Loading...
HomeMy WebLinkAboutResolution 53-25RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO 53-25 Resolution No. Passed. i ACCEPTING THE LOWEST AND BEST BID FOR THE COTA BUS STOP IMPROVEMENTS AND SAWMILL ROAD SIDEWALK CONNECTION PROJECT (24-024-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the COTA Bus Stop Improvements and Sawmill Sidewalk Connection Project (24-024-CIP); and WHEREAS, Council has determined that the bid submitted by Strawser Paving Company on October 15, 2025 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, __[» _ of the elected members concurring, that: Section 1. The bid submitted by Strawser Paving Company in the total amount of $465,105.74 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with Strawser Paving Company for the performance and completion of the COTA Bus Stop Improvements Project and Sawmill Sidewalk Connection Project (24-024- CIP) pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 3“ day of November, 2025. NV. Zo Mayor - Presiding Officer ATTEST: Clef of Coufcil 4 To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: October 28, 2025 Initiated By: Michael E. Barker, Deputy City Manager Jean-Ellen Willis, P.E., Director of Transportation and Mobility Tina Wawszkiewicz, P.E., Deputy Director of Transportation and Mobility J.M. Rayburn, AICP, Planner II Cameron Burrell, Civil Engineer I Re: Resolution 53-25 – Accepting the Lowest and Best Bid for the COTA Bus Stop Improvements and Sawmill Road Sidewalk Connection Project (24-024-CIP) Background On October 15, 2025, two (2) bids were received and publicly opened for the COTA Bus Stop Improvements and Sawmill Road Sidewalk Connection Project (24-024-CIP) (Project). The scope of work for this Project includes the construction of five bus stops along with a new sidewalk. This project was based on the discussions and direction from the February 8, 2023, Oct 11, 2023 and April 10, 2024 Public Services Committee meetings and the regular City Council meeting on August 26, 2024. At those meetings, the following bus stop locations were selected: 1. Sawmill and Bright Roads 2. Sawmill and Hard Roads 3. Sawmill and Snouffer Roads 4. Sawmill Road and E. Bridge Street 5. E. Bridge Street and Dale Drive Consistent with the directions provided at the previous meetings, the improvement package for each location includes a concrete pad, bench, trash and recycling receptacle, two bike racks, and a canopy structure. The budgeted funds for the COTA Bus Shelter Program were included in the 2023-2027 Capital Improvement Program (CIP) are $400,000 (MB23C02). The subsequent 2024-2028 CIP removed the canopy element and reduced the funding amount to $157,000 accordingly. However, following further discussions between the Committee and Council, it was decided to include the canopy shelters in the final design. Additionally, Council requested a sidewalk along the west side of Sawmill Road, between Tuller Road and Bridge Park Avenue, to create a pedestrian connection from the Sawmill and Snouffer Roads bus stop to the Dublin Food Pantry access drive. The engineer’s estimate for the combined projects is $500,000. The unencumbered 2025 CIP fund balance is sufficient to cover all project costs. Strawser Paving Company submitted the lowest and best bid of $465,105.74, which is 7% below the engineer’s estimate. Staff has reviewed all bids, and a summary of the bids received is listed on page 2. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Resolution 53-25 – COTA Bus Stop Improvements and Sawmill Road Sidewalk Connection Project (24-024-CIP) October 28, 2025 Page 2 of 3 Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Strawser Paving Company $465,105.74 -7.0% N/A LuAva, Inc $582,000.00 +16.4% N/A The work for this Project is expected to commence upon acceptance of this bid and subsequent contract execution and is scheduled to be completed by May 22, 2026. The material delivery for the bus shelters is estimated to be approximately five months, resulting in the final project completion in spring 2026. Typical and customary communication methods will be used to convey construction information to residents and the public throughout the project's duration. The city will have a designated Engineering Project Inspector assigned to the work for the Program who will provide coordination, be available to answer questions, and manage access needs at adjacent residences throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by Strawser Paving Company. Previous experience with Strawser Paving Company has been favorable, including these recent projects: Bright Road Corridor Improvements and the Emerald Parkway and Mount Carmel Roundabout Projects, River Forest Storm and Roadway Improvements Project, Riverside Drive East Shared Use Path - Section 1 from Emerald Parkway to Hanna Hills Drive, and many Street Maintenance Programs from previous years. Staff is confident that Strawser Paving Company has the capacity, capability and experience to perform well on the Project. Staff recommends Council approve Resolution 53-25, accepting as lowest and best the bid of Strawser Paving Company in the amount of $465,105.74 and authorizing the City Manager to enter into a contract with Strawser Paving Company for this Project. Figure 1. Location Map Resolution 53-25 – COTA Bus Stop Improvements and Sawmill Road Sidewalk Connection Project (24-024-CIP) October 28, 2025 Page 3 of 3 Figure 3. Trash/Recycle Receptacle and Bike Racks Figure 2. Bus Shelter