits within these criteria, it is on the minimum edge. Additionally, assurances are needed that no three -story homes will be built, as previously discussed. The Residential Low Density designation explicitly calls for homes to be 1 to 2 stories, with a single-family scale and appearance, integrated into the natural setting. This further supports our concern that the proposed scale of development is incompatible with the character and capacity of the site. We urge the Zoning Commission and City Council to reflect on these concerns and the long -term impact this development may have on the character, safety, and cohesion of our community. To whom it may concern, After reviewing the minutes from the commission’s meeting on April 17, we continue to believe that the submission for Liu Court should be rejected. We feel that the proposed subdivision does not align with the community plan and that the committee should disapprove the preliminary plat based on §152.015(B). Specifically, we feel there is evidence that the developer did not familiarize himself with the comprehensive plan or zoning ordinance before submitting/developing the preliminary plat. On several occasions the developer has demonstrated that they are unfamiliar with city ordinance including the accumulation of building materials on site prior to commission approval, the initial refusal to remove building materials after notification of violation (eventually requiring involvement of city attorney), as well as the current submission of a final plat without a preliminary plat being approved by the commission (§152.085(B), §152.089(B)). In addition, the proposed plat only feigns alignment with the city’s comprehensive plan and, in reality, is completely misaligned with the city’s long term development goals as outlined in Envision Dublin. • Instead of “exemplary fiscal stewardship” the plan requires modification of Dublin Road which was just recently improved. • Instead of “maintaining neighborhood character” the plan proposes the destruction of an iconic river property less than a mile from historic Dublin. • Instead of building homes which “compliment existing homes” the proposed structures are smaller in scale to the primary property creating a manor/serf layout. • Instead of “gently and appropriately increasing density” the plan requests an immediate 700% increase in housing density. • Instead of “exploring ADUs”, this plan recommends the destruction of all potential ADU’s on site. • Instead of “enhancing walkability and bikability” the developer requested a fee-in-lieu of a walking path • Instead of creating “shared public space” the developer states use of the shared space is contingent on other factors (see submitted comments from previous meeting) • Instead of mitigating “detrimental impacts on ecosystems”, “protecting natural resources”, and “limiting the environmental footprint” the revised plat appears to destroy even more landmark and canopy trees than the original submission • Instead of “proactively maintaining the integrity and capacity” of the natural watershed, the existing ditch is artificially moved 30 feet towards multiple neighboring properties. • Instead of maintaining “river character” along Dublin Road, existing stone walls, natural features, and topography are all altered. We request that the committee protect the character of our existing neighborhood by rejecting this poorly conceived project for the reasons listed above. It seems to us that the only thing “Distinctively Dublin” about the plan is the location of the lot itself, and we believe this demonstrates that the developer was not adequately familiarized prior to submitting the preliminary plat. Respectfully, Zack and Rachel Olson 19 Browning Court Name * Milissa Weiss Email * mwojta1930@gmail.com Address * 7301 Loch Dunne Place Dubin, Ohio 43016 United States Phone Number (614) 581-1510 Case Number or Name * 25-079FDP, 25-081FP Public Comment * Do we really need yet another neighborhood built on what little land is left on this side of the bridge? Traffic was already a nightmare on Sawmill Road before the hospital was built/opened; now, it's absolutely horrific, with wait times getting to/from 270 of up to 20 minutes from Hard Road. Sawmill Road is simply not big enough to handle the increased traffic. Plus, this means that we'll enjoy even more traffic noise in our surrounding neighborhoods, and more large/loud construction trucks flying up/down Hard Road at all hours of the day. With Bright Road being a dead-end, the next several years will be a disaster for current residents. Please leave what little land we have open, alone. Not that you probably care, but the wildlife around our neighborhoods will be impacted as well. The deer, coyotes, foxes, etc. already have very little land left to roam/forage. Where will they go? I realize my opinion won't impact the final decision, but when is enough, enough? Dear Tammy This is Michelle Mundy. I am the current President of the Coventry Woods HOA. I was able to attend the April meeting where the project for Lui Court was tabled. I am unable to attend this week's meeting and I do have a question and concern on this project that has been raised by our residents. I have read all the documents and cannot see a place to find the answer to the question/concern. The question/concern is with the placement of the curb cut for the new road, Lui Court, and the associated left turn lane. The question is to find out for the placement of the left turn lane, has consideration been given to how Dublin Rd undulates in this section, the current placement of the the two driveways to the west, the current placement of the driveway to the south, the proximity of the intersection of Chaddington Dr. and Browning Ct with Dublin Rd and the proximity to the round-a-bout at Dublin Rd. and Brand Rd. The residents are concerned about back-ups on south bound Dublin adding to the degree of difficulty to execute turns from Chaddington Dr. and Browning Ct. on to Dublin and minimizing the visibility looking south from Chandding Dr. and Browning Ct. as one negotiates turns onto Dublin Rd. Thank you for your review and consideration of this question/concern Michelle Mundy President Coventry Woods HOA