Loading...
HomeMy WebLinkAboutResolution 28-25RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 Resolution No. 28-25 Passed ACCEPTING THE LOWEST AND BEST BID FOR THE SCHOOL ZONE BEACONS AND DRIVER FEEDBACK SIGNS PROJECT (24-026-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the School Zone Beacons and Driver Feedback Signs Project (24-026-CIP); and WHEREAS, Council has determined that the bid submitted by Path Master, Inc. on April 2, 2025 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, ‘T of the elected members concurring, that: Section 1. The bid submitted by Path Master, Inc. in the total amount of $182,820.00 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with Path Master, Inc., which is to supply the materials necessary for the City to complete the School Zone Beacons and Driver Feedback Signs Project (24- 026-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 21° day of April, 2025. WR —* Mayor - Presiding Officer ATTEST: Clerk/of Council To: Members of Dublin City Council From: Megan O’Callaghan, City Manager Date: April 15, 2025 Initiated By: Jean-Ellen Willis, PE, Director of Transportation and Mobility Marc Dilsaver, Transportation Program Manager Re: Resolution 28-25 – Accepting the Lowest and Best Bid for the School Zone Beacons and Driver Feedback Signs Citywide Communications Project (24-026- CIP) Background On April 2, 2025, one (1) bid was received and publicly opened for the School Zone Beacons and Driver Feedback Signs – Citywide Communications Project, 24-026-CIP (Project). This Project upgrades the time-based school zone flashing beacons and driver feedback signs in Dublin's school zones to allow for easier maintenance and programming, including turning off the flashers during inclement weather events. In addition, the start and stop times of the school zone beacons and driver feedback signs will be more reliable and consistent across the City. Predicable and accurate school zone timings will improve driver compliance and improve safety and comfort for students and all roadway users. This bid purchases materials only for new Variable Speed Limit / Driver Feedback dual display assemblies (Figure 1) within the school zones for full system integration as the other needed components were available via cooperative purchasing agreements. Figure 1 The Project was included in the 2024-2028 Capital Improvements Program (CIP) and in the 2025- 2029 CIP. The funds budgeted for design and construction in 2024 were $550,000 with a total of $328,564 being expensed for design and purchase of a portion of the system. The funds budgeted in 2025 are $75,000. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Resolution 28-25 – Accepting the Lowest and Best Bid for the School Zone Beacons and Driver Feedback Signs Citywide Communications Project, Project (24-026-CIP) April 15, 2025 Page 2 of 2 Path Master, Inc. submitted the lowest and best bid of $182,820, which is 1.6% over the engineer’s estimate ($180,000). Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Path Master, Inc. $182,820 +1.6% N/A A summary of the combined purchases for the Project is listed below. Budget Year Cost Design 2024 $67,821.00 Applied Information Time Switches 2024 $225,605.00 CV2X Upgrade 2024 $34,959.00 Total Cost in 2024 $328,385 Time switch installation 2025 $10,050 Dual Display Driver Feedback Sign Assembly equipment 2025 $182,820 Total Cost in 2025 $192,870 Total project cost (2024-2025) $521,255 The total project cost is $521,255, which is under the intended project cost as budgeted in the 2024-2028 CIP. In addition, the budgeted funds for the School Zone Beacons and Driver Feedback Signs – Citywide Communications project in the 2025-2029 Capital Improvements Program (CIP) are $75,000. The additional funding needed for the project is available from the unencumbered, available balance in the Capital Improvements Fund. Recommendation Staff has thoroughly reviewed the bid submitted by Path Master, Inc. Previous experience with Path Master, Inc. has been favorable and staff is confident that Path Master, Inc. will perform well on this Project. Staff recommends Council approve Resolution 28-25 accepting as lowest and best the bid of Path Master, Inc. in the amount of $182,820 and authorizing the City Manager to enter into a contract with Path Master, Inc. for this Project.