HomeMy WebLinkAboutResolution 45-25RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 ACCEPTING THE LOWEST AND BEST BID FOR THE WATERWAYS MAINTENANCE PROGRAM 2025 PROJECT (24-016-CIP) | | Resolution No. 45-25 Passed. > | | WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the Waterways Maintenance Program 2025 Project (24-016-CIP); and WHEREAS, Council has determined that the bid submitted by Brennstuhl | Construction, Inc. on August 6, 2025 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, _.5 _ of the elected members concurring, that: Section 1. The bid submitted by Brennstuhl Construction, Inc. in the total amount of $1,060,205.94 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with Brennstuhl Construction, Inc. for the performance and completion of the Waterways Maintenance Program 2025 Project (24-016-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said work on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 8" day of September, 2025. Vice Mayor — Presiding Officer ATTEST: ams OR To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: September 2, 2025 Initiated By: Michael E. Barker, Deputy City Manager Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Michael B. Hendershot, P.E., Director of Utilities and Stormwater Management Thomas E. Fuqua, Civil Engineer I Re: Resolution 45-25 – Accepting the Lowest and Best Bid for the Waterways Maintenance Program 2025 Project (24-016-CIP) Background The Waterways Maintenance Program (Program) provides for the maintenance of waterways, open channels, and streams located within City of Dublin (City)-owned properties or properties where the City has maintenance responsibility through an established easement. The Program preserves and improves the stability and flood carrying capacity of the waterways, addresses areas of erosion, and protects riparian corridors and infrastructure. The proper operation of waterways is critical to ensuring the conveyance of stormwater runoff and reducing the occurrence of flooding and damage to infrastructure due to channel erosion. Reducing areas of erosion will decrease the sediment loading in a waterway, improve the aquatic habitat and reduce turbidity in the water. On July 1, 2025, City Council adopted Ordinances 24-25 through 27-25, authorizing the City Manager to execute and accept necessary conveyance documents and contracts to acquire temporary easements from four (4) properties for construction operations for the Waterways Maintenance Program 2025 Project (24-016-CIP) (Project): 6810 Avery-Muirfield Drive, 7777 Lanham Court, 7771 Boylston Court, and 7772 Boylston Court. Summary On August 6, 2025, three (3) bids were received and publicly opened for the Project. The Project identified within the Program includes improving bank stabilization for the following eight (8) stream sites across the City, as shown on the Project Location Maps at the end of this memo: • Site 3: Located along Tamarisk Creek, north of Tonti Drive, east of Red Bay Court • Site 18: Located along South Fork Indian Run, within Darree Fields • Site 22: Located along South Fork Indian Run, north of Post Road, east of Avery-Muirfield Drive • Site 24: Located along Bait Shop Creek, south of Tonti Drive • Site 25, 27, and 28: Located along Tonti Creek, south of Wyandotte Woods Boulevard, west of Lanham Court • Site 44: Located along North Fork Indian Run, north of Brand Road, west of Shannon Glen Boulevard The stream sites included in the Project were prioritized based on the severity of erosion and other relevant factors. The Project consists of clearing and grading activities, stream bank reshaping and Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Resolution 45-25 – Accepting the Lowest and Best Bid for the Waterways Maintenance Program 2025 Project (24-016-CIP) September 2, 2025 Page 2 of 5 stabilization, and riprap, native material, and erosion protection matting installation. The Project also includes the installation of temporary sediment controls, permanent stabilization of disturbed areas, and riparian buffer zone plantings to enhance channel stability. The budgeted funds for this Project in the 2025-2029 Capital Improvements Program (CIP) are $1,600,000.00 from the Waterways Maintenance Program (SW25M04). The engineer’s estimate for the Project is $1,220,000.00. Brennstuhl Construction, Inc. submitted the lowest and best bid of $1,060,205.94, which is 13.10% below the engineer’s estimate. Staff has reviewed all bids, and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Responsive? Over (+) or Under (-) Engineer’s Estimate Brennstuhl Construction, Inc. $1,060,205.94 -13.10% Yes V3 Construction Group, Ltd. $1,186,595.00 -2.74% Yes Ironsite, Inc. $1,249,025.92 +2.38% Yes The Project is expected to commence upon this bid acceptance and subsequent contract execution, and is scheduled to be complete by the end of April 2026. The typical and customary communication methods will be used to convey construction information with the residents and impacted property owners throughout the duration of this Project. The City will have a designated Engineering Project Inspector assigned to the work for this Project who will provide coordination, be available to answer questions, and manage access needs at adjacent residences throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by Brennstuhl Construction, Inc.. Previous experience with Brennstuhl Construction, Inc. has been favorable, including these projects: Annual Shared Use Path & Parking Lot Maintenance Program 2023 Project and the Brown-Harris Cemetery Improvements Project. Additionally, Staff made inquiries with references of Brennstuhl Construction, Inc. and received positive feedback regarding their work with owners of projects involving stream bank stabilization. Staff is confident Brennstuhl Construction, Inc. has the capacity, capability and experience to perform well on this Project. Staff recommends Council approve Resolution 45-25 accepting as lowest and best the bid of Brennstuhl Construction, Inc. in the amount of $1,060,205.94 and authorizing the City Manager to enter into a contract with Brennstuhl Construction, Inc. for this Project. Resolution 45-25 – Accepting the Lowest and Best Bid for the Waterways Maintenance Program 2025 Project (24-016-CIP) September 2, 2025 Page 3 of 5 Location Maps Resolution 45-25 – Accepting the Lowest and Best Bid for the Waterways Maintenance Program 2025 Project (24-016-CIP) September 2, 2025 Page 4 of 5 Resolution 45-25 – Accepting the Lowest and Best Bid for the Waterways Maintenance Program 2025 Project (24-016-CIP) September 2, 2025 Page 5 of 5