HomeMy WebLinkAbout35-09 ResolutionRECORD OF RESOLUTIONS
Resolartion No
Inc.. Form No- 30045
35-09
Passed . 20
A RESOLUTION ACCEPTING THE LOWEST AND
BEST BID FOR THE AVERY-MUIRFIELD DRIVE
OVER U.S. 33 BARRIER IMPROVEMENTS PROJECT
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of
the Dublin Code, for the Avery-Muirfield Drive over U.S. 33 Barrier
Improvements Project; and
WHEREAS, Council has determined that the bid submitted by the Righter
Company constitutes the lowest and best bid; and
WHEREAS, Council has determined that there may be a legitimate need to
declare the relocation of the utilities in connection with the above-referenced
project as a "single source" procurement, for reason that the company owning
the utilities in question has the exclusive rights to relocate such utilities.
NOW, THEREF E, BE IT RESOLVED by the Council of the City of Dublin,
State of Ohio, of the elected members concurring:
Section 1. That the bid submitted by the Righter Company in the total
amount of $694,299.50 is hereby accepted.
Section 2. That the City Manager is hereby authorized to enter into
contracts with the Righter Company for performance and completion of the
Avery-Muirfield Drive Over U.S. 33 Barrier Improvements Project pursuant to
the Advertisement, Proposal and Contract Documents for said project on file in
the office of the City Engineer.
Section 3. That this Resolution shall take effect and be in force on the
earliest date permitted by law.
Passed this }~ day of , 2009
]/l t
Mayor -Presiding Officer
Attest:
Clerk of Council
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017
Phone: 614-410-4400 • Fax: 614-410-4490 M e m o
CITY OF DL~ELIN
To: Members of Dublin City Council
From: Terry Foegler, City Manager ~/
Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer
Kenneth B. Richardson, P.E., Engineering Manager -Design
Date: July 30, 2009
Re: Resolution 35-09 -Avery-Muirfield Drive over U.S. 33 Barrier Improvements Project
Summary
On July 27, 2009, three (3) bids were received, publicly opened and read for the Avery-Muirfield
Drive over U.S. 33 Barrier Improvements Project. Staff has reviewed all bids. The Engineer's
estimate was $730,000. Funding for this project is provided through the annual Capital
Improvement tax fund. The Righter Company submitted the lowest and best bid of $694,299.50.
The bids are listed below:
Bidder Bid as Read Bid as Read Corrected Bid
Over (+) or Under (-)
Enginccr's Estimate
Righter Company $694,299.50 -4~9%
Complete General Construction Co. $698,748.50 -4.3%
Double Z Construction $741,685.00 -1.6%
This project was previously advertised for bid, with a bid opening on June 22, 2009. At that
time, the City received only one (1) bid for this project in the amount of $756,176.00. As a
result, it was decided by staff to reject the one bid as staff could not verify that the City had
received the lowest and best bid. The City Manager reported this action to City Council at the
July 1, 2009 meeting. Subsequently the project was re-advertised for bid, with bids being
opened on July 27, 2009.
This project will provide steel-backed timber guardrail behind the bikepaths along the east and
west sides ofAvery-Muirfield Drive, north and south of the Avery-Muirfield Drive bridge over
U.S. 33, with connections to rebuilt concrete bridge parapet walls. The existing stone walls
located at the corners of the U.S. 33 ramps will be reconstructed with curvature following the
roadway radii to allow for proper connection of the guardrail ends. The guardrail extending from
the stone walls east along the ramps will be deep-beam steel guardrail. All the newly installed
guardrail, whether timber or steel, will be painted a wolf grey color. The Ohio Department of
Transportation (ODOT) has thoroughly reviewed these improvements and approved them
through the issuance of alimited-access right-of--way permit.
At least one bikepath along Avery-Muirfield Drive in the project area will be open at all times
during construction. Traffic on Avery-Muirfield Drive will be maintained during construction.
Memorandum re. Res. 35-09 -Avery-Muirfield-US 33 Barrier Improvements Project
July 30, 2009
Page 2
However, between the times of 8:30 a.m. and 4:00 p.m. on weekdays, one lane of traffic on
Avery-Muirfield Drive in the project area maybe closed. All U.S. 33 ramps will remain open to
traffic with no intended closure throughout the project duration. The project completion date is
November 20, 2009.
A general location exhibit is attached for reference. Additionally, a copy of the Avery-Muirfield
Drive over U.S. 33 Barrier Improvements Project construction drawings has been placed in the
Council conference room for your reference and review.
Staff has thoroughly reviewed the Righter Company bid and has found it to be complete.
Previous City experience with the Righter Company has been favorable, including the 2004
Clover Court Channel Improvements project.
Recommendation
Staff recommends Council approval of Resolution 35-09 accepting the bid of the Righter
Company in the amount of 5694,299.50 as the lowest and best bid and authorizing the City
Manager to enter into a contract with the Righter Company.
CITY OF DUBLIN 08-014-CIP
DEPARTMENT OF DEVELOPMENT AVERY-MUIRFIELD DRIVE
DIVISION OF ENGINEERING OVER U .5.33
5800 Shier Rings Road • Dublin, Ohio 43016-1236 BARRIER IMPROVEMENT S
Phone (614)410-4600 • Fag (614)761-6506
~~ ti
K,t ~.a ~. t
_ f
.~A ~ ~
~' "~ ~/ ~ R
.~
p ~ .,
R $
f ~ ~ .~.
i
V
~} r ~ t y`
~ `"~ ±.
y, ;*
.~
r .~r. ,,y,,, 4
b""~nJ t'R k' fie,. .~ Rf-1g if '..'~,5..' :' L
• .~.~,...... _...x.~ ! wp. , rte.,
1"'~ s
~~ r T
? `=~'•
r '~aR:
~~
~~.
F,
~ ~
z e ..
_._ ... _ w~. 1t. ~ yr
...ice. _.
v ir'
I s ,~ -;~ .
~s%~x.
~~ ~ ,y~~ ~~"~ ~~.:
.~
'!`
v`
`t ~ a~ ~fi
_ ~ .,.+ .
~ - ~,
O -~-
;; ~ ,,,
~~
W ~' . ~
,, ~-.~s
4
L ,A ~
.,,,.,.
[ ~ Y ~ ~ ~
w
i,~
~.
..~~
-~
.~~
T ~ ~:~~