Loading...
HomeMy WebLinkAboutResolution 19-25RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 Resolution No._19-25 Passed ‘ ACCEPTING THE LOWEST AND BEST BID FOR THE SOUTH HIGH STREET UTILITY BURIAL — PHASE 2 PROJECT (22-018-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the South High Street Utility Burial - Phase 2 Project, (22-018-CIP); and WHEREAS, Council has determined that the bid submitted by CST Utilities LLC on February 27, 2025 constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, __‘/__ of the elected members concurring, that: Section 1. The bid submitted by CST Utilities LLC in the total amount of $2,499,652.72 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with CST Utilities LLC for the performance and completion of the South High Street Utility Burial - Phase 2 Project, (22-018-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said work on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 17 day of March, 2025. A h-—~ Mayor — Presiding Officer ATTEST: enarfo bAedl Glerk of Youncil To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: March 11, 2025 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Director – Capital Projects Joshua Miller, P.E., Civil Engineer II Re: Resolution 19-25 – Accepting the Lowest and Best Bid for the South High Street Utility Burial – Phase 2 Project (22-018-CIP) Summary As part of the Downtown Historic District beautification efforts, the City of Dublin (City) continues to advance the South High Street Utility Burial Project. The purpose and benefit of this project is the elimination of the existing overhead utility lines along South High Street and within portions of the Downtown Historic District. The Project consists of two phases as requested by American Electric Power (AEP). The Phase 1 project area included Franklin Street south of West Bridge Street and the west side of South High Street between West Bridge Street and Short Street. Phase 1 is nearly complete as communication companies remove their infrastructure followed by the removal of the bare utility poles. The Phase 2 project area includes the east side of South High Street and Blacksmith Lane between West Bridge Street and Short Street (see the Project Location Map at the end of this memo). At the completion of both phases of the project, all overhead utility lines and poles along South High Street will be removed between West Bridge Street and Short Street. Similar to Phase 1, the scope of the South High Street Utility Burial – Phase 2 Project, 22-018-CIP (Project) is to install underground electric (AEP) and communication (Spectrum, AT&T, Breezeline, and Dublink) utilities to service affected parcels in the Downtown Historic District. The Project includes the installation of a joint user duct bank along Blacksmith Lane, and in the rear of the parcels between Pinney Hill Lane and Short Street, to install underground electric and communication utilities to service the affected parcels. On February 27, 2025, two (2) bids were received and publicly opened for the Project. The budgeted funds for this Project in the 2025-2029 Capital Improvements Program (CIP) are $2,320,000 from account ET227, South High Street Utility Burial – Phase 2. The engineer’s estimate for the Project is $2,800,000. CST Utilities LLC submitted the lowest and best bid of $2,499,652.72, which is 10.73% below the Engineer’s Estimate and $179,652.73 greater than the budgeted funds. Engineering has consulted with Finance, and staff anticipates being able to cover the additional Project costs using other unencumbered budgeted funds in the CIP for 2025. Staff has reviewed all bids and a summary of the bids received is listed below. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Resolution 19-25 – Accepting the Lowest and Best Bid for the South High Street Utility Burial – Phase 2 Project (22-018-CIP) March 11, 2025 Page 2 of 3 Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate CST Utilities LLC $2,499,652.72 -10.73% N/A Danbert, Inc. $2,949,547.15 +5.34% N/A The work for this Project is expected to commence in April 2025 and be significantly complete by November 2025. Final completion of the Project is intended to occur by April 2026. The typical and customary communication methods will be used to convey construction information with the residents and impacted property owners throughout the duration of this work. The City will have a designated Engineering Project Inspector assigned to the work for this Project who will provide coordination, be available to answer questions and manage access needs at adjacent residences throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by CST Utilities LLC. Previous experience with CST Utilities LLC has been favorable, including this recent project: South High Street Utility Burial – Phase 1 Project. Staff is confident that CST Utilities LLC will do well performing the work for this Project. Staff recommends Council approve Resolution 19-25 accepting as lowest and best the bid of CST Utilities LLC in the amount of $2,499,652.72 and authorizing the City Manager to enter into a contract with CST Utilities LLC for this Project. Resolution 19-25 – Accepting the Lowest and Best Bid for the South High Street Utility Burial – Phase 2 Project (22-018-CIP) March 11, 2025 Page 3 of 3 Project Location Map